Search NASA⌕ Search

SEARCH · Search NASA

Results for “development timelines”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 163 records · Page 9

Genetically encoded sensors enable real-time observation of metabolite production

Advances in biotechnology are enabling engineers to harness natural processes for the production of valuable new chemicals and materials. Cells engineered for chemical production act as renewable factories and redefine what is possible in industries as diverse as manufacturing, pharmaceuticals, and energy. Despite this potential, long and uncertain timelines for biobased product development hinder progress. Engineering cells for chemical production is challenging because the complexity of biology necessitates many attempted designs before an optimal combination of genetic elements or culture conditions is discovered. In this work, we develop a framework that allows design evaluation to be performed with fluorescence such that microbial chemical production can be monitored in real time without the need for sample preparation or laborious analytical techniques.

59 BASIC BIOLOGICAL SCIENCES↗

Next-Generation Electric Motors and Electromagnetic Devices (CRADA Final Report)

As part of the Cyclotron Road program, the Foli Research team investigated electric motors and other electromagnetic devices additively manufactured by depositing fine conducting wire onto a substrate. By leveraging modern motion control and efficient upstream manufacturing processes, the team explored using geometric control and turnkey production comparable to printed circuit board manufacturing, aiming at ten-fold improvements in signal density, while eliminating the material use, cost, and complexity overheads of subtractive processes at large scales. Owing to the achievable density and additive scaling, disparate components became monolithic, and disparate processes were combined with the aim of reducing development costs, uncertainties, and timelines. When applied to electric motors, this technology may enable agile manufacturing of next-generation designs, with dramatic increases in achievable power density and material utilization. Electric motors represent the single largest user of electricity in the U.S. and a critical component of decarbonized infrastructure. Despite this significance, the manufacturing of motors and other electromagnetic devices remains capital-intensive, labor-intensive, and performance-limiting. Advanced manufacturing processes were required to produce high-performance, low-cost, application-specific electric motors and electromagnetic devices to support an electrified future.

42 ENGINEERING↗

Overview of NASA space station activities

The architecture, functions, and human activities on-board a space station are discussed. A manned presence is regarded as essential for innovative actions and successful exploitation of weightless conditions. The station itself could be a cluster of modules for habitation, power, operations, docking, experimentation, and storage. Additionally, the station could provide an interface for free-flying platforms and teleoperated satellite services, as well as a base for establishing space-based manufacturing facilities. NASA has projected timelines that include initial development funding in 1987, full capabilities before the year 2000, and initial costs for minimum capabilities of $7.5-9 billion. Architecture, mission requirements, trade-offs, and concepts are currently being defined as a prelude to systems development. Attention is being given to participation by both the DoD and other governments, and to defining the capabilities of the station, including habitability, closed-loop life-support system, the scope of science application and data transfer, and the power requirements.

Tilton, E. L., III↗

Access flight hardware design and development

Several items were found to be of immense value in the design and development of the Assembly Concept for Construction of Erectable Space Structures (ACCESS) hardware. The early availability of mock-up and engineering test hardware helped to develop the concept and prove the feasibility of the experiment. The extensive neutral buoyancy testing was invaluable in developing the procedures and timelines, proving that the hardware functioned as intended, and effectively trained the astronauts. The early involvement of the crew systems/astronaut personnel was extremely beneficial in shaping the design to meet the EVA compatibility requirements. Also, the early definition of coupled loads and on-orbit dynamic responses can not be overemphasized due to the relative uncertainty in the magnitude of these loads and their impact on the design.

Rogers, John F.↗

Design of a Lunar Farside Observatory

The design of a mantendable lunar farside observatory and science base is presented. A farside observatory will allow high accuracy astronomical observations, as well as the opportunity to perform geological and low gravity studies on the Moon. The requirements of the observatory and its support facilities are determined, and a preliminary timeline for the project development is presented. The primary areas of investigation include observatory equipment, communications, habitation, and surface operations. Each area was investigated to determine the available options, and each option was evaluated to determine the advantages and disadvantages. The options selected for incorporation into the design of the farside base are presented. The observatory equipment deemed most suitable for placement on the lunar farside consist of large optical and radio arrays and seismic equipment. A communications system consisting of a temporary satellite about the L sub 2 libration point and followed by a satellite at the stable L sub 5 libration point was selected. A space station common module was found to be the most practical option for housing the astronauts at the base. Finally, a support system based upon robotic construction vehicles and the use of lunar materials was determined to be a necessary component of the base.

Source record↗

Timeline-Based Space Operations Scheduling with External Constraints

We describe a timeline-based scheduling algorithm developed for mission operations of the EO-1 earth observing satellite. We first describe the range of operational constraints for operations focusing on maneuver and thermal constraints that cannot be modeled in typical planner/schedulers. We then describe a greedy heuristic scheduling algorithm and compare its performance to both the prior scheduling algorithm - documenting an over 50% increase in scenes scheduled with estimated value of millions of dollars US. We also compare to a relaxed optimal scheduler showing that the greedy scheduler produces schedules with scene count within 15% of an upper bound on optimal schedules.

Chien, Steve↗

The Nitty Gritty: How We Make Analogs Work

NASA's Human Research Program (HRP) is becoming increasingly reliant on Isolated, Confined and Controlled (ICC) analogs to accomplish many of its research objectives. Compared to other research platforms, ICC analogs present a unique set of operational challenges that must be addressed in order to ensure a high fidelity research environment. In particular, the Human Exploration Research Analog (HERA) habitat, which is classified as an ICC environment, has been developed over the past three years to accommodate the operational needs of research investigations from each of the HRP Elements. During the development period, various types of requirements have contributed to the current operational model, which strives to achieve the highest possible level of mission fidelity with limited resources. This presentation will focus on the operational aspects of the HERA habitat, with emphasis on how we develop the analog research environment to meet researchers' needs. Specific discussion topics include mission scenario development, operational tasks, mission timeline integration, stressor implementation, console support, and improvements based on lessons learned. The information is intended to help investigators better understand the details behind HERA operations and the benefits to their research goals.

Self, A. L.↗

Design and Testing of a 2-Hour Oxygen Prebreathe Protocol for Space Walks from the International Space Station

To develop and test a 2-hour prebreathe protocol for performing extravehicular activities (EVAs) from the International Space Station (ISS). Combinations of adynamia (non-walking), prebreathe exercise, and space suit donning options (10.2 vs. 14.7 psi) were evaluated, against timeline and consumable contraints to develop an operational 2- hour prebreathe protocol. Prospective accept/reject criteria were defined for decompression sickness (DCS) and venous gas emboli (VGE) from analysis of historical DCS data, combined with risk management of DCS under ISS mission circumstances. Maximum operational DCS levels were defined based on protecting for EVA capability with two crew-members at 95% confidence, throughout ISS lifetime (within the constraints of NASA DCS disposition policy JPG 1800.3). The accept/reject limits were adjusted for greater safety based on analysis of related medical factors. Monte-Carlo simulation was performed to design a closed sequential, multi-center human trial. Protocols were tested with 4 different prebreathe exercises (Phases I-IV), prior to exposure to 4.3 psi for 4 hrs. Subject selection, Doppler monitoring for VGE, test termination criteria, and DCS definitions were standardized. Phase I: upper and lower body exercises using dual-cycle ergometry (75% VO2 max for 10 min). Phase II: ergometry plus 24 min of light exercise (simulating space-suit preparations). Phase III: same 24 min of light exercise but no ergometry, and Phase IV: 56 min of light exercise without ergometry. A prebreathe procedure was accepted if, at 95% confidence, the incidence of DCS was less than 15% (with no Type II DCS), and Grade IV VGE was less than 20%.

Gernhardt, Michael L.↗

Timeline as Unifying Concept for Spacecraft Operations

The notion of Timeline has been used informally in spacecraft operations software for some time, but it has not heretofore been formalized and unified either syntactically or semantically. We have formalized and unified the Timeline so that the commonality can be exploited to reduce the cost of developing and using spacecraft operations software. The Timeline can then be used as the common data structure for storage and communications between spacecraft planning and operations software elements.

decision making↗

Autonomous Real Time Requirements Tracing

One of the more challenging aspects of software development is the ability to verify and validate the functional software requirements dictated by the Software Requirements Specification (SRS) and the Software Detail Design (SDD). Insuring the software has achieved the intended requirements is the responsibility of the Software Quality team and the Software Test team. The utilization of Timeliner-TLX(sup TM) Auto-Procedures for relocating ground operations positions to ISS automated on-board operations has begun the transition that would be required for manned deep space missions with minimal crew requirements. This transition also moves the auto-procedures from the procedure realm into the flight software arena and as such the operational requirements and testing will be more structured and rigorous. The autoprocedures would be required to meet NASA software standards as specified in the Software Safety Standard (NASASTD- 8719), the Software Engineering Requirements (NPR 7150), the Software Assurance Standard (NASA-STD-8739) and also the Human Rating Requirements (NPR-8705). The Autonomous Fluid Transfer System (AFTS) test-bed utilizes the Timeliner-TLX(sup TM) Language for development of autonomous command and control software. The Timeliner- TLX(sup TM) system has the unique feature of providing the current line of the statement in execution during real-time execution of the software. The feature of execution line number internal reporting unlocks the capability of monitoring the execution autonomously by use of a companion Timeliner-TLX(sup TM) sequence as the line number reporting is embedded inside the Timeliner-TLX(sup TM) execution engine. This negates I/O processing of this type data as the line number status of executing sequences is built-in as a function reference. This paper will outline the design and capabilities of the AFTS Autonomous Requirements Tracker, which traces and logs SRS requirements as they are being met during real-time execution of the targeted system. It is envisioned that real time requirements tracing will greatly assist the movement of autoprocedures to flight software enhancing the software assurance of auto-procedures and also their acceptance as reliable commanders

Plattsmier, George I.↗

Mars Surface Operations via Low-Latency Telerobotics from Phobos

To help assess the feasibility and timing of Low-Latency Telerobotics (LLT) operations on Mars via a Phobos telecommand base, operations concepts (ops cons) and timelines for several representative sequences for Mars surface operations have been developed. A summary of these LLT sequences and timelines will be presented, along with associated assumptions, operational considerations, and challenges.

telerobotics↗

Steps Towards the Integration of Conflict Resolution with Metering and Scheduling

NASA Ames Research Center is developing decision support tool technology for air traffic controllers to improve the efficiency and capacity of National Airspace System. The goal is to provide technology, tools and procedures that result in the highest possible level of user preferred trajectories whenever possible with safe and efficient traffic management when necessary. The work is being conducted under the NASA Advanced Air Transportation Technology Program in cooperation with the FAA through the Inter-Agency Integrated Product Team. The objective is to develop technology and procedures that lead towards a seamless integration of conflict resolution with metering and scheduling for arrival aircraft and en route aircraft that are under metering restrictions. A requirement is that the integration incorporate user preferred trajectories. The ultimate goal is the implementation and validation of the Descent Advisor (DA) concept which provides clearance advisories to a sector controller that simultaneously meet metering constraints, are conflict free, incorporate a user preferred (e.g., minimum fuel) descent profile, and generally require no further corrective clearance as the aircraft transitions from en route cruise into the TRACON. The DA concept may also be applied to en route aircraft under metering constraints, e.g., miles-in-trail. To achieve the DA concept a stepwise development and field evaluation is anticipated. This paper addresses the initial steps towards implementation of the DA. The Traffic Management Advisor (TMA) computes arrival time sequence and required delay information for display to the sector controller during periods when arrivals must be metered due to landing rate restrictions at the airport. The Initial Conflict Probe (ICP) compares trajectory predictions for all aircraft and alerts the controller when any two aircraft are predicted to violate separation standards (5 mi. and 2000 ft. in en route airspace). ICP also includes a trial planning function allowing the controller to develop and check a separate "what if" trajectory for conflict resolution. TMA and ICP currently operate independent of one another and have separate controller displays. The TMA meter list is on the radar controller's plan view display. The ICP is still under development, but the current concept calls for a list of predicted conflicts at the data controller position. The research described herein address two steps towards the implementation of DA. The first is to develop a concept for integrated display of conflict and metering information on a controller's display. The objective is to provide the controller with situational awareness of one problem while he develops a solution to the other. The next step is to expand the concept for display of automated clearance advisories for one problem (e.g., metering) which take into account the other problems (e.g., conflicts). Information to be communicated between TMA and ICP to facilitate' manual or automated advisories is being identified as the concept matures. In order to study the ICP/TMA integration concept the CTAS conflict probe capability has been adapted to Ft. Worth Center. The system is being validated in the laboratory with all-track data and for non -interference with TMA, TMA is already running as a daily use prototype at Ft. Worth Center. A laboratory prototype system has been developed under the CTAS baseline which combines conflict and metering information on a common user interface. Elements of the user interface are shown in Figure 1. In this simple illustration the user sees the simultaneous effect of a trial plan on meter fix delay and conflict status. Delay information is shown in the aircraft flight data block, the meter list, and the TMA timeline. Experience during Descent Advisor development and observations at Ft. Worth Center high and low attitude arrival sectors during metering suggests that manual trial planning will be unworkable during rush periods due to high controller workload.

McNally, B. David↗

Autonomous Real Time Requirements Tracing

One of the more challenging aspects of software development is the ability to verify and validate the functional software requirements dictated by the Software Requirements Specification (SRS) and the Software Detail Design (SDD). Insuring the software has achieved the intended requirements is the responsibility of the Software Quality team and the Software Test team. The utilization of Timeliner-TLX(sup TM) Auto- Procedures for relocating ground operations positions to ISS automated on-board operations has begun the transition that would be required for manned deep space missions with minimal crew requirements. This transition also moves the auto-procedures from the procedure realm into the flight software arena and as such the operational requirements and testing will be more structured and rigorous. The autoprocedures would be required to meet NASA software standards as specified in the Software Safety Standard (NASASTD- 8719), the Software Engineering Requirements (NPR 7150), the Software Assurance Standard (NASA-STD-8739) and also the Human Rating Requirements (NPR-8705). The Autonomous Fluid Transfer System (AFTS) test-bed utilizes the Timeliner-TLX(sup TM) Language for development of autonomous command and control software. The Timeliner-TLX(sup TM) system has the unique feature of providing the current line of the statement in execution during real-time execution of the software. The feature of execution line number internal reporting unlocks the capability of monitoring the execution autonomously by use of a companion Timeliner-TLX(sup TM) sequence as the line number reporting is embedded inside the Timeliner-TLX(sup TM) execution engine. This negates I/O processing of this type data as the line number status of executing sequences is built-in as a function reference. This paper will outline the design and capabilities of the AFTS Autonomous Requirements Tracker, which traces and logs SRS requirements as they are being met during real-time execution of the targeted system. It is envisioned that real time requirements tracing will greatly assist the movement of autoprocedures to flight software enhancing the software assurance of auto-procedures and also their acceptance as reliable commanders.

Plattsmier, George↗

Space Shuttle Orbiter - Countdown

The status of Orbiter launch planning is reviewed, with consideration given to major structure elements, subsystem and component development, readiness for launch, and follow-on Orbiters. It is noted that timelines in the completion of each increment of development of the first Orbital Flight Vehicle become increasingly crucial as the scheduled launch date approaches. Concurrent with the testing and finalization of this vehicle's software and hardware construction are the preliminary developmental stages of future Shuttle Orbiters.

Cohen, A.↗

Certified Green Building Materials: Policy Impact Assessment

Chinese building construction is rapidly expanding, making it critical to focus on energy efficiency to curb the increase of energy consumption and emissions over a building’s lifetime. A key mechanism to do so is through building material certification systems and programs. These establish how building materials will perform and can be used to promote energy and resource efficiency, which help create a more sustainable and healthy building industry. This report begins by identifying characteristics of a strong certification system and ways to improve existing systems. To curb building energy demand, the Chinese government began developing a building material certification program to encourage energy and resource efficiency in the building sector. A timeline is provided of their program’s development and provides analysis. China’s building material database is highlighted and analyzed for their significance and opportunities for improvement. The report then continues to analyze the importance of policies such as procurement programs, and the Chinese government is developing their procurement programs for certified green building materials. To understand the potential large-scale impacts of green building material certifications, we conducted an analysis of the environmental and market impact of a nationwide green building procurement policy for all new residential and commercial construction.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Roads to Removal: Options for Carbon Dioxide Removal in the United States

Our analysis shows it is feasible for the United States to remove a staggering amount of CO 2 from the air—this will be critical to becoming carbon neutral by 2050. Our comprehensive, first-of-its-kind, county-resolution analysis indicates that our country can accomplish this goal by relying on demonstrated technology, natural resources, and workforces we already have. Additionally, ongoing technology development can lower costs, shorten timelines, and deliver new solutions. Our analysis evaluated how we can use forests, cropland soils, and waste biomass, along with purpose-built machines, to get us to net-zero. Further, we considered community impacts and identified locations where certain solutions could be uniquely beneficial or potentially counterproductive. Our findings enable decisionmakers to weigh both opportunities and constraints and to decide what roads to use to meet our national climate goal for net-zero CO 2 emissions.

03 NATURAL GAS↗

Shuttle-attached Antenna Flight Experiment Definition Study (FEDS)

The control algorithms, techniques, and hardware which would be required to support whether flight experiments of large space structures control are assessed for a 55-meter diameter wrap-rib reflector with a three degree-of-freedom gimbal. Strowman requirements were established for geometry, mass property, and elastic mode identification as well as for control and slewing. A five-body simulation of the Shuttle and test article was built with the ALLFLEX computer program. A maximum likelihood estimator, the flight experiment timeline, and the LSS control development test plan are discussed.

Hannan, G. J.↗