Search NASA⌕ Search

SEARCH · Search NASA

Results for “Project Management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,747 records · Page 97

Completion of Launch Director Console Project and Other Support Work

There were four projects that I was a part of working on during the spring semester of 2018. This included the completion of the Launch Director Console (LDC) project and the completion and submission of a Concept of Operations (ConOps) document for the Record and Playback System (RPS) at the Launch Control Center (LCC), as well as supporting the implementation of a unit in RPS known as the CDP (Communication Data Processor). Also included was my support and mentorship of a High School robotics team that is sponsored by Kennedy Space Center. The LDC project is an innovative workstation to be used by the launch director for the future Space Launch System program. I worked on the fabrication and assembly of the final console. The ConOps on RPS is a technical document for which I produced supporting information and notes. All of this was done in the support of the IT Project Management Office (IT-F). The CDP is a subsystem that will eventually be installed in and operated by RPS.

Steinrock, Joshua G.↗

Mission Status for Earth Science Constellation MOWG Meeting @ Sioux Falls SD EOS Aura

This presentation provides mission operations status for the Earth Observing System (EOS) Aura satellite for the past six-months (December 2017 through May 2018). It only contains information that is of interest to the International Earth Science Constellation (ESC) Mission Operations Working Group (MOWG) member missions. It will be presented at the bi-annual MOWG Meeting at the USGS EROS Data Center in Sioux Falls, South Dakota on Wednesday, June 12, 2018. These meetings have been occurring twice a year since the MOWG was formed in 2003. The presentation has been reviewed and approved by Eric Moyer, ESMO Deputy Project Manager Technical.

Aura satellite↗

Design Limit Loads and Verification Approach for the TESS Observatory

The Transiting Exoplanet Survey Satellite (TESS) is a NASA Explorer mission. The TESS Observatory is scheduled to launch on Falcon 9 in April 2018. This presentation covers the process used to define and update design limit loads for the observatory, instrument, and components throughout the life of the program. The limit loads that drove the need for a SoftRide isolation system are highlighted. The testing performed to qualify the observatory for launch loads at the instrument and observatory level is also detailed. In addition, exchanges with the launch vehicle provider in terms of loads predictions and hardware for test are discussed along with the associated issues encountered and lessons learned. The loads development and verification success on TESS was a team effort. Orbital ATK is the spacecraft provider, NASA GSFC provides project management and technical oversight, the instrument is managed by MIT Kavli Institute and the instrument cameras are built and tested by MIT Lincoln Laboratory. Since the instrument was designed in parallel with the spacecraft, the instrument design limit loads were developed in partnership with NASA and the instrument team. The three teams collaborated on a regular basis starting in the early design phase and continuing through observatory level testing.

Limit Loads↗

Tracking Components

This poster outlines the findings during a 10-week, full-time summer internship at NASA’s Stennis Space Center (SSC) in Mississippi. As an intern with RA10, the Project Management Division of Center Operations Directorate, I contributed to tasks related to the advancement of systems and operations across SSC. My main priority was to optimize the transportation process of work order kits delivered from the Michoud Assembly Facility (MAF) in New Orleans, Louisiana. An example work order kit would include instructions and materials to complete the replacement of a broken light switch. Unfortunately, kits that arrive at SSC often contain incorrect parts, which results in returning to MAF to get the necessary parts. Integrating a wireless tracking and identification system could improve this way of operating by providing a parts lists and kit location. This idea of using wireless technology will essentially cut costs, time and effort. The main objective for this summer is to develop options for affordable tracking and identification systems that can be used across the agency.

Meredith, Shelby↗

Rapid Trajectory Prediction for a Fixed-Wing UAS in a Uniform Wind Field with Specified Arrival Times

This paper presents an algorithm to rapidly generate trajectories for a kinematic fixed-wing Unmanned Aircraft System (UAS) model flying at constant altitude in a uniform wind field. Arrival times are specified by operators and rapid generation is accomplished via an elliptic integral problem formulation. Simulations are provided that illustrate this approach in the context of NASA's UAS Traffic Management Project.

trajectory↗

Mission Operations Working Group (MOWG) Report to the OMI Science Team

This PowerPoint presentation will discuss Aura's current spacecraft and OMI insturment status, highlight anyperformance trends and impacts to OMI operations, identify any operational changes and express concerns or potential process improvements. Reviewed by Eric Moyer, ESMO Deputy Project Manager.

Aura Mission Status↗

Sharing the NASA Experience

Dr. Obadiah Kegege will share his career experience with the University of Missouri _ Kansas City Students. This experience spans from academia, research and development, working on flight and ground systems for space exploration, to current work in engineering project management. Most of his NASA experience concentrates on supporting the Space Communication and Navigation Program (SCaN) program. SCaN implements, manages, and maintains communications and navigation services to existing and planned space missions. Dr. Kegege's talk will touch on topics like "how do we communicate to space," as well giving an overview of NASA's Near-Earth Network (NEN), Space Network (SN), and the Deep Space Network (DSN). Also, Dr. Kegege will answer a few questions from students, i.e applying for NASA internships, applying for jobs at NASA, etc.

Kegege, Obadiah O.↗

Refurbishment of NASA's Johnson Space Center Liquid Nitrogen Bulk Storage Tanks in Preparation for Thermal Vacuum Optical Testing of the James Webb Space Telescope (JWST)

NASA is the mission lead for the James Webb Space Telescope (JWST), the next of the "Great Observatories", scheduled for launch in 2019. It is directly responsible for the integration and test (I&T) program that culminated in an end-to-end cryo vacuum optical test of the flight telescope and instrument module in Chamber A at NASA Johnson Space Center. Historic Chamber A is the largest thermal vacuum chamber at Johnson Space Center and one of the largest space simulation chambers in the world. Chamber A has undergone a major modernization effort to support the deep cryogenic, vacuum and cleanliness requirements for testing the JWST. Chamber A utilizes Liquid Nitrogen as a thermal barrier between the 300 Kelvin vessel wall and the 20 Kelvin helium environmental conditioning shrouds. The 155,000 gallon capacity of the six vessels support long duration testing which support low and deep space simulations for today's testing. This paper describe the challenges of refurbishing six liquid nitrogen bulk storage vessels that are 60 year old. The vessels were refurbished in place and focused primarily on the vacuum annulus. The challenges of vessel research, design engineering and project management will be discussed. The refurbishment of the vessels has extended the life of the vessels for another 35-50 years on the vacuum annulus integrity. The survivability of the bulk storage vessels was tested during the historic hurricane Harvey of 2017 during the 100 day JWST thermal-vacuum test.

Garcia, Sammy↗

Mission Operations Working Group (MOWG) Report to the Aura Science Team

This PowerPoint presentation will discuss Aura's current spacecraft and instrument status, highlight any performance trends and impacts to operations, identify any operational changes and express concerns or potential process improvements. Reviewed by Eric Moyer, ESMO Deputy Project Manager.

Fisher, Dominic M.↗

Supply Chain Research and Analysis: Illuminating Risks in Complex Systems

Framing the strategic challenge posed by the interconnected, multitiered supply chains of mission projects managed by the NASA Goddard Space Flight Center. Discussing conditions and risks which can disrupt or threaten the availability, production and delivery of products and services for complex space systems. Utilizing a holistic analytical framework, business intelligence techniques, an integrated information system platform and analytics to produce insight into suppliers / supply chains and associated risks. Advancing supply chain risk management capabilities to support the successful performance of space missions.

supply chain risk management↗

The LUVOIR Concepts

As part of the LUVOIR splinter session at the 234th Meeting of the American Astronomical Society, this talk will present an overview of the LUVOIR concept designs. The second portion of the talk will address recommendations made by the LUVOIR science and technology definition team on project management lessons learned.

Bolcar, Matthew R.↗

NASA Handbook 7010: Direct Field Acoustic Testing

Instruments, spacecraft, antennas, reflectors, and other mechanical hardware have been undergoing acoustic qualification testing over the last decade using loudspeakers. This speaker-generated Direct Field Acoustic Test (DFAT) method offers cost, mobility, and schedule advantages over the conventional Reverberant Acoustic Field Test (RAFT) method. To develop most appropriate acoustic test program using the DFAT method for a flight project, flight project managers and their technical staffs will need overall guidance and technical rational for using DFAT to qualify flight hardware for acoustic environments. The NASA Chief Engineer Office had tasked JPL to prepare a NASA Handbook for DFAT Dynamics Testing. The handbook was completed and was released by NASA headquarters in 2015. The handbook provides advantages and disadvantages of such method of testing, key references and a series of recommended practices for test preparation and test performance. This paper will summarize key and important steps related to this method of acoustic testing.

Kolaini, Ali R↗

Technology Readiness Assessment Best Practices Guide

This guide establishes standard definitions and best practices for conducting technology readiness assessments (TRAs) for in flight projects and NASA’s research and technology missions. These best practices originated from a NASA TRA Committee that met weekly in 2014. The team was co-led by the Headquarters (HQ) Office of the Chief Engineer (OCE) and the HQ Office of the Chief Technologist (OCT), and included one to two representatives from each Center.

Technology readiness level↗

The Comet Astrobiology Exploration Sample Return (CAESAR) Mission

The Comet Astrobiology Exploration Sample Return (CAESAR) mission will acquire and return to Earth for laboratory analysis a minimum of 80 grams of surface material from the nucleus of comet 67P/Chur-yumov-Gerasimenko (67P). CAESAR will characterize the surface region sampled, preserve the collected sample in a pristine state, and return evolved volatiles by capturing them in a separate gas reservoir. NASA Goddard Space Flight Center provides project management, systems engineering, safety and mission assurance, contamination control, mission operations, and many other important functions. Northrop Grumman Space Systems will build the spacecraft, based on Dawn mission heritage, which like CAESAR, uses solar electric propulsion. CAESAR was selected by for Phase A study in the New Frontiers 4 Competition and will be proposed to New Frontiers 5.Collection of a sample from the surface of comet 67P is facilitated by a set of cameras that together provide images to support sample site selection, perform optical navigation, and document the sample before, during, and after col-lection. The sample is collected at the end of an arm during a 5-second touch-and-go (TAG) maneuver with the Sample Acquisition System (SAS)designed by Honeybee Robotics for the surface properties of comet 67P observed by the Rosetta mission. After sample collection, and while the sample is still cold (< -80°C), the TAG Arm inserts the sample container into the Sample Containment System (SCS) mounted inside the Sample Return Capsule (SRC). The SCS is sealed, preventing the sample from escaping into space. The sample is slowly warmed inside the SCS to enable sublimation of volatiles, which are collected in the Gas Containment System (GCS), a passively cooled gas reservoir. Separating the volatiles from the solid sample protects the solid sample from alteration. Once all sublimated H2O is transferred to the GCS, the GCS is sealed to capture the volatile sit contains, and the SCS is vented to space to maintain the solid sample under vacuum. The SCS vent is closed before Earth entry to prevent atmospheric contamination. Detailed laboratory analyses of the sample from 67P will trace the history of volatile reservoirs, delineate the chemical pathways that led from simple interstellar species to complex molecules, constrain the evolution of the comet, and evaluate the role of comets in delivering water and prebiotic organics to the early Earth. CAESAR will achieve these goals by carrying out coordinated sample analyses that will link macroscopic properties of the comet with microscale mineralogy, chemistry, and isotopic studies of volatiles and solids. Most of the sample (≥75%) will be set aside for analyses by generations of scientists using continually advancing tools and methods, yielding an enduring scientific treasure that only sample return can provide. This presentation will review development conducted during NF4 Phase A and discuss the NF5 mission concept.

A G Hayes↗

A Systematic Approach to Hardware Qualification

A systematic approach for the development of a hardware qualification approach is described. This approach stems from the need to break the "Catch-22" of not being able to fly new technology because it hasn't flown. A physics of failure approach is used to identify failure modes and the impact and likelihood of these failures on the mission requirements is plotted in a Requirements Matrix. These same failure modes are plotted against the effectiveness of the available Preventions, Analyses, Control and Tests (PACTs) at screening for, or eliminating, these failure modes in a Test Effectiveness Matrix. Matrix multiplication results in a ranked set of PACTs which can be sorted according to cost and redundancy with other PACTs. This, and other information which results from the process, will allow project managers to make more informed decisions regarding the cost and risk tradeoffs inherent in any qualification program.

hardware↗

Future Model-Based Systems Engineering Vision and Strategy Bridge for NASA

A vision for the future of model-based systems engineering (MBSE) at NASA in 2029 and a strategy bridge towards that future are presented. Strategic thinking and leading change concepts were used to analyze reports and presentations on global trends and visionary thinking about the future of systems and digital engineering. The context, strategic time horizon, stakeholders, strategic challenges, strategic advantages, driving forces, and opportunities were considered. The analysis resulted in a future vision of MBSE that shows what NASA systems engineers and digital machines will do to perform rapid, extraordinary, and unprecedented missions. The NASA systems engineer, in this future vision, works with a global project team in a virtual and collaborative environment, engineers the system, and uses digital approaches as the routine and default way of working. The digital machines provide data-driven and automated mission designs; have a backbone of program and project management, systems engineering, and product life-cycle management; and are a knowledge-sharing infrastructure. The NASA systems engineer and the systems engineering team are envisioned to use digital machines to plan and perform rapid exploration missions, develop a digital twin that lasts across the life cycle, and develop enduring and adaptable systems. NASA has an engineering enterprise and a life-cycle management framework that endure, adapt, and respond. A strategy bridge based on the Baldrige Criteria for Performance Excellence Framework and lessons learned from a recent MBSE initiative illuminates a way forward from today to this desired future. The bridge lays out a strategy for leaders and recommends investments of today for immediate benefits and for benefits in 2029.

model-based systems engineering, digital engineeri↗

Advanced Technology Infusion into a Spacesuit System

Advancement in technology drives our future. Moreover, the successful implementation of a technology drives its possibilities. The National Aeronautics and Space Administration (NASA) has invested in numerous technologies over the decades. A quote from NASA’s Space Technology Mission Directorates indicates the importance of technology: “Historically, technology has driven humanity’s progress and will continue to define our future. Our nation chooses to invest in new technology not only to maintain our edge in the global economy but also because technology helps us: Redefine the possible; Create a technologically advanced future; and Drive economic growth.” It is difficult for a technology to satisfy these goals unless it can be successfully infused into a system. For a technology to continue to evolve, become a reality, and infuse into NASA’s missions, there must exist a compilation of success-oriented factors for the technology to reach fruition. Understanding these factors could help decrease the complexity of technology infusion and bridge the gap between technology developers and system integrators. Ultimately, the knowledge gained could facilitate the design, development, and infusion of a technology to be more effective and efficient. Successful technology infusion is complex. Even complexity at the interfaces can be daunting when advanced technology’s infuse into complex systems such as a spacesuit. Additionally, unforeseen emergent behavior and challenges can surface upon integration. Overall, there is a need to understand and measure the success of infusing an advanced technology into a complex system. Industry and academia desire to quantify performance benefits of technologies integrated into complex systems. This paper will focus advanced technology infusion into a spacesuit system. This research could help NASA and industry’s project managers and system mangers integrate advanced technologies more effectively and efficiently.

Advanced Technology↗

GRACE Follow-On Early In-Flight Challenges

The Gravity Recovery and Climate Experiment (GRACE) Follow-On Mission is a successor to the highly successful GRACE Mission, which operated from 2002-2017. It is a partnership between the National Aeronautics and Space Administration (NASA) and the German Research Center for Geosciences, GeoForschungsZentrum Potsdam (GFZ). Under this partnership, the United States provides the project management, satellites and instruments, Germany provides the launch and mission operations. The partners share responsibilities for producing science data products. GRACE Follow-On, like its predecessor GRACE, consists of twin satellites which fly in a tandem formation at a near polar orbit separated by about 200 km along track. The mission continues the work of GRACE by tracking the movement of water, observing changes in ice sheets and sea level to provide a unique view of Earth’s changing climate. The satellites were launched May 22, 2018 from Vandenberg Air Force Base, in California, on a SpaceX Falcon 9 Rocket. Launch and Early Operations (LEOP) were completed within the first week and on-orbit commissioning proceeded for the next 8 months. The GRACE Follow-On mission is designed to last five years. The mission operations team has had to address several technical challenges early into the planned five-year mission life. The commissioning period was extended by 5 months to successfully address these issues, making it possible for the mission to meet key requirements for delivery and quality of the science data products. This paper will address the challenges faced by GRACE Follow-On and the actions taken by the mission operations team to continue to safely operate the mission.

Witkowski, M.M.↗