Knowledge Guide : Environmental In-Situ Gamma Spectroscopy Overview for RAP Team Scientists, Revision 00
Explore the source record for details and available documents.
SEARCH · Search NASA
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
The Full-scale Emplacement (FE) heater experiment at the Mont Terri Underground Rock Laboratory (URL) was designed and conducted by Nagra to replicate an emplacement tunnel of Nagra’s reference repository design at 1:1 scale. Alongside testing the technical feasibility of constructing disposal tunnels, emplacing waste containers in the tunnels and then backfilling them, the main goals of the FE experiment are (1) to obtain a better understanding of the coupled effects of induced thermo-hydro-mechanical (THM) processes that may occur and (2) to validate existing coupled THM models (Müller et al., 2017). A key aspect of ensuring safety for repositories located in low-permeability rock involves minimizing any damage to the rock itself, thereby preserving its integrity and promoting a stable environment Amongst a number of processes that could damage the rock is the increase in pore pressure due to thermal loading caused by heat emitted from the waste. To reduce the potential damage of the rock, it is important to analyse the evolution of heat over time due to the heat load of the containers and assess possible consequences by coupled THM models. The aim of Task C of DECOVALEX-2023 was to build 3D numerical models of the FE experiment, focussing in particular on the heating induced pore pressure change in the Opalinus Clay. Data from a large number of sensors were available from the FE experiment for model comparison. These sensors measured temperature and relative humidity in the bentonite around the heaters, and temperature, pressure and displacement/strain in the surrounding Opalinus clay. Data were available from the start of excavation (April 2012) up to August 2020 for most sensors (more than 5 years from the start of heating in December 2014). To fulfil the overall aim of the task, the work was broken down into a number of steps, starting with simpler models to build confidence in each team’s approach and then moving to more complex models that better represent the FE experiment. Step 0 consisted of 2D benchmark models, gradually increasing the number of processes that are represented from thermal (T) only models in Step 0a, to coupled thermal hydraulic (TH) models in Step 0b with a representation of changing porosity, to coupled thermo-hydro-mechanical (THM) models in Step 0c, where porosity changes are calculated by the mechanical model. A detailed specification of processes, parameters, initial and boundary conditions was provided for this step, with the ambition that all teams would work towards close agreement in their model results, thus building confidence in the model implementations. vi It was not straightforward to achieve agreement between the teams, so additional steps (Step 0b2, 0b3, 0c2, 0c3) were added along with derivation of some analytical solutions against which the models could be compared. The reasons for the differences between teams were investigated and found to be caused primarily by different conceptual model assumptions (including temperature dependence of the thermal expansion of water), different model formulations (including porosity evolution) and differences in modelled domain sizes, boundary conditions and grid discretisation. This demonstrates that comparisons between multiple modelling teams and/or comparison with analytical results and experimental data are highly beneficial in providing an indication of uncertainty in model predictions. At the conclusion of Step 0, almost all teams had achieved a close agreement in model results and those that had not achieved an agreement knew the reason for this. Step 1 moved from 2D models to 3D models of the FE experiment without adding technical features like shotcrete or EDZ, and only considering the heating phase. Initially the 3D model was tightly specified to continue to build confidence in the model implementations (Step 1a). The results of Step 1a were compared to the data from the FE-experiment without the teams seeing the data. The teams were then provided with a sub-set of the data from the FE-experiment and invited to consider how best to use the large dataset for model comparison (Step 1b). Teams were then asked to use the data provided to calibrate their models, only changing material property values rather than adding features or processes to their models (Step 1c). In Step 1, teams were asked to only model the heating phase of the experiment, so pressure in the Opalinus Clay was reported as change in pressure since the initial conditions were specified rather than modelled. The change from 2D to 3D models was accompanied by an increase in the dispersion of results between the teams. Some of this was resolved during the task, but some remained and is potentially due to model discretisation. Calibration of parameters was useful in improving the fit of the models to the data but the remaining differences indicated that the models were missing features or processes. In Step 2, the teams were asked to update their models with additional features and processes as well as calibrating parameters to try and improve the fit of the models to the data. Teams were encouraged to represent ventilation of the open FE tunnel prior to backfilling with heaters and bentonite and in Step 2, the absolute pressure in the Opalinus Clay was compared between the teams. Teams took different approaches, but there was consideration of adding shotcrete and an EDZ into the model, representing stress change during excavation and different approaches to modelling ventilation of the FE tunnel. Overall, the documented results showed a very good agreement for temperature. The results for porewater pressure evolution showed a significant improvement for most teams compared to Step 1c with a good agreement to the measurements for several teams whereas some teams overpredicted the pressure increase and others overpredicted the drainage effect especially for the sensors close to the heater. Step 3 was an opportunity for teams to use the models developed in Step 1 and Step 2 to make predictions about the temperature and pressure changes that will be expected at the FE experiment over the next few years in light of the planned changes in thermal output of the heaters.
RTX Technology Research Center (RTRC), together with Collins Aerospace (Collins) and Oak Ridge National Laboratory (ORNL) has developed an Artificial Intelligence (AI) / Machine Learning (ML) guided solution to advance the manufacturing and assembly of high performance and lightweight thermoplastic composite (TPC) aerospace products. The solution aims to lower risk, cost and lead time for induction heating based welding and consolidation processes for TPC structure. The cost and lead time of part and material specific process development for induction welding (IW) and induction consolidation will be reduced by replacing traditional empirical methods with optimization methods that merge AI/ML and physics-based process simulations and process experiments with sensing and controls. TPC-IW process development is empirical in nature, and uncertainties in material & process behavior exist near & far from the induction coil. Physics-based simulations can be leveraged directly for process optimization but can be too computationally expensive to run in high fidelity and real time to do robust process optimization. The key impact of successful TPC induction consolidation and welding is cost & lead time reduction for part & material specific consolidation and welding recipes. This is an enabler for more rapid deployment of TPC structures via joining assembly, which can reduce energy & cost intensive usage of autoclaves & ovens. The solution aimed to advance the U.S. Department of Energy’s interests in using thermoplastics and automation in composite manufacturing for improvement of products for existing markets via increased production speeds, reduced costs, and lowered use of energy. Welded TPC structures can offer significant weight & energy savings for high-value commercial aerospace & industrial applications compared to metal & thermoset composite structures assembled by mechanical fastening and/or adhesive bonding. The project was organized into two Budget Periods. Budget Period 1 (BP1) was 15 months and its goal was to perform ML process optimization framework development & deployment on lab-coupon aerostructure components. A Go/No-Go Review was performed at the end of BP1 to verify fulfilment of key tasks & milestones to justify a Go Decision to move into the next Budget Period. Budget Period 2 (BP2) was 12 months and its goal was the deployment of the ML framework for ML process optimization of pilot industrial scale aerostructure components. The overall project aim was to develop & demonstrate ML-enhanced modeling framework that learns process-property mapping from multiple data sources at different fidelities. During BP1, the team accomplished key tasks & milestones to demonstrate the concept of multi-source ML for TPC aerostructure consolidation and assembly. First, the team completed documentation of induction based TPC heating requirements including baseline metrics to compare measured results against. Next the team completed demonstration of data generation from physics-based simulations for ML surrogate model generation and demonstrated the integration of physics-based simulation data into multi-source AI/ML algorithms. In parallel, the team established the lab-coupon scale induction welding system and completed a process to label and reduce generated data from physics-based simulation and experiments for ML surrogate models to enable multi-source ML model training & testing. To complete BP1, the team integrated physics-based simulation data and experimental data into multi-source ML algorithms. This was based on the team completing ML deployment of the induction welding on a lab system at RTRC and AI/ML deployment on existing induction welding line at Collins. ORNL visited both Collins and RTRC sites to witness the TPC induction welding process. Then, ORNL designed and constructed a new version of their vision-based sensing system better adapted to acquire process signals of the TPC induction welding process for process anomaly and defect detection. In BP2, the team accomplished key tasks & milestones to scale up multi-source ML for TPC aerostructure consolidation and assembly from the lab-coupon scale to the pilot-industrial scale. In BP2, the team demonstrated real time anomaly & defect detection via experiments performed by ORNL & RTRC. The team completed ML-optimization heating trials for TPC induction consolidation at Collins, and the team confirmed pilot industrial scale experimental data from Collins was compatible with the developed ML pipeline from RTRC. The team completed sub-element scale ML process optimization demonstration at RTRC, where the team leveraged RTRC’s robotic TPC welding setup to de-risk the ML process optimization by performing ML analysis of recorded temperatures to account for complex part features. Then, the team applied its ML-derived control strategies and ML process optimization framework at Collins to the pilot-industrial scale on a demo skin-stiffener part representative of a nacelle aerostructure fan cowl section. The key innovation is the AI/ML framework enabling effective process development of high performance, lightweight, energy efficient TPCs for composite aircraft structures.
Most of Hawai'i's geothermal resources are blind—their manifestations, such as hot springs and steam vents, do not appear on the ground surface because the heated water flows far below. With the exception of $K\bar{i}lauea East Rift Zone$, in most areas of Hawai'i, high lateral permeability in the first kilometer below ground surface prevents surface thermal features from developing. As a methodology for discovering these blind resources, Play Fairway Analysis (PFA) involves finding potential locations of blind hydrothermal systems and describing potential geothermal sources in rift-zone settings. Using the PFA to find Hawai'i's geothermal resources, the University of Hawai'i (UH) conducted the Hawai‘i Play Fairway Project, Hawai'i's first statewide geothermal resource assessment since 1985. Sponsored by the U.S. Department of Energy, the Hawai'i Play Fairway Project provided an updated resource assessment, a roadmap for additional exploration activities, and the identification of areas for further exploration. Benefitting from UH's core competency in earth sciences and experienced geothermal researchers, the project comprised three phases. During the first phase, the team identified, compiled, and ranked existing geologic, groundwater, and geophysical datasets relevant to subsurface heat, fluid and permeability. Using a Bayesian statistical approach, the team developed a statistical methodology to integrate these data into a resource probability map. The team evaluated the confidence in the probability value and considered development viability of areas with geothermal resources. With these analyses, the team identified 10 locations in the Hawaiian Islands for exploration activities. For the second phase, the team collected new groundwater data in 10 locations across the state and new geophysical data on $L\bar{a}na‘i, Maui$, and central Hawai'i Island and modeled topographically induced stress to better characterize subsurface permeability. Analyzing the subsurface stresses, the team evaluated the potential for fracture-induced permeability. The team inverted the MT and gravity data to produce 3D models of resistivity and density, respectively, on $L\bar{a}na‘i$, across $Haleakal\bar{a}'s$ SW rift (Maui), and surrounding Mauna Kea (Hawai‘i Island). The team developed and applied a new method for incorporating depth information about resistivity, density, and potential for fracture-induced permeability into the statistical method for computing resource probability in these three focus areas. The team incorporated the new groundwater results with the new geophysical results and the calculations of potential for fracture-induced permeability to produce updated maps of resource probability and confidence. Through combining data from the first and second phases, the team determined locations for further exploration during the third phase. For MT and gravity surveys, the team recommended $Kaua'i's$ $L\bar{i}hu'e$ $Basin$, the east rift of $Maui's$ $Haleakal\bar{a}$ volcano, and the southwest rift of Hawai'i Island's Mauna Loa volcano. The MT and gravity surveys aimed to enable improved confidence in the resource potential in these locations. For drilling deep groundwater well(s), the team recommended Southeast Mauna Kea and $L\bar{a}na's$ $P\bar{a}l\bar{a}wai$ $Basin$. During the third phase, further exploration involved drilling a groundwater well in $L\bar{a}na's$ $P\bar{a}l\bar{a}wai$ $Basin$ and performing more geophysical surveys. We deepened an existing water well proximal to our target area on $L\bar{a}na'i$ due to funding constraints that precluded us from spudding a new well that would exceed 1km depth. Drilling was preceded by a number of substantial elements including: writing an Environmental Assessment and the subsequent legal process, performance of deviation logging, lowering a camera down the well, coordinating site preparation with $P\bar{u}lama$ $L\bar{a}na'i$, shipping the UH-owned rig interisland, procuring supplies, and leading 3 community meetings on $L\bar{a}na'i$. Drilling occurred 24/7 the entire month of June 2019 over which time $L\bar{a}na'i$ $Well$ 10 was deepened from 427 m to 1057 m, with continuous core collected. We measured a roughly linear temperature gradient averaging 42°C/km and a maximum bottom hole temperature of 66°C. This gradient is more than twice the background for Hawai'i and within a range of gradients measured in this depth range for some exploration wells within KERZ. We consider these results encouraging for $L\bar{a}na'i's$ resource potential and recommend following with a slim hole within $L\bar{a}na'i's$ caldera (our target zone) to ~ 2 km. Further, the positive implications such results have for the island of O‘ahu are substantial - the shield stage of O'ahu's volcanoes ended 1-2 My earlier. However, O'ahu uses more electricity than the rest of the islands combined, and the utility recently called for 500-700MW of firm, dispatchable renewable electricity on O'ahu by 2033. In Phase 3, we also collected limited new encouraging groundwater data, and updated our thoughts on the probabilities of fluid and permeability at resource depths (Pr F = 1; Pr P = mostly unconstrained). Ultimately, we advocate for using our final probability of heat, and confidence in this probability, to drive the next phase of exploration. We contend further development of geothermal in Hawai‘i will enable the state to achieve its 100% renewable policy objective and Hawai'i to transition off of fossil fuels through geothermal discovery and development. The project not only produced a large amount of data and expanded the existing knowledge of Hawai'i's geothermal resources, but also produced publications, theses, presentations, core photos, datasets, media reports, television interviews, community events, and a blog. Students and new professionals benefitted from the project's hands-on research experiences and educational opportunities and earned awards and recognition.
The combination of increased electric load growth across all sectors, deferred electrical infrastructure investment, and other factors resulting in variable electric power supply, has created technical challenges to maintaining a resilient and reliable grid. Many federal, regional, and local efforts are in play to modernize the electric grid, including advancing building technologies and distributed energy resources (DERs) that are utilizing smarter controls to become responsive to both occupant and grid needs. This report reviews ten pilot projects demonstrating how groups of buildings combined with behind-the-meter (BTM) DERs such as electric vehicle (EV) charging, battery storage, flexible HVAC and domestic hot water systems, and photovoltaic systems can reliably and cost effectively provide grid services. Each of the ten pilot projects aim to deliver both energy efficiency and demand flexibility (DF) while supporting load growth. The ten demonstration teams are piloting flexible DER packages across diverse communities of residential and commercial buildings to address a variety of regional grid needs. The outcomes of these pilot projects will be used to inform future scaling through utility program development. This paper characterizes the ten teams, showcasing the decision-making process used by each group to develop their packages (Section 2), the grid services they plan to deliver (Section 3), the types of DER packages selected for deployment within building sectors (Section 4) and trends between building sector, DER types, and grid services In order to achieve community scale benefits, the pilot projects must utilize aggregated control mechanisms for coordinating buildings and DERs together. Several types of coordinated control architectures have evolved amongst the teams, influenced by use type, existing market conditions, and integration type. Three coordinated controls architectures have been characterized, highlighting their use cases, benefits, challenges, and tradeoffs in their design. These insights can aid utilities, control vendors, and developers in scaling community-level energy systems (Paul, 2024). Ultimately, the technology packages selected by the ten teams will be coordinated to provide power system services, also known as grid services. Insights from these demonstrations will be useful for grid operators, regulators, aggregators and other stakeholders as they look to deploy demand flexible resources as grid services in the future. The grid services that each team is targeting for demonstration are described in Section 3 and Section 4. Methods for evaluating the grid services have been described in the paper Metrics for Evaluating Grid Service Provision from Communities of Grid-interactive and Efficient Buildings and other DER (MacDonald, 2023). To identify technology packages for demonstration, Section 2 shows that project teams used a range of analysis approaches, including building energy modeling, AMI data analysis, cost-benefit frameworks, and utility pilot data. Some teams emphasized technical modeling to quantify grid impacts and demand reduction potential, while others prioritized economic evaluations, stakeholder input, or exploratory pilots to inform deployment decisions. This diversity reflects the need to tailor selection methods to project goals, available data, and organizational context. Section 5 discusses trends between the DER technologies deployed and the grid service provisions from each team. Residential buildings (multifamily and single family) lean towards technologies that enhance energy efficiency (e.g. weatherization upgrades, smart thermostats) and onsite power generation integration (e.g. solar PV). Commercial building demonstrations prioritize technologies that ensure operational reliability (e.g. battery storage) and centralized energy management systems and optimization solutions. Teams that are deploying controllable storage-based technologies are more likely to provide grid services that require a near real-time response. Teams incorporating load shifting technologies like smart thermostats with HEMs are likely to include energy markets participation and customer bill management offerings. Campus demonstrations are adopting diverse sets of DERs to emphasize renewable generation, paired with centralized control. This section also describes technologies that were considered during project planning but ultimately excluded from final deployment. These demonstrations reveal that effective DER package design should be tailored to building type, customer segment, and construction vintage. Multifamily buildings benefit from centralized HVAC upgrades and supervisory controls, while single-family homes are well-suited for individualized technologies like solar, storage, and smart home energy monitors. Commercial and campus settings prioritize EMIS integration and load optimization. New construction enables cost-effective integration of DER-ready infrastructure, whereas retrofits require deployments aligned with owner and tenant value streams. For utility program planners, early coordination with developers and building owners, paired with segmented and modular program offerings, can improve adoption, scalability, and grid impact.
This project encompasses the continued development and training of a U.S. operational team, the Test Site Verification Team (TSVT), supporting verification of nuclear testing activities. TSVT builds on decades of U.S. nuclear testing history and nuclear explosion monitoring experience. The Team maintains readiness to deploy internationally on short notice to provide field-based support of verification of declared or undeclared nuclear testing and associated activities, as well as follow-on activities including monitoring and capability disablement and dismantlement, as established by negotiated agreement or treaty. The roles and structure of the TSVT are integrated with other NA-243 deployable verification teams and the interagency. FY23 TSVT activities focus on continued capability buildup within the team, including Team trainings and exercises with a focus on missions in confined spaces (e.g., tunnels, mines, other underground facilities), increased familiarity with foreign nuclear weapons testing programs, demonstration of Team capacity to deploy, train, and practice sustained OPSEC in non-western locations, establishment of sustainable storage and maintenance of equipment, specification and procurement of additional equipment to support field observations, further evolution of concepts of operation documents (CONOPs), and mission coordination with Headquarters and associated Stakeholders. Activities will culminate with a full-scale domestic team exercise at the end of FY23 focusing on underground activities signatures/observations and safety including advanced outdoor safety and familiarity in working around explosive test environments. In addition, we will be further articulating approaches and capacity relevant to the identification of nuclear tests, as well as monitoring of nuclear testing activities and/or dismantlement of nuclear test sites and anticipate developing additional equipment requests in support of this evolution. The TSVT Team Leads will also coordinate with its Senior Advisor, the TSVT Logistics and Readiness (L&R) Training Lead, and NNSA Headquarters to draft a five-year TSVT training and exercise plan, that strategically and incrementally builds capacity and expertise in key areas of significance for the continuum of nuclear and nuclear-related testing activities that fall within the team’s mission space.
We present results from an international model comparison study of the Full-Scale Emplacement (FE) experiment in Opalinus Clay at the Mont Terri Laboratory, Switzerland. Based on a provided parameter set the teams decided which parameters they adopted for their models, whether they considered the excavation and the ventilation phase in addition to the heating phase and if they included technical features like the shotcrete or the EDZ. The teams were able to reproduce the measured parameters temperature, relative humidity and pore pressure. The modelled results for temperature agree very closely between the teams especially in the sensors in Opalinus Clay. All teams were able to reproduce the redistribution of water in the bentonite backfill due to heating. The evolution of the relative humidity showed similar trends with differences in the intensity of the dry out effect. To model the pore pressure evolution is more complex because it comprises the full interaction of the coupled THM processes. The spread between the pore pressure modelled by the teams was larger, with some teams overestimating the pressure increase due to heating and some teams overestimating the extent of drainage. The agreement of modelled results with measurements improves with larger distance to the heater. We conclude that the EDZ and the shotcrete potentially influence the behaviour of the rock causing higher differences closer to the heater. Further research is needed to better implement those influences into the models. Based on the calibrated models, the future evolution of temperature, relative humidity and pore pressure was predicted over the next 10 years following a change of the heat power applied in 2023 and 2024. Again, the predicted temperatures agree very closely between the teams. Most teams do not expect an increase in relative humidity during the next 10 years after the initial dry-out.
This report is a deliverable for the “Final Report” task of DOE NEET Project 19-16790, "Context-Aware Safety Information Display for Nuclear Field Workers." This project's overall goal is to test the hypothesis that integrating computer vision and process reasoning methods will enable proactive visualization of the safe operation and maintenance processes of Nuclear Power Plants (NPP) for field workers. Augmented Reality (AR) glasses adopting such proactive safety information visualization techniques can significantly increase personnel safety and reduce the NPP’s operating costs. The current practice of monitoring NPPs requires workers to switch between digital models, data, and physical workspaces in identifying relevant but potentially occluded objects and in assessing the risks of operation and maintenance processes. On the other hand, frequently changed field conditions require field workers to report to supervisors for real-time guidance. Such guidance is essential to ensure that changing conditions will not invalidate or endanger the work order and other ongoing processes that may jeopardize NPP operations. Additionally, incorrect recognition of equipment objects can result in communication errors and safety problems. AR techniques can assist engineers in viewing the physical workspaces with objects labeled with detailed operation procedures and safety reminders during field operations. The project team developed an “Intelligent Context-Aware Safety Information Display” (ICAD) for supporting Nuclear Power Plant (NPP) field workers in achieving safe and efficient execution of a series of operational tasks in uncertain and changing workspaces of an NPP. Before designing the ICAD-AR prototype, the project team synthesized NPP operational knowledge models through literature review studies, surveys, interviews with domain experts, and knowledge modeling. The project team conducted an extensive study of the operational procedures of various NPPs, and digital technologies that can support the safe and efficient execution of those procedures in different NPP operational contexts. This literature review helped the project team conduct surveys and interviews with nuclear engineers and field workers to identify three categories of information. The NPP knowledge modeling efforts reveal that the three categories of information identified have different levels of importance in a typical procedure of carrying out a series of tasks to achieve a specific NPP operation goal (e.g., shutdown, mode changes). These three categories of information include 1) Workspace dynamics – the changing spatial arrangements of workspaces, tools, protection equipment, and supporting materials, 2) Workflow prognostics – the dynamic dependencies between different parts of an NPP that functionally support and influence each other in terms of safety and efficiency, and 3) Hazards – objects and spaces that contain hazardous materials or physical conditions that can pose risks to workers or mechanical systems. The project team has profiled the importance levels of these categories of information into a knowledge model. This knowledge model specifies what types of information are more critical for a given task in a given workspace so that computers can automatically identify critical objects and sensors in a scene for delivering context-ware safety information to field workers through AR devices. Significant research development of this project results in technical research outcomes and a prototyping system that illustrates the technical feasibility of establishing an ICAD-AR system supporting the proactive safety information display for nuclear field workers. This final report summarizes the project team’s technological achievements in the past three years. Overall, the project team completed the development and integration of five techniques into a prototype ICAD Augmented Reality (ICAD-AR) system and demonstrated the developed system’s real-time execution in a mechanical room. The project team completed the analysis of using this prototype in other types of workspaces based on 3D image data and digital design models collected from two additional workspaces (a water treatment plant and a flow loop training facility). The integrated techniques include 1) Natural Language Processing (NLP) algorithms supporting the generation and updates of nuclear fieldwork process models based on text analysis of work packages and operation manuals; 2) sensor log analysis for predicting control actions in given sensor reading contexts; 3) computer vision algorithms for automatic localization and navigation of workers; 4) object detection algorithms for identifying task-related objects and correlated sensors for safety checking; 5) AR technique as a platform for supporting the integration. The testing results of these five techniques have shown that 1) the sensor log analysis model can predict the next control action with an accuracy of 0.883; 2) the trained natural language processing model can extract more than 80% of the critical information from paper-based procedures (PBPs); 3) the navigation algorithm with the integration of Visual Inertial Odometry (VIO) and Non-Recursive Bayesian Filter methods make operator’s trajectory estimation resilient to drift error; 4) the computer vision algorithm can detect task-specific and safety-critical objects with an average accuracy of 95.3%. The project team used work procedures collected from a flow loop training facility and two datasets collected from two mechanical rooms simulating the workspaces of NPPs to demonstrate the technical capabilities of the developed ICAD-AR prototype. The demonstration validated the technical feasibility of establishing the ICAD-AR system for nuclear field workers and identified the challenges in 1) automatic text analysis of work packages; 2) use of limited samples of sensor logs for predicting the proper timings of control actions; 3) reliably tracking workers and their task progress in mechanical rooms with many similar objects.
Task D of DECOVALEX-2023 is focused on the simulation of the coupled thermal hydraulic-mechanical (THM) behaviour in the full-scale engineered barrier system (EBS). The Horonobe EBS experiment is the demonstration of the full-scale EBS in the underground research laboratory (URL) (performed by JAEA in the Horonobe URL in Japan). Task D consisted of the three steps, a preliminary step (Step 0), simulation of the laboratory tests (Step 1) and simulation of the in-situ full-scale EBS experiment (Step 2). Since the Horonobe EBS experiment demonstrates the vertical emplacement option of the EBS, the experiment gallery is also backfilled with the backfill material. Therefore, interaction between the EBS and the backfill material can also be demonstrated, such as deformation (change of density) of the buffer material. The underground water in the Horonobe URL is saline. This fact adds chemical processes to THM behaviour. For example, mechanical properties (such as swelling pressure of the buffer material and backfill material) and hydraulic properties (such as permeability of the buffer material and backfill material) change depending on the water chemistry. Task D was therefore a challenging Task focused on not only the relatively simple THM behaviour but also complex THM behaviour including chemical processes. Six research teams (BGR, CAS, JAEA, KAERI, SNL and Taipower) participated the Task D. BGR, CAS, JAEA, KAERI and Taipower research teams selected a THM approach, while the SNL research team selected a TH approach. Step 1 involved the simulation of laboratory test results and was important to check the numerical codes developed by the research teams. Step 1 was divided into four sub steps. The simulation results through the Step 1 identified the parameters for simulation of the Step 2. Basic parameters of the materials (buffer material, backfill material, rock mass, concrete, sand) were provided by JAEA. Special parameters which research team needed were identified by back analysis of Step 1. Most notably the mechanical behaviour of swelling and displacement depended on the applied model (elastic model or elastoplastic model). Parameters such as Young’s modulus were found to need smaller values than characterised in the fundamental laboratory test results (Step 1-1, 1-2) for the elastic model. Although laboratory experiments are usually simple, test results contained some error. For example, if the saturation level is 100 % or higher, it should be considered an error. This situation was presented in the Step 1-3. A possible reason is that the buffer material is a mixture of bentonite and silica sand. When a specimen is cut to measure volume or weight, sand grains will affect the measurement data. In Step 2, boundary conditions such as temperature on the surface of the simulated overpack, heater power of the electrical heaters installed in the simulated overpack, injection pressure and inflow rate of the test water, were applied. The outer boundary conditions can be selected using measured data (injection pressure and inflow rate of the test water that is controlled by the injection systems installed in the sand layer around the buffer material and in the boundary between backfill material and concrete support). Since such measured data has some noise, research teams developed their own simplified boundary conditions. Inner boundary conditions can be selected using measured data as heater power and temperature on the surface of the simulated overpack. These data also contain some noise, so research teams developed their own simplified developed boundary conditions. Task D validated various approaches thorough the simulation of the in-situ full scale EBS system including backfill of the gallery: variations in the coupling processes (THM or THC), analysis codes, and boundary conditions. Temperature distribution in the buffer material was simulated well by all research teams. This means thermal behaviour is not sensitive to the simulation approaches. Although the water content distribution on the outside of the buffer material was well simulated by all research teams, the simulation results differ from the measured values inside the buffer material (at the centre and inside, near the simulated overpack). The buffer material is made from tap water, but in the in-situ experiment, saline groundwater infiltrates the buffer material. Therefore, the selection of the hydraulic parameters of the buffer material greatly affects the simulation results of the re saturation behaviour of the buffer material. In the Horonobe EBS experiment, measured values suitable for validating the simulation results were not obtained near the simulated overpack. When simulating the pressure and deformation of the buffer material, the measurement data is easily affected by the installation conditions of the measurement sensors, so verifying the measurement data itself remains an issue. Mechanical simulation results differ depending on whether they are considered as elastic or elastoplastic phenomena. The accuracy of measured in-situ data can be assessed by detailed analysis comparing sampling specimen analysis and measured data. The Horonobe EBS experiment is scheduled to be dismantled in the future (FY2026 and 2027). This detailed dismantling investigation will finally confirm the measured data.
Getting my team members to all agree that we needed to pursue possible solutions for our documentation review process was an idea that came across very well with the team. This specific topic has be something that as a team we have been having struggles with recently due to the shear amount of documents that have been flowing through the team’s hands to review. We all realized that the process had areas that we could change that would eliminate confusion for new employees, reduce backload, and improve efficiency and quality of the documentation reviews. The key personnel on our team that have the most direct control and impact over this process are the production control specialists, documentation preparation and review is their primary job function. They are denoted in the action pack as “doc spec 1” and this individual has 12 years of expertise in their role. The engineers are denoted as “engineer 1, 2, 3” respectively. Engineer 1 has 10 years of experience in this team, engineer 3 has 38 years of experience on the team, and engineer 2 is myself with 5 years of expertise with this team and 5 with the department of defense.
During the years of 2018 through 2023, The Washington State University Energy Program (WSU EP) operated the Northwest Combined Heat and Power Technical Assistance Partnership under contract to the US Department of Energy’s Advanced Manufacturing Office (AMO), a part of DOE’s larger Office of Energy Efficiency and Renewable Energy. This contract provided direction and funding for providing technical outreach, information and technical/economic analysis services in support of expanding development of Combined Heat and Power (CHP) over a four state region in the Pacific Northwest. The states served included Alaska, Idaho, Oregon and Washington. During the duration of this contract, the WSU EP delivered performed specific assigned tasks and provided services of various generally prescribed types, with the overall goal of increasing adoption of CHP as an efficient heat and power supply in the region. Indications – though not formally evaluated to our knowledge – are that this goal was achieved. Over many years, the WSU team has provided support for CHP developments in these states under similar previous Department of Energy contracts, and many such projects have been built. While the early-phase outreach, education and techno-economic assessments that the NW CHP TAP provides rarely immediately result in project construction, there is no doubt that the WSU EP team has had substantial influence in the construction of a number of important CHP projects in the region. Examples of projects implemented directly under the current team’s guidance and services during this contract cycle include an 875 kilowatt biomass fueled CHP system installed at the University of Idaho, and 5 megawatt natural gas fueled CHP system at the University of Montana ( UM Breaks Ground on New Power Facility, Slashes Emissions 30% (umt.edu) ). Many other CHP systems recently installed are also either directly or at least partially the result of information and technical services provided by the team. Finally, though much more difficult to quantify and less glamorous, the team has helped countless organizations to understand CHP and determine whether and how CHP may be a fit for them, before they consider paying for engineering services. Whether the ultimate outcome has been to include CHP or not, the expert skills provided by the NW CHP TAP team have provided real value to these organizations considering this relatively complex technology. Over the duration of the contract our team provided 71 Initial Technical Assessments and 17 Advanced Technical Assessments; 53 End-User Engagements and 33 Stakeholder Engagements of various types; 42 Technical Profiles (Project Profiles, Program Profiles and Policy Profiles), and produced 14 technical articles for the Department of Energy. Unfortunately, these quantities provide no measure of the value that the team has provided. Only our clients can judge that, and we are confident that they are pleased with the benefits we have offered them.
This is the Task E final report for DECOVALEX-2023. Task E is focused on understanding thermal, two-phase hydrological, and mechanical (TH2M) processes, especially related to predicting brine migration in the excavation damaged zone around a heated excavation in salt. Salt is attractive as a disposal medium for radioactive waste because it is self-healing and is essentially impermeable and essentially non-porous in the far field (away from excavations). Investigation of the short-term (days to years) near-field (centimeters to tens of meters) behavior of salt is important for radioactive waste disposal because this early period strongly controls the amount of brine in a salt repository. Brine leads to corrosion of waste forms and waste packages, and possible dissolution of radionuclides with brine transport being a potential transport vector to the accessible environment. The main test case used in Task E is the ongoing Brine Availability Test in Salt (BATS) heater test located underground at the Waste Isolation Pilot Plant (WIPP) near Carlsbad, New Mexico, USA. The Task was divided into a series of Steps. Step 0 was an introduction to processes in salt, that included matching historical unheated brine inflow data from boreholes at WIPP and matching temperature observations during BATS heater test 1a. Step 1 included validation of models against a thermo-poroelastic analytical solution relevant to heated boreholes in salt, and two-phase flow around an excavation in salt. Step 2 required all the individual components covered in steps 0 and 1 to come together to match observed brine inflow behavior during the BATS 1a heater test. There were a range of approaches from the teams, from mechanistic to prescriptive. Given the uncertainties in the problem, some teams used one- or two-dimensional models of the processes, while other teams included more geometrical complexity in three-dimensional models. The key learning points from Task E have been: • Heat conduction through salt typically requires non-linear thermal conductivity (as a function of temperature), but most models do a good job matching observations, given appropriate adjustments to the applied power and some thermocouple locations. • Thermal pressurization requires coupled thermal-hydrological-mechanical (THM) responses that consider the thermal expansion of the fluid and solid phases. • Initialization of two-phase flow models around a borehole or excavation in salt are more realistically represented as “wetting up”, rather than “drying down” (i.e., the initial state after excavation is mostly dry, rather than mostly wet). • The BATS 1a heater test includes a significant release of brine after the end of heating, which requires a large increase in permeability to recreate. Task E has been a great learning experience for all the teams involved, and feedback from the modeling teams has led to changes in the design of follow-on BATS experiments, which are now ongoing underground at WIPP. There was a balance throughout the task between freedom to model phenomena how each team saw fit, and prescriptiveness in problem design to bring the modeling teams closer together to allow attribution of smaller differences between models to different modeling choices. The modeling approaches seem to go through two phases: an early phase of discovery or testing, and a later phase of refinement and improvement. In future modeling efforts, different field data could be used (e.g., BATS 2) and more time should be included in the processes for teams to make multiple model refinement or even significant changes to their conceptual model or setup, based on lessons learned from the modeling exercise.
DECOVALEX-2023 Task F is a comparison of models and methods for post-closure performance assessment (PA) of a deep geologic repository for radioactive waste. The general aims of Task F are to build confidence in the models, methods, and software used for PA and to stimulate additional research and development in PA methodologies. The task objectives are to motivate development of PA modelling skills and capabilities, to examine the influence of model choices on calculated repository performance, and to compare the uncertainties introduced by model choices to other sources of uncertainty. Task F involves no actual experiment or site. It is a PA modelling exercise that requires the conceptual development of hypothetical repository designs and geologic settings. Because three of the teams were interested in salt and the rest of the teams were interested in crystalline rock, Task F was split into two branches: Task F1 for crystalline rock and Task F2 for salt. This report is for Task F1, crystalline rock. Teams from seven countries (Canada, Czech Republic, Germany, Korea, Sweden, Taiwan, and United States) participated in Task F1. The teams worked together to define the features, events, and processes of the reference case repository and established a set of performance measures. In addition, they defined a set of benchmark problems designed to test and compare modelling capabilities for fracture flow and transport at different scales. The repository design and benchmark problems are documented in a Task Specification that evolved over time as the group honed the specifications. The benchmark problems verified that each team can aptly model flow and transport in fractured media in 1-, 2-, and 3-dimensions. Two general approaches were used for the 3-dimensional benchmarks: discrete fracture network (DFN) and equivalent continuous porous medium (ECPM). DFN modelling involves explicit meshing of each fracture while ECPM modelling aims to capture the effective porosity and directional permeability of each cell in a space-filling mesh as affected by intersecting fractures. In some models, a combination of the two is used, i.e., DFN for large known fractures and ECPM for the rest of the domain. Transport is solved by using either the advection-dispersion equation or particle tracking. Although some variation is observed among model breakthrough curves in the benchmark problems, there is strong agreement in breakthrough behaviour up to at least the 75 th percentile for all benchmarks. At the 90 th percentile, breakthrough results show larger differences, suggesting several models retain substantially higher fractions of tracer in regions of slower moving water. In addition to the flow and transport benchmarks, several teams completed the source term benchmark, verifying capabilities for modelling radionuclide decay and ingrowth, waste package breach, instant release fractions, fuel matrix degradation rates, and radionuclide solubility limitations. The reference case is conceptualized as a generic spent fuel repository at a depth of 450 m in fractured crystalline rock. The repository has 50 parallel backfilled drifts, each with 50 deposition holes 6 m apart. Each deposition hole contains a 4-PWR waste package and bentonite buffer. The rock domain is 5 km in length, 2 km in width, and 1 km in depth. It has 6 deterministic fractured deformation zones and a multitude of stochastic fractures. Teams generally used the ECPM approach for the entire rock or a hybrid approach in which the deterministic fracture zones are modelled with a DFN and the rest of the rock is modelled by ECPM. Of the reference case problems specified, only the results of the initial reference case problem are compared in this report. The initial problem focuses on transport from the deposition holes to the surface, i.e., it neglects waste package performance. Tracers are released at all waste package locations at time zero and tracked for their releases to the near field and ground surface. The water fluxes calculated at the ground surface entry and exit regions of the domain are similar for all models except for two that have considerably lower fluxes. For tracer transport, large differences are observed among models in the magnitude of tracer transported. Much of the difference appears to be due to how the repository is implemented and hence the different degrees of repository simplification. Models that exclude the drifts, buffer, and backfill from the domain tend to show greater release of tracers and radionuclides from the repository. The initial study presented here indicates that major differences in modelling important processes within the repository (e.g., diffusion through buffer and backfill) can produce broadly different release and transport results, especially when those processes are excluded. Even for the models that included all specified features, events, and processes, the results show significant differences and demonstrate the importance of examining multiple modelling approaches in performance assessment. The differences in results observed in this study are expected to motivate teams to either increase complexity in future versions of the reference case models or to improve methods to account for the effects of simplified features and processes. Either way, future improvements in these models are expected to produce results that more closely agree.
Carbon fiber composites have attracted considerable attention due to the potential for substantial mass savings, with many examples now implemented in the low-volume luxury car market. However, migration to higher volume applications has been hindered by: (a) high material cost, (b) high processing times, and (c) perception of low Sustainability. This project will address all three of these barriers: (a) carbon fiber material to replace aluminum in structural components at a cost penalty of no more than $5/Kg-saved (aka weight buy), (b) fitting into high-rate processes for automotive production like injection molding, and (c) end-to-end Sustainable material – based on post industrial waste carbon fiber and nylon 66 and ability to recycle end-of-life auto parts. The opportunity lies in combining DowAksa capabilities in carbon fiber manufacturing, resin chemistry intermediate production with the unique testing capabilities inherent within PNNL. The teams from PNNL and DowAksa held several meetings virtually and in-person in Michigan and at PNNL, including a lab tour at PNNL. Throughout, the teams discussed DowAksa material sources, commercially available recycled base materials, and preliminary material properties. The teams also engaged in multiple discussions and evaluations of potential automotive applications based on the ideas suggested by PNNL. The teams discussed several potential automotive applications in which recycled carbon fiber and recycled PA resin can be used. The PNNL team identified 38 cast aluminum components that can potentially be assessed for redesign using the DowAksa materials system. The PNNL team also identified 27 polyamide components. The teams discussed the lists and narrowed it down to a handful of applications that are exterior and interior to common vehicle architectures. The team also considered semi-structural and structural components and short-listed the highest potential candidates, such as cross-car-beam. The cross-car beam was considered to be highly suitable and potentially viable demonstration applications based on the properties of the materials as well as the weight savings potentials and the reduction in embodied energy by utilizing wholly sustainable materials, since both materials, carbon fiber and resin, were derived from recycled materials. The next step was to reach out to potential OEMs and/or Tier1s who were interested in exploring such technology for future applications. However, the project was terminated, and no further discussions or exchange of information took place. No new data were generated, including no IP and no publications.
Lawrence Livermore National Security, LLC (LLNS) is the prime contractor responsible for managing and operating Lawrence Livermore National Laboratory (LLNL). The mission of the LLNL is to strengthen security of the United States through development and application of world-class science and technology to enhance the nation's defense, reduce the global threat from terrorism and weapons of mass destruction, and respond with vision, quality, integrity, and technical excellence to scientific issues of national importance. To accomplish its mission, LLNL must plan and manage its campus space and facilities to optimize use of its relatively small one-square-mile footprint. LLNL currently has numerous excess facilities that require decontamination and demolition (D and D). The LLNL Legacy Facility Program is responsible for stewardship and risk reduction programs to effectively manage these excess assets at LLNL. The Legacy Facility Program identified 10 excess facilities at LLNL that were candidates for demolition based on risks from further degradation of the facilities, potential exposure to hazardous materials, or need for removal to make way for new program facilities. The buildings range from a structure built in 1943 to serve as a US Navy drill hall during World War II, to a facility that provided neutrons to study material properties for the fusion energy program. The National Nuclear Security Administration (NNSA) appropriated FY19 funding for the development of Class 3 estimates for these 10 excess facilities that would be used to develop a Program Management Plan for funding consideration. Class 3 estimates are not conceptual, nor overly detailed, but adequate to be used for budget and appropriation purposes. Using existing strategic sourcing agreements, LLNL was able to organize a team of senior subject matter experts (SMEs) with diverse technical backgrounds across the Department of Energy (DOE) Complex to complete extensive process knowledge (PK) reviews and walk-downs of each excess facility and to deliver accurate and complete estimates under an expedited schedule (i.e., within eight weeks). To facilitate the expedited schedule, LLNL was fully prepared for the arrival of the JGMS team, which consisted of the following companies: J.G. Management Systems, Inc. (JGMS); Strata-G, LLC; and Michael Baker International. LLNL provided background and PK information on the excess facilities, pictures, supporting historical documentation, and radiological survey history as well as escorted access to the facilities. The JGMS team has previous experience supporting Program Management Plans for excess facilities at the Y-12 National Security Complex. The team mobilized to LLNL and performed the facility walk-downs from January 22-25, 2019. Using a methodical evaluation process, expertise, and experience, the team was able to deliver walk-down draft reports and estimates to LLNL before their February 8, 2019 deadline. LLNL then in turn reviewed, completed the estimates by adding waste management costs and other LLNL costs, and delivered the estimates to NNSA by February 15, 2019. The completed final reports, including draft D and D estimates, were delivered to LLNL before their March 6, 2019 deadline. The work was successfully completed ahead of the expedited schedule required by LLNL, resulting in a commendation from the client. This paper describes how the partnership and collaboration as a fully integrated team comprised of the prime contractor, LLNS, and the JGMS team successfully met the needs of the US government, resulting in the performance of expedited site walk-downs, the development of summary evaluation reports, and the preparation of draft Class 3 estimates and preliminary schedules for the D and D of 10 excess facilities at LLNL. The efforts of the team will enable the D and D of the first excess facility in the 2020-2021 time frame. (authors)
The Experiment of Sea-Breeze Convection, Aerosols, Precipitation and Environment (ESCAPE) field project deployed two aircraft and ground-based assets in the vicinity of Houston, Texas, between 27 May and 2 July 2022, examining how meteorological conditions, dynamics, and aerosols control the initiation, early growth stage, and evolution of coastal convective clouds. To ensure that airborne- and ground-based assets were deployed appropriately, a forecasting and nowcasting team was formed. Daily forecasts guided real-time decision-making by assessing synoptic weather conditions, environmental aerosol, and a variety of atmospheric modeling data to assign a probability for meeting specific ESCAPE campaign objectives. During the research flights, a small team of forecasters provided “nowcasting” support by analyzing radar, satellite, and new model data in real time. The nowcasting team proved invaluable to the campaign operation, as sometimes changing environmental conditions affected, for example, the timing of convective initiation. In addition to the success of the forecasting and nowcasting teams, the ESCAPE campaign offered a unique “testbed” opportunity where in-person and virtual support both contributed to campaign objectives. The forecasting and nowcasting teams were each composed of new and experienced forecasters alike, where new forecasters were given invaluable experience that would otherwise be difficult to attain. Both teams received training on forecast models, map analysis, Hybrid Single-Particle Lagrangian Integrated Trajectory model (HYSPLIT), and thermodynamic sounding analysis before the beginning of the campaign. In this article, the ESCAPE forecasting and nowcasting teams reflect on these experiences, providing potentially useful advice for future field campaigns requiring forecasting and nowcasting support in a hybrid virtual/in-person framework.
An important strategy to meet California's ambitious energy efficiency goals is to use innovative wireless communications, embedded sensors, data analytics and controls to significantly reduce lighting energy use in commercial buildings. This project developed a suite of networked lighting solutions to further this goal. The technologies include a platform for low-cost sensing, distributed intelligence and communications, the “PermaMote,” which is a self-powered sensor and controller for lighting applications. The project team also developed a task ambient daylighting system that integrates sensors with data-driven daylighting control using an open communication interface, called the “Readings-At-Desk” (RAD) system. To address the problem of building occupants being confused about how to operate traditional lighting control systems, the research team created content that could be the basis for a user interface standard for lighting controls. Finally, to address the difficulty of ensuring that advanced lighting control systems actually deliver their promised energy savings, the project team developed a new method for evaluating and specifying lighting systems’ performance. The research team validated these technologies in the laboratory, showing significant lighting energy savings, up to 73% for the PermaMote sensor system from occupancy control and daylight dimming features, compared to the same light source (LED replacement lamps) operated via simple on/off scheduling. The project team also developed a proposed standard lighting data model and user interface elements, which were contributed to the ANSI Lighting Systems Committee (C137) for standardization. Existing data models are incomplete and inconsistent, whereas the lighting-specific data model developed here is clear and comprehensive, to serve as a starting point for creating common, universally agreed upon semantic definitions of key lighting parameters, to promote interoperability. For the task on verifiable performance of lighting systems, the project team developed a more effective metric for capturing the actual energy impact of a lighting system over time — the energy usage intensity (kWh/ft2/year). Three commercial lighting systems were tested in FLEXLAB® using this new metric, and the tests show a wide range in the accuracy of the self-reported energy-use metric, from 0.5% to 28% error compared to direct measurement of lighting energy using dedicated submeters. Overall, the project team estimates that these advanced technologies can reduce California office lighting energy use by 20% (above and beyond normal advanced lighting controls mandated by Title 24), resulting in about 1,600 GWh/year in savings.