Search NASA⌕ Search

SEARCH · Search NASA

Results for “Reconfiguration”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,675 records · Page 93

Roadmap on thermodynamics and thermal metamaterials

Thermal metamaterials represent a transformative paradigm in modern physics, synergizing thermodynamic principles with metamaterial engineering to master heat flow at will. As next-generation technologies demand multi-scale thermal control, this field urgently requires systematic frameworks to unify its multidisciplinary advances. Curated through a global collaboration involving over 50 specialists across 25 subdisciplines, this review primarily summarizes two decades of advancements, ranging from theoretical breakthroughs to functional implementations. The review reveals groundbreaking innovations in heat manipulation through the exploration of both classical and non-classical transport regimes, topological thermal control mechanisms, and quantum-informed phonon engineering strategies. By bridging physical insights like non-Hermitian thermal dynamics and valleytronic phonon transport with cutting-edge applications, we demonstrate paradigm-shifting capabilities: environment-adaptive thermal cloaks, AI-optimized metamaterials, and nonlinear thermal circuits enabling heat-based computation. Experimental milestones include 3D thermal null media with reconfigurable invisibility and thermal designs breaking classical conductivity limits. Here, this collaborative effort establishes an indispensable roadmap for physicists, highlighting pathways to quantum thermal management, entropy-controlled energy systems, and topological devices. As thermal metamaterials transition from laboratory marvels to technological cornerstones, this work provides the foundational lexicon and design principles for the coming era of intelligent thermal matter.

heat conduction control↗

Simulations of High Current NuMI Magnetic Horn Striplines at FNAL

Both the NuMI (Neutrinos and the Main Injector) beam line, that has been providing intense neutrino beams for several Fermilab experiments (MINOS, MINERVA, NOVA), and the newly proposed LBNF (Long Baseline Neutrino Facility) beam line which plans to produce the highest power neutrino beam in the world for DUNE (the Deep Underground Neutrino Experiment) need pulsed magnetic horns to focus the mesons which decay to produce the neutrinos. The high-current horn and stripline design has been evolving as NuMI reconfigures for higher beam power and to meet the needs of the LBNF design. The CSU particle accelerator group has aided the neutrino physics experiments at Fermilab by producing EM simulations of magnetic horns and the required high-current striplines. In this paper, we present calculations, using the Poisson and ANSYS Maxwell 3D codes, of the EM interaction of the stripline plates of the NuMI horns at critical stress points. In addition, we give the electrical simulation results using the ANSYS Electric code. These results are being used to support the development of evolving horn stripline designs to handle increased electrical current and higher beam power for NuMI upgrades and for LBNF

43 PARTICLE ACCELERATORS↗

DESIGN UPDATE ON THE HSR INJECTION KICKER FOR THE EIC

The Electron-Ion Collider (EIC), the next-generation nuclear science facility, is under the design at the Brookhaven National Laboratory. The present RHIC rings will be reconfigured as the Hadron Storage Ring (HSR) for the EIC. Design of a stripline injection kicker for the HSR for beams with the rigidity of ~ 81 T-m poses some technical challenges due to the expected shorter bunch spacing, heating due to higher peak current and the larger number of bunches, and the required higher pulsed voltage. Recently, we updated its mechanical design to optimize the characteristic and beam coupling impedances. In addition, we incorporated the impedance tuning capability by introducing the kicker aperture adjustment mechanism. Finally, we incorporated high voltage FID feedthroughs (FC26) to this kicker. This paper reports the design and optimization updates of the HSR injection kicker including the impedance tuning capability, optimization of both the characteristic and the beam coupling impedances, and finally the incorporation of a high voltage feedthrough design.

HSR INJECTION KICKER FOR THE EIC∗↗

Measurement and modeling of beam transport in the FODO line of the Spallation Neutron Source Beam Test Facility

Ongoing studies at the Spallation Neutron Source (SNS) Beam Test Facility (BTF) seek to understand and model bunch dynamics in a high-power LINAC front-end. The BTF has recently been upgraded with a reconfiguration from a U-shaped line to a Straight line. We report the current state of model benchmarking, with a focus on RMS beam sizes within the FODO line. The beam measurement is obtained via three camera/screen pairs in the FODO line. This presentation discusses the methodology and results of this measurement.

Thompson, Trent↗

Slow Extraction Beam Commissioning for the Mu2e Experiment at Fermilab

Following the successful completion of the Muon g-2 experiment run at Fermilab, the Muon Campus facility has been reconfigured from delivering 3 GeV muon beams to the g-2 storage ring to providing slow-extracted 8 GeV proton beam spills for the Mu2e experiment. The first full-scale commissioning run with slow extraction was conducted during the 2025 run, followed by the second run in early 2026. We present the results and current status of this commissioning campaign.

Nagaslaev, V. [Fermilab]↗

Universal Injector at LERF – Baseline Design

A new electron injector complex has been proposed within the Low Energy Recirculating Facility (LERF) vault, which would serve both the 22 GeV CEBAF and the positron programs, while being compatible with the electron source required to produce positrons for Ce+BAF. The baseline design of a 3-pass recirculator features a main linac configured with three cryomodules, five isochronous arcs and three straight sections, allowing electron beam acceleration up to 650 MeV. The injector offers the flexibility to extract 1-pass and 2-pass energy electrons, as needed for positron production, with final reconfiguration to a 3-pass 650 MeV injector for 22 GeV CEBAF. This paper provides an overview of the baseline design of the Universal injector complex, including the 8 MeV injector and the recirculator. A comprehensive suite of beam dynamics studies to validate our design is being launched, starting with start-to-end tracking with Elegant followed by the orbit correction and error mitigation.

Bogacz, A. [Thomas Jefferson National Accelerator ↗

Progress towards halo modeling at the SNS Beam Test Facility

The SNS beam test facility is a model of the SNS front end (source through medium-energy transport). On-going work at the BTF focuses on accurate modeling of the beam distribution to enable the prediction of halo losses (>100 parts per million). This presentation will discuss the latest progress towards this goal, including recent results after a reconfiguration of the test beamline. Good agreement within the 90% beam core is shown for a 30 mA beam at 2.5 MeV.

Ruisard, Kiersten↗

Learning the ground state of a non-stoquastic quantum Hamiltonian in a rugged neural network landscape

Strongly interacting quantum systems described by non-stoquastic Hamiltonians exhibit rich low-temperature physics. Yet, their study poses a formidable challenge, even for state-of-the-art numerical techniques. Here, we investigate systematically the performance of a class of universal variational wave-functions based on artificial neural networks, by considering the frustrated spin- 1/2 1 / 2 J_1-J_2 J 1 − J 2 Heisenberg model on the square lattice. Focusing on neural network architectures without physics-informed input, we argue in favor of using an ansatz consisting of two decoupled real-valued networks, one for the amplitude and the other for the phase of the variational wavefunction. By introducing concrete mitigation strategies against inherent numerical instabilities in the stochastic reconfiguration algorithm we obtain a variational energy comparable to that reported recently with neural networks that incorporate knowledge about the physical system. Through a detailed analysis of the individual components of the algorithm, we conclude that the rugged nature of the energy landscape constitutes the major obstacle in finding a satisfactory approximation to the ground state wavefunction, and prevents learning the correct sign structure. In particular, we show that in the present setup the neural network expressivity and Monte Carlo sampling are not primary limiting factors.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

Biomolecular transport and separation in nanotubular networks.

Cell membranes are dynamic substrates that achieve a diverse array of functions through multi-scale reconfigurations. We explore the morphological changes that occur upon protein interaction to model membrane systems that induce deformation of their planar structure to yield nanotube assemblies. In the two examples shown in this report we will describe the use of membrane adhesion and particle trajectory to form lipid nanotubes via mechanical stretching, and protein adsorption onto domains and the induction of membrane curvature through steric pressure. Through this work the relationship between membrane bending rigidity, protein affinity, and line tension of phase separated structures were examined and their relationship in biological membranes explored.

59 BASIC BIOLOGICAL SCIENCES↗

Trapping of Electron Cloud LLC/Cesrta Quadrupole and Sextupole Magnets

The Cornell Electron Storage Ring (CESR) has been reconfigured as an ultra low emittance damping ring for use as a test accelerator (CesrTA) for International Linear Collider (ILC) damping ring R&D [1]. One of the primary goals of the CesrTA program is to investigate the interaction of the electron cloud with low emittance positron beam to explore methods to suppress the electron cloud, develop suitable advanced instrumentation required for these experimental studies and benchmark predictions by simulation codes. This paper reports the simulation of the electron-cloud formation in CESRTA and ILC quadrupole and sextupole magnets using the 3D code CLOUDLAND. We found that electrons can be trapped with a long lifetime in a quadrupole and sextupole magnet due to the mirror field trapping mechanism. We study the effects of magnet strength, bunch current, ante-chamber effect, bunch spacing effect and secondary emission yield (SEY) in great detail. The development of an electron cloud in magnets is the main concern where a weak solenoid field is not effective. Quadrupole and sextupole magnets have mirror field configurations which may trap electrons by the mirror field trapping mechanism [2]. Fig.1 shows the orbit of a trapped electron in a quadrupole magnet. The electron makes gyration motion (called transverse motion) and also moves along the field line (called longitudinal motion). At the mirror point (middle of the field line), there is a maximum longitudinal energy and minimum transverse energy. When the electron moves away from the mirror point, its longitudinal energy reduces and the transverse energy increases as the magnetic field increases. If the magnetic field is strong enough, the longitudinal energy becomes zero at one point and then the electron is turned back by the strong field. Note that the electrons are trapped in the region near the middle of the field lines. Although all quadrupole and sextupole magnets can trap electrons in principle, the trapping mechanism is also greatly sensitive to the detail dynamics of the electrons [3]. Both the positron beam and the spacing charge force of electron cloud itself play important roles. This paper reports the simulation of electron cloud in CESRTA/ILC quadrupole and sextupole magnets. Table 1 shows the main parameters used in the simulation.

43 PARTICLE ACCELERATORS↗

Integrated control of next generation power system

The multi-agent system (MAS) approach has been applied with promising results for enhancing an electric power distribution circuit, such as the Circuit of the Future as developed by Southern California Edison. These next generation power system results include better ability to reconfigure the circuit as well as the increased capability to improve the protection and enhance the reliability of the circuit. There were four main tasks in this project. The specific results for each of these four tasks and their related topics are presented in main sections of this report. Also, there were seven deliverables for this project. The main conclusions for these deliverables are summarized in the identified subtask section of this report. The specific details for each of these deliverables are included in the “Project Deliverables” section at the end of this Final Report.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Improved Controls for Fusion RF Systems. Final technical report

We have addressed the specific requirements for the integrated systems controlling an array of klystrons used for Lower Hybrid Current Drive (LHCD). The immediate goal for our design was to modernize the transmitter protection system (TPS) for LHCD on the Alcator C-Mod tokamak at the MIT Plasma Science and Fusion Center (MIT-PSFC). Working with the Alcator C-Mod team, we have upgraded the design of these controls to retrofit for improvements in performance and safety, as well as to facilitate the upcoming expansion from 12 to 16 klystrons. The longer range goals to generalize the designs in such a way that they will be of benefit to other programs within the international fusion effort was met by designing a system which was flexible enough to address all the MIT system requirements, and modular enough to adapt to a large variety of other requirements with minimal reconfiguration.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

CIRCULATING MOVING BED COMBUSTION PROOF OF CONCEPT

Circulating Moving Bed (CMB) combustion technology has its roots in traditional circulating fluidized bed technology and involves a novel method of solid fuel combustion and heat transfer. CMB technology represents a step change in improved performance and cost relative to conventional PC and FBC boilers. The CMB heat exchanger preheats the energy cycle working fluid, steam or air, to the high temperature levels required in systems for advanced power generation. Unique features of the CMB are the reduction of the heat transfer surfaces by about 60% as a result of the enhanced heat transfer rates, flexibility of operation, and about 30% lower cost over existing technology. The CMB Phase I project ran from July 2001 through March 2003. Its objective was to continue development of the CMB technology with a series of proof of concept tests. The tests were conducted at a scale that provided design data for scale up to a demonstration plant. These objectives were met by conducting a series of experiments in ALSTOM Power’s Multi-use Test Facility (MTF). The MTF was modified to operate under CMB conditions of commercial interest. The objective of the tests were to evaluate gas-to-solids heat transfer in the upper furnace, assess agglomeration in the high temperature CMB bubbling bed, and evaluate solids-to-tube heat transfer in the moving bed heat exchanger. The Phase I program results showed that there are still some significant technical uncertainties that needed to be resolved before the technology can be confidently scaled up for a successful demonstration plant design. Work remained in three primary areas: • scale up of gas to solid heat transfer • high temperature finned surface design • the overall requirements of mechanical and process design. The CMB Phase II workscope built upon the results of Phase I and specifically addressed the remaining technical uncertainties. It included a scaled MTF heat transfer test to provide the necessary data to scale up gas-to-solids heat transfer. A stress test rig was built and tested to provide validation data for a stress model needed to support high temperature finned surface design. Additional cold flow model tests and MTF tests were conducted to address mechanical and process design issues. This information was then used to design and cost a commercial CMB design concept. Finally, the MBHE was reconfigured into a slice arrangement and tested for an extended duration at a commercial CFB plant.

42 ENGINEERING↗

Investigating the effectiveness of many-core network processors for high performance cyber protection systems. Part I, FY2011.

This report documents our first year efforts to address the use of many-core processors for high performance cyber protection. As the demands grow for higher bandwidth (beyond 1 Gbits/sec) on network connections, the need to provide faster and more efficient solution to cyber security grows. Fortunately, in recent years, the development of many-core network processors have seen increased interest. Prior working experiences with many-core processors have led us to investigate its effectiveness for cyber protection tools, with particular emphasis on high performance firewalls. Although advanced algorithms for smarter cyber protection of high-speed network traffic are being developed, these advanced analysis techniques require significantly more computational capabilities than static techniques. Moreover, many locations where cyber protections are deployed have limited power, space and cooling resources. This makes the use of traditionally large computing systems impractical for the front-end systems that process large network streams; hence, the drive for this study which could potentially yield a highly reconfigurable and rapidly scalable solution.

99 GENERAL AND MISCELLANEOUS↗

GammeV and GammeV-CHASE

Physics beyond the Standard Model might include Weakly Interacting Slim Particles (WISPs) that address questions such as what is the nature of dark matter or even shed insight into the underlying nature of dark energy. WISPs are a general class of particles that include axions, axion-like particles, hidden sector photons, milli-charged particles, chameleons, etc. The GammeV (Gamma to milli-eV) experiment originated in 2007 in order to test a positive anomalous axion-like particle interpretation of the PVLAS experiment which was not evident in subsequent data. The experiment was also motivated as it was realized that the milli-eV scale appears naturally in a see-saw between the electroweak and Planck scales, neutrino mass differences, the dark energy density, and the possible mass for certain dark matter candidates. GammeV was first to exclude both a scalar and pseudoscalar axion-like particle interpretation of the anomalous PVLAS result setting a limit of around 3.1 x 10 -7 GeV -1 on the coupling to photons for low mass axion-like particles. It has also been found that the parameter space of a variety of other WISP candidates is both largely unexplored and is accessible by modest experiments employing lasers and possibly accelerator magnets. GammeV data has also been used to set limits on possible hidden sector photons. Further work by the GammeV team has focused on a reconfiguration of the apparatus to be sensitive to possible chameleon particles. Chameleons are scalar (or pseudoscalar) particles that couple to the stress energy tensor in a potential such that their properties depend on their environment. In particular, a chameleon acquires an effective mass which increases with local matter density, ρ. For a certain class of such potentials, the chameleon field has properties that might explain dark energy. GammeV set the first limits on the coupling of chameleons to photons. A dedicated follow-up experiment, GammeV-CHASE, (CHameleon Afterglow SEarch), has also been performed and sets limits on both photon and some model dependent matter couplings as a function of an effective chameleon mass.

43 PARTICLE ACCELERATORS↗

AFIP-6 MKII First Cycle Report

The first fuel plate frame assembly of the AFIP-6 MKII experiment was irradiated as planned from December, 2011 through February, 2012 in the center flux trap of the Advanced Test Reactor during cycle 151A. Following irradiation in this cycle and while reconfiguring the experiment in the ATR canal, a non-fueled component (the bottom plate) of the first fuel plate frame assembly became separated from the rail sides. There is no evidence that the fueled region of the fuel plate frame assembly was compromised by this incident or the irradiation conditions. The separation of this component was determined to have been caused by flow induced vibrations, where vortex shedding frequencies were resonant with a natural frequency of the bottom plate component. This gave way to amplification, fracture, and separation from the assembly. Although parallel flow induced vibrations were analyzed, vortex shedding flow induced vibrations was an unfamiliar failure mode that was difficult to identify. Both the once-irradiated first fuel plate and un-irradiated second fuel plate frame assemblies were planned for irradiation in the subsequent cycle 151B. The AFIP-6 MKII experiment was excluded from irradiation in cycle 151B because non-trivial design modifications would be needed to mitigate this type of incident during the second irradiation cycle. All items of the experiment hardware were accounted for and cycle 151B occurred with a non-fueled AFIP backup assembly in the center flux trap. Options for completion of the AFIP-6 MKII experiment campaign are presented and future preventative actions are recommended.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Development and validation of a radial inflow turbine model for simulation of the SNL S-CO 2 split-flow loop

A one-dimensional model for a radial inflow turbine has been developed for super-critical carbon dioxide (S-CO 2 ) Brayton cycle applications. The model accounts for the main phenomena present in the volute, nozzle, and impeller of a single-stage turbine. These phenomena include internal losses due to friction, blade loading, and angle of incidence and parasitic losses due to windage and blade-housing leakage. The model has been added as a component to the G-PASS plant systems code. The model was developed to support the analysis of S-CO 2 cycles in conjunction with small-scale loop experiments. Such loops operate at less than a MWt thermal input. Their size permits components to be reconfigured in new arrangements relatively easily and economically. However, the small thermal input combined with the properties of carbon dioxide lead to turbomachines with impeller diameters of only one to two inches. At these sizes the dominant phenomena differ from those in larger more typical machines. There is almost no treatment in the literature of turbomachines at these sizes. The present work therefore is aimed at developing turbomachine models that support the task of S-CO 2 cycle analysis using small-scale tests. Model predictions were compared against data from an experiment performed for Sandia National Laboratories in the split-flow Brayton cycle loop currently located at Barber-Nichols Inc. The split-flow loop incorporates two turbo-alternator-compressor (TAC) units each incorporating a radial inflow turbine and a radial flow compressor on a common shaft. The predicted thermodynamic conditions at the outlet of the turbine on the main compressor shaft were compared with measured values at different shaft speeds. Two modifications to the original model were needed to better match the experiment data. First, a representation of the heat loss from the volute downstream of the sensed inlet temperature was added. Second, an empirical multiplicative factor was applied to the Euler head and another to the head loss to bring the predicted outlet pressure into better agreement with the experiment. These changes also brought the overall efficiency of the turbine into agreement with values cited by Barber Nichols for small turbines. More generally, the quality of measurement set data can in the future be improved by additional steps taken in the design and operation of the experimental apparatus. First, a thermocouple mounted at the nozzle inlet would provide a better indication of temperature at this key point. Second, heat losses from the turbine should be measured directly. Allowing the impeller to free wheel at inlet conditions and measuring the temperature drop between inlet and outlet would provide a more accurate measure of heat loss. Finally, the enthalpy change during operation is more accurately obtained by measuring the torque on the stator using strain gauges rather than by measuring pressure and temperature at inlet and outlet to infer thermodynamic states.

42 ENGINEERING↗

High-Temperature Split-Flow Recompression Brayton Cycle Initial Test Results

Supercritical CO 2 (S-CO 2 ) power plants offer the potential for better economics because of their small size, use of standard materials, and improved electrical power conversion efficiency at modest temperature (400–750°C). Sandia National Laboratories (SNL or Sandia) and the U.S. Department of Energy Office of Nuclear Energy (DOE-NE) are operating a supercritical CO 2 Brayton cycle power system—the Generation IV (Gen IV) split-flow S-CO 2 compressor test loop—currently located in Arvada Colorado, at Barber Nichols, Inc., under contract to Sandia. A photograph of the upgraded loop is shown in Figure E-1. This system is one of the first S-CO 2 power-producing Brayton cycles operating in the world. This report provides a summary of the newly installed hardware and briefly describes some of the test results that were performed in the upgraded split-flow Brayton loop during June and July of 2011. The Gen IV S-CO 2 split-flow Brayton loop was reconfigured to operate as a simple heated recuperated Brayton loop for the testing in this report period. The test loop had just concluded a phase of construction that substantially increased the capability of the loop by adding heaters, a high-temperature (HT) recuperator, more waste heat removal capability, high-power load banks, larger diameter piping with more bends to reduce thermal stress, and more capable scavenging pumps to reduce windage and friction within the turbomachinery and provide greater cooling capabilities. With these additions, the loop greatly increased its capacity for electrical power generation (30–80 kWe per generator, depending on the loop configuration) and its ability to reach high temperatures (up to 810 K [1000°F]). In recent weeks of testing, the test facility began to realize this potential by achieving new records in turbine inlet temperature (615 K [650°F]), shaft speed (52,000 rpm), pressure ratio (1.65), flow rate (2.7 kg/s), and electrical power generated (20 kWe). These operating conditions still remain short of design conditions for each turbine—an inlet temperature of 810 K (1000°F), a pressure ratio of 1.8, a shaft speed of 75,000 rpm, a flow rate of 3.5 kg/s, and a maximum generator power of 125 kWe—but they are beginning to be approached. Not all planned upgrades were implemented due to the limited funding profile of FY2010. Only 520 kW of heater power were installed—not the total 780 kW. Furthermore, because one of the heater controllers was not functioning, only 390 kW of heater power were available. Similarly, the 3-in. piping was installed only in the high-pressure leg of the loop, not in the low-pressure leg, as was originally planned. We also had to rely on the new load bank capability for rapid shutdown situations, and were not able to install a dedicated shutdown resistor. Nevertheless, in spite of these limitations, we operated the loop at record operating conditions and were largely limited only by the facility and support equipment—not the turbomachinery.

Wright, Steven Alan↗