Search NASA⌕ Search

SEARCH · Search NASA

Results for “BEAM ACCEPTANCE”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

SU-F-BRD-08: A Novel Technique to Derive a Clinically-Acceptable Beam Model for Proton Pencil-Beam Scanning in a Commercial Treatment Planning System

Purpose: To evaluate the accuracy and limitations of a commercially-available treatment planning system’s (TPS’s) dose calculation algorithm for proton pencil-beam scanning (PBS) and present a novel technique to efficiently derive a clinically-acceptable beam model. Methods: In-air fluence profiles of PBS spots were modeled in the TPS alternately as single-(SG) and double-Gaussian (DG) functions, based on fits to commissioning data. Uniform-fluence, single-energy-layer square fields of various sizes and energies were calculated with both beam models and delivered to water. Dose was measured at several depths. Motivated by observed discrepancies in measured-versus-calculated dose comparisons, a third model was constructed based on double-Gaussian parameters contrived through a novel technique developed to minimize these differences (DGC). Eleven cuboid-dose-distribution-shaped fields with varying range/modulation and field size were subsequently generated in the TPS, using each of the three beam models described, and delivered to water. Dose was measured at the middle of each spread-out Bragg peak. Results: For energies <160 MeV, the DG model fit square-field measurements to <2% at all depths, while the SG model could disagree by >6%. For energies >160 MeV, both SG and DG models fit square-field measurements to <1% at <4 cm depth, but could exceed 6% deeper. By comparison, disagreement with the DGC model was always <3%. For the cuboid plans, calculation-versus-measured percent dose differences exceeded 7% for the SG model, being larger for smaller fields. The DG model showed <3% disagreement for all field sizes in shorter-range beams, although >5% differences for smaller fields persisted in longer-range beams. In contrast, the DGC model predicted measurements to <2% for all beams. Conclusion: Neither the TPS’s SG nor DG models, employed as intended, are ideally suited for routine clinical use. However, via a novel technique to be presented, its DG model can be tuned judiciously to yield acceptable results.

60 APPLIED LIFE SCIENCES↗

A large-acceptance beam-deceleration module for retrofitting into ion-source beam lines

We describe a large-acceptance deceleration module capable of decelerating large-emittance full-intensity ion beams typical of ECR ion sources to very low energies with high efficiency. The deceleration module is designed to permit convenient retrofitting into an existing beam line to replace, e.g., the first Faraday cup after magnetic analysis of the beam extracted from the ion source. For starting energies of 10 keV, and incident ion currents as large as 300 {mu}A, deceleration efficiencies have been measured to be greater than 80% for final energies as low as 70 eV. The decelerated beam intensity can be monitored either by insertion of a beam catcher floating at the final deceleration voltage or from the current to the exit grid itself, with suitable correction applied for the grid transparency factor. The behavior of the deceleration optics was modeled using SIMION, incorporating the effects of intra-beam space charge repulsion. We describe a recent application of this deceleration module to study near-surface He bubble and blister formation of a W target heated to 1250 K and irradiated with a 98 eV He ion beam with a flux of {approx}10{sup 16} cm{sup -2} s{sup -1}.

43 PARTICLE ACCELERATORS↗

The Next Generation Muon Source at J-PARC/MLF

The Materials and Life Science Facility (MLF) is currently under construction at J-PARC in Tokai, Japan. The muon section of the facility will house the muon production target and four secondary beam lines used to transport the muons into two experimental halls. Currently, one of the four beam lines (the Decay beam line) has been completed and is operational. The beam line currently under construction is the large acceptance beam line (the so called Super-Omega beam line) which, when completed, will produce the highest intensity pulsed muon beam in the world. The expected rate of surface muons for this beam line is 4x10{sup 8} mu{sup +}/s, and a cloud muon rate of 10{sup 7} mu{sup -}/s. The beam line consists of the normal-conducting capture solenoids, the superconducting curved transport solenoids, and an axial focusing magnet. The capture solenoids have been fabricated and installed on the beam line, while the transport solenoids are under design, with initial prototype coils under fabrication.

43 PARTICLE ACCELERATORS↗

Ultra-High Gradient Channeling Acceleration in Nanostructures: Design/Progress of Proof-of-Concept (POC) Experiments

A short bunch of relativistic particles or a short-pulse laser perturbs the density state of conduction electrons in a solid crystal and excites wakefields along atomic lattices in a crystal. Under a coupling condition the wakes, if excited, can accelerate channeling particles with TeV/m acceleration gradients in principle since the density of charge carriers (conduction electrons) in solids n 0 = ~ 10 20 – 10 23 cm -3 is significantly higher than what can be obtained in gaseous plasma. Nanostructures have some advantages over crystals for channeling applications of high power beams. The dechanneling rate can be reduced and the beam acceptance increased by the large size of the channels. For beam-driven acceleration, a bunch length with a sufficient charge density would need to be in the range of the plasma wavelength to properly excite plasma wakefields, and channeled particle acceleration with the wakefields must occur before the ions in the lattices move beyond the restoring threshold. In the case of the excitation by short laser pulses, the dephasing length is appreciably increased with the larger channel, which enables channeled particles to gain sufficient amounts of energy. This paper describes simulation analyses on beam- and laser (X-ray)-driven accelerations in effective nanotube models obtained from Vsim and EPOCH codes. Experimental setups to detect wakefields are also outlined with accelerator facilities at Fermilab and NIU. In the FAST facility, the electron beamline was successfully commissioned at 50 MeV and it is being upgraded toward higher energies for electron accelerator R&D. The 50 MeV injector beamline of the facility is used for X-ray crystal-channeling radiation with a diamond target. It has been proposed to utilize the same diamond crystal for a channeling acceleration POC test. Another POC experiment is also designed for the NIU accelerator lab with time-resolved electron diffraction. Recently, a stable generation of single-cycle laser pulses with tens of Petawatt power based on thin film compression (TFC) technique has been investigated for target normal sheath acceleration (TNSA) and radiation pressure acceleration (RPA). The experimental plan with a nanometer foil is discussed with an available test facility such as Extreme Light Infrastructure – Nuclear Physics (ELI-NP).

43 PARTICLE ACCELERATORS↗

Design of the injection beamline for the Californium Rare Isotope Breeder Upgrade electron beam ion source charge breeder

The design of the ion injection line connecting the electron beam ion source (EBIS) charge breeder and the Californium Rare Isotope Breeder Upgrade radio frequency quadrupole cooler-buncher at the Argonne Tandem Linear Accelerator System was investigated with particle tracking simulations. The injection line was configured to accommodate several differential pumping sections, individual optical components were optimized to minimize emittance growth, and the ion beam parameters were matched with the EBIS electron beam acceptance to minimize losses upon injection.

43 PARTICLE ACCELERATORS↗

Full Multilayer Laue Lens for Focusing Hard X-rays

Multilayer Laue Lenses (MLLs) were developed by us using dynamic diffraction effects to efficiently focus hard x-rays to very small spots. Using a partial MLL we were able to focus 19.5-keV hard x-rays to a line focus of 16 nm with an efficiency of 31%. A full MLL is a complete linear MLL structure. It can be fabricated by bonding two partial MLL wafers, or by growing the full structure using magnetron sputtering without bonding. A 40-{mu}m full MLL, with a total of 5166 layers of WSi{sub 2} and Si, has been successfully grown by sputter deposition. The layer thicknesses gradually vary from 4 nm to {approx}400 nm and then back to 4 nm. Two coating runs were used to grow the full structure, one for each half. It took over 56 h for each run. A 100-{mu}m nearly-full MLL was constructed by bonding. Each 50-{mu}m half-structure has 1788 WSi{sub 2} and Si layers with 12-nm to {approx}32-nm thicknesses and {approx}32-{mu}m total thickness, followed by a thick WSi{sub 2} layer of {approx}17 {mu}m, and an AuSn layer of {approx}1 {mu}m. Both full MLL structures survived dicing and polishing. The primary results demonstrate the feasibility and potential of a full MLL with a doubled numerical aperture and large beam acceptance for hard x-rays.

75 CONDENSED MATTER PHYSICS, SUPERCONDUCTIVITY AND↗

In-hardware demonstration of model-independent adaptive tuning of noisy systems with arbitrary phase drift

In this work, an implementation of a recently developed model-independent adaptive control scheme, for tuning uncertain and time varying systems, is demonstrated on the Los Alamos linear particle accelerator. The main benefits of the algorithm are its simplicity, ability to handle an arbitrary number of components without increased complexity, and the approach is extremely robust to measurement noise, a property which is both analytically proven and demonstrated in the experiments performed. We report on the application of this algorithm for simultaneous tuning of two buncher radio frequency (RF) cavities, in order to maximize beam acceptance into the accelerating electromagnetic field cavities of the machine, with the tuning based only on a noisy measurement of the surviving beam current downstream from the two bunching cavities. The algorithm automatically responds to arbitrary phase shift of the cavity phases, automatically re-tuning the cavity settings and maximizing beam acceptance. Because it is model independent it can be utilized for continuous adaptation to time-variation of a large system, such as due to thermal drift, or damage to components, in which the remaining, functional components would be automatically re-tuned to compensate for the failing ones. We start by discussing the general model-independent adaptive scheme and how it may be digitally applied to a large class of multi-parameter uncertain systems, and then present our experimental results.

42 ENGINEERING↗

Beam Loss Studies for the 2-MW LBNE Proton Beam Line

Severe limits are required for allowable beam loss during extraction and transport of a 2.3 MW primary proton beam for the Long Baseline Neutrino Experiment (LBNE) at Fermilab. Detailed simulations with the STRUCT and MARS codes have evaluated the impact of beam loss of 1.6e14 protons per pulse at 120 GeV, ranging from a single pulse full loss to sustained small fractional loss. It is shown that localized loss of a single beam pulse at 2.3 MW will result in a destructive event: beam pipe failu re, damaged magnets and high levels of residual radiation inside the tunnel. A sustained full beam loss would be catastrophic. Acceptable beam loss limits have been determined and robust solutions developed to enable efficient proton beam operation under these constraints.

43 PARTICLE ACCELERATORS↗

High performance charge breeder for HIE-ISOLDE and TSR@ISOLDE applications

We report on the development of the HEC{sup 2} (High Energy Compression and Current) charge breeder, a possible high performance successor to REXEBIS at ISOLDE. The new breeder would match the performance of the HIE-ISOLDE linac upgrade and make full use of the possible installation of a storage ring at ISOLDE (the TSR@ISOLDE initiative [1]). Dictated by ion beam acceptance and capacity requirements, the breeder features a 2–3.5 A electron beam. In many cases very high charge states, including bare ions up to Z=70 and Li/Na-like up to Z=92 could be requested for experiments in the storage ring, therefore, electron beam energies up to 150 keV are required. The electron-beam current density needed for producing ions with such high charge states at an injection rate into TSR of 0.5–1 Hz is between 10 and 20 kA/cm{sup 2}, which agrees with the current density needed to produce A/q<4.5 ions for the HIE-ISOLDE linac with a maximum repetition rate of 100 Hz. The first operation of a prototype electron gun with a pulsed electron beam of 1.5 A and 30 keV was demonstrated in a joint experiment with BNL [2]. In addition, we report on further development aiming to achieve CW operation of an electron beam having a geometrical transverse ion-acceptance matching the injection of 1{sup +} ions (11.5 μm), and an emittance/energy spread of the extracted ion beam matching the downstream mass separator and RFQ (0.08 μm normalized / ± 1%)

43 PARTICLE ACCELERATORS↗

Electromagnetic Design of RF Cavities for Accelerating Low-Energy Muons

A high-gradient linear accelerator for accelerating low-energy muons and pions in a strong solenoidal magnetic field has been proposed for homeland defense and industrial applications. The acceleration starts immediately after collection of pions from a target in a solenoidal magnetic field and brings decay muons, which initially have kinetic energies mostly around 15-20 MeV, to 200 MeV over a distance of {approx}10 m. At this energy, both ionization cooling and further, more conventional acceleration of the muon beam become feasible. A normal-conducting linac with external-solenoid focusing can provide the required large beam acceptances. The linac consists of independently fed zero-mode (TM{sub 010}) RF cavities with wide beam apertures closed by thin conducting edge-cooled windows. Electromagnetic design of the cavity, including its RF coupler, tuning and vacuum elements, and field probes, has been developed with the CST MicroWave Studio, and is presented.

43 PARTICLE ACCELERATORS↗

Dynamic Aperture Evaluation for the Hadron Storage Ring in the Electron-Ion Collider

The Electron-Ion Collider (EIC) is aiming at a design luminosity of 1e34 cm⁻²s⁻¹. To maintain such a high luminosity, both beams in the EIC need an acceptable beam lifetime in the presence of the beam-beam interaction. For this purpose, we carried out weak-strong element-by-element particle tracking to evaluate the long-term dynamic aperture for the hadron ring lattice design. We improved our simulation code SimTrack to treat some new lattice design features, such as radially offset on-momentum orbits, coordinate transformations in the interaction region, etc. In this article, we will present the preliminary dynamic aperture calculation results with β^{*}- function scan, radial orbit shift, crossing angle collision, and magnetic field errors.

Luo, Y.↗

R & D of a Gas-Filled RF Beam Profile Monitor for Intense Neutrino Beam Experiments

We report the R&D of a novel radiation-robust hadron beam profile monitor based on a gas-filled RF cavity for intense neutrino beam experiments. An equivalent RF circuit model was made and simulated to optimize the RF parameter in a wide beam intensity range. As a result, the maximum acceptable beam intensity in the monitor is significantly increased by using a low-quality factor RF cavity. The plan for the demonstration test is set up to prepare for future neutrino beam experiments.

43 PARTICLE ACCELERATORS↗

Safe operating conditions for NSLS-II Storage Ring Frontends commissioning

The NSLS-II Storage Ring Frontends are designed to safely accept the synchrotron radiation fan produced by respective insertion device when the electron beam orbit through the ID is locked inside the predefined Active Interlock Envelope. The Active Interlock is getting enabled at a particular beam current known as AI safe current limit. Below such current the beam orbit can be anywhere within the limits of the SR beam acceptance. During the FE commissioning the beam orbit is getting intentionally disturbed in the particular ID. In this paper we explore safe operating conditions for the Frontends commissioning.

43 PARTICLE ACCELERATORS↗

The Future Electron-Ion Collider

Generalized Parton Distributions include rich information and became a powerful tool for studying hadron structure. Deeply Virtual Compton Scattering is the golden channel to access GPDs. The development of high luminosity and high-acceptance detectors (Electron-Ion Collider) allows physicists to overcome the difficulty of DVCS measurements. The outstanding performance of the accelerator performs the eA collisions at the center of mass energy from 20 to 140 GeV, while the luminosity at the scale of 1034 cm?2s?1. The new type of high-density crystal, PWO-II, produced by CRYTUR in 2×2×20 cm3 will be utilized in the calorimeter. The transparency of PWO-II crystals is > 70% at 620 nm, > 60% at 420 nm, and >35% at 360 nm. The crystals also show good radiation hardness under 30 Gy radiation exposure. Ten PWO-II crystals have a uniform light yield at 30 p.e./MeV, providing sufficient light yield to reduce the fluctuation of the energy measurements. Near 3000 crystals were constructed inside the 12-sided polygon supporting structure in the simulation. The island clustering algorithm was used for reconstructed the energy. The energy resolution study by the particle gun shows the stochastic term and constant term are 1.8% and 1.2%, respectively. The spatial resolution of NEEMC varies from 5% to 15% of the crystal?s width depending on the particle?s incident angle. The pion rejection of NEEMC can reach 103 with electron efficiency > 85% when the particle?s energy is larger than 1GeV. The Pi0- identified efficiency study can be interpreted as finding the local maxima in the single cluster caused by two high energy close photons. The study results show that efficiency is nearly 100% for pi0 energy is smaller than 10 GeV, and efficiency drops to 30% with 20 GeV pi0. The new type of 3x3 pixelated AC-LGAD were wire bonded to ALTIROC for performance test. The cross-talk between the adjacent channels is about 20% for VPA and 10% for TZ. A series of the TDC characteristic measurements show that the jitter for both preamplifiers is about 20 ps, and the time-walk effect is mild for inject charge > 12 pF. Furthermore, the beta source radiation results quantify the sharing scale of the 3x3 pixels AC-LGAD (? 20%). The electronics simulation study results show no significant changes in the spatial resolution, whether ADC resolution is 8, 10, or 12 bits. The 8-bit ADC is decided to use in the EICROC as it has a smaller size and power consumption than the 10-bit and 12-bit ADC. The ECCE is one of the full detector proposals for EIC. The new type of DVCS generator, called TOPEG, is used to generate the high acceptance beam configurations of 18×110 GeV2 electron and 4He. The acceptance study shows a -1.8 < ? < -1.4 gap between the BEMC and EEMC. The 10?x,y geometry cut is applied on the Roman Pots, so the acceptance of Roman Pots quickly drops to 0% when the polar angle of the recoiled 4He < 2 mrad. This primary ECCE simulation study suggests extending the acceptance of BEMC longitudinally as the structure limits the radial size of EEMC. The acceptance of the Roman Pots is still challenging. In 2023, The overall design of ePIC was finalized by merging two full detector proposals (ECCE and ATHENA) after a series of intensive simulation studies.

Wang, Pu-Kai↗

TH-E-BRE-06: Challenges in the Dosimetry of Flattening Filter Free Beams

Purpose: In current dosimetry protocols [AAPM TG51, IAEA TRS-389] the beam quality correction factor kQ and the water-to-air restricted mass collision stopping-power ratio SPR are related to beam quality specifiers %dd(10){sub x} respectively TPR{sub 20,10} Determining kQ and SPR using these regular beam quality specifiers for conventional accelerators (WFF) and flattening filter free accelerators (FFF) similarly could lead to systemic bias.The influence of the flattening filter on the relationship between various beam quality specifiers and SPR respectively k{sub Q} was studied using Monte Carlo simulations with realistic beam sources. Methods: All Monte Carlo simulations were performed using the BEAMnrc/EGSnrc code system. Radiation transport through nine linear accelerator heads modeled according to technical drawings given by the manufactures and a {sup 60} Co therapy source was simulated with BEAMnrc and then used as a radiation source for further simulations. FFF beam sources were implemented by removing the fattening filter from the WFF model. SPR was calculated applying the user code SPRRZnrc. The mean photon energy below the accelerator head and the mean energies of photons and electrons at the measuring point within the water phantom were calculated using FLURZnrc. Dose calculations within a small water voxel and the thimble ionization chamber PTW-31010 in a water depth of 10 cm were made using the egs-chamber code. Results: SPR and k{sub Q} as a function of fluence spectra based beam quality specifiers as well as conventional beam quality specifiers differ systematically between FFF and WFF beams. According to the results the specifier %dd(10){sub x} revealed the smallest deviation (max. 0.4%) between FFF and WFF beams. Conclusion: The results show that %dd(10){sub x} is an acceptable beam quality specifier for FFF beams. Nevertheless the results confirm the expected bias between FFF and WFF beams which must by further investigated.

07 ISOTOPE AND RADIATION SOURCES↗

EIC Hadron Beamline Vacuum Studies

Ninety percent of the EIC hadron ring vacuum chamber consists of cold-bore sections running through and interconnecting 4.55 K RHIC superconducting (SC) magnets. The EIC operating specification requires shorter bunches and 3x higher intensity beams which are not appropriate for the present RHIC stainless steel cold-bore beam tube. The intensity and emittance of the hadron beams will degrade due to interactions with residual gas or vacuum instabilities arising from the expected resistive-wall (RW) heating, electron clouds, and beam-induced desorption mechanisms. Without strategies to limit RW heating, major cryogenic system modifications are needed to prevent SC magnet quenches. The SC magnet cold-bore beam tubes will be equipped with a high RRR copper-clad stainless steel screen to significantly reduce RW heating and so the effect on the SC magnet cryogenic heat load and temperature. A thin amorphous carbon film applied to the beam-facing copper surface will suppress electron cloud formation. This paper discusses the vacuum requirements imposed by the EIC hadron beams and the plans to achieve the necessary vacuum and thermal stability that ensure acceptable beam quality and lifetime.

43 PARTICLE ACCELERATORS↗

Beam Loss Studies for the 2-MW LBNE Proton Beam Line

Severe limits are put on allowable beam loss during extraction and transport of a 2.3 MW primary proton beam for the Long Baseline Neutrino Experiment (LBNE) at Fermilab. Detailed simulations with the STRUCT and MARS codes have evaluated the impact of beam loss of 1.6 x 10{sup 14} protons per pulse at 120 GeV, ranging from a single pulse full loss to sustained small fractional loss. It is shown that loss of a single beam pulse at 2.3 MW will result in a catastrophic event: beam pipe destruction, damaged magnets and very high levels of residual radiation inside and outside the tunnel. Acceptable beam loss limits have been determined and robust solutions developed to enable efficient proton beam operation under these constraints.

43 PARTICLE ACCELERATORS↗

Study of a multi-beam accelerator driven thorium reactor

The primary advantages that accelerator driven systems have over critical reactors are: (1) Greater flexibility regarding the composition and placement of fissile, fertile, or fission product waste within the blanket surrounding the target, and (2) Potentially enhanced safety brought about by operating at a sufficiently low value of the multiplication factor to preclude reactivity induced events. The control of the power production can be achieved by vary the accelerator beam current. Furthermore, once the beam is shut off the system shuts down. The primary difference between the operation of an accelerator driven system and a critical system is the issue of beam interruptions of the accelerator. These beam interruptions impose thermo-mechanical loads on the fuel and mechanical components not found in critical systems. Studies have been performed to estimate an acceptable number of trips, and the value is significantly less stringent than had been previously estimated. The number of acceptable beam interruptions is a function of the length of the interruption and the mission of the system. Thus, for demonstration type systems and interruption durations of 1sec < t < 5mins, and t > 5mins 2500/yr and 50/yr are deemed acceptable. However, for industrial scale power generation without energy storage type systems and interruption durations of t < 1sec., 1sec < t < 10secs., 10secs < t < 5mins, and t > 5mins, the acceptable number of interruptions are 25000, 2500, 250, and 3 respectively. However, it has also been concluded that further development is required to reduce the number of trips. It is with this in mind that the following study was undertaken. The primary focus of this study will be the merit of a multi-beam target system, which allows for multiple spallation sources within the target/blanket assembly. In this manner it is possible to ameliorate the effects of sudden accelerator beam interruption on the surrounding reactor, since the remaining beams will still be supplying source neutrons. The proton beam will be assumed to have an energy of 1 GeV, and the target material will be natural lead, which will also be the coolant for the reactor assembly. Three proton beam arrangements will be considered, first a single beam (the traditional arrangement) with an entry at the assembly center, two more options will consist of three and six entry locations. The reactor fuel assembly parameters will be based on those of the S-PRISM fast reactor proposed by GE, and the fuel composition and type will be based on that proposed by Aker Solutions for use in their accelerator driven thorium reactor. The following table summarizes the parameters to be used in this study. The isotopic composition of the fertile material is 100% Th-232, and the plutonium isotopic distribution corresponds to that characteristic of the discharge from a typical LWR, following five years of decay. Thus, the isotopic distribution for the plutonium is; Pu-238 2.5%, Pu-239 53.3%, Pu-240 25.1%, Pu-241 11.8%, and Pu-242 7.3%.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗