Search NASA⌕ Search

SEARCH · Search NASA

Results for “construction support”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 163 records · Page 9

Extravehicular Crewman Work System (ECWS) study program. Volume 1: Executive summary

The Extravehicular Crewman Work System (ECWS) requirements for manned support of space construction and satellite service are defined. Characteristics of structures and satellites are described. Requirements for extravehicular tasks and support equipment are defined. Equipment concepts are presented and evaluated for extravehicular life support, spacesuit, and work aids. Preliminary design of recommended ECWS equipment concepts and new technology developments required for their implementation are discussed.

Wilde, R. C.↗

Solar panel field array support system and apparatus and method for construction use

A combined PV panel assembly jig and forklift transport pallet is used to assemble PV panels for transport to a field array from a protected manufacturing environment. The panels are assembled to have adhesively applied rails for transport by a robotic drone on a ground-support rack and are pre-wired. The PV panel assembly jig holds, protects, and aligns the PV panels in an upside down position, opposite to their operational position, for ease of wiring in order to decrease the manual labor required in the field. Once the pallet is transported to the load station at the end of a row of solar panel racks in the field array, a robotic loader lifts the upside down PV panels from the combined PV panel assembly jig and forklift transport pallet in an arcing overhead motion that lifts, tilts, and deposits the PV panels in an upright position at the loading station of a railed rack support as ground-mounted in a solar panel field array.

14 SOLAR ENERGY↗

Environmental control medical support team

The activities conducted in support of the Environmental Control and Life Support Team during December 7, 1987 through September 30, 1988 are summarized. The majority of the ongoing support has focused on the ECLSS area. Through a series of initial meetings with the ECLSS team and technical literature review, an initial list of critical topics was developed. Subtasks were then identified or additional related tasks received as action items from the ECLSS group meetings. Although most of the efforts focused on providing MSFC personnel with information regarding specific questions and problems related to ECLSS issues, other efforts regarding identifying an ECLSS Medical Support Team and constructing data bases of technical information were also initiated and completed. The specific tasks are as follows: (1) Provide support to the mechanical design and integration of test systems as related to microbiological concerns; (2) Assist with design of Human Subjects Test Protocols; (3) Interpretation and recommendations pertaining to air/water quality requirements; (4) Assist in determining the design specifications required as related to the Technical Demonstration Program; (5) Develop a data base of all microorganisms recovered from previous subsystem testing; (6) Estimates of health risk of individual microbes to test subjects; (7) Assist with setting limits for safety of test subjects; (8) Health monitoring of test subjects; (9) Assist in the preparation of test plans; (10) Assist in the development of a QA/QC program to assure the validity, accuracy and precision of the analyses; and (11) Assist in developing test plans required for future man in the loop testing.

Crump, William J.↗

Construction in space: A proposed experiment in support of the space solar power concept and other large space systems

The conceptual equipment and techniques for fabricating and assembling a ladder-like structure of triangular cross section trusses suitable for mounting solar cell arrays are described. The detail information is presented in the context of a proposed experiment to be conducted from the shuttle in the 1980-84 time period as an early experiment in the development of techniques for the construction of large space structures that would be required for space solar power stations and other large systems.

Source record↗

A comparison of the Shuttle remote manipulator system and the Space Station Freedom mobile servicing center

The Shuttle Remote Manipulator System is a mature system which has successfully completed 18 flights. Its primary functional design driver was the capability to deploy and retrieve payloads from the Orbiter cargo bay. The Space Station Freedom Mobile Servicing Center is still in the requirements definition and early design stage. Its primary function design drivers are the capabilities: to support Space Station construction and assembly tasks; to provide external transportation about the Space Station; to provide handling capabilities for the Orbiter, free flyers, and payloads; to support attached payload servicing in the extravehicular environment; and to perform scheduled and un-scheduled maintenance on the Space Station. The differences between the two systems in the area of geometric configuration, mobility, sensor capabilities, control stations, control algorithms, handling performance, end effector dexterity, and fault tolerance are discussed.

Taylor, Edith C.↗

A lunar/Martian anchor emplacement system

On the Moon or Mars, it is necessary to have an anchor, or a stable, fixed point able to support the forces necessary to rescue a stuck vehicle, act as a stake for a tent in a Martian gale, act as a fulcrum in the erection of general construction poles, or support tent-like regolith shields. The anchor emplacement system must be highly autonomous. It must supply the energy and stability for anchor deployment. The goal of the anchor emplacement system project is to design and build a prototype anchor and to design a conceptual anchor emplacement system. Various anchors were tested in a 1.3 cubic meter test bed containing decomposed granite. A simulated lunar soil was created by adjusting the moisture and compaction characteristics of the soil. We conducted tests on emplacement torque, amount of force the anchor could withstand before failure, anchor pull out force at various angles, and soil disturbances caused by placing the anchor. A single helix auger anchor performed best in this test bed based on energy to emplace, and the ultimate holding capacity. The anchor was optimized for ultimate holding capacity, minimum emplacement torque, and minimum soil disturbance in sandy soils yielding the following dimensions: helix diameter (4.45 cm), pitch (1.27 cm), blade thickness (0.15 cm), total length (35.56 cm), shaft diameter (0.78 cm), and a weight of 212.62 g. The experimental results showed that smaller diameter, single-helix augers held more force than larger diameter augers for a given depth. The emplacement system consists of a flywheel and a motor for power, sealed in a protective box supported by four legs. The flywheel system was chosen over a gear system based on its increased reliability in the lunar environment.

Clinton, Dustin↗

Lessons learned studying design issues for lunar and Mars settlements

In a study of lunar and Mars settlement concepts, an analysis was made of fundamental design assumptions in five technical areas against a model list of occupational and environmental health concerns. The technical areas included the proposed science projects to be supported, habitat and construction issues, closed ecosystem issues, the "MMM" issues (mining, material processing, and manufacturing), and the human elements of physiology, behavior, and mission approach. Four major lessons were learned. First it is possible to relate public health concerns to complex technological development in a proactive design mode, which has the potential for long-term cost savings. Second, it became very apparent that prior to committing any nation or international group to spending the billions to start and complete a lunar settlement, over the next century, that a significantly different approach must be taken from those previously proposed, to solve the closed ecosystem and "MMM" problems. Third, it also appears that the health concerns and technology issues to be addressed for human exploration into space are fundamentally those to be solved for human habitation of the Earth (as a closed ecosystem) in the 21st century. Finally, it is proposed that ecosystem design modeling must develop new tools, based on probabilistic models as a step up from closed circuit models.

Life Support Systems↗

An experimental-theoretical study of free vibrations of plates on elastic point supports

A theoretical and experimental study is made to investigate the effect on plate vibrations of varying the stiffness of corner elastic point supports. A theoretical model is developed using a Rayleigh-Ritz analysis which approximates the plate mode shapes as products of free-free beam modes. The elastic point supports are modelled both as massless translational springs, and springs with tip masses. The tip masses are included to better represent the experimental supports. An experiment is constructed using the bending stiffness of horizontal beams to support a square plate at its four corners. The stiffness of these supports can be varied over such a range that the plate fundamental frequency is lowered to 40% of the rigid support frequency. The variation with support stiffness of the frequencies of the first eight plate modes is measured, and compared with the theoretical results. The plate mode shapes for rigid supports are analyzed using holographic interferometry. There is excellent agreement between the theoretical and experimental results, except for high plate modes where the theoretical model is demonstrated to be inadequate.

Leuner, T. R.↗

Pre-Excavation Activities for the Long Baseline Neutrino Facility Far Site

The Long Baseline Neutrino Facility Far Site at the Sanford Underground Research Facility in Lead, South Dakota will house four large detector tanks located deep underground. Construction of the supporting infrastructure required for this project is already underway including installation of a waste rock conveyance system including, but not limited to, a grizzly, skip loader, crusher, belt conveyor, and rehab of existing mine drifts and ore passes. This paper will discuss the design and construction of these pre-excavation works, and the overall project schedule as it closes in on commencement of mass excavation activities.

Pollock, Seth↗

ATHLETE as a Mobile ISRU and Regolith Construction Platform

The All-Terrain Hex-Limbed Extra-Terrestrial Explorer (ATHLETE) robotic mobility platform can provide precision positioning and mobility for site preparation and regolith construction needs. ATHLETE is a multi-use platform designed to use swap-out tools and implements that can be applied to any number of tasks that need precision limb manipulation or mobility. Major capabilities include off-loading habitats, transporting surface assets, robotically assembling outposts from multiple mission manifests, and supporting science and technology objectives. This paper describes conceptual approaches for supporting NASA regolith construction research, such as additive construction, modular brick and panel factory, and mobile ISRU platform.

human spaceflight↗

Independent Component Analysis for Preprocessing Optical Signals in Support of Multi-User Communication

In an effort to construct an optical transceiver for supporting multi-point communication, researchers developed large field-of-view FSO transceivers with wide apertures for facilitating rapid acquisition and optical signal tracking. The design is constructed from fiber-bundle(s) intelligently arranged to provide multiple optical pathways within a single transceiver, with each pathway limited to a particular optical directionality. Because designs with wide apertures are susceptible to receiving several optical signals simultaneously from multiple transmitters, accurately decoding individual signals and achieving true multi-user communication can be difficult. The work detailed in this paper investigated the use of blind source separation techniques, mainly independent component analysis (ICA), to estimate transmitted signals from their observed, combined mixtures sans information. Effects of signal power, format, data rate, wavelength, and turbulence severity on signal separation, as well as signal demodulation accuracy was also analyzed using experimental optical signals and corresponding mixtures. Signal generators, laser sources, turbulence emulator, beam profiler, photodiodes, and oscilloscopes comprised the experiment setup. Optical signals with varying power, format, and wavelength were generated and propagated through turbulence with varying degree severity, and finally received by the fiber-bundle-based optical transceiver. Results demonstrate that an ICA technique can accurately process the combined signals into corresponding individual components. The investigation further identified signal characteristics (e.g., power levels, format, data rate) and turbulence severity under which ICA is unable to accurately perform signal separations.

Optics↗

A Versatile Lifting Device for Lunar Surface Payload Handling, Inspection and Regolith Transport Operations

Devices for lifting and transporting payloads and material are critical for efficient Earth-based construction operations. Devices with similar functionality will be needed to support lunar-outpost construction, servicing, inspection, regolith excavation, grading and payload placement. Past studies have proposed that only a few carefully selected devices are required for a lunar outpost. One particular set of operations involves lifting and manipulating payloads in the 100 kg to 3,000 kg range, which are too large or massive to be handled by unassisted astronauts. This paper will review historical devices used for payload handling in space and on earth to derive a set of desirable features for a device that can be used on planetary surfaces. Next, an innovative concept for a lifting device is introduced, which includes many of the desirable features. The versatility of the device is discussed, including its application to lander unloading, servicing, inspection, regolith excavation and site preparation. Approximate rules, which can be used to size the device for specific payload mass and reach requirements, are provided. Finally, details of a test-bed implementation of the innovative concept, which will be used to validate the structural design and develop operational procedures, is provided.

Doggett, William R.↗

Vision and Development of a Design, Implementation, and Verification Automation (DIVA) Software Platform for DNA Construction

Abstract DNA construction, while a prerequisite to many biological endeavors, is often a time-consuming distraction from an individual’s primary research objectives. We envisioned that with the right software infrastructure and cultural mindset, a single person could execute in parallel the batched DNA construction tasks of an entire research institute, at scales realizing efficiency gains through process and laboratory automation. In pursuit of this vision, we developed the Design, Implementation, and Verification Automation (DIVA) software platform. DIVA’s web interface enables researchers to design DNA constructs (using visual biological computer-aided design tools and biological parts repositories), submit designs for construction to dedicated staff, and track DNA construction as it progresses. DIVA supports the dedicated staff through the DNA construction process and records both successful and unsuccessful attempts toward improving the overall process. The platform is publicly available at public-diva.jbei.org and its open-source code through github.com/JBEI/DIVA.

Plahar, Hector [DOE Agile BioFoundry , , ,; DOE Jo↗

Project Title: Demonstration High Temperature Superconducting NonPlanar Stellarator Magnet with Advanced Manufactured Assemblies

This is the final report for the project “Demonstration High Temperature Superconducting Non- Planar Stellarator Magnet with Advanced Manufactured Assemblies”, funded by DOE, and performed by Type One Energy from September, 2020, to March 2024 involving the Fusion Technology Institute at the University of Wisconsin–Madison, the Plasma Science and Fusion Center (PSFC) at the Massachusetts Institute of Technology (MIT) and Commonwealth Fusion Systems (CFS) to design and fabricate the first non-planar HTS (REBCO) coil for a high-field stellarator based on the SPARC tokamak’s VIPER cable concept. Stellarators at high fields make high-temperature superconducting magnets necessary for a compact fusion device. But the asymmetric and non-planar nature of its components, especially the magnets make it difficult for scalable producibility. To address these challenges, two promising technologies have emerged: advanced manufacturing (AM) for the supporting plates for forming the magnets, and high-temperature superconducting (HTS) cables inside the plates. AM has advanced enough to produce stellarator components with the necessary geometric complexity, size, and the precision, leading to potentially significant reductions in production time, cost, and waste. The cost of HTS tape has decreased dramatically, and progress in HTS planar magnet development has reached a point where it can be proposed for application to complex 3D non-planar magnets. The main objective of this project is to develop, demonstrate and pre-commercialize a novel, non-planar HTS coil shape that remains superconducting to achieve production scalable reductions in time and cost and performance. The proposed technology is based on the novel concept of a precision sub-scale HTS nonplanar coil assembly. This project focuses on the design, fabrication, material optimization of cable design, and validation and demonstration of the high current carrying capability of superconducting magnets and their support in a complex 3D shape needed for application to stellarator magnetic plasma confinement. The specific objectives of this research program include: (1) The successful application of metal AM to build a precision sub-scale HTS nonplanar coil, (2) An HTS cable and cross-section design that can conform to the required nonplanar coil shape (bend radii as tight as 10-cm) and remains superconducting at an engineering current density of 1.35 kA/cm 2 at 77 K and 1 tesla at the conductor (5 kA in the cable). To achieve the above challenging goals, we have formed a multidisciplinary research team consisting of members from Type One Energy and UW-Madison, MIT PSFC and CFS with complementary skills and strong facilities. The team worked collaboratively on fundamental and applied research on the following three major technical areas: (1) Design, fabrication, and optimization of non-planar HTS Cable The ultimate goal of the project is to determine if commercial REBCO tapes and additive manufacturing can be used to fabricate high field (≥ 10T) non-planar coils with tight bending radii (≃ 100mm) and with a degradation of the critical current (Ic) smaller than 20% with respect to the expected performance. We started with shorter length cable to evaluate the scalability of the production process and eventually reached multiple turns for higher magnetic fields. Our findings suggest that a stellarator coil system of a relevant size, characterized by its asymmetric and non-planar components, can be fabricated using a formed cable in plate method. This system can be simulated using a large-scale modeling approach. The use of hybrid modeling 3 techniques will be pivotal in reducing the complexity of the model and in assessing expected performance in designs. (2) Modeling and simulation of the non-planar HTS Cable Multiphysics simulations are performed using the commercial software and are carried out in self-field conditions, involving 2D and 3D models and twisted around one slot of twist-pitched VIPER cable. Multiphysics simulations are mainly focused on the coil for the critical current evaluation, the magnetic field map, self-Lorentz forces and mechanical, and magnetothermal behavior and the quench dynamics. The detailed model and prediction of the superconducting performance of a stellarator-relevant demonstration cable from numerical simulations supports the results from the actual testing backing the results. A detailed description and results are provided in the later sections. (3) Design, fabrication, and optimization of support for the non-planar HTS Cable The team developed an additive manufactured (AM) coil positioning plate that formed into the required non-planar geometry (with bend radii as tight as 10-cm) and to acceptable tolerances required for a stellarator magnet: (+0.25-mm from ideal on dimensions of coil positioning plates and up to +1-mm from ideal for position of wound coil). The plate materials is also included in this selection process from fabrication and 3D printing perspective and commensurate with eventual application to a fusion reactor. From the cost effectiveness point of view, the HTS coil and plate has the potential to cost less than that made in conventional methods with less waste (<75% waste) reducing time (<50%) and cost (<50%), especially as the AM field matures. The application of advanced manufacturing in the construction of the support plates will also lead to cost reduction, as the cables can be easily replaced, thereby making the assembly modular. With such high primary cost and time savings, high current densities and magnetic field, the funded R&D work has validated the designs, proven the feasibility, and characterized the performance of the HTS coil and plate assembly, paving the way for a relevant-size stellarator coil system.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Decision Engines for Software Analysis Using Satisfiability Modulo Theories Solvers

The area of software analysis, testing and verification is now undergoing a revolution thanks to the use of automated and scalable support for logical methods. A well-recognized premise is that at the core of software analysis engines is invariably a component using logical formulas for describing states and transformations between system states. The process of using this information for discovering and checking program properties (including such important properties as safety and security) amounts to automatic theorem proving. In particular, theorem provers that directly support common software constructs offer a compelling basis. Such provers are commonly called satisfiability modulo theories (SMT) solvers. Z3 is a state-of-the-art SMT solver. It is developed at Microsoft Research. It can be used to check the satisfiability of logical formulas over one or more theories such as arithmetic, bit-vectors, lists, records and arrays. The talk describes some of the technology behind modern SMT solvers, including the solver Z3. Z3 is currently mainly targeted at solving problems that arise in software analysis and verification. It has been applied to various contexts, such as systems for dynamic symbolic simulation (Pex, SAGE, Vigilante), for program verification and extended static checking (Spec#/Boggie, VCC, HAVOC), for software model checking (Yogi, SLAM), model-based design (FORMULA), security protocol code (F7), program run-time analysis and invariant generation (VS3). We will describe how it integrates support for a variety of theories that arise naturally in the context of the applications. There are several new promising avenues and the talk will touch on some of these and the challenges related to SMT solvers. Proceedings

Bjorner, Nikolaj↗

Blockchain Smart Contract Reference Framework and Program Logic Architecture for Transactive Energy Systems

This paper proposes a reference framework for a transactive energy market based on blockchain. The framework was designed based on the engineering requirements of a distribution-scale market; including participant needs, expected market transactions, and the cybersecurity constructs required to support a fair, secure and efficient market operation. It leverages the existing blockchain primitives to provide clear value propositions to the transactive market, including identity management (access control), data security (integrity), resiliency (decentralization, scalability and performance). The validity of the proposed framework is demonstrated using a real-time 5-min double-auction market. The results highlight its benefits while providing strong validation of applicability to blockchain within transactive energy systems.

Gourisetti, Sri Nikhil Gupta↗