Search NASA⌕ Search

SEARCH · Search NASA

Results for “waste utilization”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,711 records · Page 95

AN ASSESSMENT OF THE SERVICE HISTORY AND CORROSION SUSCEPTIBILITY OF TYPE IV WASTE TANKS

Type IV waste tanks were designed and built to store waste that does not require auxiliary cooling. Each Type IV tank is a single-shell tank constructed of a steel-lined pre-stressed concrete tank in the form of a vertical cylinder with a concrete domed roof. There are four such tanks in F-area, Tanks 17-20F, and four in H-Area, Tanks 21-24H. Leak sites were discovered in the liners for Tanks 19 and 20F in the 1980's. Although these leaks were visually observed, the investigation to determine the mechanism by which the leaks had occurred was not completed at that time. Therefore, a concern was raised that the same mechanism which caused the leak sites in the Tanks in F-area may also be operable in the H-Area tanks. Data from the construction of the tanks (i.e., certified mill test reports for the steel, no stress-relief), the service history (i.e., waste sample data, temperature data), laboratory tests on actual wastes and simulants (i.e., electrochemical testing), and the results of the visual inspections were reviewed. The following observations and conclusions were made: (1) Comparison of the compositional and microstructural features indicate that the A212 material utilized for construction of the H-Area tanks are far more resistant to SCC than the A285 materials used for construction of the F-Area tanks. (2) A review of the materials of construction, temperature history, service histories concluded that F-Area tanks likely failed by caustic stress corrosion cracking. (3) The environment in the F-Area tanks was more aggressive than that experienced by the H-Area tanks. (4) Based on a review of the service history, the H-Area tanks have not been exposed to an environment that would render the tanks susceptible to either nitrate stress corrosion cracking (i.e., the cause of failures in the Type I and II tanks) or caustic stress corrosion cracking. (5) Due to the very dilute and uninhibited solutions that have been stored in Tank 23H, vapor space corrosion has occurred on some of areas of the liner. The mild pitting that was observed is broad and shallow and has no structural impact. Further significant pit growth has not been observed since the 1980's.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Task Order 22 – Engineering and Technical Support, Deep Borehole Field Test. AREVA Summary Review Report

Under Task Order 22 of the industry Advisory and Assistance Services (A&AS) Contract to the Department of Energy (DOE) DE-NE0000291, AREVA has been tasked with providing assistance with engineering, analysis, cost estimating, and design support of a system for disposal of radioactive wastes in deep boreholes (without the use of radioactive waste). As part of this task order, AREVA was requested, through a letter of technical direction, to evaluate Sandia National Laboratory’s (SNL’s) waste package borehole emplacement system concept recommendation using input from DOE and SNL. This summary review report (SRR) documents this evaluation, with its focus on the primary input document titled: “Deep Borehole Field Test Specifications/M2FT-15SN0817091” Rev. 1 [1], hereafter referred to as the “M2 report.” The M2 report focuses on the conceptual design development for the Deep Borehole Field Test (DBFT), mainly the test waste packages (WPs) and the system for demonstrating emplacement and retrieval of those packages in the Field Test Borehole (FTB). This SRR follows the same outline as the M2 report, which allows for easy correlation between AREVA’s review comments, discussion, potential proposed alternatives, and path forward with information established in the M2 report. AREVA’s assessment focused on three primary elements of the M2 report: the conceptual design of the WPs proposed for deep borehole disposal (DBD), the mode of emplacement of the WP into DBD, and the conceptual design of the DBFT. AREVA concurs with the M2 report’s selection of the wireline emplacement mode specifically over the drill-string emplacement mode and generically over alternative emplacement modes. Table 5-1 of this SRR compares the pros and cons of each emplacement mode considered viable for DBD. The primary positive characteristics of the wireline emplacement mode include: (1) considered a mature technology; (2) operations are relatively simple; (3) probability of a radiological release due to off-normal events are relatively low; (4) costs are relatively low; and (5) maintenance activities are relatively simple. The primary drawback associated with the wireline emplacement mode for DBD is the number of emplacement trips-in to the borehole, which results in a relatively higher probability for a drop event. Fortunately, the WPs can be engineered with impact limiters that will minimize the likelihood of a breach of the WP due to a drop. The WP designs presented in the M2 report appear to be focused on compatibility with the drill-string emplacement mode (e.g., the threaded connections). With the recommendation that the wireline emplacement mode be utilized for the DBFT, some changes may be warranted to these WPs. For example, the development of a WP release connection that is more reliable than the currently credited connection, which is considered to have a high failure probability, and the integration of an impact limiter into its design. The M2 report states the engineering demonstration of the DBFT will occur in the FTB over a 4-year period. AREVA recommends development and testing of the WP emplacement handling equipment occur separately (but concurrently, if not earlier) from the FTB at a mock-up facility. The separation of this activity would prevent schedule interference between the science and engineering thrusts of the project. Performing tests in a mock-up facility would allow additional control and observation compared to the FTB. The mock-up facility could also be utilized as a training facility for future operations. Terminal velocity and impact limiter testing would require the FTB for testing, since these areas would be difficult to reproduce in a limited depth mock-up. Although only at the end of the conceptual stage of design development, DBD appears to be a viable solution for some waste forms produced by the nuclear industry. However, regulatory requirements have yet to be established for pre- and post-closure performance of DBD and should be established as soon as possible. Some of the main areas of focus from a regulatory perspective include: (1) establishing acceptable performance requirements for the long-term behavior of DBD; (2) determining acceptable borehole abandonment criteria; (3) establishing retrievability requirements; (4) developing a consensus on the factor of safety (FoS) for the emplacement mode and WP; and (5) establishing safety and safeguards performance requirements for DBD. Although conservative requirements have been utilized to provide the foundation for the conceptual design of DBD, regulatory requirements and feedback are necessary to confirm recommendations made herein and to ensure the long-term performance of DBD is acceptable. The combination of the M2 report and this SRR is intended to facilitate the completion of the conceptual design for DBD for the Cs and Sr capsules and calcined waste forms. Using the conceptual design, preliminary design activities (the second stage of a three-stage process described in the M2 report) can proceed and the DBFT utilized to support, demonstrate, and confirm engineering elements of this design.

42 ENGINEERING↗

TCCR Operational Summary and Optimization for Tank 9 Processing - 20314

Savannah River Remediation (SRR) manages and operates the liquid waste facilities at Savannah River Site (SRS) for the Department of Energy (DOE). Stored liquid waste is a complex mixture of insoluble solids (sludge) and soluble salts in an alkaline solution. SRR has deployed the Tank Closure Cesium Removal (TCCR) system, a tank-side ion exchange process, to remove radioactive cesium from salt waste and enable onsite disposal of the resulting decontaminated salt solution as low-level waste at the Saltstone facilities. The TCCR system consists of two prefilters, four ion exchange (IX) columns, one resin trap, and a ventilation system. The IX process uses a form of inorganic crystalline silicotitanate (CST), which has a high affinity for cesium and other alkali metals, strontium, and actinides. This process is currently deployed utilizing salt feed from Tank 10, with future plans to dissolve solid salt in Tank 9 and transfer the salt solution to Tank 10 for processing through TCCR. The feed for TCCR must be created from salt-cake in Tank 10 through a dissolution process. Once enough salt has been dissolved, a qualification process is entered. This process characterizes the feed and ensures the cesium loading on the columns will not cause boiling of waste within the columns during or after processing. Once the batch has been qualified, salt waste is fed to the TCCR system through a transfer pump in the center of the tank. The waste is filtered through a set of two shielded, dead-end prefilters that prevent solids buildup in the columns. The filtered salt solution then travels to the shielded IX columns, which can be operated individually or in series, where the cesium is sorbed on the CST media. The decontaminated salt solution (DSS) then travels through a resin trap and out of the module to Tank 11. TCCR has successfully processed approximately 795,000 L of Tank 10H radioactive salt waste over two batches to date. There has not yet been a system induced shutdown. The prefilters performed as expected with only minor degradation in recovery of differential pressure after a backflush sequence. The time between backflushes decreased as each batch reached the end of processing. The hydraulics in the IXCs mostly performed as expected at all flow rates, except for one IXC that will be further investigated during Batch 3 processing. The TCCR system has shown some opportunities for more efficient processing during the length of the demonstration so far. For future processing of material from Tank 9H through Tank 10H and the TCCR unit, TCCR 1A will implement changes to the prefilters and the IXCs. The prefilters will have an increased surface area and a new filter media in an effort to increase time between filter swaps and improve backwashing cleaning capability. The IXCs will have a reduced diameter to allow for increased heat transfer out of the column and increased loading of Cs-137. Additionally, a new form of CST with an increased kinetic performance is being investigated for use during TCCR 1A operation. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Final Technical Report

The project, Capital Investment to Fund Equipment Purchases and Facility Modifications to Create a Sustainable Future for EnergyXchange served to replace landfill gas energy with alternative energy resources, primarily solar and wood waste. This is the final project closeout report.

09 BIOMASS FUELS↗

Low Activation Materials for Holders and Containments in Test Reactor Experiments

For fueled experiments or experiments with highly activated specimens there is no benefit to selecting low activation materials for holders or containments. However, some experiments, such as those with graphite or SiC specimens, or most medical isotopes, can be benefitted by selecting low activation materials for holders and containments. For many experiments the bulk of the cost and time is in the post irradiation phase. For some of these, shipping and examination costs can be dramatically reduced by careful selection of materials. This presentation will discuss low activation material candidates, the effects of impurities in these materials, and other practical issues associated with these materials. Examples of Advanced Test Reactor experiments utilizing low activation materials will also be provided.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Geochemical Characterization of Rare Earth Elements in Coal Combustion Byproducts Utilizing Synchrotron Technology

Coal combustion by-products (CCBs) are being examined as a potential domestic resource for rare earth element (REE) recovery. In particular, fly ash is being explored due to its relatively abundant REE content, low-to-no-cost availability as a waste product, fine particle size, and enrichment with critical REEs. In order to develop an effective protocol for REE recovery, this study characterized speciation and distribution of REE in CCBs collected from various states.

Lopano, Christina↗

Determination of the Distribution and Inventory of Radionuclides within a Savannah River Site Waterway - 13202

An investigation was conducted to evaluate the radionuclide inventory within the Lower Three Runs (LTR) Integrator Operable Unit (IOU) at the U.S. Department of Energy's (DOE's) Savannah River Site (SRS). The scope of this effort included the analysis of previously existing sampling and analysis data as well as additional stream bed and flood plain sampling and analysis data acquired to delineate horizontal and vertical distributions of the radionuclide as part of the ongoing SRS environmental restoration program, and specifically for the LTR IOU program. While cesium-137 (Cs-137) is the most significant and abundant radionuclide associated with the LTR IOU it is not the only radionuclide, hence the scope included evaluating all radionuclides present and includes an evaluation of inventory uncertainty for use in sensitivity and uncertainty analyses. The scope involved evaluation of the radionuclide inventory in the P-Reactor and R-Reactor cooling water effluent canal systems, PAR Pond (including Pond C) and the flood plain and stream sediment sections of LTR between the PAR Pond Dam and the Savannah River. The approach taken was to examine all of the available Sediment and Sediment/Soil analysis data available along the P- and R-Reactor cooling water re-circulation canal system, the ponds situated along those canal reaches and along the length of LTR below Par Pond dam. By breaking the IOU into a series of sub-components and sub-sections, the mass of contaminated material was estimated and a representative central concentration of each radionuclide was computed for each compartment. The radionuclide inventory associated with each sub-compartment was then aggregated to determine the total radionuclide inventory that represented the full LTR IOU. Of special interest was the inventory of Cs-137 due to its role in contributing to the potential dose to an offsite member of the public. The overall LTR IOU inventory of Cs-137 was determined to be 2.87 E+02 GBq, which is similar to two earlier estimates. This investigation provides an independent, ground-up estimate of Cs-137 inventory in LTR IOU utilizing the most recent field data. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Model Study and Site Experience of Radiation Physics Analysis for Research Reactor Decommissioning - 18586

The University of Alberta Safe Low Power Kritical Experiment (SLOWPOKE II) nuclear reactor facility (UASF) was commissioned on April 22, 1977. It was designed, built and installed by Atomic Energy of Canada Limited (AECL) and was the fourth SLOWPOKE II research reactor installed at a Canadian university at that time. The reactor was used as a source of neutrons for radionuclide production and elemental analysis via neutron activation analysis, to provide a service to industry, government and to support research and teaching at the University of Alberta. It was licensed to operate at 20 kW, less than the heat produced by a small residential furnace, and work with the reactor was typically performed at one-tenth full power. After nearly four decades of service, the reactor reached the end of its useful life in August 2017 when defueling and the project to decommission the reactor began. Decommissioning of the UASF is a process to dismantle the facility by progressively removing the reactor core and other radioactive components as well as managing the balance of contaminated materials around the reactor in a safe manner. The objective of the project is to release the site from the Canadian Nuclear Safety Commission's (CNSC) regulatory control and return the site to a 'greenfield' status. This paper will discuss the radiation physics analysis that was undertaken to support the decommissioning of the University of Alberta SLOWPOKE II Facility Reactor which took place from July - October 2017. It will address the radiation physics model study, development of the radiation protection (RP) plan, site experience and how the lessons learned from this project can be utilized for best practice on other similar projects. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Integrated Boosting and Hybridization for Extreme Fuel Economy and Downsizing

The objective of this project was to develop, demonstrate, and evaluate commercialization of a highly efficient downsized engine by electrification of the air delivery and waste heat recovery system and optimizing energy usage to achieve significant fuel economy improvement at a commercially viable cost. The system consists of an Electrically Assisted Variable speed Supercharger (EAVS), driven by an electric motor and the engine through a planetary gear train, that provides engine boost pressure and provides the mild hybrid functions of engine start/stop, torque assist, and brake energy recovery. In the exhaust path of the engine is the electric Waste Heat Recovery (eWHR) system, a roots-based expander driven by another electric motor, that enables exhaust gas energy recovery along with controlled back pressure on the engine. The two electric motors are powered by a 48V rechargeable lithium-ion battery. Further, the EAVS system coupled to an EGR valve enables very precise high exhaust recirculation rates to control the NOx emissions. Through two budget periods, the project team of Eaton, Isuzu, Southwest Research Institute and AVL designed and developed the EAVS and eWHR systems, integrated with an Isuzu diesel engine, and validated the target fuel economy performance and emissions by engine dynamometer testing and vehicle level simulations. GT Power model-based analyses results were used to size the EAVS and eWHR systems for the 1.9L Isuzu Spark engine. The two systems were built and the functional testing was carried out to verify the boosting performance of the superchargers. Following the baseline engine dynamometer testing, the two systems were integrated with the engine and the fuel economy performance and emissions were determined by combined steady state and transient testing over three drive cycles, namely, FTP75, NEDC and HWFET. The EAVS/eWHR system demonstrated 4% improvement in fuel economy for the NEDC cycle in engine dyno testing, correlating well with vehicle simulation results (5.3%). The simulation results indicated that the combination of hybrid functions and drivetrain optimization, fuel economy improvement of more than 20% was feasible with the system. The commercialization study to evaluate the cost of the system and the scalability for different engine/vehicle classes was planned for the final budget period but not completed as the project was closed at the end of budget period two.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Development and testing of techniques for in-ground stabilization, size reduction, and safe removal of radioactive wastes stored in containments buried in ground

Since the 1950's radioactive wastes from a number of laboratories have been stored below ground at the Hanford site, Washington State, USA, in vertical pipe units (VPUs) made of five 200 litre drums without tops or bottoms, and in caissons, made out of corrugated pipe, or concrete and typically 2,500 mm in diameter. The VPU's are buried of the order of 2,100 mm below grade, and the caissons are buried of the order of 6,000 mm below grade. The waste contains fuel pieces, fission products, and a range of chemicals used in the laboratory processes. This can include various energetic reactants such as un-reacted sodium potassium (NaK), potassium superoxide (KO{sub 2}), and picric acid, as well as quantities of other liquids. The integrity of the containments is considered to present unacceptable risks from leakage of radioactivity to the environment. This paper describes the successful development and full scale testing of in-ground augering equipment, grouting systems and removal equipment for remediation and removal of the VPUs, and the initial development work to test the utilization of the same basic augering and grouting techniques for the stabilization, size reduction and removal of caissons. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Low-Activity Waste Melter Process (LMP) System Design Description (Rev. 4)

This system design description (SDD) defines the technical, functional, and performance requirements of the low-activity waste (LAW) melter process system (LMP). This document details the waste treatment requirements, environmental compliance requirements, and authorization basis requirements of the LMP system as they are currently known and understood. This SDD describes the process and functional design requirements of the LMP, including the following: 1) Services and utility requirements, operating materials and supplies, and other external interfaces; 2) Operations limits and design bases; 3) Other criteria and requirements pertinent to the design of the LMP system; 4) Boundaries, system interfaces, and functional description of the LMP system. The LMP system is composed of two LAW melters of the same design with the contingency to add the third. Also included in the LMP system are the pour spouts, which are positioned under the melter discharge chambers of each melter, and the container level detectors. The boundaries, system interfaces, and functional description of the LMP system are provided in Section 2.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Radiological Soil Sorting Pilot Study Results - Middlesex Municipal Landfill - 19394

The U.S. Army Corps of Engineers (USACE) conducted a pilot scale study of radiological sorting technology at the Formerly Utilized Sites Remedial Action Program (FUSRAP) Middlesex Municipal Landfill (MML) site in Middlesex, New Jersey. Residual uranium ore pieces or 'nuggets' and associated soil contamination are present at the MML site as a result of the nation's early atomic energy program. Study questions and objectives of the MML Pilot Study project were to 1) evaluate the accuracy with which contaminated soils can be separated from uncontaminated soils using a radiologic soil sorting system, 2) determine the optimal full-scale operational process throughput rate that might reasonably be achieved, 3) determine the waste volume reduction that might be expected when operating at full scale, and 4) help establish the feasibility of implementing soil sorting as a potential remedy to other areas of the site. To accomplish the objectives soils were processed through the sorting system in a series of 30 different sorting experimental (test) runs utilizing approximately 917 cubic meters [1200 cubic yards (CY)] of material. The test runs included varying parameters such as belt speeds, soil layer thicknesses, and alarm criteria, all in varying combinations. Test runs also included engineered tests to evaluate point source segregation issues. This paper presents the challenges, results, lessons learned, and recommendations of the radiological soil sorting pilot study. The technical aspects and evaluation of the results of the test runs will also be discussed. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

NEXUS-DC: Nuclear Energy eXpedition for US Data Centers [Slides]

This presentation covers the growing interest in utilizing nuclear power to satisfy the increasing energy demands of data centers in the United States, emphasizing the factors that accelerate reactor deployment. It addresses clean and reliable energy needs, highlights the importance of power supply redundancy for reliability, and discusses challenges and solutions related to cooling, waste heat reuse, and techno-economics. Additionally, it includes a strength, weakness, opportunities and threat analysis and emphasizes community engagement and collaboration for accelerating regulatory approvals and reactor deployment.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Integration of Environmental Compliance at the Savannah River Site - 13024

The Savannah River Site (SRS) is a large federal installation hosting diverse missions and multiple organizations with competing regulatory needs. Accordingly, there was a need to integrate environmental compliance strategies to ensure the consistent flow of information between Department of Energy-Savannah River (DOE-SR), the regulatory agencies and other interested parties. In order to meet this objective, DOE and major SRS contractors and tenants have committed to a strategy of collaboratively working together to ensure that a consistent, integrated, and fully coordinated approach to environmental compliance and regulator relationships is maintained. DOE-SR and Savannah River Nuclear Solutions, LLC, the SRS management and operations contractor, have established an environmental compliance integration process that provides for the consistent flow down of requirements to projects, facilities, SRS contractors, and subcontractors as well as the upward flow of information to assist in the early identification and resolution of environmental regulatory issues and enhancement of compliance opportunities. In addition, this process strongly fosters teamwork to collaboratively resolve complex regulatory challenges, promote pollution prevention and waste minimization opportunities to advance site missions in a manner that balances near-term actions with the long-term site vision, while being protective of human health and the environment. Communication tools are being utilized, some with enhancements, to ensure appropriate information is communicated to all levels with environmental responsibility at SRS. SRS internal regulatory integration is accomplished through a variety of informational exchange forums (e.g., Challenges, Opportunities and Resolution (COR) Team, DOE's Joint Site Regulatory Integration Team, and the Senior Environmental Managers Council (SEMC)). SRS communications and problem-solving with the regulatory agencies have been enhanced through formation of an interagency 'SRS Regulatory Integration Team (SRIT)'. The SRIT is a partnership comprised of representatives from DOE-SR (with contractor support), EPA Region 4 and the South Carolina Department of Health and Environmental Control (SCDHEC) and is chartered to develop a consensus understanding of SRS regulatory issues and activities. These forums and a formal environmental compliance integration process improve timely cross-functional decision making, problem solving, information sharing, and issue resolution. The SRS internal process has been formally documented in an Environmental Regulatory Integration Program Description, which is linked to the SRS Environmental Policy and agreed upon by all major contractors, subcontractors and tenants. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Application of an AREVA Mobile Evaporator Design Used Successfully at NRC Licensed U.S. Commercial Nuclear Sites to Support Hanford Site Operations - 18134

The U.S. Department of Energy (DOE), Office of River Protection (ORP), manages the River Protection Project at the Hanford site in the South Eastern corner of Washington State in the Pacific Northwest of the United States. The mission of the River Protection Project is to retrieve and treat Hanford's tank waste and close the tank farms to protect the Columbia River. The Site Tank Operations Contractor (Washington River Protection Solutions (WRPS)) via its site operations teams creates additional space in the Double Shell Tanks (DSTs) using the site's only remaining operational evaporator - 242-A. The current 242-A Evaporator has long been identified as a potential single point of failure that in the event of a major breakdown, could significantly impact retrieval operations at the Hanford Site. Areva has experience both on the Hanford site as an integrated subcontractor to the mission and in the design, procurement and construction of a mobile forced circulation evaporator unit designed to be used on Nuclear Regulatory Commission commercial nuclear utility sites. The mobile unit has been used at the following nuclear power plants: SONGS, Salem, Davis Besse, Waterford and Palo Verde. It was designed to take spent Water-EDTA based chemical cleaning solvent and evaporate water off to reduce the volume of waste required to go through downstream processes. It was further designed to fit inside ISO shipping containers. A multi-step approach will be used to: 1. review lessons learned from the previous DOE study for deploying a mobile evaporator on the Hanford sit, 2. evaluate the proposed waste streams and the required throughput and waste arising, sizing the evaporator appropriately, 3. develop a concept design requirements document for the use of a customized evaporator to meet the Hanford need 4. Design, and build a mobile evaporator and 5. Test, install and commission at a site to be agreed with WRPS/DOE. With an overall budget for the approach described of around $35 m, an operational evaporator could be delivered to site in 18-24 months from the approval of a detailed design package. Potential befits include the elimination of the 242-A evaporator as a single point failure, the creation of additional DST tank space and the elimination of the need to stage waste at the 242-A evaporator by moving the mobile unit to a location where is could be deployed at or close to the tank such as in 200W. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Comparison of microprecipitation methods for polonium source preparation for alpha spectrometry

Detection of radioactive isotopes of polonium is important for understanding natural processes, management and assessment of radioactive waste, and nuclear forensics applications. Further, the most common methods for preparation of polonium samples for alpha spectrometry are electrodeposition and spontaneous deposition which are time consuming. Here, we compare three approaches utilizing rapid microprecipitation from bismuth phosphate, copper sulfide, or tellurium alongside traditional spontaneous deposition methods. From these experiments, results show that copper sulfide microprecipitation recoveries are similar to spontaneous deposition on silver and less time consuming with an approximate five-fold decrease in preparation time, including in the presence of complex matrices like seawater.

38 RADIATION CHEMISTRY, RADIOCHEMISTRY, AND NUCLEA↗

Characterization and Catalytic Upgrading of Aqueous Stream Carbon from Catalytic Fast Pyrolysis of Biomass

Catalytic fast pyrolysis (CFP) of biomass produces a liquid product consisting of organic and aqueous streams. The organic stream is typically slated for hydrotreating to produce hydrocarbon biofuels, while the aqueous stream is considered a waste stream, resulting in the loss of residual biogenic carbon. Here, we report the detailed characterization and catalytic conversion of a CFP wastewater stream with the ultimate aim to improve overall biomass utilization within a thermochemical biorefinery. An aqueous stream derived from CFP of beech wood was comprehensively characterized, quantifying 53 organic compounds to a total of 17% organics. The most abundant classes of compounds are acids, aldehydes, and alcohols. The most abundant components identified in the aqueous stream were C1-C2 organics, comprising 6.40% acetic acid, 2.16% methanol, and 1.84% formaldehyde on wet basis. The CFP aqueous stream was catalytically upgraded to olefins and aromatic hydrocarbons using a Ga/HZSM-5 catalyst at 500 degrees C. When the conversion yield of the upgraded products was measured with fresh, active catalyst, 33% of the carbon in the aqueous stream was recovered as aromatic hydrocarbons and 29% as olefins. The majority of the experiments were conducted using a molecular beam mass spectrometer and separate GC-MS/FID experiments were used to confirm the assignments and quantification of products with fresh excess catalyst. The recovered 62% carbon in the form of olefins and aromatics can be used to make coproducts and/or fuels potentially improving biorefinery economics and sustainability. Spent catalysts were collected after exposure to varying amounts of the feed, and were characterized using multipoint-Brunauer-Emmett-Teller (BET) adsorption, ammonia temperature programmed desorption (TPD), and thermogravimetric analysis (TGA) to monitor deactivation of Ga/HZSM-5. These characterization data revealed that deactivation was caused by coke deposits, which blocked access to active sites of the catalyst and spent catalysts regained total activity after regeneration.

09 BIOMASS FUELS↗

Adaptive Urban Traffic Signal Control for Multiple Intersections: An LQR Approach

Traffic congestion leads to severe problems especially in urban traffic networks. It increases the chance of accidents, energy waste, and social costs. In order to address these problems, an adaptive linear quadratic regulator (LQR) approach is developed for traffic signal control at multiple intersections in an urban area. The proposed method controls the green time of the traffic signals to reduce traffic congestion and smooth traffic flow. Real-world data from vision-based traffic sensors are used to build the traffic network model, which mimics the real-world traffic behavior. In addition, the proposed control utilizes recursive least square parameter estimation, which is capable of tracking dynamic changes in traffic conditions. Simulation of Urban MObility (SUMO) is used to analyze the efficacy of the proposed method. Results of the simulation show that the proposed method outperforms pretimed control in various aspects.

adaptive LQR control↗