Search NASA⌕ Search

SEARCH · Search NASA

Results for “hardware design”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 163 records · Page 9

A Stream lined Approach for the Payload Customer in Identifying Payload Design Requirements

NASA payload developers from across various disciplines were asked to identify areas where process changes would simplify their task of developing and flying flight hardware. Responses to this query included a central location for consistent hardware design requirements for middeck payloads. The multidisciplinary team assigned to review the numerous payload interface design documents is assessing the Space Shuttle middeck, the SPACEHAB Inc. locker, as well as the MultiPurpose Logistics Module (MPLM) and EXpedite the PRocessing of Experiments to Space Station (EXPRESS) rack design requirements for the payloads. They are comparing the multiple carriers and platform requirements and developing a matrix which illustrates the individual requirements, and where possible, the envelope that encompasses all of the possibilities. The matrix will be expanded to form an overall envelope that the payload developers will have the option to utilize when designing their payload's hardware. This will optimize the flexibility for payload hardware and ancillary items to be manifested on multiple carriers and platforms with minimal impact to the payload developer.

Miller, Ladonna J.↗

Low SWaP Onboard Satellite Navigation, Guidance, and Control Technology

Onboard autonomy is a necessity for responsive space operations. Autonomous navigation, guidance, and control (NGC) enables space missions to reduce their dependence on high demand ground assets and costly ground personnel. It also allows for in-situ decision making and higher return on mission data. A flight software and hardware system providing this capability, called “autoNGC,” is currently being developed at NASA Goddard Space Flight Center for infusion into multiple future missions. The first build of autoNGC, providing autonomous navigation for lunar orbiting spacecraft, is targeted for completion by Fall 2024. It provides sensor fusion of multiple measurement types including pseudo-range from a weak signal Global Navigation Satellite Service (GNSS) receiver, 1-way and 2-way direct to Earth (DTE) range and Doppler, bearing and range from optical camera sensed images, and an accelerometer. AutoNGC is also being targeted for future missions that involve small body proximity operations, Sun Earth Libration point orbits, and distributed systems missions (DSMs) including those at outer planets. AutoNGC flight software is being built upon the plug-and-play architecture of the core Flight System (cFS) [Ref. 1]. Figure (Slide 7) shows the message-based software bus layout of various software applications (“apps”) consisting of the standard cFS apps and autoNGC interface apps and libraries. Accurate onboard navigation and timing is obtained through the Goddard Enhanced Onboard Navigation System (GEONS) software library [Ref. 2], which fuses different measurement types through an extended Kalman filter (EKF) framework. Optical measurements that are ingested in GEONS are provided by the cFS Goddard Image Analysis and Navigation Tool (cGIANT) app [Ref. 3]. This app processes optical images to extract the bearing angles of the centroid of the imaged body (near or far), the range to the imaged body, and/or of the features on the surface of a body to perform terrain relative navigation (TRN). Measurement of range to the body’s center of mass can also be derived from the detection of the limb. The first build of autoNGC for a lunar orbiting spacecraft is a minimal size, weight, and power (SWaP) hardware design allowing for inclusion into CubeSats and SmallSat-size class buses. Advancements in miniaturized space processors, such as the SpaceCube 3.0 Mini and the SpaceCube Mini-Z [Ref. 4] are utilized for low SWaP while maintaining a high level of performance. Figure (Slide 11) shows the composition of the first autoNGC build. The current enclosure design has dimensions 12 cm x 17 cm x 13.5 cm. The box mass is expected to be less than 2 kg, and the nominal power is 21 W. The hardware interfaces are designed for flexibility with a variety of sensor inputs. The achievable navigation performance depends on the sensors utilized, including the onboard clock for 1-way pseudo-range measurements. Analysis using a configuration that consists of weak signal GPS, TRN, and 1-way DTE has shown position and velocity accuracies of 10 meters and 2 cm/s (3-σ ) RSS, respectively, with onboard time knowledge estimated to better than 13 ns (3-σ ), for a spacecraft in a representative 12-hour eccentric lunar orbit. Other measurement types such as x-rays from known pulsars (called XNAV) and cross-links can also be processed in GEONS. With the plug-and-play architecture of autoNGC, cFS apps can easily be added and replaced, even after launch. Goddard is actively seeking partners to collaborate in the development of additional capabilities for autoNGC, including industry, academia, and others across the US Government. Plans are being formulated to make the autoNGC software platform available for use by any US government organization to leverage the non-recurring engineering associated with the development of onboard autonomous NGC 3 capabilities. As advancements in space qualified sensors, microprocessors, and algorithms are made, the autoNGC platform provides a ready starting point for inclusion of these technologies.

C. J. Gramling↗

Ground Safety Issues

In the history of humankind, every space adventure, great or small, has begun on the ground. While this seems to be stating the obvious, mission and flight hardware designers who have overlooked this fact have paid a high price, either in loss or damage to the hardware pre-launch, or in mission failure or reduction. Designers may risk not only their flight hardware, but they may also risk their lives, their co-workers lives and even the general public by not heeding safety on the ground. Their eyes may be on the stars but their feet are on the ground! This discussion applies to all forms of flight hardware from the largest rockets to the smallest spare parts.

Kirkpatrick, Paul D.↗

Concept report: Experimental vector magnetograph (EXVM) operational configuration balloon flight assembly

The observational limitations of earth bound solar studies has prompted a great deal of interest in recent months in being able to gain new scientific perspectives through, what should prove to be, relatively low cost flight of the magnetograph system. The ground work done by TBE for the solar balloon missions (originally planned for SOUP and GRID) as well as the rather advanced state of assembly of the EXVM has allowed the quick formulation of a mission concept for the 30 cm system currently being assembled. The flight system operational configuration will be discussed as it is proposed for short duration flight (on the order of one day) over the continental United States. Balloon hardware design requirements used in formulation of the concept are those set by the National Science Balloon Facility (NSBF), the support agency under NASA contract for flight services. The concept assumes that the flight hardware assembly would come together from three development sources: the scientific investigator package, the integration contractor package, and the NSBF support system. The majority of these three separate packages can be independently developed; however, the computer control interfaces and telemetry links would require extensive preplanning and coordination. A special section of this study deals with definition of a dedicated telemetry link to be provided by the integration contractor for video image data for pointing system performance verification. In this study the approach has been to capitalize to the maximum extent possible on existing hardware and system design. This is the most prudent step that can be taken to reduce eventual program cost for long duration flights. By fielding the existing EXVM as quickly as possible, experience could be gained from several short duration flight tests before it became necessary to commit to major upgrades for long duration flights of this system or of the larger 60 cm version being considered for eventual development.

Source record↗

NASA Ares I Crew Launch Vehicle Upper Stage Overview

By incorporating rigorous engineering practices, innovative manufacturing processes and test techniques, a unique multi-center government/contractor partnership, and a clean-sheet design developed around the primary requirements for the International Space Station (ISS) and Lunar missions, the Upper Stage Element of NASA's Crew Launch Vehicle (CLV), the "Ares I," is a vital part of the Constellation Program's transportation system. Constellation's exploration missions will include Ares I and Ares V launch vehicles required to place crew and cargo in low-Earth orbit (LEO), crew and cargo transportation systems required for human space travel, and transportation systems and scientific equipment required for human exploration of the Moon and Mars. Early Ares I configurations will support ISS re-supply missions. A self-supporting cylindrical structure, the Ares I Upper Stage will be approximately 84' long and 18' in diameter. The Upper Stage Element is being designed for increased supportability and increased reliability to meet human-rating requirements imposed by NASA standards. The design also incorporates state-of-the-art materials, hardware, design, and integrated logistics planning, thus facilitating a supportable, reliable, and operable system. With NASA retiring the Space Shuttle fleet in 2010, the success of the Ares I Project is essential to America's continued leadership in space. The first Ares I test flight, called Ares I-X, is scheduled for 2009. Subsequent test flights will continue thereafter, with the first crewed flight of the Crew Exploration Vehicle (CEV), "Orion," planned for no later than 2015. Crew transportation to the ISS will follow within the same decade, and the first Lunar excursion is scheduled for the 2020 timeframe.

McArthur, J. Craig↗

NASA Ares I Crew Launch Vehicle Upper Stage Overview

By incorporating rigorous engineering practices, innovative manufacturing processes and test techniques, a unique multi-center government/contractor partnership, and a clean-sheet design developed around the primary requirements for the International Space Station (ISS) and Lunar missions, the Upper Stage Element of NASA's Crew Launch Vehicle (CLV), the "Ares I," is a vital part of the Constellation Program's transportation system. Constellation's exploration missions will include Ares I and Ares V launch vehicles required to place crew and cargo in low-Earth orbit (LEO), crew and cargo transportation systems required for human space travel, and transportation systems and scientific equipment required for human exploration of the Moon and Mars. Early Ares I configurations will support ISS re-supply missions. A self-supporting cylindrical structure, the Ares I Upper Stage will be approximately 84' long and 18' in diameter. The Upper Stage Element is being designed for increased supportability and increased reliability to meet human-rating requirements imposed by NASA standards. The design also incorporates state-of-the-art materials, hardware, design, and integrated logistics planning, thus facilitating a supportable, reliable, and operable system. With NASA retiring the Space Shuttle fleet in 2010, the success of the Ares I Project is essential to America's continued leadership in space. The first Ares I test flight, called Ares 1-X, is scheduled for 2009. Subsequent test flights will continue thereafter, with the first crewed flight of the Crew Exploration Vehicle (CEV), "Orion," planned for no later than 2015. Crew transportation to the ISS will follow within the same decade, and the first Lunar excursion is scheduled for the 2020 timeframe.

Davis, Daniel J.↗

The walking robot project

A walking robot was designed, analyzed, and tested as an intelligent, mobile, and a terrain adaptive system. The robot's design was an application of existing technologies. The design of the six legs modified and combines well understood mechanisms and was optimized for performance, flexibility, and simplicity. The body design incorporated two tripods for walking stability and ease of turning. The electrical hardware design used modularity and distributed processing to drive the motors. The software design used feedback to coordinate the system and simple keystrokes to give commands. The walking machine can be easily adapted to hostile environments such as high radiation zones and alien terrain. The primary goal of the leg design was to create a leg capable of supporting a robot's body and electrical hardware while walking or performing desired tasks, namely those required for planetary exploration. The leg designers intent was to study the maximum amount of flexibility and maneuverability achievable by the simplest and lightest leg design. The main constraints for the leg design were leg kinematics, ease of assembly, degrees of freedom, number of motors, overall size, and weight.

Williams, P.↗

Orbiter CIU/IUS communications hardware evaluation

Inertial Upper Stage (IUS) and DoD Communication Interface Unit (CIU) communication system design, hardware specifications, and interfaces were evaluated to determine their compatibility with the Orbiter payload communication and data handling equipment and the Orbiter network communication equipment.

Huth, G. K.↗

Processor architectures utilizing magnetic bubble and semi-conductor memories

To aid work being conducted on the feasibility of a low cost Omega navigational receiver, a control panel was designed and constructed according to supplied specifications. Since the proposed Omega receiver is designed around a microprocessor, software engineering necessary for control panel operation is included in the design. The control panel is to be used as an operational model for use in the design of a prototype receiver. A detailed description of the hardware design is presented along with a description of the software needed to operate the panel. A complete description of the operating procedures for the panel are also included.

Parrish, E. A., Jr.↗

Use of human engineering standards in design

Results are presented for a research study intended to assess the impact of present human engineering standards on product design. The approach consisted of three basic steps: a comparison of two display panels to determine if, in fact, products designed to the same standards are truly standardized; a review of two existing standards to determine how well their information can be used to solve design problems; and a survey of human factors specialists to assess their opinions about standards. It is shown that standards have less than the desired influence on product design. This is evidenced by a lack of standardization between hardware designed under common standards, by deficiencies within the standards that detract from their usefulness and encourage users to ignore them, and by the respondents of the survey who consider standards less valuable than other reference sources for design implementation. Recommendations aimed at enhancing the use of standards are set forth.

Rogers, J. G.↗

Active/passive scanning

The paper deals with the design, construction, and applications of an active/passive multispectral scanner combining lasers with conventional passive remote sensors. An application investigation was first undertaken to identify remote sensing applications where active/passive scanners (APS) would provide improvement over current means. Calibration techniques and instrument sensitivity are evaluated to provide predictions of the APS's capability to meet user needs. A preliminary instrument design was developed from the initial conceptual scheme. A design review settled the issues of worthwhile applications, calibration approach, hardware design, and laser complement. Next, a detailed mechanical design was drafted and construction of the APS commenced. The completed APS was tested and calibrated in the laboratory, then installed in a C-47 aircraft and ground tested. Several flight tests completed the test program.

Woodfill, J. R.↗

Calibration Methodology for the Lightweight Rainfall Radiometer STAR Aircraft Sensor

A proposed methodology for the in-flight calibration of a Synthetic Thinned Aperture Radiometer (STAR) airborne sensor with the potential application to a space flight version. The application of the spaceflight version of this instrument will address several pressing issues related to the Global Precipitation Measurement Mission (GPM). The X-Band Lightweight Rainfall Radiometer using STAR technology (LRR-X) is an aircraft sensor that is jointly developed by the NASA Goddard Space Flight Center and the University of Michigan. This paper will describe the theory of calibration as well as the hardware design specifications used by the method. The on-board hardware uses individual uncorrelated warm loads on each receiver as well as to a single noise diode providing a correlated noise source to each receiver. A procedure for maintaining onboard calibration with an optimum running average using correlated bursts of thermal noise interleaved with scene data will be exercised during the maiden flight of the LRR-X instrument during the spring of 2003. The final component of calibration of a synthetic aperture radiometer is the image reconstruction algorithm that uses the measured correlations to produce the temperature brightness (TB) images. An overview of system-level testing, both on the ground and in-flight, will be presented to validate the absolute accuracy of the image reconstruction algorithm.

Principe, Caleb↗

Hardware

The full complement of EDOMP investigations called for a broad spectrum of flight hardware ranging from commercial items, modified for spaceflight, to custom designed hardware made to meet the unique requirements of testing in the space environment. In addition, baseline data collection before and after spaceflight required numerous items of ground-based hardware. Two basic categories of ground-based hardware were used in EDOMP testing before and after flight: (1) hardware used for medical baseline testing and analysis, and (2) flight-like hardware used both for astronaut training and medical testing. To ensure post-landing data collection, hardware was required at both the Kennedy Space Center (KSC) and the Dryden Flight Research Center (DFRC) landing sites. Items that were very large or sensitive to the rigors of shipping were housed permanently at the landing site test facilities. Therefore, multiple sets of hardware were required to adequately support the prime and backup landing sites plus the Johnson Space Center (JSC) laboratories. Development of flight hardware was a major element of the EDOMP. The challenges included obtaining or developing equipment that met the following criteria: (1) compact (small size and light weight), (2) battery-operated or requiring minimal spacecraft power, (3) sturdy enough to survive the rigors of spaceflight, (4) quiet enough to pass acoustics limitations, (5) shielded and filtered adequately to assure electromagnetic compatibility with spacecraft systems, (6) user-friendly in a microgravity environment, and (7) accurate and efficient operation to meet medical investigative requirements.

Source record↗

JSC Metal Finishing Waste Minimization Methods

THe paper discusses the following: Johnson Space Center (JSC) has achieved VPP Star status and is ISO 9001 compliant. The Structural Engineering Division in the Engineering Directorate is responsible for operating the metal finishing facility at JSC. The Engineering Directorate is responsible for $71.4 million of space flight hardware design, fabrication and testing. The JSC Metal Finishing Facility processes flight hardware to support the programs in particular schedule and mission critical flight hardware. The JSC Metal Finishing Facility is operated by Rothe Joint Venture. The Facility provides following processes: anodizing, alodining, passivation, and pickling. JSC Metal Finishing Facility completely rebuilt in 1998. Total cost of $366,000. All new tanks, electrical, plumbing, and ventilation installed. Designed to meet modern safety, environmental, and quality requirements. Designed to minimize contamination and provide the highest quality finishes.

Sullivan, Erica↗

Conceptual Design of the Space Station Fluids Module

The purpose of this paper is to describe the conceptual design of the Fluids Module for the International Space Station Alpha (ISSA). This module is part of the Space Station Fluids/Combustion Facility (SS FCF) under development at the NASA Lewis Research Center. The Fluids/Combustion Facility is one of several science facilities which are being developed to support microgravity science investigations in the US Laboratory Module of the ISSA. The SS FCF will support a multitude of fluids and combustion science investigations over the lifetime of the ISSA and return state-of-the-art science data in a timely and efficient manner to the scientific communities. This will be accomplished through modularization of hardware, with planned, periodic upgrades; modularization of like scientific investigations that make use of common facility functions; and use of orbital replacement units (ORU's) for incorporation of new technology and new functionality. Portions of the SS FCF are scheduled to become operational on-orbit in 1999. The Fluids Module is presently scheduled for launch to orbit and integration with the Fluids/Combustion Facility in 2001. The objectives of this paper are to describe the history of the Fluids Module concept, the types of fluids science investigations which will be accommodated by the module, the hardware design heritage, the hardware concept, and the hardware breadboarding efforts currently underway.

Rohn, Dennis W.↗