Search NASA⌕ Search

SEARCH · Search NASA

Results for “program managers”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 163 records · Page 9

The NASA Cryogenic Fluid Management Technology Program Plan

The status of the NASA Cryogenic Fluid Management Technology Program Plan is discussed along with specific needs for near future missions. Using the Space Exploration Initiative mission set, cost/benefit projections are then made for development of advanced cryogenic fluid management techniques. Space based and earth based test programs are discussed relative to the technology requirements for liquid storage, supply and transfer and for fluid transfer and advanced instrumentation.

Faddoul, James R.↗

PCMDI - An Earth System Model Evaluation Project Lawrence Livermore National Laboratory Annual Report

This annual report describes the activities of PCMDI – An Earth System Model Evaluation Project for the period November 1, 2019 – June 30, 2020. PCMDI is a project at Lawrence Livermore National Laboratory that is funded by the Climate and Environmental Sciences Division (CESD) of the Department of Energy. PCMDI is funded by two efforts within CESD: The Regional and Global Model Analysis program area (Dr. Renu Joseph, program manager) and the Atmospheric Systems Research program (Dr. Shaima Nasiri and Jeffrey Stehr, program managers). As instructed by Drs. Joseph, Nasiri, and Stehr, we provide an annual report addressing sections 4 (Progress and Plans) and 5 (Staffing and Budget Summary) of the SFA Program Management and Performance Reporting Criteria.

54 ENVIRONMENTAL SCIENCES↗

NASA Lewis Research Center low-gravity fluid management technology program

A history of the Lewis Research Center in space fluid management technology program is presented. Current programs which include numerical modeling of fluid systems, heat exchanger/radiator concept studies, and the design of the Cryogenic Fluid Management Facility are discussed. Recent analytical and experimental activities performed to support the Shuttle/Centaur development activity are highlighted.

Aydelott, J. C.↗

NASA Lewis Research Center low-gravity fluid management technology program

A history of the Lewis Research Center in space fluid management technology program is presented. Current programs which include numerical modeling of fluid systems, heat exchanger/radiator concept studies, and the design of the Cryogenic Fluid Management Facility are discussed. Recent analytical and experimental activities performed to support the Shuttle/Centaur development activity are highlighted.

Aydelott, J. C.↗

Income Verification Strategies for Income-Based Solar Programs

The Inflation Reduction Act has created substantial new programs that support adoption of solar power by low-income households, including the $7 billion Solar For All program and the Low-Income Communities Bonus Credit Program, which increases the investment tax credit for certain types of deployment. In addition, a growing number of states are using solar programs to reduce energy burdens and create energy justice opportunities for low-income households and disadvantaged communities. Verifying the income of participating customers is an important component of these programs. Program managers are seeking strategies to verify a large number of subscribing customers in an accurate, timely, and cost-efficient manner. To help inform program managers, Berkeley Lab investigated how a number of energy and non-energy programs manage income verification. The most common approach is to require proof through tax documents, pay stubs, or other formal income documentation, which can pose an impediment to enrolling eligible customers and create a paperwork burden for administrators. In order to reduce the burden for both the applicant and the program manager, some programs use alternative methods. We identify three common alternative verification methods: -Categorical eligibility: Customers enrolled in other, similar income-verified assistance programs are automatically eligible for enrollment in other income-qualified programs. -Geographic eligibility: Eligibility is based on the customer’s location within a specified area, typically a low-income or disadvantaged community or census tract, and; -“Self-attestation”: The participant claims eligibility with or without further documentation. We describe these options, their pros and cons, give examples of how they are used, and explore how some low-income programs address administrative issues, audits, or other quality control measures. Finally, we explore the risk of mistaken verifications (finding a participant eligible when they are not) in the different strategies. While this memo was initiated by a request relating to income-based community solar programs, the methods are applicable to any program with income eligibility requirements in the energy or non-energy sector. Funding was provided for this research by the Solar Energy Technologies Office of the US Department of Energy, through the National Community Solar Partnership.

14 SOLAR ENERGY↗

Innovation Flex Time

The authors examine the problem of how to provide a time code for staff to use in pursuit of innovation. Four potential options are explored ranging from not providing funds for this activity, to charging such efforts against existing or expanded program management and program development funds. One solution that provides funded time without raising laboratory overhead rates is identified and referred to as Innovation Flex Time. This would consist of capturing hours worked in excess of the standard work week but not charged to customers and making those hours available to fund time for exploring new ideas. A brief examination of labor relations laws, and laws regulating laboratory directed research and development suggests that Innovation Flex Time is a viable option for the laboratory. However, implementation of Innovation Flex Time would require NNSA approval and modification of the existing management and operations contract.

99 GENERAL AND MISCELLANEOUS↗

Space Station Freedom media handbook

This handbook explains in lay terms, the work that is going on at the NASA Centers and contractors' plants in designing and developing the Space Station Freedom. It discusses the roles, responsibilities, and tasks required to build the Space Station Freedom's elements, systems, and components. New, required ground facilities are described, organized by NASA Center in order to provide a local angle for the media. Included are information on the historical perspective, international aspects, the utilization of the Space Station Freedom, a look at future possibilities, a description of the program, its management, program phases and milestones, and considerable information on the role of various NASA Centers, contractors and international partners. A list of abbreviations, a four-page glossary, and a list of NASA contacts are contained in the appendices.

Source record↗

Charting Multidisciplinary Team External Dynamics Using a Systems Thinking Approach

Using the formalism provided by the Systems Thinking approach, the dynamics present when operating multidisciplinary teams are examined in the context of the NASA Langley Research and Technology Group, an R&D organization organized along functional lines. The paper focuses on external dynamics and examines how an organization creates and nurtures the teams and how it disseminates and retains the lessons and expertise created by the multidisciplinary activities. Key variables are selected and the causal relationships between the variables are identified. Five "stories" are told, each of which touches on a different aspect of the dynamics. The Systems Thinking Approach provides recommendations as to interventions that will facilitate the introduction of multidisciplinary teams and that therefore will increase the likelihood of performing successful multidisciplinary developments. These interventions can be carried out either by individual researchers, line management or program management.

Barthelemy, Jean-Francois↗

NASA management of the Space Shuttle Program

The management system and management technology described have been developed to meet stringent cost and schedule constraints of the Space Shuttle Program. Management of resources available to this program requires control and motivation of a large number of efficient creative personnel trained in various technical specialties. This must be done while keeping track of numerous parallel, yet interdependent activities involving different functions, organizations, and products all moving together in accordance with intricate plans for budgets, schedules, performance, and interaction. Some techniques developed to identify problems at an early stage and seek immediate solutions are examined.

Peters, F.↗

INTEGRATION OF DATA ANALYTICS WITH SYSTEM HEALTH PROGRAMS

Industry equipment reliability and asset management programs are essential elements that help ensure the safe and economical operation of nuclear power plants. The effectiveness of these programs is addressed in several industry developed and regulatory programs. However, these programs have proven to be labor intensive and expensive. There is an opportunity to significantly enhance the collection, analysis, and use of this information to provide more cost-effective plant operation. Additionally, there is an acute industry need to leverage advanced technology to reduce costs and improve operational effectiveness. The goal of this paper is to provide effective and efficient analytical methods and tools to support risk-informed decisions for the equipment reliability and asset management programs at nuclear power plants. This is accomplished by creating a direct bridge between component health/lifecycle data and decision making (e.g., maintenance scheduling and project prioritization). Here we are supporting typical system engineer decisions regarding maintenance activity scheduling and component ageing management. This is performed in a risk-informed context where herein the term “risk” is broadly constructed to include both plant reliability and economics. This framework combines data analytics tools to analyze equipment reliability data with risk-informed methods designed to support system engineer decisions (e.g., maintenance and replacement schedules, optimal maintenance posture) in a customizable workflow. A challenge is that the structure of this workflow strongly depends on the decision that needs to be made, the type of data available, and the constraints that need to be considered. Current methods are designed to provide specific answers to specific problems; however, these methods might prove to be inadequate even when problem settings slightly change (e.g., different types of requirements, additional dependencies between system reliability and economics). We tackled this challenge by designing framework in a flexible and modular fashion such that the user can assemble and customize his/her own workflow that integrates SSC economic lifecycle models (e.g., maintenance and replacement costs), system reliability models, and optimization methods.

97 - MATHEMATICS AND COMPUTING↗

Metaevaluation Final Report: Sandia National Laboratories Recorded Information Management Training Program Evaluation

For my internship project, I chose to evaluate the training program for the Sandia National Laboratories (SNL) Recorded Information Management (RIM) Program. The purpose of the evaluation was to identify: Where the current training meets federal and corporate requirements and if not, what gaps exist; If the training is accessible in a consistent location; If the training contains a consistent message about the responsibility of managing documents; If the training is organized by records management subject areas.

96 KNOWLEDGE MANAGEMENT AND PRESERVATION↗

The successful management of programs for human factors certification of advanced aviation technologies

In recent years there have been immense pressures to enact changes on the air traffic control organizations of most states. In addition, many of these states are or have been subject to great political, sociological and economic changes. Consequently, any new schemes must be considered within the context of national or even international changes. Europe has its own special problems, and many of these are particularly pertinent when considering human factors certification programs. Although these problems must also be considered in the wider context of change, it is usually very difficult to identify which forces are pressing in support of human factors aspects and which forces are resisting change. There are a large number of aspects which must be taken into account if human factors certification programs are to be successfully implemented. Certification programs would be new ventures, and like many new ventures it will be essential to ensure that managers have the skills, commitment and experience to manage the programs effectively. However, they must always be aware of the content and the degree of certainty to which the human factors principles can be applied - as Debons and Horne have carefully described. It will be essential to avoid the well known pitfalls which occur in the implementation of performance appraisal schemes. While most appraisal schemes are usually extremely well thought out, they often do not produce good results because they are not implemented properly and staff therefore do not have faith in them. If the manager does not have the commitment and interest in his/her staff as human beings, then the schemes will not be effective. Thus, one aspect of considering human factors certification schemes is within the context of a managed organization. This paper outlines some of the management factors which need to be considered for the air traffic control services. Many of the points received attention during the plenary sessions while others were covered by the working groups when the question arose of how various aspects of human factors certification programs would be managed. Management and organizational issues will certainly need to be included in any frame of reference by those who may be involved in developing certification programs.

Baldwin, Rod↗

STS-121/Discovery: Launch Readiness Press Conference

Participants in the briefing included: Bruce Buckingham (NASA Public Affairs), John Shannon (Chairman, Mission Management Team), Mike Suffredini (ISS Program Manager), Mike Leinbach (Shuttle Launch Director), Alan Thirkettle (ISS Program Manager, ESA) and 1st Lt. Kaleb Nordgen (USAF 45th Weather Squadron). There are no constraints to launch except for questionable weather. The crew is ready to go. PROGRESS has provided logistics and is ready to be installed. No cryogenics have been loaded because of a Phase 1 lightning advisory. The shuttle crew is in good shape, just waiting for the weather to clear. ISS is making preparations for the Columbus Mission and future plans are to increase the crew from 3 to 6 people. The floor was opened to questions from the press.

Source record↗

Best Practices for Fatigue Risk Management in Non-Traditional Shiftwork

Fatigue risk management programs provide effective tools to mitigate fatigue among shift workers. Although such programs are effective for typical shiftwork scenarios, where individuals of equal skill level can be divided into shifts to cover 24 hour operations, traditional programs are not sufficient for managing sleep loss among individuals with unique skill sets, in occupations where non-traditional schedules are required. Such operations are prevalent at NASA and in other high stress occupations, including among airline pilots, military personnel, and expeditioners. These types of operations require fatigue risk management programs tailored to the specific requirements of the mission. Without appropriately tailored fatigue risk management, such operations can lead to an elevated risk of operational failure, disintegration of teamwork, and increased risk of accidents and incidents. In order to design schedules for such operations, schedule planners must evaluate the impact of a given operation on circadian misalignment, acute sleep loss, chronic sleep loss and sleep inertia. In addition, individual-level factors such as morningness-eveningness preference and sleep disorders should be considered. After the impact of each of these factors has been identified, scheduling teams can design schedules that meet operational requirements, while also minimizing fatigue.

research↗

Detailed requirements document for common software of shuttle program information management system

Common software was investigated as a method for minimizing development and maintenance cost of the shuttle program information management system (SPIMS) applications while reducing the time-frame of their development. Those requirements satisfying these criteria are presented along with the stand-alone modules which may be used directly by applications. The SPIMS applications operating on the CYBER 74 computer, are specialized information management systems which use System 2000 as a data base manager. Common software provides the features to support user interactions on a CRT terminal using form input and command response capabilities. These features are available as subroutines to the applications.

Everette, J. M.↗

STS-114: Discovery Day 6 Post MMT Meeting

Wayne Hale, Space Shuttle Deputy Program Manager and Steve Poulos, Orbiter Program Manager, discuss the damage assessment from the tiles that came off the Space Shuttle Discovery during launch. Poulos presents charts and discusses in detail the following topics: 1) Composite Tile Damage/Gap Filler Sites Evaluation; 2) Protruding Ceramic Shim Aft of the Nose Landing Gear Door (NLGD); 3) Protruding Chine Gap Filler; 4) RH NLGD Tile Damage; 5) RH NLGD Damage Analysis; 6) Left Wing Tile Damage; 7) Comparison of Ground Test Results vs. FD5 Focused Inspection; 8) Current Status: Focused Inspection 721L07-01 ITVC FD5 Image of Panel 7L Apex 9) Current Status: Focused Inspection Lower Panel 7L721L07-02; 10) Current Status Focused Inspection 721L10-02 Lower Panel 10L Close-up view; and 11) Window 1 Blanket. The presentation ends with a question and answer period from the news media.

Source record↗

Working at the Ohio Aerospace Institute

The Ohio Aerospace Institute is a wonderful place to work. I enjoy coming to work everyday knowing that I will be surrounded by smiling faces. My mentor, Mary Auzenne, is the Program Manager of the LERCIP College Internship Program, however, I spend most of my time working with Akua Soadwa, the Assistant Program Manager. She is in charge of planning, coordinating, and managing every event that is involved with the college internship program such as the socials, picnic, banquet, workshops, and research symposium. My job is to make her job easier. I help out with the planning, coordinating, and managing of these events. When I first got on board Akua was in the process of planning the second social for the interns. The social is a way for the interns to interact with one another as well as to find out more about where the other interns are working at NASA. We ordered the food, went shopping, and set up the Guerin House for the party. I made sign-in sheets, which helped us get a rough count of the attendees. The next event was the Technical Presentation Workshop and the Professional Development Workshop. These workshops are designed to enhance skills of the interns. We were there to sign people in and direct them to the room where the presentation was to take place. I also took pictures of the workshop and provided copies for the presenters, as well as our files.

Szabo, Hortenzia↗