Search NASA⌕ Search

SEARCH · Search NASA

Results for “DOCUMENTATION”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,783 records · Page 99

Xyce Parallel Electronic Simulator Reference Guide (Version 7.2)

This document is a reference guide to the Xyce Parallel Electronic Simulator, and is a companion document to the Xyce Users Guide. The focus of this document is (to the extent possible) exhaustively list device parameters, solver options, parser options, and other usage details of Xyce. This document is not intended to be a tutorial. Users who are new to circuit simulation are better served by the Xyce Users Guide.

42 ENGINEERING↗

G3P3 Phase 3 Project Execution Plan. Issue 1

The National Solar Thermal Test Facility (NSTTF) at Sandia National Laboratories New Mexico (SNL/NM) developed this Project Execution Plan (PEP) to document its process for executing, monitoring, controlling and closing-out Phase 3 of the Gen 3 Particle Pilot Plant G3P3. This plan serves as a resource for stakeholders who wish to be knowledgeable of project objectives and how they will be accomplished. The plan is intended to be used by the development partners, principal investigator, and the federal project director. Project objectives are derived from the mission needs statement, and an integrated project team assists in development of the PEP. This plan is a living document and will be updated throughout the project to describe current and future processes and procedures. The scope of the PEP covers: Cost, schedule, and scope Project reporting Staffing plan Quality assurance plan Environment, safety, security, and health This document is a tailored approach for the Facilities Management and Operations Center (FMOC) to meet the project management principles of DOE Order 413.3B, Program and Project Management for the Acquisition of Capital Assets , and DOE G 413.3-15, DOE Guide for Project Execution Plans. This document will elaborate on content as knowledge of the project is gained or refined.

14 SOLAR ENERGY↗

Waste stream knowledge assessment memorandum

To ensure that the Acceptable Knowledge (AK) documentation relating to the management of potentially reactive, corrosive, ignitable, and incompatible transuranic (TRU) waste materials is adequate, current, and accurately described in existing AK Summary Reports (AKSR), an Acceptable Knowledge Assessment (AKA) will be performed for each waste stream with unshipped containers or containers that are not emplaced. The primary focus of the AKA will be to review and verify the AK documentation associated with the historic and current use of absorbents, immobilization products, and neutralization agents used in the management of potentially corrosive, ignitable, or reactive liquids. In addition, the AKA will assess the specific management of other potentially incompatible or reactive materials generated at the Building 6580 Hot Cell Facility (HCF) and repackaged at the Auxiliary Hot Cell Facility (AHCF) at the Sandia National Laboratory (SNL). The AKA is performed in accordance with Section 4.13 of the Central Characterization Procedure (CCP) CCPTP- 005, CCP Acceptable Knowledge Documentation. This AKA specifically addresses the subpopulation of containers previously certified by CCP for waste stream SNL-HCF-S5400-RH during AHCF repackaging campaigns 11, 12, 14, and 17 and primarily consists of fuel examination waste (FEW). This subpopulation of containers was generated primarily at the HCF from the late 1970s to mid-1990s, and repackaging history as well as historical information are listed in Attachment 1, Waste Stream SNL-HCF-S5400-RH (FEW lnventory) Containers List. Attachment 2, Waste Stream SNL-HCF-S5400-RH (FEW lnventory) Container Evaluations, presents a summary review of site container documentation and the descriptions from the CCP visual examination (VE) during repackaging at the AHCF.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Sandia National Laboratories Advanced Simulation and Computing (ASC) Appraisal Method for the Implementation of the ASC Software Quality Engineering Practices (V.2.0)

This document provides a guide to the process of conducting software appraisals under the Sandia National Laboratories (SNL) ASC Program. The goal of this document is to describe a common methodology for planning, conducting, and reporting results of software appraisals thereby enabling: 1) Identification of improvements in implementation of the software quality engineering (SQE) practices identified in the ASC Software Quality Plan across the ASC Program against objective baselines. 2) Feedback from project teams on SQE opportunities for improvement. 3) Identification of strengths and opportunities for improvement for individual project teams. 4) Guidance to the ASC Program on the focus of future SQE activities. Document contents include process descriptions, templates to promote consistent conduct of appraisals, and an explanation of the relationship of this procedure to the SNL ASC software program. The activities described by this document are under the oversight of SNL ASC Program Director and SNL ASC Program Manager.

42 ENGINEERING↗

Xyce Parallel Electronic Simulator Reference Guide (V.7.1)

This document is a reference guide to the Xyce Parallel Electronic Simulator, and is a companion document to the Xyce Users' Guide. The focus of this document is (to the extent possible) exhaustively list device parameters, solver options, parser options, and other usage details of Xyce. This document is not intended to be a tutorial. Users who are new to circuit simulation are better served by the Xyce Users' Guide.

42 ENGINEERING↗

TCR Postulated Accident and MHA Dose Assessment

Oak Ridge National Laboratory (ORNL) is engaged in regulatory activities to gain US Department of Energy (DOE) approval to build and operate a small high-temperature gas reactor, the Transformational Challenge Reactor (TCR). ORNL uses advanced manufacturing techniques to produce select reactor components. The TCR is unique in its mission: the reactor’s at-power operating lifetime will be less than one effective full-power day to limit the radiological source term to very low values, thus facilitating approval to operate. The primary regulatory documents governing construction and operation of the facility are NUREG-1537, “Guidelines for Preparing and Reviewing Applications for the Licensing of Non-Power Reactors” and DOE-STD-3009, “Preparation of Nonreactor Nuclear Facility Documented Safety Analysis.” Although this document is not a safety basis document, it provides a conservative indication of the magnitude of onsite and offsite radiological doses for specific scenarios, thus informing future design and regulatory activities. As required by NUREG-1537, scenarios included in this analysis are (1) a worstcase depressurized loss-of-forced-circulation accident, and (2) a maximum hypothetical accident. Details on the analysis of dose consequences with various system configurations are also provided.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Xyce™ Parallel Electronic Simulator Reference Guide, Version 7.3

This document is a reference guide to the Xyce Parallel Electronic Simulator, and is a companion document to the Xyce Users' Guide. The focus of this document is (to the extent possible) exhaustively list device parameters, solver options, parser options, and other usage details of Xyce. This document is not intended to be a tutorial. Users who are new to circuit simulation are better served by the Xyce Users' Guide.

42 ENGINEERING↗

Verification and Validation of the PLTEMP/ANL Code for Thermal-Hydraulic Analysis of Experimental and Test Reactors (Code Version 4.3)

The document compiles in a single volume the verification and validation works done for the PLTEMP/ANL code during the years of its development and improvement. The verification of sixteen capabilities of the PLTEMP/ANL Version 4.3 code that were identified by research reactor analysts as frequently used in their thermal-hydraulic analysis are described and documented. Each chapter of the document deals with the verification or validation of a specific part of the software that calculates a specific phenomenon, e.g., channel flow calculation, coolant property calculation, heat transfer calculation, and flow instability calculation. The software verification work is usually done by comparing the code with hand calculation, Microsoft spreadsheet calculation, or Mathematica calculation. The software validation is done by comparing the code with experimental data or a widely tested code like the RELAP5 code. In addition, some PLTEMP/ANL verification works that are available in the open literature are simply referenced and not included in the document. PLTEMP/ANL has been used in conversion safety analysis reports of several US and foreign research reactors that have been licensed and converted. A list of such reactors is given.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Agile Strategy Living Laboratory Reflection Paper

Getting my team members to all agree that we needed to pursue possible solutions for our documentation review process was an idea that came across very well with the team. This specific topic has be something that as a team we have been having struggles with recently due to the shear amount of documents that have been flowing through the team’s hands to review. We all realized that the process had areas that we could change that would eliminate confusion for new employees, reduce backload, and improve efficiency and quality of the documentation reviews. The key personnel on our team that have the most direct control and impact over this process are the production control specialists, documentation preparation and review is their primary job function. They are denoted in the action pack as “doc spec 1” and this individual has 12 years of expertise in their role. The engineers are denoted as “engineer 1, 2, 3” respectively. Engineer 1 has 10 years of experience in this team, engineer 3 has 38 years of experience on the team, and engineer 2 is myself with 5 years of expertise with this team and 5 with the department of defense.

96 KNOWLEDGE MANAGEMENT AND PRESERVATION↗

Xyce™ Parallel Electronic Simulator Reference Guide (V.7.4)

This document is a reference guide to the Xyce Parallel Electronic Simulator, and is a companion document to the Xyce Users' Guide. The focus of this document is (to the extent possible) exhaustively list device parameters, solver options, parser options, and other usage details of Xyce. This document is not intended to be a tutorial. Users who are new to circuit simulation are better served by the Xyce Users' Guide.

97 MATHEMATICS AND COMPUTING↗

November 2021 Operational Highlights

Completed: 1. the initial tests of document workflows for Titan on the Red, which included standing up a software encryption capability to test data ingestion; 2. a software encryption capability in order to ingest the first data source by the end of the month; 3. a stand-alone computer for classified ontology data entry. Titan on the Red is an artificial intelligence/machine learning system to make digitizing, cataloging, and searching NSRC collections easier and more efficient. Created Online Vault backups, with one copy stored at LANL and one shipped to Lawrence Livermore National Laboratory. The Online Vault is a classified, searchable library of LANL’s nuclear weapons design and test history. Imported new Laboratory Directed Research and Development (LDRD) documents based on revised access categories. Bulk ingested nearly 10,000 documents via java-based PowerLoader. This application ingests metadata and content into the Online Vault to meet the requirements for the NSRC collections. Rehoused 300 linear feet of weapons physics documents in archival, acid-free storage folders and boxes.

96 KNOWLEDGE MANAGEMENT AND PRESERVATION↗

Background Information on the Protection Requirements in IEEE Std 1547-2018

As the DER penetration level has risen significantly in recent times, parameter settings and configuration of installed DERs are having direct impact on local electric distribution utilities as well as bulk power systems during normal and abnormal grid conditions. On the other hand, all grid-connected DERs in the United States of America must conform to the interconnection requirements prescribed in the IEEE Std 1547-2018. Because of these reasons, it is crucial to understand the expected DER performance during abnormal grid conditions considering the requirements of the IEEE Std 1547-2018. The aim of this document is twofold: (1) to summarize requirements in IEEE Std 1547-2018 having direct implications in distribution network protection, and (2) to provide the reader with knowledge and information that will be required for users to apply the requirements specified. Since the focus of this document is on distribution network protection in the presence of DERs, it is assumed that the readers have basic understanding of distribution network protection as well as working principles of DERs. This document starts with a brief introduction on protection systems for distribution network followed by a discussion on the impact of DER on the protection systems. Current practices to provide network protection in the presence of DER is briefly discussed. The document then explores the DER performance requirements in IEEE Std. 1547-2018; especially on those related to distribution network protection. Section 6.1 in IEEE Std. 1547-2018 provides an overview of capabilities and control requirements for DER under abnormal operating conditions. This section also introduces abnormal operating performance categories I, II, III. The DER response to various types of faults and grid conditions such as short-circuit faults and open phase conditions are discussed in section 6.2 in the standard while requirements for coordination with the Area EPS reclosing scheme are provided in section 6.3. Section 6.4 in the IEEE Std 1547-2018 specifies requirements for mandatory voltage tripping and ride-through requirements during low and high voltage disturbances and section 6.5 specifies similar requirements for low and high frequency disturbances. IEEE Std. 1547 requires that the conformance of the DERs to IEEE Std 1547-2018 requirements should be verified in accordance with IEEE Std. 1547. 1. There are several parameters and settings of DERs that need to be properly selected for reliable operation during abnormal grid condition while applying the requirements of IEEE Std 1547-2018. Key decisions for proper selections of parameter and settings are: 1. Determination of required DER abnormal operating performance category, 2. Determination of DER response (shall trip) to abnormal voltages and 3. Determination of DER response (shall trip) to abnormal frequency.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Report on High Energy Arcing Fault Experiments

This report documents an experimental program designed to investigate High Energy Arcing Fault (HEAF) phenomena for medium voltage electrical switchgear containing aluminum conductors. This report covers full-scale laboratory experiments using representative nuclear power plant (NPP) three-phase electrical equipment. Electrical, thermal, and pressure data were recorded for each experiment and documented in this report. This report covers four of the fourteen planned medium voltage electrical enclosure experiments. Subsequent reports will document the additional experiments performed in the future. The experiments were performed at KEMA Labs located in Chalfont, Pennsylvania. The experimental design, setup, and execution were completed by staff from the United States Nuclear Regulatory Commission (NRC), the National Institute of Standards and Technology (NIST), Sandia National Laboratories (SNL) and KEMA. In addition, representatives from the Electric Power Research Institute (EPRI) observed some of the experimental setups and execution. The HEAF experiments were performed on four near-identical units of General Electric metal-clad medium voltage switchgear. The three-phase arcing fault was initiated on the primary cable connection bus. All four experiments used the same system voltage (6.9 kV) but varied the current and duration. Real-time electrical operating conditions, including voltage, current and frequency, were measured during the experiments. Heat fluxes and incident energies were measured with plate thermometers and slug calorimeters at various locations around the electrical enclosures. Internal enclosure pressures were measured during the experiments. The experiments were documented with normal and high-speed videography, infrared imaging, and photography. Insights from the experimental series included timing information related to enclosure breach, event progression, mass loss measurements for electrodes and steel enclosures, peak pressure rise, particle analysis, along with visual and thermal imaging data to better understand and characterize the hazard. These results will be used in subsequent efforts to advance the state of knowledge related to HEAF.

42 ENGINEERING↗

FECM/NETL CO 2 Transport Cost Model (2022): Description and User’s Manual

The FECM/NETL CO 2 Transport Cost Model (CO 2 _T_COM) is an Excel spreadsheet model that calculates the cost of transporting CO 2 from the beginning to the end of a pipeline. This document provides two main functions. First, the document describes the equations and algorithms that are used by the model to calculate technical quantities (such as the minimum inner pipe diameter needed to transport a user-specified CO 2 mass flow rate a specified distance) and engineering-economic quantities (such as capital costs, operating costs and cash flows). Second, the document is a user’s manual for the model that describes the procedures the user must follow to run the model. The document also describes input variables and output variables (i.e., results) for the model.

42 ENGINEERING↗

Design Guidelines for Deployable Wind Turbines for Military Operational Energy Applications

This document aims to provide guidance on the design and operation of deployable wind systems that provide maximum value to missions in defense and disaster relief. Common characteristics of these missions are shorter planning and execution time horizons and a global scope of potential locations. Compared to conventional wind turbine applications, defense and disaster response applications place a premium on rapid shipping and installation, short-duration operation (days to months), and quick teardown upon mission completion. Furthermore, defense and disaster response applications are less concerned with cost of energy than conventional wind turbine applications. These factors impart design drivers that depart from the features found in conventional distributed wind turbines, thus necessitating unique design guidance. The supporting information for this guidance comes from available relevant references, technical analyses, and input from industry and military stakeholders. This document is not intended to be a comprehensive, prescriptive design specification. This document is intended to serve as a written record of an ongoing discussion of stakeholders about the best currently available design guidance for deployable wind turbines to help facilitate the effective development and acquisition of technology solutions to support mission success. The document is generally organized to provide high-level, focused guidance in the main body, with more extensive supporting details available in the referenced appendices. Section 2 begins with a brief qualitative description of the design guidelines being considered for the deployable wind turbines. Section 3 provides an overview of the characteristics of the mobile power systems commonly used in U.S. military missions. Section 4 covers current military and industry standards and specifications that are relevant to a deployable wind turbine design. Section 5 presents the deployable turbine design guidelines for the application cases.

17 WIND ENERGY↗

SAS4A/SASSYS-1 Verification and Validation Plan for the Versatile Test Reactor

Software verification and validation (V&V) hold an important role in the safety analysis for nuclear facilities. Codes and models utilized in calculations that demonstrate the safety basis as part of a license application or authorization must demonstrate an acceptable pedigree with regard to key critical characteristics that are comprised of the functional and performance requirements of the software. This document describes the methodology for verification and validation of the SAS4A/SASSYS-1 systems-level liquid-metal safety analysis software in support of DOE authorization of the Versatile Test Reactor (VTR). The overall goal of this V&V effort is to demonstrate the suitability of SAS4A/SASSYS-1 for evaluation of safety performance and characterization of safety margins in VTR. To that end, the V&V methodology will be used to demonstrate the adequacy of the component and physical models of SAS4A/SASSYS-1 for the corresponding VTR design elements. This methodology, which has been derived as a generalized approach to the U.S. NRC’s evaluation model development and assessment process (EMDAP) of Regulatory Guide 1.203, entails four high-level activities: software requirements identification, assessment base development, determination of acceptance, and gap closure. The methodology has been generalized to be suitable for both verification and validation of the software for the VTR project. Several high-level engineering analysis quality assurance measures as well as supporting V&V methodology documentation are also described in this document to help support demonstration of software acceptance. To support initial development of the SAS4A/SASSYS-1 V&V basis, existing verification test problems and systems benchmarks are also identified and briefly described in this document.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Xyce™ Parallel Electronic Simulator Reference Guide, Version 7.5

This document is a reference guide to the Xyce Parallel Electronic Simulator, and is a companion document to the Xyce Users' Guide. The focus of this document is (to the extent possible) exhaustively list device parameters, solver options, parser options, and other usage details of Xyce. This document is not intended to be a tutorial. Users who are new to circuit simulation are better served by the Xyce Users' Guide.

97 MATHEMATICS AND COMPUTING↗

Technical Guidance for Creation of 237 NP Irradiation Target Fabrication Packages

This document describes the process used to document the fabrication of irradiation targets that may be inserted into either the High Flux Isotope Reactor (HFIR) at Oak Ridge National Laboratory (ORNL), or the Advanced Test Reactor (ATR) at Idaho National Laboratory (INL). The targets are being irradiated to produce 238 Pu (5.48Mev alpha decay, T1/2 = 87.7 y) used in the fabrication of radioisotope thermoelectric generators (RTGs). RTGs powered by 238 Pu are an established power source technology for National Aeronautics and Space Administration space missions where solar power is not viable. The documentation included in fabrication files demonstrates full traceability of all materials, components, and assemblies used to build 237 Np targets. To accomplish this, all documentation (e.g., certified material test reports, weld reports, leak test reports) will be maintained and reviewed throughout materials procurement, component fabrication, and target assembly.

07 ISOTOPE AND RADIATION SOURCES↗