Low temperature battery First quarterly report, 14 Dec. 1965 - 13 Mar. 1966
Low temperature battery - development of pasted plate cathode construction to extend cell life
SEARCH · Search NASA
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Low temperature battery - development of pasted plate cathode construction to extend cell life
Physical and chemical stability, transport properties, and battery performance in simplified cell design for alkaline silver battery separator materials
Tracking and ground-based navigation; communications, spacecraft-ground; station control and system technology; capabilities for new projects; networks consolidation program; and network sustaining are described.
Simulator verifies proper operation of a battery cell voltage-monitoring device. It also contains variable ac voltage to ascertain that a battery scanner will perform its function at all possible ac voltages.
The HyTEC Phase 1 3-Stage Compressor Rig project was conducted to mature and validate front-stage aerodynamic technologies in support of HyTEC Phase 2 and GEA’s Compact Core compressor. Building on the prior ERA Phase 2 Baseline Rig, GEA and NASA collaborated on the design and testing of the HyTEC rig, incorporating advanced technologies such as increased radius ratio, higher aerodynamic loading, and advanced casing treatment. The HyTEC test campaign leveraged similar design and instrumentation philosophy, test execution approach, and the same facility (NASA W-7) to enable clear comparison with the legacy ERA rig results. The HyTEC rig was designed to deliver benefits in efficiency, tip loading, operability, and aeromechanics, with success measured against defined TPMs that were anchored to the ERA baseline rig data.
Hand operated shear removes a battery case without disturbing the internal components which are to be tested. It consists of three tool-steel elements, the cutter blade, and a hand lever that provides the mechanical advantage required to cut steel.
Requirements of the flywheel electronic system are to accelerate the momentum wheel to a fixed maximum speed when solar energy is available and to maintain a constant voltage on the spacecraft bus under varying loads when solar energy is not available.
The following topics are presented in viewgraph format: Cosmic Background Explorer (COBE) mission background; battery background and specifications; cell history; battery mechanical/structural design; battery test data; and flowcharts of the various battery approval procedures.
These abstracts from the symposium represent the data analysis of the 57 experiments flown on the LDEF. The experiments include materials, coatings, thermal systems, power and propulsion, science, (cosmic ray, interstellar gas, heavy ions, micrometeoroids, etc.), electronics, optics, and life science.
Computer program calculates spacecraft battery energy at specific times dictated by input sequence of recharge, discharge, and no activity phases. Recharge phases are assumed during times not specified, unless batteries are fully charged. Warnings are printed when energy falls below specified level. Program assumes two identical batteries.
The Nickel Cadmium 129-ampere hour cell was tested in order to characterize the cell under controlled conditions. Results of charge characterization and discharge characterization are reported. Ampere hour efficiency, open circuit stand, and cycle life operation results are included. The battery is briefly described.
NASA’s spacesuit government reference design for returning to the Moon is called the Exploration Extravehicular Mobility Unit (xEMU). The xEMU subassembly that provides life support, such as oxygen and thermal control, is the Portable Life Support System (PLSS). Inside the PLSS is a new technology that NASA wanted to test to provide cooling to the crew during EVAs (ExtraVehicular Activity). This technology is called the Spacesuit Water Membrane Evaporator (SWME). In order to test SWME in an improved thermal control loop (TCL) both on Earth and in Space, the Spacesuit Evaporation Rejection Flight Experiment (SERFE) was created. The Ground unit, or testbed at Johnson Space Center (JSC), tested the cooling technology in Earth’s gravity, while the Flight unit, or payload on the International Space Station (ISS), tested the cooling technology in micro-gravity. Since fluids flow differently in micro-gravity, testing in both environments would provide important data for improving cooling performance during EVAs. Both units completed 25 simulated EVAs with the same settings so SWME performance on the ground could be compared to the ISS. The Flight unit was completed first and performed EVAs on the ISS between 2020 and 2022. The Ground unit performed EVAs between 2021 and 2022. When the Flight unit came back from the ISS, it was taken apart for analysis. This analysis looked at how well SWME was able to maintain its heat rejection capability after various dwell times, such as a 90 day Airlock Coolant Loop Recovery (ALCLR) cycle, when the Extravehicular Mobility Unit (EMU) currently on the ISS would normally need maintenance. After a three year simulated spacesuit dwell, the Ground unit performed another EVA series in 2025 to test SWME’s shelf life. The results from this test series will inform mission planning as NASA plans to go back to the Moon and beyond.
NASA’s spacesuit government reference design for returning to the Moon is called the Exploration Extravehicular Mobility Unit (xEMU). The xEMU subassembly that provides life support, such as oxygen and thermal control, is the Portable Life Support System (PLSS). Inside the PLSS is a new technology that NASA wanted to test to provide cooling to the crew during EVAs (ExtraVehicular Activity). This technology is called the Spacesuit Water Membrane Evaporator (SWME). In order to test SWME in an improved thermal control loop (TCL) both on Earth and in Space, the Spacesuit Evaporation Rejection Flight Experiment (SERFE) was created. The Ground unit, or testbed at Johnson Space Center (JSC), tested the cooling technology in Earth’s gravity, while the Flight unit, or payload on the International Space Station (ISS), tested the cooling technology in micro-gravity. Since fluids flow differently in micro-gravity, testing in both environments would provide important data for improving cooling performance during EVAs. Both units completed 25 simulated EVAs with the same settings so SWME performance on the ground could be compared to the ISS. The Flight unit was completed first and performed EVAs on the ISS between 2020 and 2022. The Ground unit performed EVAs between 2021 and 2022. When the Flight unit came back from the ISS, it was taken apart for analysis. This analysis looked at how well SWME was able to maintain its heat rejection capability after various dwell times, such as a 90 day Airlock Coolant Loop Recovery (ALCLR) cycle, when the Extravehicular Mobility Unit (EMU) currently on the ISS would normally need maintenance. After a three year simulated spacesuit dwell, the Ground unit performed another EVA series in 2025 to test SWME’s shelf life. The results from this test series will inform mission planning as NASA plans to go back to the Moon and beyond.
A detailed description of the space shuttle vehicle and associated subsystems is given. Space transportation system propulsion, power generation, environmental control and life support system and avionics are among the topics. Also, orbiter crew accommodations and equipment, mission operations and support, and flight crew complement and crew training are addressed.
The battery was a three ampere hour nickel cadmium prismatic cell. The battery consists of 20 cells connected in series and there were two batteries per spacecraft. The battery operations (voltage and temperature) that the spacecraft sees during a normal operational day are discussed.
The objectives of the project are the following: (1) to improve system safety and reliability; (2) to improve Space Shuttle Payload performance - 12,000 lb; (3) to optimize program cost; and (4) to promote a competitive solid rocket motor industry. The topics are presented in viewgraph form and include the Advanced Solid Rocket Motor (ASRM) project team, ASRM design, design schedules, and technical issues.
Corrective actuator forces are applied to the DSS 13 antenna structure to improve its accuracy. These forces are calibrated according to the antenna elevation requirements. The calibration is derived from accurate field measurements and is not subject to the errors that result from computer modeling. A successful demonstration provided significant antenna surface improvement. An improvement of 0.6 to 1 dB is predicted.
The proceedings of the 32nd Aerospace Mechanism Symposium are reported. NASA John F. Kennedy Space Center (KSC) hosted the symposium that was held at the Hilton Oceanfront Hotel in Cocoa Beach, Florida on May 13-15, 1998. The symposium was cosponsored by Lockheed Martin Missiles and Space and the Aerospace Mechanisms Symposium Committee. During these days, 28 papers were presented. Topics included robotics, deployment mechanisms, bearing, actuators, scanners, boom and antenna release, and test equipment.