Search NASA⌕ Search

SEARCH · Search NASA

Results for “resource planning optimization”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 163 records · Page 9

SPASIM: A Spacecraft Simulator

The SPAcecraft SIMulator (SPASIM) simulates the functions and resources of a spacecraft to quickly perform conceptual design (Phase A) trade-off and sensitivity analyses and uncover any operational bottlenecks during any part of the mission. Failure modes and operational contingencies can be evaluated allowing operational planning (what-if scenarios) and optimization for a range of mission scenarios. The payloads and subsystems are simulated, using a hierarchy of graphical models, in terms of how their functions affect resources such as propellant, power, and data. Any of the inputs and outputs of the payloads and subsystems can be plotted during the simulation or stored in a file so they can be used by other programs. Most trade-off analyses, including those that compare current versus advanced technology, can be performed by changing values in the parameter menus. However, when a component is replaced by one with a different functional architecture, its graphical model can also be modified or replaced by drawing from a component library. SPASIM has been validated using several spacecraft designs that were at least at the Critical Design Review level. The user and programmer guide, including figures, is available on line as a hypertext document. This is an easy-to-use and expandable tool which is based on MATLAB(R) and SIMULINK(R). It runs on Silicon Graphics Inc. workstations and personal computers with Windows 95(TM) or NT(TM).

Liceaga, Carlos A.↗

REopt: Energy Decision Analysis

REopt transforms complex energy project decisions into actionable results for building owners, utilities, and industry. Based on decades of NREL decision-support expertise, REopt guides investment in economic, resilient energy technologies. This presentation provides an overview of how REopt can help building owners, utilities, developers, and industry optimize the economic and resilience benefits of distributed energy resources.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Community Microgrid Planning Considering Building Thermal Dynamics

In this paper, the building thermal dynamic characteristics are introduced in the community microgrid (MG) planning model. The proposed planning model is formulated as a mixed integer linear programming (MILP) which seeks to determine the optimal deployment strategy for various distributed energy resources (DER). The objective is to minimize the annualized cost of community MG, including investment cost in DER, operation cost for dispatchable fuel-generators (DFG), energy storage system (ESS) degradation cost, energy purchasing and peak demand charge at PCC, customer discomfort cost due to the room temperature deviation and load curtailment cost. Given the slow thermal dynamic characteristics of buildings, the heating, ventilation and air-conditioning (HVAC) system in the proposed model is treated as a demand side management (DSM) component, whose dispatch commands are provided by the central MG controller. Numerical results based on a community MG comprising of 20 residential buildings demonstrate the effectiveness of the proposed planning model and the benefits of introducing the building thermal dynamic model.

Zhang, Xiaohu↗

Achieving groundwater monitoring optimization at SRS: a core team process based on rigorous technical assessment - 15273

The optimization of groundwater monitoring at Savannah River Site (SRS) was achieved through a core team process based on the application of a comprehensive, technical evaluation of individual regulated groundwater units. Groundwater monitoring at SRS is required at dozens of waste sites and includes about 4,000 samples annually. The expected longevity of groundwater contamination and associated groundwater monitoring and reporting constitutes a significant long-term cost to the environmental management budget. The core team, consisting of representatives from the Department of Energy (DOE); U.S. Environmental Protection Agency (USEPA); and the South Carolina Department of Health and Environmental Control (SCDHEC), recognized that monitoring needs for individual plumes evolve as remediation work progresses. The technical evaluation plan was generally based on the availability of many years of monitoring data. In addition, it was recognized that the well network, sampling frequency, and analytical suite had been the same for years and warranted evaluation to determine if the existing monitoring was meeting the current objectives. In order to systematically evaluate monitoring at eighteen different groundwater units, SRS developed a decision-logic analysis using flow sheets to address five areas of optimization identified with core team agreement, including: (1) current monitoring vs regulatory requirements, (2) spatial optimization, (3) temporal assessment, (4) analyte assessment, and (5) reporting assessment. The evaluation resulted in SRS proposing changes in the spatial, temporal, analyte, and reporting aspects of groundwater monitoring for fifteen of the eighteen individual groundwater units evaluated. Overall, these changes have resulted in annual savings of $370 K to date, with an additional $200 K in annual savings pending. Early and frequent core team deliberations helped ensure the success of this optimization effort. The technical evaluation was conducted after receiving core team buy-in for the goals and methods of the project. Technical evaluations for each unit were proposed to the regulators in unit-specific regulatory submittals. The technical justifications and core team decisions were all documented and implemented in accordance within the framework of the SRS Federal Facility Agreement or Resource Conservation and Recovery Act (RCRA) Permit process. This optimization approach can be expected to be highly successful for sites with rich historical data sets and where the requirements in regulatory monitoring plans can be negotiated. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Analysis and Optimization of Test Plans for Advanced Exploration Systems Reliability and Supportability

Future crewed exploration missions beyond Low Earth Orbit (LEO) will operate farther from Earth and be logistically isolated for longer than any previous human spaceflight mission. Under these conditions, supportability and reliability willbestronger drivers of mission mass and risk than they have been in the past. Items with high failure rates, or uncertain failure rates, can result in high spares mass requirements and/or high risk on deep space missions. Testing is a critical element of system development which provides the opportunity to identify and resolve design issues, defects, or other failure modes before they cause problems during a mission. Reliability growth programs can reduce failure rates by identifying and remove failure modes via design changes, and long-duration life testing can provide valuable data to reduce failure rate estimate uncertainty and verify (to some level of confidence) that components are as reliable as expected. Testing activities take time and resources, however, and must be incorporated into program plans in order to be fully effective. This paper presents an integrated reliability test plan analysis and optimization methodology, which has been used to inform Advanced Exploration Systems (AES) Life Support Systems (LSS) ground test planning for future missions. The methodology determines the optimal number of test units to purchase and allocation of test time –split between reliability growth and uncertainty reduction testing –across a given set of items in order to minimize spares mass for a given mission under constraints on total test cost and schedule. Model outputs also include expected spares mass after testing and the expected number of modifications or refurbishments during testing, both of which can inform program planning. Discussion of the model, conclusions, and future work are also presented.

Testing↗

Analysis and Optimization of Test Plans for Advanced Exploration Systems Reliability and Supportability

Future crewed exploration missions beyond Low Earth Orbit (LEO) will operate farther from Earth and be logistically isolated for longer than any previous human spaceflight mission. Under these conditions, supportability and reliability willbestronger drivers of mission mass and risk than they have been in the past. Items with high failure rates, or uncertain failure rates, can result in high spares mass requirements and/or high risk on deep space missions. Testing is a critical element of system development which provides the opportunity to identify and resolve design issues, defects, or other failure modes before they cause problems during a mission. Reliability growth programs can reduce failure rates by identifying and remove failure modes via design changes, and long-duration life testing can provide valuable data to reduce failure rate estimate uncertainty and verify (to some level of confidence) that components are as reliable as expected. Testing activities take time and resources, however, and must be incorporated into program plans in order to be fully effective. This paper presents an integrated reliability test plan analysis and optimization methodology, which has been used to inform Advanced Exploration Systems (AES) Life Support Systems (LSS) ground test planning for future missions. The methodology determines the optimal number of test units to purchase and allocation of test time –split between reliability growth and uncertainty reduction testing –across a given set of items in order to minimize spares mass for a given mission under constraints on total test cost and schedule. Model outputs also include expected spares mass after testing and the expected number of modifications or refurbishments during testing, both of which can inform program planning. Discussion of the model, conclusions, and future work are also presented.

Testing↗

Distribution Substation Planning Toolkit (dsp-toolkit) v1.0

The Distribution Substation Planning Toolkit (DSP Toolkit) is a software suite designed to streamline the planning and optimization of distribution substations. This toolkit offers a comprehensive set of tools and APIs for data curation, short-term electric load forecasting, and weather-sensitive load adjustment, making it an essential resource for utility companies, engineers, and researchers. Features • Data Preprocessing and Curation: Efficiently manage and preprocess large datasets to ensure high-quality input for analysis. • Short-Term Load Forecasting: Utilize data-driven models to predict short-term electric loads accurately. • Weather-Sensitive Modeling: Automatically adjust load forecasts based on weather data to predict future peak demands more precisely. Uses The DSP Toolkit is ideal for planning and optimizing distribution substations, providing a user-friendly interface and comprehensive documentation. It is suitable for both novice and experienced users, facilitating efficient and accurate planning processes. Advantages • Efficiency: Automates complex planning tasks, reducing manual effort and minimizing errors. • Scalability: Handles large datasets and complex models, making it suitable for large-scale projects. • Community and Support: Open-source with active community contributions, ensuring continuous improvement and support. • Extensibility: Easily extendable with custom modules and plugins, allowing users to tailor the toolkit to their specific needs. The DSP Toolkit stands out by offering a robust, flexible, and user-friendly solution for distribution substation planning. Public Abstract

Li, Han [Lawrence Berkeley National Laboratory (LB↗

Integrated Modeling Approach for Optimal Management of Water, Energy and Food Security Nexus

We report that water, energy and food (WEF) are inextricably interrelated. Effective planning and management of limited WEF resources to meet current and future socioeconomic demands for sustainable development is challenging. WEF production/delivery may also produce environmental impacts; as a result, green-house-gas emission control will impact WEF nexus management as well. Nexus management for WEF security necessitates integrated tools for predictive analysis that are capable of identifying the tradeoffs among various sectors, generating cost-effective planning and management strategies and policies. To address these needs, we have developed an integrated model analysis framework and tool called WEFO. WEFO provides a multi-period socioeconomic model for predicting how to satisfy WEF demands based on model inputs representing productions costs, socioeconomic demands, and environmental controls. WEFO is applied to quantitatively analyze the interrelationships and trade-offs among system components including energy supply, electricity generation, water supply-demand, food production as well as mitigation of environmental impacts. WEFO is demonstrated to solve a hypothetical nexus management problem consistent with real-world management scenarios. Model parameters are analyzed using global sensitivity analysis and their effects on total system cost are quantified. Lastly, the obtained results demonstrate how these types of analyses can be helpful for decision-makers and stakeholders to make cost-effective decisions for optimal WEF management.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

The Frontiers of Nuclear Science: A Long-Range Plan

In a letter dated July 17, 2006, the Department of Energy’s (DOE) Office of Science for Nuclear Physics and the National Science Foundation’s (NSF) Mathematical and Physical Sciences Directorate charged the Nuclear Science Advisory Committee (NSAC) to “conduct a study of the opportunities and priorities for U.S. nuclear physics research and recommend a long range plan that will provide a framework for coordinated advancement of the nation’s nuclear science research programs over the next decade.” This request set in motion a bottom-up review and forward look by the nuclear science community. With input from this community-wide process, a 59 member working group, which included the present NSAC members, gathered at the beginning of May, 2007, to develop guidance on how to optimize the future research directions for the field based on the projected resources outlined in the charge letter from DOE and NSF. A new long range plan—The Frontiers of Nuclear Science—grew out of this meeting. For the last decade, the top priority for nuclear science has been to utilize the flagship facilities that were built with investments by the nation in the 1980s and 1990s. Research with these facilities has led to many significant new discoveries that have changed our understanding of the world in which we live. But new discoveries demand new facilities, and the successes cannot continue indefinitely without new investment.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

REopt: Energy Decision Analysis [Slides]

REopt transforms complex energy project decisions into actionable results for building owners, utilities, and industry. Based on decades of NREL decision-support expertise, REopt guides investment in economic, resilient energy technologies. This presentation provides an overview of how REopt can help building owners, utilities, developers, and industry optimize the economic and resilience benefits of distributed energy resources.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

HURON (HUman and Robotic Optimization Network) Multi-Agent Temporal Activity Planner/Scheduler

HURON solves the problem of how to optimize a plan and schedule for assigning multiple agents to a temporal sequence of actions (e.g., science tasks). Developed as a generic planning and scheduling tool, HURON has been used to optimize space mission surface operations. The tool has also been used to analyze lunar architectures for a variety of surface operational scenarios in order to maximize return on investment and productivity. These scenarios include numerous science activities performed by a diverse set of agents: humans, teleoperated rovers, and autonomous rovers. Once given a set of agents, activities, resources, resource constraints, temporal constraints, and de pendencies, HURON computes an optimal schedule that meets a specified goal (e.g., maximum productivity or minimum time), subject to the constraints. HURON performs planning and scheduling optimization as a graph search in state-space with forward progression. Each node in the graph contains a state instance. Starting with the initial node, a graph is automatically constructed with new successive nodes of each new state to explore. The optimization uses a set of pre-conditions and post-conditions to create the children states. The Python language was adopted to not only enable more agile development, but to also allow the domain experts to easily define their optimization models. A graphical user interface was also developed to facilitate real-time search information feedback and interaction by the operator in the search optimization process. The HURON package has many potential uses in the fields of Operations Research and Management Science where this technology applies to many commercial domains requiring optimization to reduce costs. For example, optimizing a fleet of transportation truck routes, aircraft flight scheduling, and other route-planning scenarios involving multiple agent task optimization would all benefit by using HURON.

Hua, Hook↗

Optimal CO 2 storage management considering safety constraints in multi-stakeholder multi-site GCS projects: A Markov game perspective

Geological carbon storage (GCS) projects could involve a diverse array of stakeholders or players from public, private, and regulatory sectors, each with different objectives and responsibilities. Given the complexity, scale, and long-term nature of GCS operations, determining whether individual stakeholders can independently optimize their interests — or whether collaborative coalition agreements are needed — remains a central question for effective GCS project planning and management. To access large, high-quality storage resources, future GCS deployment may increasingly occur in geologically connected sites, where shared geological features such as pressure space and reservoir pore capacity can lead to competitive behavior among stakeholders. In this work, we propose a paradigm based on Markov games to quantitatively investigate how different coalition structures affect the goals of stakeholders. We frame this multi-stakeholder multi-site problem as a multi-agent reinforcement learning problem with safety constraints. Our approach enables agents to learn optimal strategies while complying with safety regulations. We present an example where multiple operators are injecting CO 2 into their respective project areas in a geologically connected basin. To address the high computational cost of repeated simulations of high fidelity models, a previously developed surrogate model based on the Embed-to-Control (E2C) framework is employed. Our results demonstrate the effectiveness of the proposed framework in addressing optimal management of CO 2 storage when multiple stakeholders with different objectives and goals are involved.

58 GEOSCIENCES↗

Assessing the Reliability Benefits of Energy Storage as a Transmission Asset

Utilizing energy storage solutions to reduce the need for traditional transmission investments has been recognized by system planners and supported by federal policies in recent years. This work demonstrates the need for detailed reliability assessment for quantitative comparison of the reliability benefits of energy storage and traditional transmission investments. First, a mixed-integer linear programming expansion planning model considering candidate transmission lines and storage technologies is solved to find the least-cost investment decisions. Next, operations under the resulting system configuration are simulated in a probabilistic reliability assessment which accounts for weather-dependent forced outages. The outcome of this work, when applied to TPPs, is to further equalize the consideration of energy storage compared to traditional transmission assets by capturing the value of storage for system reliability.

co-optimization↗

A Hierarchical Optimization Method for Electric Vertical Takeoff and Landing Aircraft Network Design

Electric vertical takeoff and landing aircraft (eVTOLs) are expected to serve urban air mobility in a station-to-station configuration, which makes the optimal network design of eVTOL stations a critical question to explore. Existing approaches often face limitations, such as the inability to interact station locations with demand or difficulty in finding the optimal solution for large study regions. Here, this paper first proposes a mathematical model to generate optimal eVTOL station locations while considering associated potential eVTOL demand, and then proposes a heuristic algorithm, Hierarchical Optimization MEthod (HOME), to efficiently solve the model. With a case study of Southern California, HOME was compared to 1) directly solving the original integer linear programming-based network design problem, and 2) employing the widely used genetic algorithm. Results suggest that HOME can find optimal solutions with limited computational resources. The proposed framework powered by HOME provides a computationally efficient way to support urban air mobility planning.

97 MATHEMATICS AND COMPUTING↗

Duke Energy Photovoltaic Integration Study: Carolinas Service Areas

Solar energy collected using photovoltaic (PV) technology is a clean and renewable energy source that offers multiple benefits to the electric utility industry and its customers, such as cost predictability, reduced emissions, and loss reduction by distributed installations. Renewable energy goals established in North Carolina Senate Bill 3 (SB3), in combination with the state tax credit and decreases in the cost of energy from PV panels, have resulted in rapid solar power penetration within the Carolinas services areas of Duke Energy. Continued decreases in PV prices are expected to lead to greater PV penetration rates than currently required in SB3. Despite the potential benefits, significant penetration of PV energy is of concern to the utility industry because of its impact on operating reliability and integration cost to customers, and equally important, how any additional costs may be allocated to different customer groups. Some of these impacts might become limiting factors for PV energy, especially growing distributed generation installed at customer sites. Recognizing the importance of renewable energy developments for a sustainable energy future and economic growth, Duke Energy has commissioned this study to simulate the effects of high-PV penetration rates and to initiate the process of quantifying the impacts. The objective of the study is to inform resource plans, guide operation improvements, and drive infrastructure investments for a steady and smooth transition to a new energy mix that provides optimal values to customers. The study team consists of experts from Pacific Northwest National Laboratory (PNNL), Power Costs, Inc. (PCI), Clean Power Research (CPR), Alstom Grid, and Duke Energy. PNNL, PCI, and CPR performed the study on generation impacts; Duke Energy modeled the transmission cases; and distribution simulations were conducted by Alstom Grid. PNNL analyzed the results from each work stream and produced the report.

14 SOLAR ENERGY↗

Recent results in Mars Relay Network planning and scheduing

At different time periods in the future, Mars missions will overlap and previous studies indicate that during such periods existing deep space communication infrastructure will not be able to handle all Mars communication needs. A plausible solution is to perform optimal resource allocation for the Mars relay communication network; a network consisting of multiple surface units and orbiters on Mars and the Deep Space Stations. Unlike direct-to-earth, a relay communication, either in real-time or store-and-forward, can increase network science data return, reduce surface unit's direct-to-earth communication demands, and enable communication even when the surface unit is not facing Earth. It is the objective of this paper to take advantage of the relay operation to efficiently plan and schedule the network communications.

Relay Network planning and scheduling constrained ↗

GeoRePORT Protocol Volume I: Background Document

The U.S. Department of Energy’s (DOE’s) Geothermal Technologies Office (GTO) uses various metrics to track and measure impacts of its funding meant to catalyze innovation and private investment. As an example, one GTO goal is to “accelerate development of…undiscovered hydrothermal resources” (Williams et al. 2008a). For goals to be useful, however, it is important to be able to develop and measure baseline values, as well as incremental improvements, both at the individual project and aggregated portfolio levels. This need was the driving force behind the development of the Geothermal Resource Portfolio Optimization and Reporting Technique (GeoRePORT).

15 GEOTHERMAL ENERGY↗