Search NASA⌕ Search

SEARCH · Search NASA

Results for “contingency”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 163 records · Page 9

Contingency Trajectory Design for a Lunar Orbit Insertion Maneuver Failure by the Lunar Atmosphere Dust Environment Explorer (LADEE) Spacecraft

The purpose of this extended abstract is to present results from a failed lunar-orbit insertion (LOI) maneuver contingency analysis for the Lunar Atmosphere Dust Environment Explorer (LADEE) mission, managed and operated by NASA Ames Research Center in Moffett Field, CA. The LADEE spacecrafts nominal trajectory implemented multiple sub-lunar phasing orbits centered at Earth before eventually reaching the Moon (Fig. 1) where a critical LOI maneuver was to be performed [1,2,3]. If this LOI was missed, the LADEE spacecraft would be on an Earth-escape trajectory, bound for heliocentric space. Although a partial mission recovery is possible from a heliocentric orbit (to be discussed in the full paper), it was found that an escape-prevention maneuver could be performed several days after a hypothetical LOI-miss, allowing a return to the desired science orbit around the Moon without leaving the Earths sphere-of-influence (SOI).

Lunar Orbit Insertion↗

Contingency Trajectory Design for a Lunar Orbit Insertion Maneuver Failure by the LADEE Spacecraft

This paper presents results from a contingency trajectory analysis performed for the Lunar Atmosphere & Dust Environment Explorer (LADEE) mission in the event of a missed lunar-orbit insertion (LOI) maneuver by the LADEE spacecraft. The effects of varying solar perturbations in the vicinity of the weak stability boundary (WSB) in the Sun-Earth system on the trajectory design are analyzed and discussed. It is shown that geocentric recovery trajectory options existed for the LADEE spacecraft, depending on the spacecraft's recovery time to perform an Earth escape-prevention maneuver after the hypothetical LOI maneuver failure and subsequent path traveled through the Sun-Earth WSB. If Earth-escape occurred, a heliocentric recovery option existed, but with reduced science capacapability for the spacecraft in an eccentric, not circular near-equatorial retrograde lunar orbit.

LADEE↗

Dynamic Vehicle Assessment for Intelligent Contingency Management of Urban Air Mobility Vehicles

New algorithms will be required to ensure passenger and bystander safety during the expected era of autonomous urban air mobility (UAM) aircraft. This paper examines an approach for assessing the vehicle capability to fly itself and to complete a mission safely. The concepts combine elements of system identification, adaptive control, flight dynamics, envelope predictions, and handling qualities, as well as human pilot intuition. The approach is applied to a simulation of a generic distributed electric propulsion urban air mobility-type aircraft, which was developed under the NASA Transformational Tools and Technologies (TTT) project, Autonomous Systems / Intelligent Contingency Management subproject.

flight envelope↗

Intelligent Contingency Management for Urban Air Mobility

The third aviation revolution is seeking to enable transportation where users have access to immediate and flexible air travel; the users dictate trip origin, destination and timing. One of the major components of this vision is urban air mobility (UAM) for the masses. UAM means a safe and efficient system for vehicles to move passengers and cargo within a city. In order to reach UAM’s full market potential the vehicle will have to be autonomous. One of the primary challenges of autonomous flight is dealing with off-nominal events, both common and unforeseen; thus, intelligent contingency management (ICM) is one of the enabling technologies. In this context, the vehicle has to be aware of its internal state and external environment at all times, ascertain its capability and make decisions about mission completion or modification. All of these functions require data to model and assess the environment and then take actions based on these models. Necessarily, there is uncertainty associated with the data and the models generated from it. Since we are dealing with safety-critical systems, one of the main challenges of ICM is to generate sufficient data and to minimize its uncertainty to enable practical and safe decision making. We propose an overall architecture that incorporates deterministic and learning algorithms together to assess vehicle capabilities, project these into the future and make decisions on mission management level. A layered approach allows for mature parts and technologies to be integrated into early highly automated vehicles before the final state of autonomy is reached.

data-driven systems↗

Intelligent Contingency Management for Urban Air Mobility

The third aviation revolution is seeking to enable transportation where users have access to immediate and flexible air travel; the users dictate trip origin, destination and timing. One of the major components of this vision is urban air mobility (UAM) for the masses. UAM means a safe and efficient system for vehicles to move passengers and cargo within a city. In order to reach UAM’s full market potential the vehicle will have to be autonomous. One of the primary challenges of autonomous flight is dealing with off-nominal events, both common and unforeseen; thus, intelligent contingency management (ICM) is one of the enabling technologies. This paper proposes an ICM architecture with associated tools that would help enable the UAM vision.

UAM↗

Intelligent Contingency Management for Urban Air Mobility

The third aviation revolution is seeking to enable transportation where users have access to immediate and flexible air travel; the users dictate trip origin, destination and timing. One of the major components of this vision is urban air mobility (UAM) for the masses. UAM means a safe and efficient system for vehicles to move passengers and cargo within a city. In order to reach UAM’s full market potential the vehicle will have to be autonomous. One of the primary challenges of autonomous flight is dealing with off-nominal events, both common and unforeseen; thus, intelligent contingency management (ICM) is one of the enabling technologies. This paper proposes an ICM architecture with associated tools that would help enable the UAM vision.

UAM;↗

Automated Flight & Contingency Management (AFCM) Power Slide

This single slide presentation gives a summary of the Advanced Air Mobility (AAM) Automated Flight & Contingency Management (AFCM) subproject, at a high level for a potentially non-NASA technical audience.

Advanced Air Mobility↗

Wash Vehicle Fleet Sizing for Contingency Planning Against Dust Storms: Preprint

Wash vehicles containing either high- or low-pressure water sprayers, a collection of rotating brushes, or a combination of these, are frequently utilized in concentrating solar power (CSP) plants to maintain a high level of optical efficiency in the solar field. In recent years, multiple modeling approaches have been developed to obtain fleet sizes and mirror-washing schedules that optimize the tradeoff of vehicle capital and use costs and labor versus lost revenues due to soiling. These planning models cover normal operating conditions well but do not consider rare events such as dust storms which can a significant reduction in receiver productivity, or shut down operations until most or all of the solar field’s mirrors have been cleaned. To that end, we propose a methodology that evaluates whether additional capital should be deployed to hedge against these events by weighing the net present value of the expected benefits against the capital costs. The output of this method is a breakeven frequency, a metric we sue to determine whether an additional vehicle should be purchased to address the contingency of dust storms by comparing it to the expected annual storm frequency We develop a small collection of case studies using commercial-scale CSP tower plants and obtain breakeven frequencies that mostly fall between 0.1 and 1.0 storms per year, depending on the existing fleet size and storm severity.

41 EE - Solar Energy Technologies Office (EE-4S)↗

MARS 2020 Contingency Planning Overview

Case study on contingency planning for the MARS 2020 rover launch. Intended as part of a training for international consequence management personnel for IAEA and/or NATO-sponsored training classes. Funded through NA-81

61 RADIATION PROTECTION AND DOSIMETRY↗

Real-Time Corrective Switching in Response to Simultaneous Contingencies

The standard optimal power flow (OPF) problem is an economic dispatch (ED) problem combined with transmission constraints, which are based on a static topology. Prior research has demonstrated that cooptimization of generation dispatch and transmission topology results in cost savings. However, the computational complexity associated with topology control (TC) has been a major deterrent to its implementation. The proposed work investigates the application of a heuristic, a greedy algorithm, to improve the computational time for the TC problem while still maintaining the ability to find quality solutions. An expression is derived, which indicates the impact on the objective for a marginal change in the state of a transmission line. This expression is used to generate a priority list with potential candidate lines for switching, which may provide huge improvements to the system. The advantage of this method is that it is a fast heuristic as compared to using mixed integer programming (MIP) to find a solution. The heuristic is tested on real-time applications such as N-1 events, N - m events (m simultaneous contingencies), and cascading events. The proposed algorithm specifically targets cases that lead to load shedding in the system and provides a quick and efficient method to restore the loads by improving the deliverability of reserves via TC. Simulation results on the IEEE 73 bus test system and the IEEE 118 bus test system suggest a significant improvement in the amount of load served to the system with TC as opposed to without TC with minimal time and computation.

Electric power systems↗

Contingency Contractor Optimization Phase 3 Sustainment Cost by JCA Implementation Guide

This document provides implementation guidance for implementing personnel group FTE costs by JCA Tier 1 or 2 categories in the Contingency Contractor Optimization Tool – Engineering Prototype (CCOT-P). CCOT-P currently only allows FTE costs by personnel group to differ by mission. Changes will need to be made to the user interface inputs pages and the database

97 MATHEMATICS AND COMPUTING↗

Severe Contingency Solver

Los Alamos researchers have developed the Severe Contingency Solver (SCS) to help power network operators and policy makers better understand the vulnerabilities of electric power transmission systems to extreme events, such as hurricanes, ice storms, and earthquakes. It guarantees a solution for power networks with hundreds to thousands of damaged components. SCS supports multiple platforms (e.g., Linux, Windows, Mac OS X) and removes the need for human intervention when analyzing severely damaged power networks. The information can be used to prepare for extreme events and plan network upgrades for improved network resilience.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Pantex Plant Ogallala Aquifer and Perched Groundwater Contingency Plan

A Long Term Monitoring System Design has been designed to monitor conditions in the perched groundwater including changes in the perched aquifer as a result of implementing the response actions. Monitoring is required for verifying the effectiveness of perched groundwater response actions (i.e., conditions in the perched aquifer are being affected as intended) and for confirming that the perched aquifer and Ogallala Aquifer characterization as defined in the Resource Conservation and Recovery Act Facility Investigation Report and the Corrective Measure Studies/Feasibility Study remains accurate. If monitoring results obtained through the monitoring network identify an unexpected conditions or deviation, contingent actions will be considered and implemented as necessary to ensure continued protection of the Ogallala Aquifer and human health and the environment.

54 ENVIRONMENTAL SCIENCES↗

Operator Insights and Usability Evaluation of Machine Learning Assistance for Power Grid Contingency Analysis

Introducing machine learning (ML) assistance into any established process comes with adoption barriers, including entrenched procedures, technological and human readiness levels, human-machine trust, and work culture resistance to change. These barriers are even greater in critical operations such as operating a national or regional power grid, in which both regulatory frameworks and the importance of maintaining reliability levels causes additional resistance to the adoption of new computational support. Developers of future systems and job aides must consider not only technical aspects, but also whether new systems are usable by power system operators. This work presents the methodology and results of a study to evaluate the usability and readiness of a prototype recommender system for power grid contingency analysis. We explore operator cognitive load and evaluate operator performance when solving a collection of scenarios both with and without recommender assistance. We also examine operator trust in the system. We report insights gained on the readiness of the system using a collection of evaluation techniques.

Human-Machine Teaming, Power Systems, usability ev↗