Search NASA⌕ Search

SEARCH · Search NASA

Results for “EVALUATION”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,693 records · Page 94

Status of ORNL TSL evaluations [Slides]

This presentation is on the status of Oak Ridge National Laboratory (ORNL) Thermal Scattering Evaluation (TSL) evaluations. A focus of this presentation centers on the preliminary work on Teflon and Polyethylene evaluation validation.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Nondestructive Evaluation (NDE) of Cable Anomalies using Frequency Domain Reflectometry (FDR) and Spread Spectrum Time Domain Reflectometry (SSTDR)

This report presents a comparative assessment of the performance of frequency domain reflectometry (FDR) and spread spectrum time domain reflectometry (SSTDR) in detecting a wide range of electrical cable anomalies. All tests and results reported herein were performed at the PNNL Accelerated and Real-Time Environmental Nodal Assessment (ARENA) cable and motor test bed. The primary objective of this work was to evaluate the effectiveness of SSTDR, a fledgling cable monitoring technique that shows promise for application in online monitoring of energized cable systems, against FDR, an offline technique widely employed in the nuclear power plant (NPP) industry. FDR tests are becoming more widely used in nuclear power plant cable aging management and test programs – particularly for low voltage cables. FDR capabilities for these kinds of tests have been reported by PNNL and others. The FDR test is performed on de-energized cables by connecting the FDR instrument to two of the cable conductors, or one conductor and the shield. A broad band low voltage (< 5 V) chirp is introduced in the cable, and any reflected response is captured in the frequency domain. The captured reflection is then processed by performing an inverse Fourier transform to a time domain response which can then be converted to a distance response based on the cable velocity of propagation (VoP). SSTDR measurements are functionally similar to FDR measurements in that a broad-band voltage signal composed of a square or sine wave modulated pseudo-random sequence of chips (< 5 volts), is injected onto one of the cable conductors. The injected signal will experience partial energy reflection and transmission at each impedance discontinuity along the transmission line. Any reflected response is detected by computing a cross-correlation between the reflected signals and a delayed copy of the incident SSTDR signal. the time delay for the reflected signal to experience the best matched correlation with the incident signal, indicates the travel time for the signal to reach a change in impedance. By knowing this time delay and velocity of propagation (VoP) of the signal, one can compute the physical distance. A big advantage that SSTDR measurements have over other methods is the ability to be connected to energized or live wires (currently up to 1kV) thereby enabling online monitoring of cables. SSTDR has been used successfully in several applications, e.g., aircraft, rail, and photovoltaic systems. In this work FDR and SSTDR cable assessment techniques were used to characterize a variety of cable anomalies and faults including: (1) Presence or absence of a motor; (2) Ground faults and short circuit faults; (3) Moist environments and water ingress faults; (4) Accelerated thermal aging. Both shielded and non-shielded cables were evaluated in this report. Offline measurements were made using FDR and online measurements were made by SSTDR for a range of test scenarios. Based on the results across all cable anomalies evaluated in this study, FDR displayed high sensitivity towards cable condition assessment, while SSTDR showed promise for future application in monitoring NPP cable systems. However, further developments are suggested to improve the resolution and sensitivity of SSTDR towards faults and anomalies in low voltage cables.rt presents a comparative

42 ENGINEERING↗

Ghent Generating Station Nuclear Study: Siting Evaluation

The purpose of this initial siting evaluation is to assess the suitability of the PPL Corporation (PPL) owned land at/near the Kentucky Utilities Ghent Generating Station (GGS) for the deployment of advanced nuclear reactors and to determine if there are any exclusionary or avoidance factors associated with siting nuclear power at GGS. The formal siting process for a nuclear reactor requires a great level of time (i.e., multiple years), effort, and detail. The Electric Power Research Institute (EPRI) estimates the formal siting process could take a dedicated team between one and three years to complete. This initial siting evaluation considers several characteristics (e.g., environmental conditions, seismic concerns, footprint, water use, etc.) and highlights favorable/preferred characteristics as well as potential risks to feasibility. Potential risks were explored in greater detail to provide PPL with additional insights to support decision planning. The results indicate the strengths and weaknesses associated with the GGS site as a location for a nuclear generating station and are intended to inform PPL’s next steps. The results of this initial siting evaluation will also inform the selection of candidate nuclear technologies for the GGS site that align with PPL’s mission and business objectives.

99 GENERAL AND MISCELLANEOUS↗

A Resolved Resonance Evaluation for 51 V with Resonance Parameter Covariance

In this presentation the 51 V evaluation in response to NCSP need is completed. Issues in connection to RR representation are addressed. Uncertainty and covariance information derived with the evaluation. Evaluation proposed and accepted for inclusion in ENDF/B-VIII.1 library.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Analytical and Performance-Based Evaluation Alternatives to Full-Scope, High-Fidelity Testbeds

One consequence the design and operational differences of advanced reactors is that integrated system validation (ISV) using full-scope, high-fidelity testbed might not be cost-justified or practical. The absence of traditional ISV may pose an issue for the conduct of safety evaluations since it may leave regulators without the information derived from this performance-based testing. The purpose of this research is to identify analytical and performance-based test and evaluation methods that are alternatives to full-scope, high-fidelity testbeds that have traditionally been used for ISV. We developed a method to test validation based on a multi-stage validation (MSV) framework. MSV is an approach to meeting validation objectives through incremental, successive validation activities beginning in the early stages of the design process and continuing through the later stages. MSV doesn't rely solely on late stage validation, rather it accommodates the use of a broad spectrum of analytical and performance-based information and a diversity of testbeds. In addition, MSV embraces the use of information from other types of evaluations and analyses.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Nuclear Power Plant Infrastructure Evaluations for Removal of Spent Nuclear Fuel

This report provides evaluations of the NPP site infrastructure and near-site transportation infrastructure for removing SNF from 19 NPP sites and the Morris Independent Spent Fuel Storage Installation (ISFSI). The material to be removed from the NPP sites includes both the SNF and the greater-than-Class C low-level radioactive waste (GTCC waste)3 that is stored, or will be stored, at the sites. This report is an update of the report Nuclear Power Plant Infrastructure Evaluations for Removal of Spent Nuclear Fuel (Maheras et al. 2021) and includes expansion of the site evaluations to include operating nuclear power plant (NPP) sites and to incorporate updated site inventory data. Figures that include the number of spent nuclear fuel (SNF) assemblies and metric tons heavy metal (MTHM) in a single figure have also been added to the report.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Research, Monitoring, and Evaluation for the Federal Columbia River Estuary Program

The purpose ofthis document is to describe research, monitoring, and evaluation (RME) for the Federal Columbia River Estuary Program. The intent of this RME effort is to provide data and information to evaluate progress toward meeting program goals and objectives and support decision-making in the Estuary Program. The goal of the Estuary Program is to understand, conserve, and restore the estuary ecosystem to improve the performance of listed salmonid populations. The Estuary Program has five general objectives, designed to fulfill the program goal, as follows. 1. Understand the primary stressors affecting ecosystem controlling factors, such as ocean conditions and invasive species. 2. Conserve and restore factors controlling ecosystem structures and processes, such as hydrodynamics and water quality. 3. Increase the quantity and quality of ecosystem structures, i.e., habitats, juvenile salmonids use during migration through the estuary. 4. Maintain the food web to benefit salmonid performance. 5. Improve salmonid performance in terms of life history diversity, foraging success, growth, and survival. The goal of estuary RME is to provide pertinent and timely research and monitoring information to planners, implementers, and managers of the Estuary Program. In conclusion, the estuary RME effort is designed to meet the research and monitoring needs of the estuary Program using an adaptive management process. Estuary RME's success and usefulness will depend on the actual conduct of adaptive management, as embodied in the objectives, implrementation, data, reporting, and synthesis, evaluation, and decision-making described herein.

54 ENVIRONMENTAL SCIENCES↗

Systems Analysis Programs for Hands-on Intergrated Reliability Evaluations (SAPHIRE) Summary Manual

The Systems Analysis Programs for Hands-on Integrated Reliability Evaluations (SAPHIRE) is a software application developed for performing a complete probabilistic risk assessment (PRA) using a personal computer (PC) running the Microsoft Windows operating system. SAPHIRE is primarily funded by the U.S. Nuclear Regulatory Commission (NRC) and developed by the Idaho National Laboratory (INL). INL's primary role in this project is that of software developer and tester. However, INL also plays an important role in technology transfer by interfacing and supporting SAPHIRE users, who constitute a wide range of PRA practitioners from the NRC, national laboratories, the private sector, and foreign countries. SAPHIRE can be used to model a complex system’s response to initiating events and quantify associated consequential outcome frequencies. Specifically, for nuclear power plant applications, SAPHIRE can identify important contributors to core damage (Level 1 PRA) and containment failure during a severe accident which lead to releases (Level 2 PRA). It can be used for a PRA where the reactor is at full power, low power, or at shutdown conditions. Furthermore, it can be used to analyze both internal and external initiating events and has special features for transforming an internal events model to a model for external events, such as flooding and fire analysis. It can also be used in a limited manner to quantify risk in terms of release consequences to the public and environment (Level 3 PRA). SAPHIRE also includes a separate module called the Graphical Evaluation Module (GEM). GEM is a special user interface linked to SAPHIRE that automates the SAPHIRE process steps for evaluating operational events at commercial nuclear power plants. Using GEM, an analyst can estimate the risk associated with operational events (for example, to calculate a conditional core damage probability) very efficiently and expeditiously. This report provides an overview of the functions available in SAPHIRE and presents general instructions for using the software. Section 1 presents SAPHIRE’s historical evolution and summarizes its capabilities. Section 2 presents instructions for installing and using the code. Section 3 explains the database structure used in SAPHIRE and discusses database concepts. Section 4 explains how PRA data (event frequencies, human error probabilities, etc.) can be generated and manipulated using “change sets.” Section 5 deals with fault tree operations, including constructing, editing, solving, and displaying results. Section 6 presents operations associated with event trees, including rule application for event tree linking, partitioning, and editing sequences. Section 7 presents how accident sequences are generated, solved, quantified, and analyzed. Section 8 discusses the functions available for performing end state analysis. Section 9 explains how to modify data stored in a SAPHIRE database. Section 10 illustrates how to generate and customize reports. Section 11 covers SAPHIRE utility options to perform routine functions such as defining constant values, recovering databases, and loading data from external sources. Section 12 provides an overview of GEM’s features and capabilities. Finally, Section 13 summarizes SAPHIRE’s quality assurance process.

97 MATHEMATICS AND COMPUTING↗

TECHNICAL EVALUATION OF THE INTERACTION OF GROUNDWATER WITH THE COLUMBIA RIVER AT THE DEPARTMENT OF ENERGY HANFORD SITE 100-D AREA

Groundwater beneath much of Hanford's 100 Areas is contaminated with hexavalent chromium (Cr{sup +6}) as a consequence of treating reactor cooling water to prevent corrosion. Several treatment systems are in place to remove Cr{sup +6} from the groundwater; however, these systems currently do not reduce Cr{sup +6} to concentrations below aquatic standards. Of concern is the transport of Cr{sup +6} to areas within the channel of the river, as sensitive species inhabit the river and its associated transition zone. The aquatic standard for Cr{sup +6} is currently 11 ug/l under the Record of Decision (ROD) for Interim Action and Department of Energy (DOE) currently plans to pursue remediation of the groundwater to achieve the 11 ug/l standard. Because the compliance wells used to monitor the current remediation systems are located some distance from the river, they may not provide an accurate indication of Cr{sup +6} concentrations in the water that reaches the riverbed. In addition, because salmon spawning areas are considered a high priority for protection from Hanford contaminants, it would be advantageous to understand (1) to what extent Cr{sup +6} discharged to the near-shore or river ecosystems is diluted or attenuated and (2) mechanisms that could mitigate the exposure of the river ecosystems to the discharging Cr{sup +6}. The current concentration target for Cr{sup +6} at near-river groundwater monitoring locations is 20 {micro}g/L; it is assumed that this groundwater mixes with river water that contains virtually no chromium to meet Washington Department of Ecology's (Ecology) water quality standard of 10 {micro}g/L in the river environment. This dynamic mixing process is believed to be driven by daily and seasonal changes in river stage and groundwater remediation system operations, and has been validated using analytical data from numerous groundwater samples obtained adjacent to and within the banks of the river. Although the mean mixing factor of river water and site groundwater in this zone has been estimated to be equal parts of groundwater and river water, a wide range of mixing ratios likely occurs at various times of the day and year. The degree of mixing and dilution appears to be greatly influenced by the river stage and other groundwater/surface water interaction. The extent of mixing, thus, has implications for the design and operation of the groundwater remediation systems. Improved understanding of this 'dilution' mechanism is needed to design an optimum 'systems approach' to accelerate remediation of the near-shore contaminant plumes. More information on the pathway from near-river mapped plumes to riverbed receptor locations is also needed to develop a defensible proposed plan for a future ROD for final remedial action of contaminated groundwater. In April 2008, an expert panel of scientists was convened to review existing information and provide observations and suggestions to improve the current understanding of groundwater surface water interactions in the 100 Areas (primarily focusing on 100-D Area), and to identify what additional analyses or approaches may provide critical information needed to design and implement remediation systems that will minimize impacts to river aquatic systems. Specific objectives provided to the panel included: (1) comment on approaches and methods to improve the current understanding of groundwater-surface water interactions, specifically how contaminated groundwater enters the riverbed and how this relates to remediation of chromate in the groundwater in the 100 Areas; (2) evaluate past and current data collection methods, data analysis techniques, assumptions, and groundwater transport and mixing mechanisms; (3) evaluate the current monitoring network (monitoring wells, aquifer tubes, and shoreline/river monitoring); (4) evaluate the role played by modeling; and (5) suggest additional research to fill data gaps and perform modeling.

54 ENVIRONMENTAL SCIENCES↗

Conceptual Soundness, Metric Development, Benchmarking, and Targeting for PATH Subprogram Evaluation

The objective of this study is to evaluate the conceptual soundness of the U.S. Department of Housing and Urban Development (HUD) Partnership for Advancing Technology in Housing (PATH) program's revised goals and establish and apply a framework to identify and recommend metrics that are the most useful for measuring PATH's progress. This report provides an evaluative review of PATH's revised goals, outlines a structured method for identifying and selecting metrics, proposes metrics and benchmarks for a sampling of individual PATH programs, and discusses other metrics that potentially could be developed that may add value to the evaluation process. The framework and individual program metrics can be used for ongoing management improvement efforts and to inform broader program-level metrics for government reporting requirements.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

2009 EVALUATION OF TRITIUM REMOVAL AND MITIGATION TECHNOLOGIES FOR WASTEWATER TREATMENT

Since 1995, a state-approved land disposal site (SALDS) has received tritium contaminated effluents from the Hanford Site Effluent Treatment Facility (ETF). Tritium in this effluent is mitigated by storage in slow moving groundwater to allow extended time for decay before the water reaches the site boundary. By this method, tritium in the SALDS is isolated from the general environment and human contact until it has decayed to acceptable levels. This report contains the 2009 update evaluation of alternative tritium mitigation techniques to control tritium in liquid effluents and groundwater at the Hanford site. A thorough literature review was completed and updated information is provided on state-of-the-art technologies for control of tritium in wastewaters. This report was prepared to satisfy the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) Milestone M-026-07B (Ecology, EPA, and DOE 2007). Tritium separation and isolation technologies are evaluated periodically to determine their feasibility for implementation to control Hanford site liquid effluents and groundwaters to meet the Us. Code of Federal Regulations (CFR), Title 40 CFR 141.16, drinking water maximum contaminant level (MCL) for tritium of 20,000 pOll and/or DOE Order 5400.5 as low as reasonably achievable (ALARA) policy. Since the 2004 evaluation, there have been a number of developments related to tritium separation and control with potential application in mitigating tritium contaminated wastewater. These are primarily focused in the areas of: (1) tritium recycling at a commercial facility in Cardiff, UK using integrated tritium separation technologies (water distillation, palladium membrane reactor, liquid phase catalytic exchange, thermal diffusion), (2) development and demonstration of Combined Electrolysis Catalytic Exchange (CECE) using hydrogen/water exchange to separate tritium from water, (3) evaporation of tritium contaminated water for dispersion in the atmosphere, and (4) use of barriers to minimize the transport of tritium in groundwater. Continuing development efforts for tritium separations processes are primarily to support the International Thermonuclear Experimental Reactor (ITER) program, the nuclear power industry, and the production of radiochemicals. While these applications are significantly different than the Hanford application, the technology could potentially be adapted for Hanford wastewater treatment. Separations based processes to reduce tritium levels below the drinking water MCL have not been demonstrated for the scale and conditions required for treating Hanford wastewater. In addition, available cost information indicates treatment costs for such processes will be substantially higher than for discharge to SALDS or other typical pump and treat projects at Hanford. Actual mitigation projects for groundwater with very low tritium contamination similar to that found at Hanford have focused mainly on controlling migration and on evaporation for dispersion in the atmosphere.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

FY08 VPP Program Evaluation

The Voluntary Protection Program (VPP) is a recognized third-party certification of worker safety and health program excellence, based on industry best practices that focus on management leadership and employee involvement, as well as other safety and health program elements. This Pacific Northwest National Laboratory (PNNL) VPP Program Evaluation is the FY-2008 report of the PNNL VPP Steering Committee regarding the status of VPP at PNNL. It is an update of the previous annual report dated January, 2007 and was completed in January 2008. An annual evaluation of the status of VPP is required of all sites that participate in the DOE-VPP. This report provides a detailed summary of the PNNL VPP Steering Committee’s evaluation of program performance and documents both strengths and improvement opportunities related to the various aspects of the VPP model.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

A summary of 22 Years of Fish Screen Evaluation in the Yakima River Basin, Summary Report 1985-2007.

Sixty fish screen facilities were constructed in the Yakima River basin between 1985 and 2006 as part of the Northwest Power and Conservation Council plan to mitigate the effects of federal hydroelectric projects on fish and wildlife populations. This report summarizes evaluations of some of those and other fish screen facilities conducted by Pacific Northwest National Laboratory (PNNL) from 1985 through 2006. The objective of these studies was to determine if the newly designed and constructed fish screens were effective at providing juvenile salmonids safe passage past irrigation diversions. To answer that question, PNNL conducted release-and-catch studies at eight Phase I sites in the Yakima River basin. Increasing concerns about the impacts of hatchery fish releases on the wild fish population, as well as the cost and time necessary to perform these kinds of biological studies at more than 60 planned Phase II sites, required development of techniques to evaluate the effectiveness of the sites without releasing fish. The new techniques involved collecting information on screen design, operation, and effectiveness at guiding fish safely through the fish screen facility. Performance measures including water velocities and passage conditions provide a good alternative to biological studies at significantly lower cost and time. Physical techniques were used at all 10 Phase I and 28 Phase II sites evaluated by PNNL over the following 19 years. Results of these studies indicate the Phase I and II fish screen facilities are designed and capable of providing safe passage for juvenile salmonids so long as construction, maintenance, and operations meet the criteria used in the design of each site and the National Marine Fisheries Service criteria for juvenile fish screen design.

13 HYDRO ENERGY↗

Performance Evaluation for Modular, Scalable Cooling Systems with Hot Aisle Containment in Data Centers

Scientific and enterprise data centers, IT equipment product development, and research data center laboratories typically require continuous cooling to control inlet air temperatures within recommended operating levels for the IT equipment. The consolidation and higher density aggregation of slim computing, storage and networking hardware has resulted in higher power density than what the raised-floor system design, coupled with commonly used computer rack air conditioning (CRAC) units, was originally conceived to handle. Many existing data centers and newly constructed data centers adopt CRAC units, which inherently handle heat transfer within data centers via air as the heat transfer media. This results in energy performance of the ventilation and cooling systems being less than optimal. Understanding the current trends toward higher power density in IT computing, more and more IT equipment manufacturers are designing their equipment to operate in 'conventional' data center environments, while considering provisions of alternative cooling solutions to either their equipment or supplemental cooling in rack or row systems. Naturally, the trend toward higher power density resulting from current and future generations of servers has, in the meanwhile, created significant opportunities for precision cooling suppliers to engineer and manufacture packaged modular and scalable systems. The modular and scalable cooling systems aim at significantly improving efficiency while addressing the thermal challenges, improving reliability, and allowing for future needs and growth. Such pre-engineered and manufactured systems may be a significant improvement over current design; however, without an energy efficiency focus, their applications could also lead to even lower energy efficiencies in the overall data center infrastructure. The overall goal of the project supported by California Energy Commission was to characterize four commercially available, modular cooling systems installed in a data center. Such modular cooling systems are all scalable localized units, and will be evaluated in terms of their operating energy efficiency in a real data center, respectively, as compared to the energy efficiency of traditional legacy data center cooling systems. The technical objective of this project was to evaluate the energy performance of one of the four commercially available modular cooling systems installed in a data center in Sun Microsystems, Inc. This report is the result of a test plan that was developed with the industrial participants input, including specific design and operating characteristics of the selected modular localized cooling solution provided by vendor 2. The technical evaluation included monitoring and measurement of selected parameters, and establishing and calculating energy efficiency metrics for the selected cooling product, which is a modular, scalable pair of chilled water cooling modules that were tested in a hot/cold aisle environment with hot aisle containment. The scope of this report is to quantify energy performance of the modular cooling unit in operation as it corresponds to a combination of varied server loads and inlet air temperatures. The information generated from this testing when combined with a concurrent research study to document the energy efficiency of the host data center's central chilled water cooling plant can be used to estimate potential energy savings from implementing modular cooling compared to conventional cooling in data centers.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Performance Evaluation for Modular, Scalable Liquid-Rack Cooling Systems in Data Centers

Scientific and enterprise data centers, IT equipment product development, and research data center laboratories typically require continuous cooling to control inlet air temperatures within recommended operating levels for the IT equipment. The consolidation and higher density aggregation of slim computing, storage and networking hardware has resulted in higher power density than what the raised-floor system design, coupled with commonly used computer rack air conditioning (CRAC) units, was originally conceived to handle. Many existing data centers and newly constructed data centers adopt CRAC units, which inherently handle heat transfer within data centers via air as the heat transfer media. This results in energy performance of the ventilation and cooling systems being less than optimal. Understanding the current trends toward higher power density in IT computing, more and more IT equipment manufacturers are designing their equipment to operate in 'conventional' data center environments, while considering provisions of alternative cooling solutions to either their equipment or supplemental cooling in rack or row systems. In the meanwhile, the trend toward higher power density resulting from current and future generations of servers has created significant opportunities for precision cooling suppliers to engineer and manufacture packaged modular and scalable systems. The modular and scalable cooling systems aim at significantly improving efficiency while addressing the thermal challenges, improving reliability, and allowing for future needs and growth. Such pre-engineered and manufactured systems may be a significant improvement over current design; however, without an energy efficiency focus, their applications could also lead to even lower energy efficiencies in the overall data center infrastructure. The overall goal of the project supported by California Energy Commission was to characterize four commercially available, modular cooling systems installed in a data center. Such modular cooling systems are all scalable localized units, and will be evaluated in terms of their operating energy efficiency in a real data center, respectively, as compared to the energy efficiency of traditional legacy data center cooling systems. The technical objective of this project was to evaluate the energy performance of one of the four commercially available modular cooling systems installed in a data center in Sun Microsystems, Inc. This report is the result of a test plan that was developed with the industrial participants input, including specific design and operating characteristics of the selected modular localized cooling solution provided by vendor 3. The technical evaluation included monitoring and measurement of selected parameters, and establishing and calculating energy efficiency metrics for the selected cooling product, which is a modular, scalable liquid-rack cooling system in this study. The scope is to quantify energy performance of the modular cooling unit in operation as it corresponds to a combination of varied server loads and inlet air temperatures, under various chilled-water supply temperatures. The information generated from this testing when combined with documented energy efficiency of the host data center's central chilled water cooling plant can be used to estimate potential energy savings from implementing modular cooling compared to conventional cooling in data centers.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Performance Evaluation for a Modular, Scalable Passive Cooling System in Data Centers

Scientific and enterprise data centers, IT equipment product development, and research data center laboratories typically require continuous cooling to control inlet air temperatures within recommended operating levels for the IT equipment. The consolidation and higher density aggregation of slim computing, storage and networking hardware has resulted in higher power density than what the raised-floor system design, coupled with commonly used computer rack air conditioning (CRAC) units, was originally conceived to handle. Many existing data centers and newly constructed data centers adopt CRAC units, which inherently handle heat transfer within data centers via air as the heat transfer media. This results in energy performance of the ventilation and cooling systems being less than optimal. Understanding the current trends toward higher power density in IT computing, more and more IT equipment manufacturers are designing their equipment to operate in 'conventional' data center environments, while considering provisions of alternative cooling solutions to either their equipment or supplemental cooling in rack or row systems. In the meanwhile, the trend toward higher power density resulting from current and future generations of servers has created significant opportunities for precision cooling to engineer and manufacture packaged modular and scalable systems. The modular and scalable cooling systems aim at significantly improving efficiency while addressing the thermal challenges, improving reliability, and allowing for future needs and growth. Such pre-engineered and manufactured systems may be a significant improvement over current design; however, without an energy efficiency focus, their applications could also lead to even lower energy efficiencies in the overall data center infrastructure. The overall goal of the project supported by California Energy Commission was to characterize four commercially available, modular cooling systems installed in a data center. Such modular cooling systems are all scalable localized units, and will be evaluated in terms of their operating energy efficiency in a real data center, respectively, as compared to the energy efficiency of traditional legacy data center cooling systems. The technical objective of this project was to evaluate the energy performance of one of the four commercially available modular cooling systems installed in a data center in Sun Microsystems, Inc. This report is the result of a test plan that was developed with the industrial participants input, including specific design and operating characteristics of the selected passive, modular localized cooling solution provided by vendor 4. The technical evaluation included monitoring and measurement of selected parameters, and establishing and calculating energy efficiency metrics for the selected cooling product, which is a passive, modular, scalable liquid cooling system in this study. The scope is to quantify energy performance of the modular cooling unit corresponding to various server loads and inlet air temperatures, under various chilled-water supply temperatures. The information generated from this testing when combined with documented energy efficiency of the host data center's central chilled water cooling plant can be used to estimate potential energy savings from implementing modular cooling compared to conventional cooling in data centers.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

National SCADA Test Bed Substation Automation Evaluation Report

Increased awareness of the potential for cyber attack has recently resulted in improved cyber security practices associated with the electrical power grid. However, the level of practical understanding and deployment of cyber security practices has not been evenly applied across all business sectors. Much of the focus has been centered on information technology business centers and control rooms. This report explores the current level of substation automation, communication, and cyber security protection deployed in electrical substations throughout existing utilities in the United States. This report documents the evaluation of substation automation implementation and associated vulnerabilities. This evaluation used research conducted by Newton-Evans Research Company for some of its observations and results. The Newton Evans Report aided in the determination of what is the state of substation automation in North American electric utilities. Idaho National Laboratory cyber security experts aided in the determination of what cyber vulnerabilities may pose a threat to electrical substations. This report includes cyber vulnerabilities as well as recommended mitigations. It also describes specific cyber issues found in typical substation automation configurations within the electric utility industry. The evaluation report was performed over a 5-month period starting in October 2008

24 POWER TRANSMISSION AND DISTRIBUTION↗