Search NASA⌕ Search

SEARCH · Search NASA

Results for “Implementation Plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,711 records · Page 95

Initial implementation of the conversion from the energy-subtracted CT number to electron density in tissue inhomogeneity corrections: An anthropomorphic phantom study of radiotherapy treatment planning

Purpose: To achieve accurate tissue inhomogeneity corrections in radiotherapy treatment planning, the authors had previously proposed a novel conversion of the energy-subtracted computed tomography (CT) number to an electron density (ΔHU–ρ{sub e} conversion), which provides a single linear relationship between ΔHU and ρ{sub e} over a wide range of ρ{sub e}. The purpose of this study is to present an initial implementation of the ΔHU–ρ{sub e} conversion method for a treatment planning system (TPS). In this paper, two example radiotherapy plans are used to evaluate the reliability of dose calculations in the ΔHU–ρ{sub e} conversion method. Methods: CT images were acquired using a clinical dual-source CT (DSCT) scanner operated in the dual-energy mode with two tube potential pairs and an additional tin (Sn) filter for the high-kV tube (80–140 kV/Sn and 100–140 kV/Sn). Single-energy CT using the same DSCT scanner was also performed at 120 kV to compare the ΔHU–ρ{sub e} conversion method with a conventional conversion from a CT number to ρ{sub e} (Hounsfield units, HU–ρ{sub e} conversion). Lookup tables for ρ{sub e} calibration were obtained from the CT image acquisitions for tissue substitutes in an electron density phantom (EDP). To investigate the beam-hardening effect on dosimetric uncertainties, two EDPs with different sizes (a body EDP and a head EDP) were used for the ρ{sub e} calibration. Each acquired lookup table was applied to two radiotherapy plans designed using the XiO TPS with the superposition algorithm for an anthropomorphic phantom. The first radiotherapy plan was for an oral cavity tumor and the second was for a lung tumor. Results: In both treatment plans, the performance of the ΔHU–ρ{sub e} conversion was superior to that of the conventional HU–ρ{sub e} conversion in terms of the reliability of dose calculations. Especially, for the oral tumor plan, which dealt with dentition and bony structures, treatment planning with the HU–ρ{sub e} conversion exhibited apparent discrepancies between the dose distributions and dose–volume histograms (DVHs) of the body-EDP and head-EDP calibrations. In contrast, the dose distributions and DVHs of the body-EDP and head-EDP calibrations coincided with each other almost perfectly in the ΔHU–ρ{sub e} conversion for 100–140 kV/Sn. The difference between the V{sub 100}’s (the mean planning target volume receiving 100% of the prescribed dose; a DVH parameter) of the body-EDP and head-EDP calibrations could be reduced to less than 1% using the ΔHU–ρ{sub e} conversion, but exceeded 11% for the HU–ρ{sub e} conversion. Conclusions: The ΔHU–ρ{sub e} conversion can be implemented for currently available TPS’s without any modifications or extensions. The ΔHU–ρ{sub e} conversion appears to be a promising method for providing an accurate and reliable inhomogeneity correction in treatment planning for any ill-conditioned scans that include (i) the use of a calibration EDP that is nonequivalent to the patient’s body tissues, (ii) a mismatch between the size of the patient and the calibration EDP, or (iii) a large quantity of high-density and high-atomic-number tissue structures.

60 APPLIED LIFE SCIENCES↗

Energy Management Programs at the John F. Kennedy Space Center

The Energy Management internship over the summer of 2011 involved a series of projects related to energy management on the John. F. Kennedy Space Center (KSC). This internship saved KSC $14.3 million through budgetary projections, saved KSC $400,000 through implementation of the recycling program, updated KSC Environmental Management System's (EMS) water and energy-related List of Requirements (LoR) which changed 25.7% of the list, provided a incorporated a 45% design review of the Ordnance Operations Facility (OOF) which noted six errors within the design plans, created a certification system and timeline for implementation regarding compliance to the federal Guiding Principles, and gave off-shore wind as the preferred alternative to on-site renewable energy generation.

Huang, Jeffrey H.↗

Safety-Related Instrumentation and Control Pilot Upgrade: Initial Scoping Phase Implementation and Lessons Learned

In May 2016, the U.S. Nuclear Regulatory Commission (NRC) staff provided a digital instrumentation and control (I&C) regulatory infrastructure integrated action plan to the NRC for approval. One of the objectives of that plan was to establish a clear regulatory structure with reduced regulatory uncertainty to enable the expanded safe use of digital I&C in commercial nuclear reactors while continuing to ensure safety and security. To achieve this end, the NRC, with collaboration from industry, developed a streamlined License Amendment Request Alternate Review (AR) process for safety-related (SR) digital I&C upgrades. In spite of this effort, the industry has remained reluctant to perform such I&C upgrades because of perceived regulatory and financial risks associated with being the first or an early adopter of the AR process for SR I&C upgrades. The U.S. Department of Energy Light Water Reactor Sustainability Program at the Idaho National Laboratory performed Initial Scoping Phase research to help break this impasse by supporting a SR I&C Pilot Upgrade, working with MPR Associates, ScottMadden Inc., and Exelon Generation. Exelon’s Limerick Generating Station (LGS) was selected as the target for this research. This paper summarizes the Initial Scoping Phase engineering and operations, licensing, and project management activities necessary to bound the scope, schedule, and estimated cost of the project sufficiently to enable utility management authorization of Conceptual Design Phase activities. These efforts and associated products are intended to provide a template to support larger industry efforts to perform similar upgrades as a foundation stone for a digital transformation that will improve plant safety, reliability, and operational performance while lowering plant total cost of ownership. As a result of the combined effort of Exelon Generation and research participants, Conceptual Design Phase activities for the subject upgrade at LGS were approved by Exelon. Further, the U.S. Department of Energy also awarded a $50 million cost share award to Exelon in order to pave the way for SR I&C modernization and associated control room upgrades across the U.S. nuclear fleet. Additional research reports are planned for the Conceptual Design Phase, Detailed Design Phase, and the Implementation Phase of the LGS project to document the process followed and promulgate lessons learned to industry.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Software verification plan for GCS

This verification plan is written as part of an experiment designed to study the fundamental characteristics of the software failure process. The experiment will be conducted using several implementations of software that were produced according to industry-standard guidelines, namely the Radio Technical Commission for Aeronautics RTCA/DO-178A guidelines, Software Consideration in Airborne Systems and Equipment Certification, for the development of flight software. This plan fulfills the DO-178A requirements for providing instructions on the testing of each implementation of software. The plan details the verification activities to be performed at each phase in the development process, contains a step by step description of the testing procedures, and discusses all of the tools used throughout the verification process.

Dent, Leslie A.↗

OverFlight: Graphical Flight Operations Planning

OverFlight is an in-development graphical user interface (GUI) that implements a state-of-the-art rotorcraft maneuvering noise model using a source noise hemisphere approach coupled with the Aircraft NOise Prediction Program 2 (ANOPP2). This GUI stems from a demand for easy-to-use mission planning and community impact acoustic tools that can model the maneuvering flight of a rotary-wing vehicle. This paper covers the models used for the development of OverFlight and model validation efforts. Data from a joint NASA/Army flight test of an MD530F aircraft are used both for source noise hemispheres as well as maneuvering flight data. Analysis of the predicted maneuvering noise shows better agreement that traditional methods currently employed, while also demonstrating maneuvers where the underlying assumptions fail to hold.

rotorcraft↗

Assessment of the Geomechanical Risks Associated with CO 2 Injection at the FutureGen 2.0 Site: Application of the State of Stress Assessment Tool (SOSAT)

This report presents the results of the application of the State of Stress Assessment Tool (SOSAT) on the FutureGen 2.0 data set. SOSAT was developed as part of the National Risk Assessment Partnership (NRAP) project and provides a unique integrated framework for estimating the state of stress probability distribution at a given depth in the subsurface and evaluating the risk of induced shear and tensile failure resulting from the injection of carbon dioxide (CO 2 ). The approach implemented by SOSAT is based on two deterministic and widely used methods of determining the state of stress (i.e., stress polygon and one-dimensional tectonic-elastic approach). These methods have been modified using a probabilistic approach to account for uncertainties in the input parameters. The methodology proposed in SOSAT was demonstrated using the data obtained for the FutureGen 2.0 project located in the Illinois Basin. Although the FutureGen 2.0 project was suspended by the U.S. Department of Energy prior to the start of injection operations, the extensive characterization efforts undertaken at the storage site have yielded a considerable amount of valuable data about this part of the sedimentary basin. The FutureGen 2.0 storage site was designed to accommodate the injection of 1.1 million metric tons of CO 2 per year over a 20-year period. The injection of CO 2 and the associated pressure buildup in the reservoir is expected to alter the state of stress over the course of the injection. These changes in the initial stress state may affect fault stability and potentially lead to the unintentional creation of hydraulic fractures, which could pose a leakage risk if not contained within the reservoir. Assessing these risks is critical to making informed decisions about the characterization, management of the injection operation, and monitoring of the storage site. The data required by SOSAT for the geomechanical assessment of the FutureGen 2.0 site were identified, and the methodology proposed in SOSAT was followed to evaluate the probability of reactivating critically oriented faults or potentially creating hydraulic fractures in the reservoir. The results of the geomechanical analysis performed using the SOSAT led to the following conclusions. 1. The probability distribution of the state of stress indicates significant uncertainties in the magnitude of the maximum horizontal stress S Hmax , while the minimum horizontal stress S hmin is well constrained by the stress measurements conducted during the characterization efforts at the storage site. This uncertainty in the magnitude of S Hmax is a common challenge and has significant implications for geomechanical risk at sites like FutureGen 2.0 where a strike-slip tectonic regime exists. 2. The probability that the Mount Simon reservoir was initially critically stressed is relatively high—25%. When the pore pressure increases to the maximum allowable pressure permitted under the Underground Injection Control Class VI regulation of the FutureGen 2.0 project, the risk of shear failure approaches a probability of 43%. These relatively high probabilities reflect the current state of information about the geomechanical conditions in this part of the Illinois Basin. For future operations in this basin this should be a high characterization priority because it could significantly lower the risk of operations. 3. Based on the maximum injection pressure allowed in the UIC Class VI, the risk of unintentional hydraulic fracturing is limited. The risk of shear failure as determined by SOSAT is based on a very conservative approach assuming that critically oriented faults exist in the subsurface. While no faults have been formally identified at the FutureGen 2.0 site, the results obtained with SOSAT using the FutureGen 2.0 data set highlight the importance of integrating uncertainties in critical parameters to quantify geomechanical risks in a defensible way. Should SOSAT have been available at the time the characterization activities were being planned, more characterization efforts would have been implemented to reduce the uncertainties on the magnitude of the maximum horizontal stress, and to dismiss with confidence the potential existence of a critically-oriented fault in the reservoir (e.g., 3D seismic survey).

54 ENVIRONMENTAL SCIENCES↗

Resources for E-Mobility Program Implementation [Slides]

The Energy to Communities (E2C) peer-learning cohort program provides technical assistance to groups of 15 community entities around a common energy topic over the course of 6 months. Every month, participants join a virtual meeting where they hear from experts and exchange strategies and best practices with their peers. This cohort, "Successful Energy Project Implementation" will explore common challenges in implementing energy projects and learn strategies to turn project plans into reality. Each participant will focus on a local energy project or priority as a cornerstone for their learning throughout the series.This presentation overviews the basics of developing electric mobility projects with emphasis on leveraging the right tools to advance technical scoping and program design.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Autonomous Tools for Attack Surface Reduction (Final Report)

The electric power grid is a complex critical infrastructure that forms the lifeline of modern society, and its secure and reliable operation is of paramount importance to national security and economic wellbeing. However, recent findings documented in authoritative sources indicate the threat of cyber-based attacks growing in numbers and sophistication. However, securing the grid against stealthy cyberattacks is a challenging task due to legacy nature of the infrastructure coupled with dynamic nature of threat landscape and ever-growing sophistication of the adversaries. Additionally, the grid’s attack surface continues to grow with the increased dependence on digital communications and control that now extends to each consumer through smart meters and distributed energy resources. Unfortunately, this expansive surface increases the grid’s vulnerability and further exposes critical control systems in both substations and control centers. To respond to this emerging need, we had successfully assembled an interdisciplinary team with academic- industry partnership to successfully conduct research, development, evaluation, demonstration, and commercialization of attack surface reduction tools, whose goal was to significantly reduce the cyber attack surface in the North American power grid. Our proposed project was a synergistic collaborative effort leveraging the synergistic expertise of the team members across power systems, cyber security and CPS security, testbeds, field deployments and demonstration, and successful commercialization. The following are the specific tasks that have been successfully completed two phases (2016-2020). Phase I: Task 1: Developed and implemented a robust Project Management and Data Management Plan, coupled with a well thought out Risk Mitigation Plan. Task 2.1: Developed a comprehensive framework that continually assesses and autonomously reduces the attack surface for the power grid control environment spanning across substations, control center and the SCADA network to significantly reduce the risks of cyber attacks. Task 2.2: Developed attack surface analysis techniques, metrics, and tools that assess the attack surface at multiple levels including the control center, substations, and the SCADA network. Task 2.3: Developed attack surface reduction techniques and tools that dynamically reduce attack surface and hence increase attacker’s cost without interfering in the critical functions of the system. Task 2.4: Prototyped, implemented, and quantitatively evaluated/validated the techniques and tools on a realistic industrial CPS security testbed environment by leveraging the unique resources of the team. Task 3: Developed Commercialization plan to transition the developed tools into power system industry stakeholders for a broader adoption by leveraging the expertise of our industrial members. Phase II: Task 4: Successfully completed field demonstration, verification, and evaluation of the effectiveness of the attack surface analysis and reduction techniques on a realistic utility testbed environment. This also involved the development of realistic scenarios, sound metrics, data sets, evaluation criteria, and documentation. Technology integration & Field demonstration: The project had significantly advanced the state-of-the-art research and practice in improving the cybersecurity of our nation’s power grid infrastructure against cyber threats. In particular, the proposed, designed, and deployed attack surface analysis and reduction algorithms and tools have contributed to significantly reducing the exposure and risk of the devices, substations, and the integrated SCADA/EMS/ DMS grid environment to cyber threat. Strong demonstration and evaluation techniques have verified the feasibility of the developed techniques on realistic cyber-physical testbeds and utility partner's real grid environment, and collaborative research and evaluation of attack surface reduction techniques (for wide-are monitoring and control) within a vendor (GE) EMS platform. The Attack Host Analyzer (AHA) tool that was developed through this project was made available through GitHub.

24 POWER TRANSMISSION AND DISTRIBUTION↗

NASA's satellite relay tracking and data acquisition program

The Tracking and Data Acquisition System (TDAS) is currently being planned to support NASA missions and the Space Station and will serve as a replacement to the present Tracking and Data Relay Satellite System (TDRSS). Its operational date is currently projected for the late 1990s. Near term objectives involve the definition of a TDAS architecture, the development of functional and performance specifications and implementation of a TDRSS-to-TDAS transition plan. The present paper provides an overview of the baseline TDAS architecture and summarizes key ingredients of system and technology studies in progress. In particular, this paper addresses a summary of projected mission requirements for the TDAS era; a characterization of the space segment constellation; use of lasers, 60 GHz, and multibeam 30/20 GHz technologies; ground architecture and operational interfaces; a distributed hardware/software processing concept for more flexible and reliable interfaces, signal processing and operations. Also included is a status summary of the TDAS program plan for the 1984-1990 time frame. Finally, an overview is presented of NASA's current plans to augment the TDRSS to meet the Space Station IOC requirements in the time period 1993-2000.

Schwartz, J. J.↗

MO-D-BRC-04: Multiple-Criteria Optimization Planning

Treatment planning is a central part of radiation therapy, including delineation in tumor volumes and critical organs, setting treatment goals of prescription doses to the tumor targets and tolerance doses to the critical organs, and finally generation of treatment plans to meet the treatment goals. National groups like RTOG have led the effort to standardize treatment goals of the prescription doses to the tumor targets and tolerance doses to the critical organs based on accumulated knowledge from decades of abundant clinical trial experience. The challenge for each clinical department is how to achieve or surpass these set goals within the time constraints of clinical practice. Using fifteen testing cases from different treatment sites such as head and neck, prostate with and without pelvic lymph nodes, SBRT spine, we will present clinically utility of advanced planning tools, including knowledge based, automatic based, and multiple criteria based tools that are clinically implemented. The objectives of this session are: Understand differences among these three advanced planning tools Provide clinical assessments on the utility of the advanced planning tools Discuss clinical challenges of treatment planning with large variations in tumor volumes and their relationships with adjacent critical organs. Ping Xia received research grant from Philips. Jackie Wu received research grant from Varian; P. Xia, Research support by Philips and Varian; Q. Wu, NIH, Varian Medical.

60 APPLIED LIFE SCIENCES↗

MO-D-BRC-00: In Memoriam of Jan Van De Geijn: Knowledge-Based Planning

Treatment planning is a central part of radiation therapy, including delineation in tumor volumes and critical organs, setting treatment goals of prescription doses to the tumor targets and tolerance doses to the critical organs, and finally generation of treatment plans to meet the treatment goals. National groups like RTOG have led the effort to standardize treatment goals of the prescription doses to the tumor targets and tolerance doses to the critical organs based on accumulated knowledge from decades of abundant clinical trial experience. The challenge for each clinical department is how to achieve or surpass these set goals within the time constraints of clinical practice. Using fifteen testing cases from different treatment sites such as head and neck, prostate with and without pelvic lymph nodes, SBRT spine, we will present clinically utility of advanced planning tools, including knowledge based, automatic based, and multiple criteria based tools that are clinically implemented. The objectives of this session are: Understand differences among these three advanced planning tools Provide clinical assessments on the utility of the advanced planning tools Discuss clinical challenges of treatment planning with large variations in tumor volumes and their relationships with adjacent critical organs. Ping Xia received research grant from Philips. Jackie Wu received research grant from Varian; P. Xia, Research support by Philips and Varian; Q. Wu, NIH, Varian Medical.

60 APPLIED LIFE SCIENCES↗

MO-D-BRC-01: Memorial Lecture

Treatment planning is a central part of radiation therapy, including delineation in tumor volumes and critical organs, setting treatment goals of prescription doses to the tumor targets and tolerance doses to the critical organs, and finally generation of treatment plans to meet the treatment goals. National groups like RTOG have led the effort to standardize treatment goals of the prescription doses to the tumor targets and tolerance doses to the critical organs based on accumulated knowledge from decades of abundant clinical trial experience. The challenge for each clinical department is how to achieve or surpass these set goals within the time constraints of clinical practice. Using fifteen testing cases from different treatment sites such as head and neck, prostate with and without pelvic lymph nodes, SBRT spine, we will present clinically utility of advanced planning tools, including knowledge based, automatic based, and multiple criteria based tools that are clinically implemented. The objectives of this session are: Understand differences among these three advanced planning tools Provide clinical assessments on the utility of the advanced planning tools Discuss clinical challenges of treatment planning with large variations in tumor volumes and their relationships with adjacent critical organs. Ping Xia received research grant from Philips. Jackie Wu received research grant from Varian; P. Xia, Research support by Philips and Varian; Q. Wu, NIH, Varian Medical.

60 APPLIED LIFE SCIENCES↗

MO-D-BRC-02: Auto-Planning

Treatment planning is a central part of radiation therapy, including delineation in tumor volumes and critical organs, setting treatment goals of prescription doses to the tumor targets and tolerance doses to the critical organs, and finally generation of treatment plans to meet the treatment goals. National groups like RTOG have led the effort to standardize treatment goals of the prescription doses to the tumor targets and tolerance doses to the critical organs based on accumulated knowledge from decades of abundant clinical trial experience. The challenge for each clinical department is how to achieve or surpass these set goals within the time constraints of clinical practice. Using fifteen testing cases from different treatment sites such as head and neck, prostate with and without pelvic lymph nodes, SBRT spine, we will present clinically utility of advanced planning tools, including knowledge based, automatic based, and multiple criteria based tools that are clinically implemented. The objectives of this session are: Understand differences among these three advanced planning tools Provide clinical assessments on the utility of the advanced planning tools Discuss clinical challenges of treatment planning with large variations in tumor volumes and their relationships with adjacent critical organs. Ping Xia received research grant from Philips. Jackie Wu received research grant from Varian; P. Xia, Research support by Philips and Varian; Q. Wu, NIH, Varian Medical.

60 APPLIED LIFE SCIENCES↗

MO-D-BRC-03: Knowledge-Based Planning

Treatment planning is a central part of radiation therapy, including delineation in tumor volumes and critical organs, setting treatment goals of prescription doses to the tumor targets and tolerance doses to the critical organs, and finally generation of treatment plans to meet the treatment goals. National groups like RTOG have led the effort to standardize treatment goals of the prescription doses to the tumor targets and tolerance doses to the critical organs based on accumulated knowledge from decades of abundant clinical trial experience. The challenge for each clinical department is how to achieve or surpass these set goals within the time constraints of clinical practice. Using fifteen testing cases from different treatment sites such as head and neck, prostate with and without pelvic lymph nodes, SBRT spine, we will present clinically utility of advanced planning tools, including knowledge based, automatic based, and multiple criteria based tools that are clinically implemented. The objectives of this session are: Understand differences among these three advanced planning tools Provide clinical assessments on the utility of the advanced planning tools Discuss clinical challenges of treatment planning with large variations in tumor volumes and their relationships with adjacent critical organs. Ping Xia received research grant from Philips. Jackie Wu received research grant from Varian; P. Xia, Research support by Philips and Varian; Q. Wu, NIH, Varian Medical.

60 APPLIED LIFE SCIENCES↗

Managing Research in a Risk World

The Office of Chief Medical Officer (OCHMO) owns all human health and performance risks managed by the Human System Risk Board (HSRB). While the HSRB manages the risks, the Human Research Program (HRP) manages the research portion of the overall risk mitigation strategy for these risks. The HSRB manages risks according to a process that identifies and analyzes risks, plans risk mitigation and tracks and reviews the implementation of these strategies according to its decisions pertaining to the OCHMO risk posture. HRP manages risk research work using an architecture that describes evidence-based risks, gaps in our knowledge about characterizing or mitigating the risk, and the tasks needed to produce deliverables to fill the gaps and reduce the risk. A planning schedule reflecting expected research milestones is developed, and as deliverables and new evidence are generated, research progress is tracked via the Path to Risk Reduction (PRR) that reflects a risk's research plan for a design reference mission. HRP's risk research process closely interfaces with the HSRB risk management process. As research progresses, new deliverables and evidence are used by the HSRB in conjunction with other operational and non-research evidence to inform decisions pertaining to the likelihood and consequence of the risk and risk posture. Those decisions in turn guide forward work for research as it contributes to overall risk mitigation strategies. As HRP tracks its research work, it aligns its priorities by assessing the effectiveness of its contributions and maintaining specific core competencies that would be invaluable for future work for exploration missions.

Anton, W.↗

User Requirements

The capabilities, enumerated during the Planetary Data Workshop, which the ideal Planetary Data System (PDS) should provide to its users are summarized. System design and implementation activities must take into account that all requirements do not carry the same weight. While some system requirements are essential and must be met early, other requirements are of a less immediate nature and can be implemented during later stages of development. Some requirements may be determined to be not essential to the operation of a PDS or impractical, and then not considered for implementation. It is assumed, that the PDS implementation will be modular in architecture and accomplishment. The modular plan is supported by many potential benefits in that it: simplifies the design and planning activities; improves the ability to respond to the changing demands of the user community; permits incorporation of emerging technologies; and allows the implementation to remain flexible in the face of fluctuating resources.

Source record↗

2022 Project Commercialization and Market Development Awardee: Eocycle America Corporation

Annually, agriculture and related industries contribute approximately $1.2 trillion to the U.S. gross domestic product and 11% of the nation's output of greenhouse gas (GHG) emissions. At the same time, agribusiness operations account for about 30% of energy use worldwide. Distributed wind energy produced on site can power large-scale agricultural, industrial, and commercial operations in windy rural areas, offering cost savings, GHG emissions reductions, and the potential to supply excess electricity to the grid. Despite these benefits, agribusinesses have been slow to embrace the technology. Eocycle America Corporation (Eocycle) plans to develop partnerships with agriculture and related industries and implement a marketing strategy to educate corporate customers about the benefits of distributed wind. Through the CIP initiative, Eocycle will create a marketing plan to raise interest in distributed wind energy among large American and European corporations with operations in rural areas. Campaign goals are to encourage rapid deployment of distributed wind energy on a large scale, as well as to create high-paying energy sector jobs through increased manufacturing, sales, maintenance, and related services. Eocycle plans to identify 15 agriculture-related corporations with the potential for at least 25 turbine sales each.

Competitiveness Improvement Project↗

Final Work Plan: Targeted Investigation at York, Nebraska

The targeted investigation at York will be implemented in phases, so that data collected and interpretations developed at each stage of the program can be evaluated to guide subsequent phases most effectively. Section 2 of this Work Plan presents a brief overview of the York site, its geologic and hydrologic setting, and the previous CCC/USDA investigations. Section 3, outlines the proposed technical program for the targeted investigation, and Section 4 describes the investigative methods to be employed. A community relations plan is in Section 5, and Section 6 includes health and safety information. In addition to this site-specific Work Plan, the Master Work Plan (Argonne 2002) developed by Argonne for CCC/USDA investigations in Nebraska should be consulted for complete details of the methods and procedures to be used at York.

54 ENVIRONMENTAL SCIENCES↗