Search NASA⌕ Search

SEARCH · Search NASA

Results for “Construction robotics”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Teleoperation of Construction Robots Using Human Interaction: Case Study Examples: Preprint

The integration of advanced teleoperation methods in construction robotics has the potential to enhance productivity and safety in demanding environments. Among different methods, hand gestures have emerged as an intuitive approach, enabling seamless communication between human operators and robotic systems. This study demonstrates the use of hand gestures for controlling a model robotic excavator and a virtual robotic arm in construction applications. Two case study examples are presented. In the first case study, a series of hand gestures are performed to control a model robotic excavator's bucket and arm movements. The second case study focuses on using hand gestures to control a virtual robotic arm to perform a material handling task in a simulated environment. In both cases, the performed hand gestures are all successfully captured and interpreted by the gesture-based teleoperation method to conduct the corresponding tasks, which demonstrates the application of the gesture-based control method for various types of construction robots. Also, the limitations of the gesture-based teleoperation method (e.g., recognition delay, sensitivity to motion outliers) are discussed. Future work will focus on developing a digital twin system to support gesture-based teleoperation for a wider range of construction robots.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

M.I.N.G., Mars Investment for a New Generation: Robotic construction of a permanently manned Mars base

A basic procedure for robotically constructing a manned Mars base is outlined. The research procedure was divided into three areas: environment, robotics, and habitat. The base as designed will consist of these components: two power plants, communication facilities, a habitat complex, and a hangar, a garage, recreation and manufacturing facilities. The power plants will be self-contained nuclear fission reactors placed approx. 1 km from the base for safety considerations. The base communication system will use a combination of orbiting satellites and surface relay stations. This system is necessary for robotic contact with Phobos and any future communication requirements. The habitat complex will consist of six self-contained modules: core, biosphere, science, living quarters, galley/storage, and a sick bay which will be brought from Phobos. The complex will be set into an excavated hole and covered with approximately 0.5 m of sandbags to provide radiation protection for the astronauts. The recreation, hangar, garage, and manufacturing facilities will each be transformed from the four one-way landers. The complete complex will be built by autonomous, artificially intelligent robots. Robots incorporated into the design are as follows: Large Modular Construction Robots with detachable arms capable of large scale construction activities; Small Maneuverable Robotic Servicers capable of performing delicate tasks normally requiring a suited astronaut; and a trailer vehicle with modular type attachments to complete specific tasks; and finally, Mobile Autonomous Rechargeable Transporters capable of transferring air and water from the manufacturing facility to the habitat complex.

Amos, Jeff↗

A robotically constructed production and supply base on Phobos

PHOBIA Corporation is involved with the design of a man-tenable robotically constructed, bootstrap base on Mars' moon, Phobos. This base will be a pit-stop for future manned missions to Mars and beyond and will be a control facility during the robotic construction of a Martian base. An introduction is given to the concepts and the ground rules followed during the design process. Details of a base design and its location are given along with information about some of the subsystems. Since a major purpose of the base is to supply fuel to spacecraft so they can limit their fuel mass, mining and production systems are discussed. Surface support activities such as docks, anchors, and surface transportation systems are detailed. Several power supplies for the base are investigated and include fuel cells and a nuclear reactor. Tasks for the robots are defined along with descriptions of the robots capable of completing the tasks. Finally, failure modes for the entire PHOBIA Corporation design are presented along with an effects analysis and preventative recommendations.

Source record↗

ISRU-Based Robotic Construction Technologies For Lunar And Martian Infrastructures

Economically viable and reliable building systems and tool sets are being sought, examined and tested for extraterrestrial infrastructure buildup. This project utilizes a unique architecture weaving the robotic building construction technology with designs for assisting rapid buildup of initial operational capability Lunar and Martian bases. The project intends to develop and test methodologies to construct certain crucial infrastructure elements in order to evaluate the merits, limitations and feasibility of adapting and using such technologies for extraterrestrial application. High priority infrastructure elements suggested by our NASA advisors to be considered include landing pads and aprons, roads, blast walls and shade walls, thermal and micrometeorite protection shields and dust-free platforms utilizing the well-known insitu resource utilization (ISRU) strategy. Current extraterrestrial settlement buildup philosophy holds that in order to minimize the materials needed to be flown in, at great transportation costs, strategies that maximize the use of locally available resources must be adopted. Tools and heavy equipment flown as cargo from Earth are proposed to build required infrastructure to support future missions and settlements on the Moon and Mars. Several unique systems including the Lunar Electric Rover, the unpressurized Chariot rover, the versatile light-weight crane and Tri-Athlete cargo transporter as well as the habitat module mockups and a new generation of spacesuits are undergoing coordinated tests at NASAs D-RATS. This project intends to draw up a detailed synergetic plan to utilize these maturing systems coupled with modern robotic fabrication technologies based primarily on 3D Printing, tailored for swift and reliable Lunar and Martian infrastructure development. This project also intends to increase astronaut safety, improve buildup performance, ameliorate dust interference and concerns, and reduce time-to-commission, all in an economic manner. The goal stated in our Phase I proposal was a high fidelity demonstration at D-RATS to be conducted at the conclusion of the Phase II study. In the course of the Phase I study, however, it became clear that such demonstration was neither possible (due to the maximum Phase II budget limitation and the cost of NASA assets and related overhead expenses to support such demonstrations), nor necessary (due to NASA's low TRL expectation of Phase II results). These important facts were revealed to us only after interacting with the NIAC administrators and meetings with potential future partners at JPL and KSC. Accordingly, it was decided by the team that in order to make best use of resources we should investigate novel directions in the adaptation of our fabrication technologies by using in-house laboratories and to produce truly useful technologies and data, and then proceed with high fidelity demonstration at a later opportunity when sufficient resources become available. Furthermore, we have recognized that in addition to our building scale 3D printing technology called Contour Crafting, variations of some of our other fabrication technologies under development are suitable for construction of infrastructure elements such as regolith based ceramic tiles and hence we have decided to include some related preliminary research in this Phase II proposal.

Extraterrestrial↗

Development of the Advanced Regolith Ground Operations (ARGO) Test Bed– A Robotic Construction Test Facility with Simulated Lunar Environments

NASA’s Artemis Program is working towards developing a sustained presence on the Moon and eventually Mars. To achieve this goal, robotic excavation, site preparation and construction technologies are under development to establish the capability to construct infrastructure such as launch/landing pads and radiation protection shelters. Technologies must be proven in simulated Lunar conditions prior surface demonstration missions. To that end, the Relevant Additive Construction Technology (REACT) Announcement of Collaboration Opportunities (ACO) project with AI Space Factory and the NASA Kennedy Space Center’s (KSC) Granular Mechanics and Regolith Operations Laboratory (a.k.a. Swamp Works) has developed the Advanced Regolith Ground Operations (ARGO) Test Bed. ARGO includes a ~1.5m x 1.5m x 1.2m (~5x5x4ft) vacuum chamber, cryogenically cooled thermal shroud, a 3-axis robotic positioning system, and a regolith bin. For the REACT project, a pellet extruder and feed hopper have been installed on ARGO to advance the Technology Readiness Level (TRL) of regolith-polymer composite Fused Deposition Modeling (FDM) additive construction systems, processes, and materials. This paper will focus on the design and operational characteristics of the ARGO Test Bed with pellet extruder.

Moon↗

Intelligent robots for planetary exploration and construction

Robots capable of practical applications in planetary exploration and construction will require realtime sensory-interactive goal-directed control systems. A reference model architecture based on the NIST Real-time Control System (RCS) for real-time intelligent control systems is suggested. RCS partitions the control problem into four basic elements: behavior generation (or task decomposition), world modeling, sensory processing, and value judgment. It clusters these elements into computational nodes that have responsibility for specific subsystems, and arranges these nodes in hierarchical layers such that each layer has characteristic functionality and timing. Planetary exploration robots should have mobility systems that can safely maneuver over rough surfaces at high speeds. Walking machines and wheeled vehicles with dynamic suspensions are candidates. The technology of sensing and sensory processing has progressed to the point where real-time autonomous path planning and obstacle avoidance behavior is feasible. Map-based navigation systems will support long-range mobility goals and plans. Planetary construction robots must have high strength-to-weight ratios for lifting and positioning tools and materials in six degrees-of-freedom over large working volumes. A new generation of cable-suspended Stewart platform devices and inflatable structures are suggested for lifting and positioning materials and structures, as well as for excavation, grading, and manipulating a variety of tools and construction machinery.

Albus, James S.↗

Sustainable Cooperative Robotic Technologies for Human and Robotic Outpost Infrastructure Construction and Maintenance

Robotic Construction Crew (RCC) is a heterogeneous multi-robot system for autonomous acquisition, transport, and precision mating of components in construction tasks. RCC minimizes resources constrained in a space environment such as computation, power, communication and, sensing. A behavior-based architecture provides adaptability and robustness despite low computational requirements. RCC successfully performs several construction related tasks in an emulated outdoor environment despite high levels of uncertainty in motions and sensing. Quantitative results are provided for formation keeping in component transport, precision instrument placement, and construction tasks.

multi-robot systems↗

Behavior-based multi-robot collaboration for autonomous construction tasks

The Robot Construction Crew (RCC) is a heterogeneous multi-robot system for autonomous construction of a structure through assembly of Long components. The two robot team demonstrates component placement into an existing structure in a realistic environment. The task requires component acquisition, cooperative transport, and cooperative precision manipulation. A behavior-based architecture provides adaptability. The RCC approach minimizes computation, power, communication, and sensing for applicability to space-related construction efforts, but the techniques are applicable to terrestrial construction tasks.

autonomous construction↗

Robotics for Energy Infrastructure Construction on Earth and Beyond: Pilot Study Exploring Level 3-4 Semi-Autonomous Installation of a Reduced-Scale Photovoltaic Power Plant Prototype: Preprint

There is a growing need to build energy infrastructure at massive scale on both Earth and in space. On Earth, increasing electricity demand from applications such as AI data centers is driving rapid expansion of power systems, while in space, long-duration missions such as lunar operations require reliable and resilient energy infrastructure that can be deployed quickly. These needs outpace the capabilities of conventional construction methods. Robotic construction offers a path to faster, lower-cost, and more consistent deployment, yet most existing approaches focus on automating individual tasks rather than end-to-end assembly. The Industrialized Construction Innovation (ICI) team at the National Laboratory of the Rockies (NLR), in collaboration with the Colorado School of Mines, has been investigating robotics and automation strategies for rapid end-to-end energy infrastructure construction. This paper presents a pilot study demonstrating level 3-4 semi-autonomous, end-to-end robotic assembly of a reduced-scale photovoltaic power plant prototype under terrestrial conditions. The approach combines hardware redesign of photovoltaic components for robotic compatibility, discrete-event and physics-based robotic simulations in synthetic environments, and sim-to-real deployment to execute end-to-end robotic assembly of[NM1.1][NM1.2] tracking components, structural members, photovoltaic modules, and embedded electrical connections. The pilot identifies key limitations like tolerance management, perception and localization, end effector capability, fastening methods, and multi-physics simulation fidelity, that must be addressed to enable end-to-end robotic assembly of full-scale energy infrastructure. The study highlights how these insights inform scaling strategies for terrestrial energy infrastructure and adaptation to unstructured and extreme environments, including off-world scenarios such as robotic assembly of vertical tall lunar towers.

14 SOLAR ENERGY↗

Automated construction of lightweight, simple, field-erected structures

The feasibility of automation of construction processes which could result in mobile construction robots is examined. The construction of a large photovoltaic power plant with a peak power output of 100 MW is demonstrated. The reasons to automate the construction process, a conventional construction scenario as the reference for evaluation, and a list of potential cost benefits using robots are presented. The technical feasibility of using robots to construct SPS ground stations is addressed.

Leonard, R. S.↗

Swarming Robot Design, Construction and Software Implementation

In this paper is presented an overview of the hardware design, construction overview, software design and software implementation for a small, low-cost robot to be used for swarming robot development. In addition to the work done on the robot, a full simulation of the robotic system was developed using Robot Operating System (ROS) and its associated simulation. The eventual use of the robots will be exploration of evolving behaviors via genetic algorithms and builds on the work done at the University of New Mexico Biological Computation Lab.

construction overview↗

A Mars/phobos Transportation System

A transportation system will be necessary to support construction and operation of bases on Phobos and Mars beginning in the year 2020 or later. An approach to defining a network of vehicles and the types of vehicles which may be used in the system are presented. The network will provide a convenient, integrated means for transporting robotically constructed bases to Phobos and Mars. All the technology needed for the current plan is expected to be available for use at the projected date of cargo departure from the Earth system. The modular design of the transportation system provides easily implemented contingency plans, so that difficulties with any one vehicle will have a minimal effect on the progress of the total mission. The transportation network proposed consists of orbital vehicles and atmospheric entry vehicles. Initially, only orbital vehicles will participate in the robotic construction phase of the Phobos base. The Interplanetary Transfer Vehicle (ITV) will carry the base and construction equipment to Phobos where the Orbital Maneuvering Vehicles (OMV's) will participate in the initial construction of the base. When the Mars base is ready to be sent, one or more ITV's will be used to transport the atmospheric entry vehicles from Earth. These atmospheric vehicles are the One Way Landers (OWL's) and the Ascent/Descent Vehicles (ADV's). They will be used to carry the base components and/or construction equipment. The OMV's and the Orbital Transfer Vehicles (OTV's) will assist in carrying the atmospheric entry vehicles to low Martian orbit where the OWL's or ADV's will descent to the planet surface. The ADV's were proposed to accommodate expansion of the system. Additionally, a smaller version of the ADV class is capable of transporting personnel between Mars and Phobos.

Source record↗

Robotic space construction

Research at Langley AFB concerning automated space assembly is reviewed, including a Space Shuttle experiment to test astronaut ability to assemble a repetitive truss structure, testing the use of teleoperated manipulators to construct the Assembly Concept for Construction of Erectable Space Structures I truss, and assessment of the basic characteristics of manipulator assembly operations. Other research topics include the simultaneous coordinated control of dual-arm manipulators and the automated assembly of candidate Space Station trusses. Consideration is given to the construction of an Automated Space Assembly Laboratory to study and develop the algorithms, procedures, special purpose hardware, and processes needed for automated truss assembly.

Mixon, Randolph W.↗

Systems engineering studies of lunar base construction

Many ingenious concepts have been proposed for lunar base construction, but few systematic studies exist which relate time-consistent lunar base construction technologies and the choice of lunar base approach with the long-term SEI objectives - i.e., lunar indigenous base construction and Mars Exploration equipment development. To fill this gap, CSC has taken a two-pronged approach. First, the Center undertook basic geotechnical investigations of lunar soil, fabrication of a scale prototype of a lunar construction crane, a multi-robot construction team laboratory experiment, and a preliminary design of lunar base structures. Second, during Jun. and Jul. 1991 two lunar base construction systems engineering studies were accomplished - a 'near term lunar base' study, and a 'far-term lunar base' study. The goals of these studies were to define the major lunar base construction research problems in consistent technology/construction frameworks, and to define design requirements for construction equipment such as a lunar crane and a regolith mover. The 'near-term lunar base' study examined three different construction concepts for a lunar base comprised of pre-fabricated, pre-tested, Space Station Freedom-type modules, which would be covered with regolith shielding. Concept A used a lunar crane for unloading and transportation; concept B, a winch and cart; and concept C, a walker to move the modules from the landing site to the base site and assemble them. To evaluate the merits of each approach, calculations were made of mass efficiency measure, source mass, reliability, far-term base mass, Mars base mass, and base assembly time. The model thus established was also used to define the requirements for crane speed and regolith mover m(sup 3)/sec rates. A major problem addressed is how to 'mine' the regolith and stack it over the habitats as shielding. To identify when the cost of using indigenous lunar materials to construct the base exceeds the cost of development and delivery of the equipment for processing lunar materials, a study of construction of a candidate sintered regolith 'far term lunar base' was undertaken. A technique was devised for casting slabs of sintered (basaltic) regolith and assembling these into a hemispherical (or geodesic) dome. The major problem occurs with the inner liner. At 14.7 psi and 20 percent oxygen internal atmosphere, the entire structure is in tension, even with the regolith load. Also, another study has indicated that at 14.7 psi major resupply of air will be needed because of leakage, and astronauts may have to engage in extensive pre-breathing and post-breathing for extravehicular activity (EVA) tasks, thus detracting from useful mission work time. An alternative is to operate part of the base at, say, 5 psi and 70 percent oxygen, or to equip the astronauts with hard suits at 8.3 psi or greater. All of these choices directly influence base design and construction techniques.

Morgenthaler, George W.↗

Envisioning Cognitive Robots for Future Space Exploration

Cognitive robots in the context of space exploration are envisioned with advanced capabilities of model building, continuous planning/re-planning, self-diagnosis, as well as the ability to exhibit a level of 'understanding' of new situations. An overview of some JPL components (e.g. CASPER, CAMPOUT) and a description of the architecture CARACaS (Control Architecture for Robotic Agent Command and Sensing) that combines these in the context of a cognitive robotic system operating in a various scenarios are presented. Finally, two examples of typical scenarios of a multi-robot construction mission and a human-robot mission, involving direct collaboration with humans is given.

robot consciousness↗

Machine Learning for Slow but Steady Interplanetary Construction

For prolonged manned missions to destinations such as the moon and Mars, there is a need for significant infrastructure construction ahead of time, such as habitats and landing pads. Unfortunately we have little experience in remote construction and using conventional methods is likely to be expensive, cumbersome and unreliable. Fortunately these challenges may be overcome by taking advantage of the long lead time for such missions and using teams of small and slow construction robots. We propose using teams of simple autonomous robots for this purpose that would perform continuous construction over a period of many years or even decades. While individual robot reliability will be low over such long time frames, system reliability will be maintained by using machine learning over simulations to achieve coordination and reconfigurations in the event of lost robots.

Tensegrity robots↗

Crewbot Suspension Design

Planetary Surface Robot Work Crews (RWC) represent a new class of construction robots for future deployment in planetary exploration. Rovers currently being used for the RWC platform lack the load carrying capabilities required in regular work. Two new rovers, dubbed CrewBots, being designed in JPL's Planetary Robotics Lab specifically for RWC applications greatly increase the load carrying capabilities of the platform. A major component of the rover design was the design of the rocker type suspension, which increases rover mobility. The design of the suspension for the Crewbots departed from the design of recent rovers. While many previous rovers have used internal bevel gear differentials, the increased load requirements of the Crewbots calls for a more robust system. The solution presented is the use of an external modified three-bar, slider-linkage, rocker-style suspension that increases the moment arm of the differential. The final product is a suspension system capable of supporting the extreme loading cases the RWC platform presents, without consuming a large portion of the Crewbots' internal space.

Wood, Nathan A.↗