Search NASA⌕ Search

SEARCH · Search NASA

Results for “functional testing”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 163 records · Page 9

Lessons Learned During Instrument Testing for the Thermal Infrared Sensor (TIRS)

The Themal InfraRed Sensor (TIRS) instrument, set to launch on the Landsat Data Continuity Mission in 2013, features a passively cooled telescope and IR detectors which are actively cooled by a two stage cryocooler. In order to proceed to the instrument level test campaign, at least one full functional test was required, necessitating a thermal vacuum test to sufficiently cool the detectors and demonstrate performance. This was fairly unique in that this test occurred before the Pre Environmental Review, but yielded significant knowledge gains before the planned instrument level test. During the pre-PER test, numerous discrepancies were found between the model and the actual hardware, which were revealed by poor correlation between model predictions and test data. With the inclusion of pseudo-balance points, the test also provided an opportunity to perform a pre-correlation to test data prior to the instrument level test campaign. Various lessons were learned during this test related to modeling and design of both the flight hardware and the Ground Support Equipment and test setup. The lessons learned in the pre-PER test resulted in a better test setup for the nstrument level test and the completion of the final instrument model correlation in a shorter period of time. Upon completion of the correlation, the flight predictions were generated including the full suite of off-nominal cases, including some new cases defined by the spacecraft. For some of these ·new cases, some components now revealed limit exceedances, in particular for a portion of the hardware that could not be tested due to its size and chamber limitations.. Further lessons were learned during the completion of flight predictions. With a correlated detalled instrument model, significant efforts were made to generate a reduced model suitable for observatory level analyses. This proved a major effort both to generate an appropriate network as well as to convert to the final model to the required format and yielded additional lessons learned. In spite of all the challenges encountered by TIRS, the instrument was successfully delivered to the spacecraft and will soon be tested at observatory level in preparation for a successful mission launch.

Peabody, Hume L.↗

Lens collimation and testing using a Twyman-Green interferometer with a self-pumped phase-conjugating mirror

Ordinarily Twyman-Green interferometers are employed testing optical elements. In a modification of the basic configuration, the ordinary mirror in the test arm is replaced with a self-pumped phase-conjugating mirror using a barium titanate crystal. It is shown that, with a redefinition of components, the new configuration permits retention and improvement of the optical element testing function while simultaneously serving as a sensitive test for collimation. The optical path difference resulting from the double pass in the original Twyman-Green interferometer approximately equals that of the single pass and phase conjugation in the modification.

Howes, W. L.↗

Comparison of JPL and European Environmental Testing Standards

A comparison of JPL and European environmental testing standards is presented. The contents include: 1) JPL Environmental Testing Documents; 2) Focus of the Comparison; 3) Test Policy; 4) Documentation; 5) Programmatics; 6) Functional Testing; 7) Reporting; 8) Dynamics Test Levels, Durations, & Margins; 9) Thermal Test Levels, Durations, & Margins; and 10) EMC Test Levels, Durations, & Margins.

spacecraft↗

Developing Controlled Conductive Boundaries for JWST Cryogenic Testing

In 2017, the James Webb Space Telescope (JWST) underwent functional testing and optical metrology verification of the combined Optical Telescope Element and Integrated Science Instrument Module (OTIS) under cryogenic vacuum conditions in Chamber A at the Johnson Space Center. Maintaining flight-like thermal boundary conditions was a critical requirement for optical testing and required unique and challenging Ground Support Equipment (GSE) design solutions. Two such GSE systems, the Integrated Science Instrument Module (ISIM) Precool Straps and the Hardpoint Struts were direct conduction interfaces to the flight hardware. Hardware safety during cooldown required detailed design of their conductivity, and thermal balance testing required "zero-Q" (0-Q) heater implementation to bring the heat flow to zero, thereby cutting off these non-flight conductive links after operating temperatures were achieved. This paper describes the design considerations and approach implemented to achieve the required flight hardware cool down and return to ambient conditions, ensure flight hardware safety, and minimize the non-flight-like heat flows to or from the observatory during cryo-stable testing.

Cooke, D.↗

Developing Controlled Conductive Boundaries for JWST Cryogenic Testing

In 2017, the James Webb Space Telescope (JWST) underwent functional testing and optical metrology verification of the combined Optical Telescope Element and Integrated Science Instrument Module (OTIS) under cryogenic vacuum conditions in Chamber A at the Johnson Space Center. Maintaining flight-like thermal boundary conditions was a critical requirement for optical testing and required unique and challenging Ground Support Equipment (GSE) design solutions. Two such GSE systems, the Integrated Science Instrument Module (ISIM) Precool Straps and the Hardpoint Struts were direct conduction interfaces to the flight hardware. Hardware safety during cooldown required detailed design of their conductivity, and thermal balance testing required zero-Q (0-Q) heater implementation to bring the heat flow to zero, thereby cutting off these non-flight conductive links after operating temperatures were achieved. This paper describes the design considerations and approach implemented to achieve the required flight hardware cool down and return to ambient conditions, ensure flight hardware safety, and minimize the non-flight-like heat flows to or from the observatory during cryo-stable testing.

Cooke, Dwight A.↗

Europa Clipper Payload Verification and Validation: Avionics-Instrument Interface Test Campaign

NASA's Europa Clipper mission will investigate Jupiter's icy moon Europa using a payload suite consisting of nine instruments to address a range of scientific objectives concerning Europa's habitability. As the project proceeds past its Critical Design Review, confidence is being built in the system's ability to achieve mission objectives through the implementation of a rigorous payload verification and validation (V&V) program. As part of this payload V&V program, instrument box-level testing was performed by the payload team to verify select instrument-avionics interface requirements. This testing was performed at JPL using the avionics testbed's Bulk Data Storage Emulator (BDSEM) with visiting instrument Test Models. This paper summarizes the Data Link test campaign involving roughly four days of functional testing per instrument, including planning, testing methods, types of issues found, and the requirement closure process. Detail is also provided on the development, deployment, and validation of a standardized analysis tool used in data reviews. This testing verified requirements related to commanding rates, loss of link, packet format, clock counters, loopback test capability, and SpaceWire jitter and skew margins. Additional risk reduction testing of basic commanding, counter behavior, science data collection and transfer, and interface swapping was also performed. Because the BDSEM venue was not originally designed to be a run for record venue, the process of characterizing venue fidelity and establishing suitability for requirement closure using data collected in this venue will also be addressed.In order to close requirements, an extensible tool was developed to post-process instrument command and telemetry data from their original binary to a human-readable format and give visibility to errors detected within the data, such as packets with Cyclic Redundancy Check errors. This tool, called payload-packet-parser, is a Python 3.9 command line tool built using a variety of open-source Python libraries. Payload-packet-parser was designed to support parsing command and telemetry packets for all Europa Clipper instruments and additional analysis tools were developed for verification of specific information interface requirements. This test campaign, including post-processing using a single parsing and verification toolset, allowed for early interface testing, alleviating testing burdens on instrument teams and buying down risk on the instrument-avionics interface by finding hardware and software issues and idiosyncrasies prior to integration with system test venues. Over twenty issues were discovered across the payload, resulting in software updates and instrument rework well in advance of any system impacts. This paper concludes with an assessment of benefits and costs of this type of testing and lessons learned.

Montanez, Leticia↗

System architecture of a gallium arsenide one-gigahertz digital IC tester

The design for a 1-GHz digital integrated circuit tester for the evaluation of custom GaAs chips and subsystems is discussed. Technology-related problems affecting the design of a GaAs computer are discussed, with emphasis on the problems introduced by long printed-circuit-board interconnect. High-speed interface modules provide a link between the low-speed microprocessor and the chip under test. Memory-multiplexer and memory-shift register architectures for the storage of test vectors are described in addition to an architecture for local data storage consisting of a long chain of GaAs shift registers. The tester is constructed around a VME system card cage and backplane, and very little high-speed interconnect exists between boards. The tester has a three part self-test consisting of a CPU board confidence test, a main memory confidence test, and a high-speed interface module functional test.

Fouts, Douglas J.↗

Statistical prediction of space motion sickness

Studies designed to empirically examine the etiology of motion sickness to develop a foundation for enhancing its prediction are discussed. Topics addressed include early attempts to predict space motion sickness, multiple test data base that uses provocative and vestibular function tests, and data base subjects; reliability of provocative tests of motion sickness susceptibility; prediction of space motion sickness using linear discriminate analysis; and prediction of space motion sickness susceptibility using the logistic model.

Reschke, Millard F.↗

Temperature Stability and Control Requirements for Thermal Vacuum/Thermal Balance Testing of the Aquarius Radiometer

The paper describes the specific temperature stability and control requirements for the thermal vacuum and thermal balance testing of the Aquarius Instrument at the Goddard Space Flight Center in Greenbelt, Maryland. The testing was conducted in the 10' wide x 15' deep Facility 225 Thermal Vacuum chamber. The temperature control stability requirements were less than .14 C RMS thermal variation over a seven-day period. The thermal test specification also called for the ability to impose a high-resolution sinusoidal variation for all heater zones. The special requirements of the Aquarius radiometer test necessitated the construction of a multi-function test fixture and the modification of two existing heater controller racks.

Johnson, Chris↗

Flat H Redundant Frangible Joint Development

Orion and Commercial Crew Program (CCP) Partners have chosen to use frangible joints for certain separation events. The joints currently available are zero failure tolerant and will be used in mission safety applications. The goal is to further develop a NASA designed redundant frangible joint that will lower flight risk and increase reliability. FY16 testing revealed a successful design in subscale straight test specimens that gained efficiency and supports Orion load requirements. Approach / Innovation A design constraint is that the redundant joint must fit within the current Orion architecture, without the need for additional vehicle modification. This limitation required a design that changed the orientation of the expanding tube assemblies (XTAs), by rotating them 90deg from the standard joint configuration. The change is not trivial and affects the fracture mechanism and structural load paths. To address these changes, the design incorporates cantilevered arms on the break plate. The shock transmission and expansion of the XTA applies force to these arms and creates a prying motion to push the plate walls outward to the point of structural failure at the notched section. The 2014 test design revealed that parts could slip during functioning wasting valuable energy needed to separate the structure with only a single XTA functioning. Dual XTA functioning fully separated the assembly showing a discrepancy can be backed up with redundancy. Work on other fully redundant systems outside NASA is limited to a few patents that have not been subjected to functionality testing Design changes to prevent unwanted slippage (with ICA funding in 2015) showed success with a single XTA. The main goal for FY 2016 was to send the new Flat H RFJ to WSTF where single XTA test failures occurred back in 2014. The plan was to gain efficiency in this design by separating the Flat H RFJ with thicker ligaments with dimensions baselined in 2014. Other modifications included geometry changes to better disperse loads paths and to minimize air gaps. The design additionally added more structural strength to enhance the structural limits in static loads testing. The design also implemented a smoother load line through the assembly. Results / Knowledge Gained The new Flat H RFJ successfully fractured at WSTF with thicker ligaments and lower cord size. Where failure to separate occurred earlier, there is now excessive energy available for structural separation. The new challenge to provide some structural support to prevent secondary fracturing of the break plate remains to be completed. This future work is being funded by the JSC Engineering Directorate in 2017 to elevate the TRL on curved Flat H RFJs that configure with the Orion Service Panel Separation. Additional funding from JSC Engineering will provide new design testing to avoid secondary fracturing.

Brown, Chris↗

ROSA and Solar Cell Module Combined Environments Test Plan

Roll-out solar array (ROSA) technology is an emerging component of the future of spacecraft photovoltaic power subsystems. Qualification and risk reduction testing are necessary to demonstrate design worthiness for spaceflight implementation of the array and solar cell modules. Maxar Space LLC and NASA have undertaken a rigorous combined environment (CE) test campaign for a ROSA design expected to be a part of the Power and Propulsion Element (PPE) for the NASA Gateway which will be an outpost orbiting the Moon. The CE tests consist of several simulated space environment exposures associated with the planned mission: UV radiation, electron/proton radiation, xenon ion plume exposures, and vacuum thermal cycling and electrostatic discharge (ESD). These tests are conducted on small coupons consisting of the planned ROSA flight elements, and all tests are performed at the NASA Marshall Space Flight Center. This paper discusses the test plan, requirements for each environment, and the functional testing performed. Of note is a new approach for the induced primary arc used in the ESD testing, which better simulates the plasma expansion during the ESD event. Progress on executing the test plan is presented.

Space Environments Effects Testing↗

Thermal Management of JWST Cryo-Vacuum Test Support Equipment

In 2017, the James Webb Space Telescope (JWST) underwent functional testing and optical metrology verification of the combined Optical Telescope Element and Integrated Science Instrument Module (OTIS) under cryogenic vacuum conditions in Chamber A at the Johnson Space Center. The ground support and test equipment developed and tested over the previous decade to facilitate this test event were crucial elements of its success. Ground systems required for this test fall into several groups, including thermal simulators, mechanical support hardware, telemetry systems, and metrology systems. This paper will provide a summary of these systems, their development challenges, key features, and highlight thermal performance in the cryovac test.

Havey, Keith A., Jr.↗

Comparison of Cognitive Performance Tests for Promethazine Pharmacodynamics in Human Subjects

The objective of this study is to compare cognitive function tests, Automated Neurological Assessment Metrics (ANAM) based Readiness Evaluation System (ARES(Registered TradeMark)) on a Palm Pilot and Windows based Spaceflight Cognitive Assessment Tool (WinSCAT(Registered TradeMark)) on a personal computer (PC) to assess performance effects of promethazine (PMZ) after administration to human subjects. In a randomized placebo-controlled cross-over design, subjects received 12.5, 25, and 50 mg intramuscular (IM) PMZ or a placebo and completed 14 sessions with WinSCAT(Registered TradeMark) (v. 1.26) and ARES(Registered TradeMark) (v. 1.27) consecutively for 72 h post dose. Maximum plasma concentrations (4.25, 6.25 and 13.33 ng/ml) were linear with dose and were achieved by 0.75, 8, and 24 h after dosing for the three doses, respectively. No significant differences in cognitive function after PMZ dosing were detected using WinSCAT(Registered TradeMark), however, tests from ARES(Registered TradeMark) demonstrated concentration dependent decrements in reaction time associated with PMZ dose.

Vaksman, Z.↗

Integrated Advanced Microwave Sounding Unit-A(AMSU-A). Performance Verification Report, METSAT Phase Locked Oscillator Assembly, P/N 1348360-1, S/N's F07 and F08

Two Flight Model AMSU-A Phase Locked Oscillators (PIN 1348360-1, S/N F07 and F08) have been tested per AES Test Procedure AE-26758 Rev. B, which include full functional testing, vibration testing, thermal testing, and AM/FM Noise testing. Both assemblies satisfactorily passed all performance requirements of the AE-26633 Product Specification. During the thermal cycling of both units, spurs developed 1 MHz from the carrier when the units were cold, and TARs were written to document the anomaly. The symptoms observed in both cases were consistent with inadequate tuning. The units were successfully re-tuned. In the case of F08, re-tuning required a design change which allowed a greater range of possible values for tuning resisters. Both units completed thermal cycling without further delay. The results of the required tests are presented in the following section as test data. As indicated on the test data sheets, all measured data passed all requirements.

Pines, D.↗

Evaluation plan for space station network interface units

Outlined here is a procedure for evaluating network interface units (NIUs) produced for the Space Station program. The procedures should be equally applicable to the data management system (DMS) testbed NIUs produced by Honeywell and IBM. The evaluation procedures are divided into four areas. Performance measurement tools are hardware and software that must be developed in order to evaluate NIU performance. Performance tests are a series of tests, each of which documents some specific characteristic of NIU and/or network performance. In general, these performance tests quantify the speed, capacity, latency, and reliability of message transmission under a wide variety of conditions. Functionality tests are a series of tests and code inspections that demonstrate the functionality of the particular subset of ISO protocols which have been implemented in a given NIU. Conformance tests are a series of tests which would expose whether or not selected features within the ISO protocols are present and interoperable.

Weaver, Alfred C.↗

Green Run Modal Test of the NASA Space Launch System Core Stage

The Core Stage of the new NASA Space Launch System (SLS) is a 212-foot-tall rocket assembly—consisting primarily of two cryogenic propellant tanks, an engine section, and four RS-25 rocket engines—that will send crew and large payloads to the moon and beyond for NASA’s Artemis program. Prior to SLS assembly, the Core Stage completed a series of structural and functional tests in the B-2 Test Stand at Stennis Space Center, designated Green Run. The goal of Green Run was to verify analytical models, confirm proper subsystem operation, and test-fire all four RS-25 engines of the Core Stage. In January 2020, Green Run testing began with an experimental modal analysis test, performed by the Marshal Space Flight Center modal test team. A free-boundary test condition of the Core Stage was simulated as close as possible by suspending the massive launch vehicle from the B-2 Test Stand crane. Modal excitation was provided by a pair of 250-lb electro-dynamic shakers for multi-shaker random vibration testing, as well as a 12-pound instrumented hammer for impact testing. Modal response was measured with 550 accelerometer channels distributed on both the Core Stage and the B-2 Test Stand derrick crane. Following one very long day of testing, frequency response functions were calculated from the measured time histories in the target mode frequency range of 5 Hz to 15 Hz, and mode shapes, frequencies, and damping values were successfully estimated. The case-study presented in this paper will discuss Green Run, the SLS Core Stage, the modal test setup and execution, as well as a brief overview of the test results. Challenges associated with testing such a large, suspended structure in an outdoor environment will be discussed as well.

Space Launch System↗

Defining the Physiological Factors that Contribute to Postflight Changes in Functional Performance

Astronauts experience alterations in multiple physiological systems due to exposure to the microgravity conditions of space flight. These physiological changes include sensorimotor disturbances, cardiovascular deconditioning and loss of muscle mass and strength. These changes might affect the ability of crewmembers to perform critical mission tasks immediately after landing on lunar and Martian surfaces. To date, changes in functional performance have not been systematically studied or correlated with physiological changes. To understand how changes in physiological function impact functional performance an interdisciplinary pre/postflight testing regimen (Functional Task Test, FTT) has been developed that systematically evaluates both astronaut postflight functional performance and related physiological changes. The overall objective of the FTT is to identify the key underlying physiological factors that contribute to performance of functional tests that are representative of critical mission tasks. This study will identify which physiological systems contribute the most to impaired performance on each functional test. This will allow us to identify the physiological systems that play the largest role in decrement in functional performance. Using this information we can then design and implement countermeasures that specifically target the physiological systems most responsible for the altered functional performance associated with space flight. The functional test battery was designed to address high priority tasks identified by the Constellation program as critical for mission success. The set of functional tests making up the FTT include the: 1) Seat Egress and Walk Test, 2) Ladder Climb Test, 3) Recovery from Fall/Stand Test, 4) Rock Translation Test, 5) Jump Down Test, 6) Torque Generation Test, and 7) Construction Activity Board Test. Corresponding physiological measures include assessments of postural and gait control, dynamic visual acuity, fine motor control, plasma volume, orthostatic intolerance, upper and lower body muscle strength, power, fatigue, control and neuromuscular drive. Crewmembers perform both functional and physiological tests before and after short (Shuttle) and long-duration (ISS) space flight. Data are collected on R+0 (Shuttle only), R+1, R+6 and R+30.

Bloomberg, J. J.↗

Environmental Test Screening Procedure

This procedure describes the methods to be used for environmental stress screening (ESS) of the Lightning Mapper Sensor (LMS) lens assembly. Unless otherwise specified, the procedures shall be completed in the order listed, prior to performance of the Acceptance Test Procedure (ATP). The first unit, S/N 001, will be subjected to the Qualification Vibration Levels, while the remainder will be tested at the Operational Level. Prior to ESS, all units will undergo Pre-ESS Functional Testing that includes measuring the on-axis and plus or minus 0.95 full field Modulation Transfer Function and Back Focal Length. Next, all units will undergo ESS testing, and then Acceptance testing per PR 460.

Zeidler, Janet↗