Search NASA⌕ Search

SEARCH · Search NASA

Results for “Contract Status”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

MARVEL Fuel (MRD Winter Status)

Presentation containing an update on the status of contracting for fuel fabrication in support of the MARVEL project.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Findings on subtask 3.3 – applicability of automated brine chemistry determinations for treatment and recovery processes through facility automation/modularization: engineering design study

Under the Energy & Environmental Research Center’s (EERC’s) ~$\$$22 million Phase II Brine Extraction and Storage Test (BEST) Program, a multimillion-dollar brine treatment technology test bed facility was established in western North Dakota to provide a platform for evaluating developing technologies and approaches for brine treatment and volume reduction. The initial facility, and associated research effort, was funded by the U.S. Department of Energy (DOE), with in-kind contributions provided by several industry participants and the state of North Dakota. Since its opening, the Brine Technology Test Facility (BTTF) has supported performance evaluations of desalination technologies capable of treating high-salinity produced water (PW) and enabled data collection for multiple approaches of PW management and critical material recovery. As part of the decommissioning process for the original project, facility ownership and liability were transferred to Select Water, which is providing the EERC with a continuing site access option for state or federal research and/or commercial technology development. This report documents the findings from a design study conducted by the EERC and the engineering firm that was originally contracted to design and construct the facility (Advanced Engineering and Environmental Services, LLC [AE2S]) that evaluated the current status of BTTF and its systems and developed a retrofit design to increase the facility’s capabilities through automation and modularization of its PW treatment infrastructure. The proposed retrofit will provide DOE and industry with an expanded range of conditioned PW that can be produced at the facility for evaluating fit-for-purpose water treatment technologies, online instrumentation for brine chemistry determination, and systems that recover critical materials like lithium and magnesium. The current facility consists of an 9600-square-foot facility that includes a 40-foot by 65-foot Class 1, Division 2-rated demonstration area and associated control rooms and lab-ready space capable of sourcing oil and gas PW and wastewater from industrial sources or tailoring brine compositions up to 300,000 mg/L total dissolved solids (TDS) and supplying them at rates up to 25 gpm for extended-duration technology demonstrations. The colocation of the facility with Select Water’s water management facilities allows for access and unloading of more than 10,000 bbl/day of trucked water delivered to site and associated access to on-site Class I and Class II brine disposal wells and nearby hazardous waste landfills operated and/or contracted by Select Water to dispose of concentrate and/or effluents associated with the testing.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Energy Services Interface: Architecture, Requirements, and Agreements

This report continues and extends the development of the Energy Services Interface (ESI) that recently has been led by the U.S. Department of Energy’s Grid Modernization Laboratory Consortium. The ESI is intended to facilitate the coordination of multiple, flexible energy resources that work in tandem to satisfy grid objectives by using performance attributes encoded within an ESI Service Template. The ESI relies on a pair of interfaces, representing the service requestor (the consumer of a service) and a service provider (who manages its resources per the agreed performance attributes) to achieve what is commonly known as a “grid service”. Due to its performance-driven approach, the ESI is hypothesized to be able to satisfy all common grid needs via only six common ESI service types. This report first reviews the status of ESI development, including its fundamental tenets. The report makes three important contributions to ESI development: First, it recognizes the similarity between service level agreements and the contract-like agreements that would be needed between energy service requestors and providers and recommends that ESI service agreements be modeled after the web services agreement specification. Second, whereas prior development efforts had focused on a flat, five-stage lifecycle, this report asserts that the ESI should have three behavioral layers in its architecture—the discovery, agreement, and service layers. Finally, this report offers concrete requirements that should be useful toward the development of the service requestors’ and service providers’ respective communications interfaces.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Status and Trends in the U.S. Voluntary Power Market: 2023 Data

Voluntary green power, for this report, refers to renewable energy procurement by retail electricity customers above what is otherwise provided by load-serving entities. This report is part of an annual series of reports synthesizing trends in the U.S. voluntary green power market. In 2023, about 9.7 million retail electricity customers procured about 319 million megawatt-hours (MWh) of voluntary green power (Figure ES-1), representing a 17% increase over sales in 2022. Estimated voluntary green power market sales represented about 44% of non-hydropower renewable energy sales and about 8% of all U.S. retail electricity sales in 2023. Most of the remainder of U.S. renewable energy sales reflects renewable energy procured by load-serving entities to comply with state renewable energy mandates, also known as compliance-based procurement. The U.S. voluntary green power market is undergoing a clear shift toward long-term contracts, driven primarily by increasingly ambitious corporate renewable energy procurement targets.

2023↗

Dover CoreGuard Ⓡ Cybersecurity Protections for Critical Energy Infrastructure Final Report

This report documents the status of technical objectives and activities for the Department of Energy (DOE) Small Business Innovation Research (SBIR) Phase I project, titled “Dover CoreGuard Ⓡ Cybersecurity Protections for Critical Energy Infrastructure” (Award No. DE-SC0023743), undertaken by Dover Microsystems, Inc., Wayland, MA. The Principal Investigator for this project was Dr. Stephen Papa, Dover’s Chief Technology Officer (CTO). The contract PoP (Period of Performance) is scheduled for completion by February 9, 2024.

99 GENERAL AND MISCELLANEOUS↗

Status of the Ce+BAF project

Jefferson Lab is proposing to add positron beams to the 12 GeV Continuous Electron Beam Accelerator Facility (CEBAF). A team of accelerator and nuclear scientists was formed in 2018 to develop the physics case as well as a concept for the generation, production and delivery of Continuous (CW) polarized positron beams to the experimental halls, up to the full 12 GeV. A layout of the proposed concept will be shown. We will report on the ongoing efforts in the positron generation and capture, target design, beam transport and expected properties of the e+ beam on the experimental targets at 12GeV. This project is supported by the U.S. Department of Energy, Office of Science, Office of Nuclear Physics under contract DE-AC05-06OR23177

Roblin, Yves↗

Status of the Ce+BAF project

Jefferson Lab is proposing to add positron beams to the 12 GeV Continuous Electron Beam Accelerator Facility (CEBAF). A team of accelerator and nuclear scientists was formed in 2018 to develop the physics case as well as a concept for the generation, production and delivery of Continuous (CW) polarized positron beams to the experimental halls, up to the full 12 GeV. A layout of the proposed concept will be shown. We will report on the ongoing efforts in the positron generation and capture, target design, beam transport and expected properties of the e+ beam on the experimental targets at 12GeV. This project is supported by the U.S. Department of Energy, Office of Science, Office of Nuclear Physics under contract DE-AC05-06OR23177

Roblin, Yves↗

FY23 Update: Aerosol Sampling for the Canister Deposition Field Demonstration

This report describes the results of preliminary testing of aerosol monitoring equipment that will be used to continuously monitor the aerosol source term for the multi-year Canister Deposition Field Demonstration (CDFD). These data are required inputs for the development and validation of models for the deposition of dust and potentially corrosive salts on the surface of spent nuclear fuel (SNF) dry storage canisters. Surface salt loads correlate with the extent of corrosion damage on a metal surface, and potentially to the likelihood and timing of initiation of stress corrosion cracks. Aerosols will be monitored at the CDFD site using three instruments. A Dekati ® ELPI+ cascade impactor will be used for real-time monitoring of aerosol particle sizes. It will also collect dust in 14 size bins on impactor targets that can be chemically analyzed to determine the soluble salts present as a function of particle size. However, this instrument can only measure dried aerosols, with a diameter of <10 µm. The second instrument is a Topas laser particle size spectrometer, which provides real-time monitoring of aerosol particle sizes up to ~40 µm in size. It monitors both the ambient (potentially deliquesced) aerosol particle size distributions required for the dust deposition models and the distributions of the equivalent dried particles, allowing correlation with the Dekati ® data. However, it does not discriminate between inert dust particles and salt aerosols, and it does not retain samples of the different particle sizes for later analysis. The third instrument that will monitor aerosols at the CDFD site is a Clean Air Status and Trends Network (CASTNET) tower, which uses a multiple canister system to collect weekly samples for analysis to total suspended aerosol particle compositions and atmospheric gas concentrations. This status report describes work in FY23 to develop the capabilities for using these tools. In two training exercises, the cascade impactor and laser particle sizer were deployed in two different testing environments, one indoor and one outdoor. For the cascade impactor, the tests provided opportunities for the operators to familiarize themselves with impactor substrate preparation, and post-test sample removal and analysis. For the laser particle sizer, the tests were used to evaluate different instrument parameters, to determine the most appropriate settings for capturing transient events. Data and samples were collected for weeks to months for each test, and the results are presented here. In addition to the preliminary testing, contracts were developed with WSP Analytical Labs for sample preparation and analysis of the cascade impactor samples. The impactor tower from outdoor test was delivered to WSP and used to train the staff there in disassembly, sample extraction, sample analysis, and tower reassembly with new target substrates. These are tasks that WSP will be performing routinely for the CDFD project. The CASTNET system cannot be purchased or tested until an actual site has been selected for the CDFD test. Work for this FY has been restricted to preparation of contracts for purchasing the CASTNET tower, and for sample analysis, once the tower is in operation.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Offshore Wind Market Report: 2023 Edition

The Offshore Wind Market Report: 2023 Edition provides detailed information on the U.S. and global offshore wind energy industries to inform policymakers, researchers, and analysts about technology, economic, and market trends. The scope of the report covers the status of over 293 global operating offshore wind energy projects as well as the broader global pipeline of projects in various stages of development through December 31, 2022. To provide up-to-date information and discussion on this emerging industry in the United States, this report tracks the significant U.S. domestic industry progress and events from January 1, 2022, through May 31, 2023. The U.S. offshore wind energy project development pipeline has reached a potential generating capacity of over 52 gigawatts, and the industry has seen strong support from state and federal governments (such as from the Inflation Reduction Act of 2022 and the announced Floating Offshore Wind Shot to reduce the cost of floating wind by 70%). There are contracts for over 17 gigawatts of the electricity from these offshore wind projects and state policies are in place to procure over 42 gigawatts by 2040. Although some projects are facing economic headwinds due to rising costs and higher interest rates (corresponding to project cost increases of 11% - 30% in 2022), there has still been significant investment in a domestic supply chain (including manufacturing facilities, new vessels, and upgraded or planned ports). Technologies continue to evolve as offshore wind turbines in the 15-megawatt class advance towards commercial production. Key offshore wind energy market indicators, such as commercial leasing, state energy planning targets, procurement policies, offtake agreements, and federal support for U.S. jobs and supply chain development, point toward sustained market growth when viewed together, but the macroeconomic hurdles facing the first generation of commercial projects could significantly stunt that growth.

17 WIND ENERGY↗

ITER ECH Transmission Line System Design and Status

The electron cyclotron (EC) heating & current drive (H&CD) system on ITER provides plasma heating by generating, transmitting, and launching high-intensity, high-frequency (170 GHz) electromagnetic wave energy steerable across the plasma cross-section. The transmission line (TL) subsystem connects the Matching Optics Unit (MOU) on each of the 24 gyrotrons to the 32 feed points in the four upper launchers and the 24 feed points in the equatorial launcher. Each TL must be able to operate at up to 1.2 MW of input power for up to 1 hour pulse lengths. The TL system contains 50 mm water-cooled corrugated waveguide, 90o miter bends, 140o miter bends, polarizer miter bend pairs, switches, expansion units, pumpouts, DC breaks, MOU-TL adapters, Radio Frequency (RF) loads, and isolation shutter valves. A detailed finite element analysis has been used to verify the thermo-mechanical performance of each component. The microwave performance has been analyzed using a 2-D electromagnetic code combined with a Monte Carlo code. This approach allows the impact of manufacturing and installation tolerances to be assessed and optimized to provide a high probability of achieving the system performance requirements. Prototypes of the waveguide and TL components have been fabricated and tested at high-power. Production contracts are now being issued for fabrication and delivery of the waveguide and components to ITER.

Hanson, Gregory↗

1000 Soils Pilot Dataset, version 8, May 2025

This record hosts data generated by the 1000 Soils Pilot. Data will be updated as more become available. Please see the most recent data upload for current data. A beta visualization tool is available for some data types at https://shinyproxy.emsl.pnnl.gov/app/1000soils. Please submit any suggestions or comments through the 'contact' tab. We are actively working to improve visualizations and value all feedback. Data completed include: Geochemistry, texture, respiration, and enzyme activities FTICR-MS organic matter chemistry Microbial biomass C and N TOC/TDN of water-extractable OM X-ray computed tomography (derived metrics available here, raw data available upon request) Metagenomes; a variety of data formats are available upon request Soil hydraulic properties Data in progress: LC-MS/MS in development, timeline TBD, inquire for status 1000S_processed_BGC_summary.csv contains all available biogeochemical data; microbial biomass C and N; and TOC/TDN of water-extractable OM; and 1000S_Tomography.xslx contains a summary of data generated via X-ray computed tomography. icr_v2_corems2.csv contains FTICR-MS data processed by CoreMS version 2. These data are merged by formula across instrument runs to enable cross-sample comparisons. Technical replicates are merged by retaining peaks present in 2 out of 3 replicates. 1000Soils_Metadata_Site_Mastersheet_v1.csv contains site information. Soil Hydraulics_corrected_02042025.xlsx contains soil hydraulics information. Readme File_v4.xlsx is the readme file. Please contact the MONet project (monet.emsl@pnnl.gov) or Emily Graham (emily.graham@pnnl.gov) with questions. The following file and all raw data are available upon request: icr_by_mass_for_single_sample_analysis_only.csv contains FTICR-MS data processed by CoreMS and is intended for usage in the calculation of biochemical transformations within samples only. These data are not acceptable for cross-sample comparison of masses because they are from multiple instrument runs. For more information, please see: https://www.emsl.pnnl.gov/monet and https://sc-data.emsl.pnnl.gov/monet Acknowledgment: Soil data were provided by the Molecular Observation Network (MONet) at the Environmental Molecular Sciences Laboratory (https://ror.org/04rc0xn13), a DOE Office of Science user facility sponsored by the Biological and Environmental Research program under Contract No. DE-AC05-76RL01830. The work (proposal: 10.46936/10.25585/60008970) conducted by the U.S. Department of Energy, Joint Genome Institute (https://ror.org/04xm1d337), a DOE Office of Science user facility, is supported by the Office of Science of the U.S. Department of Energy operated under Contract No. DE-AC02-05CH11231. The Molecular Observation Network (MONet) database is an open, FAIR, and publicly available compilation of the molecular and microstructural properties of soil. Data in the MONet open science database can be found at https://sc-data.emsl.pnnl.gov/.

biogeochemistry↗

Oak Ridge National Laboratory Annual Sustainability Report 2023

ORNL, managed under contract by UT-Battelle LLC, is DOE’s largest science and energy laboratory and, as such, executes the widest range of mission capabilities. Diverse expertise spans a broad range of scientific and engineering disciplines, enabling research and science achievements to accelerate the delivery of solutions to the marketplace. ORNL supports DOE’s national missions of scientific discovery, clean energy, and security. To execute these activities, ORNL has grown significantly over 80 years of continuous operations, consisting of facilities with commissioning dates ranging from the 1940s to the present—an extraordinary set of distinctive scientific facilities and equipment. The complexities of such a variety of facilities require teamwork among divisions, a wide variety of conservation projects, and creative strategies to achieve the desired energy and water savings. Such a diverse and unique set of major facilities, totaling over 5.5 million square feet, with 6,000 employees, requires an innovative plan to accomplish advancements in operational efficiencies. ORNL is tasked with the management of an extraordinary set of distinctive scientific facilities and equipment for DOE. ORNL is mission-driven, and its mission has grown substantially over the decades. ORNL’s core research capabilities provide broad science and technology support for DOE in the areas of energy, environment, and national security. Currently, ORNL is a world leader in materials, neutron, and nuclear science and engineering, and in high-performance computing and data analytics. ORNL’s vast portfolio of research facilities must be maintained and carefully upgraded to protect the nation’s investment in scientific analysis. The goal of sustainable and resilient operations is to enable more effective execution of ORNL’s science and technology mission. Sustainable operational practices and enhanced resilience strive for excellent results while remaining diligent in energy conservation, environmental stewardship, asset management, and community engagement. The Sustainable ORNL Program (Sustainable ORNL) Continuous improvements in operational and business processes must be integrated into the fabric of the ORNL culture to maximize the return from the investment made in modernizing facilities and equipment. The Sustainable ORNL program promotes the legacy of system-wide best practices, management commitment, and employee engagement that will lead ORNL into a future of efficient, resilient, and sustainable operations. ORNL leadership and Sustainable ORNL champions receive regular status reports on the progress of each project and focus area (i.e., roadmap) and periodic summary reports. More information can be found at the program’s website. The Sustainable ORNL roadmap structure endorses 15 vital roadmaps. The figure below summarizes the current project assignments and demonstrates that each project contributes to the wellbeing of the whole. Continuous employee engagement and regular status reports confirm the ideals of the program. The roadmap structure is not static; as the science mission advances and the needs of the organization evolve, the Sustainable ORNL roadmap structure elements are modified to align with developing priorities. In 2022, Sustainable ORNL made roadmap changes to better align ORNL to support new federal requirements that have been issued.

54 ENVIRONMENTAL SCIENCES↗

IM3 Projected US Data Center Locations

IM3 Projected US Data Center Locations This dataset contains model projections of new data center facilities in the contiguous United States (CONUS) through 2035 using the CERF – Data Centers model. Data center locations are modeled across four data center electricity demand growth scenarios (low, moderate, high, higher) and five market gravity scenarios (0%, 25%, 50%, 75%, 100%). Projected locations are intended to be regional representations of feasible siting locations in the future to assess potential grid and water stress impacts. The data center load growth scenarios correspond with the rates outlined in EPRI (2024) and include 3.71%, 5%, 10%, and 15% annual growth of electricity demand for data centers from 2023 values in 37 states across the CONUS. Market gravity scenarios correspond to the relative importance of proximity to data center markets or high population areas compared to locational cost in the siting algorithm. 0% market gravity means that siting decisions were entirely determined by the locational cost in each feasible location. 100% market gravity means that only market proximity was considered when siting. Other scenarios have weight placed on both components where total weight always equals 100%. Locational cost is dependent on facility cooling type and corresponding electricity cost, taxes, and other factors. Facility cooling type is spatially determined where high water stress and/or areas with high summer wet bulb temperatures are assumed to operate with mechanical cooling for a higher fraction of the year rather than evaporative cooling. Feasible data center siting areas are based on geospatial suitability raster data developed with open-source information. The following areas are excluded from siting: Areas within 300 m of a federal airport runway or within an airport area boundary Waterbodies Areas with slope >16% Areas susceptible to sinkholes High coastal or inland flood risk areas Local, state, and federal parks, leisure areas, and cemeteries Areas >2 km away from electric substations Areas >5 km away from a municipal water supplier service area Areas >2 km away from high-speed fiber provider service territory USGS Protected Areas Database of the United States (PAD-US) GAP status 1, 2, or 3 areas US National Parks Wetlands USFWS critical habitats BIA land areas Railroads, major roadways, and minor roadways Military areas and training grounds NLCD developed lands Areas >0.8 km (0.5 miles) from NLCD developed lands Because we use open-source information, proprietary information that can influence siting decisions such as individual tax agreements with cities, detailed fiber line connectivity, electric grid power capacity agreements, and others, are not currently accounted for in the modeling process. Using specific building locations and footprints in the dataset for local planning purposes is not advised. Technical Information Geospatial data is provided in geojson format using the Albers Equal Area Conic (ESRI:102003) coordinate reference system. The datasets contain the following parameters: id - unique identification number within given scenario file growth_scenario – data center demand growth scenario market_gravity_weight – market gravity weight scenario (%) region – name of region (i.e., US State) total_cost_million_usd – locational siting cost ($million) campus_size_square_ft – total land acquired for data center facility (square ft) data_center_it_power_mw – IT power of data center facility (MW) mechanical_cooling_frac – fraction of year when data center uses mechanical cooling system water_cooling_frac– fraction of year when data center uses evaporative cooling system cooling_energy_demand_mwh – total annual facility energy demand for cooling (MWh) cooling_water_demand_mgy – total annual facility water demand for cooling (MG) cooling_water_consumption_mgy – total annual facility water consumed (MG) normalized_locational_cost – normalized total locational cost score for location normalized_gravity_score – normalized market gravity score for location weighted_siting_score – total weighted siting score of locational cost and gravity score geometry – polygon geometry of facility Acknowledgment IM3 is a multi-institutional effort led by Pacific Northwest National Laboratory and supported by the U.S. Department of Energy's Office of Science as part of research in MultiSector Dynamics, Earth and Environmental Systems Modeling Program. License This data is made available under a CCBY4.0 License Disclaimer This material was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor the United States Department of Energy, nor the Contractor, nor any or their employees, nor any jurisdiction or organization that has cooperated in the development of these materials, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness or any information, apparatus, product, software, or process disclosed, or represents that its use would not infringe privately owned rights. Reference herein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise does not necessarily constitute or imply its endorsement, recommendation, or favoring by the United States Government or any agency thereof, or Battelle Memorial Institute. The views and opinions of authors expressed herein do not necessarily state or reflect those of the United States Government or any agency thereof. PACIFIC NORTHWEST NATIONAL LABORATORYoperated byBATTELLEfor theUNITED STATES DEPARTMENT OF ENERGYunder Contract DE-AC05-76RL01830

Mongird, Kendall (ORCID:0000000328077088)↗

Package Data for CERF-Data Centers

This dataset contains sample input 100m resolution raster files for running the CERF-DC python package (see https://github.com/IMMM-SFA/cerf_data_centers) at the state level across the CONUS. Due to data availability constraints, some of the items included in this dataset are proxies or assumptions for siting factors used in the model. These are individually noted in the item descriptions and can be exchanged with more detailed information upon availability. Data Descriptions The following raster files are included in the data download: state_siting_region.tif — State areas identified by state FIPS code composite_siting_suitability.tif — Value of 1 indicates suitable siting location, 0 otherwise. The following areas are excluded from siting: Areas within 300 m of a federal airport runway or within an airport area boundary Waterbodies Areas with slope >16% Areas susceptible to sinkholes High coastal or inland flood risk areas Local, state, and federal parks, leisure areas, and cemeteries Areas >2 km away from electric substations Areas >5 km away from a municipal water supplier service area Areas >2 km away from high-speed fiber provider service territory USGS Protected Areas Database of the United States (PAD-US) GAP status 1, 2, or 3 areas US National Parks Wetlands USFWS critical habitats BIA land areas Railroads, major roadways, and minor roadways Military areas and training grounds NLCD developed lands Areas >0.8 km (0.5 miles) from NLCD developed lands land_value_dollar_per_sqft.tif — USD per square foot (sqft) derived from USDA $/acre land cost personal_property_tax_rate.tif — Personal property tax rate by state. Uses an assumed 0.0125 personal property tax rate for states with personal property tax, 0 for states without personal property tax. real_property_tax_rate.tif — Real property tax rate. Based on county level residential real estate property tax rates. sales_tax_rate.tif — Sales tax rate by state. mechanical_cooling_fraction.tif — Fraction of year (values between 0 and 1, inclusive) that the data center would be cooled through mechanical processes based on local water stress and humidity levels. water_cooling_fraction.tif — Fraction of year (values between 0 and 1, inclusive) that the data center would be cooled through evaporative (water cooled) processes based on local water stress and humidity levels. distance_to_substation.tif — Distance to nearest substation in hundreds of meters (i.e., value of 1 equals a distance of 100m). Offshore areas have a value of 0. industrial_electricity_rates_dollar_per_kwh.tif — USD/kWh industrial electricity rates. Represents the average industrial rate across all utilities that operate within a given county. Values are derived from the US Utility Rate Database. commercial_electricity_rates_dollar_per_kwh.tif — USD/kWh commercial electricity rates. Represents the average commercial rate across all utilities that operate within a given county. Values are derived from the US Utility Rate Database. data_center_market_locations.tif — Grid cells with positive values represent the centroid of existing data center market clusters. The value of non-zero grid cells represents the number of data centers in the market cluster. All other grid cells have a value of 0. Geospatial Metadata CRS: Albers Equal Area Conic (ESRI:102003) Extent: -2415585.0000000023283064,-1441981.2605773280374706 : 2384414.9999999976716936,1708018.7394226719625294 Dimensions: X: 48000 Y: 31500 Bands: 1 Origin: -2415585.0000000023283064,1708018.7394226719625294 Pixel Size: 100,-100 Acknowledgment IM3 is a multi-institutional effort led by Pacific Northwest National Laboratory and supported by the U.S. Department of Energy's Office of Science as part of research in MultiSector Dynamics, Earth and Environmental Systems Modeling Program. License This data is made available under a CCBY4.0 License Disclaimer This material was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor the United States Department of Energy, nor the Contractor, nor any or their employees, nor any jurisdiction or organization that has cooperated in the development of these materials, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness or any information, apparatus, product, software, or process disclosed, or represents that its use would not infringe privately owned rights. Reference herein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise does not necessarily constitute or imply its endorsement, recommendation, or favoring by the United States Government or any agency thereof, or Battelle Memorial Institute. The views and opinions of authors expressed herein do not necessarily state or reflect those of the United States Government or any agency thereof. PACIFIC NORTHWEST NATIONAL LABORATORYoperated byBATTELLEfor theUNITED STATES DEPARTMENT OF ENERGYunder Contract DE-AC05-76RL01830

Mongird, Kendall↗