Search NASA⌕ Search

SEARCH · Search NASA

Results for “Contractors”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Building a Collaborative Relationship between Contractor and Oversight at SRPPF

The success of Department of Energy (DOE) projects is dependent on a functional, healthy, and collaborative relationship between the contractor and the federal oversight. A healthy relationship marked by a collaborative mindset between these two groups, can facilitate better operational safety, operational efficiency, and regulatory compliance. This paper will explore aspects of such a relationship, the roles and responsibilities of the contractor and federal oversight, the present and historical relationships in the DOE complex, and best practices considered by the contractor and federal oversight used at the Savannah River Plutonium Processing Facility (SRPPF) at the Savannah River Site (SRS). Due to the current design phase of the SRPPF, the contractor and federal oversight have a unique opportunity to begin establishing a strong relationship early in the project’s life. As a result of this dynamic, the two groups have already demonstrated their ability to successfully respond to ongoing design issues. In general, a strong criticality safety program is beginning to mature for the SRPPF alongside a developing criticality safety federal oversight group. This paper will discuss the various factors that have brought about this collaborative relationship. Lastly, a case study will be incorporated into this paper demonstrating the ability of the SRPPF contractor and federal oversight to overcome challenges relating to the SRPPF project. This case study may guide groups around the DOE Complex to create better, more functional relationships between the two parties. The case study will provide a detailed description of the issue and parties involved, highlight the factors that allowed the group to overcome the challenge via effective collaboration, and the outcome of the event. Increasing collaboration may benefit the complex, as a whole, in order to meet the mission demands of the DOE.

collaboration↗

When and Why Hiring and Training Occur: A Survey of Building Efficiency Contractors

As state and local governments, along with homeowners, work to enhance building energy performance, a sufficiently skilled energy-efficiency workforce is essential for implementing solutions at scale. In recent years, employers in the energy efficiency sector, including building performance contractors, have frequently reported challenges finding qualified workers. Additionally, as building performance technologies evolve and become more sophisticated, current workers need to acquire new skills and practices to maintain high-quality work. This study surveyed 209 contractors involved in building energy performance projects across 37 U.S. states, Washington, D.C., Guam, and the Marshall Islands. The survey aimed to understand their experiences in the labor market, their business practices, and their decision-making processes when hiring new workers and training existing employees. The findings highlight contractors' motivations and considerations in hiring and training, as well as the most significant challenges they face in the labor market. These insights can help workforce development practitioners design training programs that are aligned with workforce needs and responsive to employer concerns.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Unlocking the Path to Decarbonized Building Thermal Systems: Strategies for Designers and Contractors: Preprint

The design and construction community plays a pivotal role in facilitating the transition to decarbonized thermal systems that maintain human comfort while reducing building emissions. Through the U.S. Department of Energy Better Buildings initiative's Design and Construction Allies, a cohort of leading architecture, engineering, and construction firms have identified top ranked barriers that designers and contractors face when implementing solutions for building owners. These barriers to decarbonizing thermal - especially heating - systems include equipment availability; electrical capacity constraints; space allocations; complex system configurations; and lack of experience in designing, installing, and maintaining heat pumps. These impediments significantly amplify the risk and financial burden associated with the adoption of decarbonized solutions. The barriers also decrease the likelihood that designers, contractors, and owners will adopt decarbonization strategies without clear plans and guidance on how to implement these solutions, mitigate risk, and overcome the identified barriers. The National Renewable Energy Laboratory, the Design and Construction Allies, and the American Society of Heating, Refrigerating, and Air-Conditioning Engineers have developed "how to" thermal decarbonization guidance based on best practices. The subjects covered range from the role of energy efficiency in facilitating decarbonized heating solutions to strategies for decarbonizing new and existing heating, ventilating, and air-conditioning systems. The focus is on overcoming barriers so that energy-efficient, electrified buildings - both new and retrofit - become the industry standard. This paper outlines 1) the method used to collect and organize this guidance, 2) industry barriers to decarbonization, and 3) decarbonization techniques that have broad market applicability.

building heating↗

Community Toolkit for Designing and Implementing a Contractor Accelerator Program

This toolkit is designed to provide communities with an overview of the methodology and approach to designing, developing, and implementing contractor development programs. These programs support small businesses from historically under-represented communities so that they can better compete and become leaders in the clean energy marketplace. The toolkit was developed by Elevate and NREL for the Communities LEAP program.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Optimizing Residential HVAC Systems: Evaluating How the Usage of Smart Diagnostic Tools for Quality Installation and Commissioning Impacts System Performance and HVAC Contractor Businesses

The adoption of digital quality installation and fault detection tools has the potential to transform the $14 billon residential heating, ventilating, and air conditioning (HVAC) service and installation industry. Increased market penetration can be accelerated by providing an increased understanding of the energy and economic value proposition of the usage of these tools. In tandem with energy and HVAC system performance impact research and analysis, the Southface Team investigated the economic business implications for HVAC service and installation contractors adopting the use of measureQuick (mQ), a smart diagnostic app that aids in quality installation and fault detection and works agnostically with Bluetooth-enabled HVAC technician tools.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Final Technical Report

Statement of the problem or situation that is being addressed in your application. The DOE and its national laboratories developed the Home Energy Score™ (HES) to encourage homeowners to improve their energy performance, lower costs and to share energy information through the MLS listing, appraisal, and financing channels. While the HES is an instrumental tool, it is currently underutilized and consists of technical, structural and sector barriers which need to be addressed in order to scale and many energy efficiency contractors are understandably overwhelmed by the added time and effort and lack of incentive to sell and deliver deep retrofit projects while simultaneously meeting the DOE HES program requirements; consequently, contractors may decide to forgo participation. Home Energy Rating System (HERS) Raters have the opportunity to play the critical Assessor role in producing a Home Energy Score (HES); this role has immense potential but currently is unfulfilled. Lastly, while utilities are interested in their customer base achieving greater energy efficiency, especially to help offset growing residential loads in states like California that are accelerating electrification, utilities do not have access to the market actors who are on the front line of influence to homeowners or review and approve their permits: HERS Raters, assessors, contractors and building departments. General statement of how this problem is being addressed: ConSol will integrate the Home Energy Score™ (HES) to its State of California, approved home energy rating services (HERS) platform (CHEERS) to develop a single tool for contractors nationwide to assess, record and install recommended cost, energy, and emissions saving measures to the 140 million single-family homes throughout the U.S. and 14 million homes in California (CHEERS+HES). The CHEERS high fidelity energy code permitting data will be integrated with HES for simple, accurate, easy-to-use home energy estimation and analysis and will directly gain access to the retrofit and renovations markets with the same upgraded platform. This innovative project will assist the utilities in supporting existing homes in their jurisdictions with HES and develop measures to improve energy efficiency and reduce emissions. How is this problem being addressed? What is the overall project approach? In effort to expand the Home Energy Score™ (HES) by increasing the use of aggregable home energy asset data, ConSol proposes to integrate the DOE HES via Application Programming Interface (API) to its State of California approved home energy rating services platform (CHEERS). Once the CHEERS platform and HES are integrated (CHEERS+HES), this enhanced platform will be instantly available and actively deployed via Phase 1 pilot to HERS Raters, assessors and contractors in California to market-test the solution, understand the rate of adoption and identify opportunities for improvement prior to scaling nationally. The CHEERS high fidelity energy code permitting data will be integrated with HES for simple, accurate, easy-to-use home energy estimation and analysis and will directly gain access to the retrofit and renovations markets with the same upgraded platform. This innovative project will assist the building industry and homeowners with an easy-to-use assessment if energy and carbon impacts of existing homes, and assist the utilities in supporting existing homes in their jurisdictions with HES to improve energy efficiency and reduce emissions. What is to be done in Phase I? During Phase I of this proposed project, ConSol will (1) design software architecture that links CHEERS to the Home Energy ScoreTM via API, (2) solicit partnership from one or more California utilities for a regional pilot, (3) test the new software with its HERS Raters and contractor network in the partnership utility jurisdiction, (4) launch a pilot version of the newly developed software with HERS Raters and contractors in the utility territory, and (5) explore California’s GoGreen energy efficiency homeowner lending program in parallel with the pilot. Commercial Applications and Other Benefits. Summarize the future applications or public benefits if the project is carried over into Phase II or Phase III and beyond. The CHEERS+HES commercialized product will be ready for national market scale following a successful Phase 1 performance. The CHEERS+HES adoption is estimated to reach a 5% adoption growth rate versus the 110,000 baseline, starting in Year 1 after Phase I completion, and continuing each year. As a direct benefit to the DOE, CHEERS will set a goal of 100,000 Home Energy Score assessments for existing home alterations within the first 10 years following Phase 1 performance. The technical benefits of this proposed project include the harmonized, automated, and seamless integration of the DOE HES into the widely used and market leading California energy registry, CHEERS. The social benefits include the aggregate energy, cost and GHG savings by allowing the broader public streamlined access to the CHEERS+HES measurement and the energy efficiency recommended measures that may result. Key Words: Home Energy ScoreTM (HES); Application Programming Interface (API); Home Energy Rating Services (HERS); HERS Raters; contractors; assessors; existing homes, energy asset data; cost, energy, and emissions saving measures; energy code (Title 24) compliance; document repository; utilities; pilot; newly developed software; energy efficiency; homeowner. Summary for Members of Congress: The DOE Home Energy Score™ (HES) is a tool to encourage homeowners to improve their energy performance, lower costs and share energy information but is underutilized and consists of barriers which need to be addressed in order to scale. In effort to expand the HES, CHEERS, Inc. will integrate the HES to its State of California, approved home energy rating services (HERS) platform (CHEERS) to develop a single tool for contractors nationwide to assess, record and install recommended cost, energy, and emissions saving measures to the 140 million single-family homes throughout the U.S. and 14 million homes in California.

Application Programming Interface (API)↗

Exhibit D Scope of Work and Technical Specifications MOX Rod Reduction

PROJECT/PROGRAM GOALS AND OBJECTIVES: The Los Alamos National Laboratory (LANL), here after referred to as the CONTRACTOR, plans to provide NQA-1 service and support for the disposition of PF-4 basement inventory of Areva fuel rods. These fuel rods need to be reduced in length for proper shipping and disposition. The objective of this acquisition is to enter into an agreement with a SUBCONTRACTOR that shall provide expertise, materials, input for procurement of specialized tooling to be identified, and mockups for size reduction and FS65 disposition. Handling and size reduction of the Areva rods would take place at LANL. Physical work at LANL will be performed by the CONTRACTOR’s field execution team, portions of this work will have expertise provided by the SUBCONTRACTOR. As cited below via an add alternative and supplemental site visit(s) to LANL the CONTRACTOR may request the SUBCONTRACTOR to ship the necessary transportation, handling and packaging equipment at the SUBCONTRACTOR’s location to the CONTRACTOR’s facility for size reduction activities at LANL by the CONTRACTOR’s self-perform field execution team. In addition, the SUBCONTRACTOR shall provide subject matter expertise to CONTRACTOR personnel cutting the mockup Areva Fuel Rod at LANL as a rehearsal prior to CONTRACTOR cutting the actual MOX Fuel Rod if this add alternative is exercised.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Realizing the Residential Electrification Opportunity: One Heat Pump at a Time

Space and water heating in residential buildings is a major contributor of greenhouse gas (GHG) emissions in the United States. Advanced electric heat pumps (HP) and heat pump water heaters (HPWH) are poised to provide a low carbon alternative to traditional fossil-based space and water heating. Widespread deployment of heat pumps could help address the significant portion of building emissions and primary energy used in American households, however much work needs to be done to close the knowledge gap between like-for-like fossil equipment replacement and switching to HPs for the average contractor. The Pacific Northwest National Laboratory (PNNL) has been working on closing this knowledge gap through the development of decision tools and resources targeted towards contractors and installers. Developed in coordination with stakeholders and experienced contractors from a variety of geographic regions, these tools help streamline the process of sizing and selecting residential HPs and HPWHs for key use cases. Along with the complementary Retrofit Decision Tool developed by PNNL, the decision tools will help contractors understand the importance of whole building considerations when choosing HPs including envelope upgrades, duct assessments, and electrical assessments to ensure optimal selection and performance of the HP or HPWH. They also provide direct links to resources and best practices developed by PNNL as well as external entities to further help contractor education and training. This paper describes the development of these tools, and their role in moving the existing space and water heating market towards HPs to help realize the country’s decarbonization goals.

heat pump, heat pump water heater, Residential bui↗

Independent Review of Non-Destructive Assay for the K-25/K-27 D&D Project: November 30-December 3, 2004, Oak Ridge, TN

The DOE with concurrence from the D&D contractor has chartered an assessment of the methods and procedures used to obtain the original NDA results of holdup deposits at the K-25 and K-27 uranium gaseous diffusion facilities in Oak Ridge. The assessment has been performed by an external review team with the participation of the D&D contractor, DOE, and DOE/OR. This document is the final report for the assessment. The DOE provided the charter for this review. The review team spent a week in Oak Ridge attending meetings and participating in discussions with expert contractor staff. Substantial additional input for the review came from numerous written materials, unpublished and published. This final report of observations, findings, and recommendations in areas defined by the charter is based on information from the meetings, discussions, and documents. The assessment of the Review Team is that the DOE/OR and BJC approach in using historical NDA data for the D&D of K-25 and K-27 is appropriate and generally acceptable. Resolving issues, addressing findings, and implementing the recommendations documented in this report will reconcile specific technical concerns.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Design Basis Document / Owner’s Technical Specification for Nitrate Salt Systems in CSP Projects (Final Technical Report)

The number of commercial coal, gas, and nuclear projects built over the past 100 years number in the thousands. As such, there is a large database, available to a wide range of commercial engineering contractors, on proven designs. In essence, unsuccessful designs have, through generations of iterations, been identified and then deleted from further consideration. In contrast, the number of commercial parabolic trough projects using nitrate salt for the thermal storage media is perhaps 60. Further, the number of commercial central receiver projects using nitrate salt as the working fluid is on the order of 20, including estimates for China. Given the relative immaturity of salt technology, and commercial pressures to successfully bid new solar projects into a mature electricity market, solar projects often promise more than has been delivered. The Design Basis Document / Owner’s Technical Specification is a first step in the iteration process. The report describes the successful features of commercial projects, outlines a range equipment and system failures in projects that didn’t operate as intended, and provides a draft set of design changes intended to correct the known problems. The product of the study is 3 volumes of technical material; one volume is on parabolic trough technologies; a second is on central receiver technologies, and the third is on potential design changes to parabolic trough and central receiver projects. The 3 volumes, which total some 590 pages, can be found at https://www.solardynllc.com/csp-plant-technologies. One of the principal topics in the report is the use of functional or prescriptive specifications. Functional specifications describe what the equipment needs to do, consistent with the minimum legal requirements of the local jurisdictions. The details of how this is to be accomplished is developed by the engineering contractor. Prescriptive specifications, which are developed by the Owner, prescribe to the engineering contractor how the functional requirements are to be met. This arrangement ensures that the favorable experience from a previous project is repeated. One example is the design code for the hot salt tank in central receiver projects. The closest design basis is API Standard 650 Welded Steel Tanks for Oil Storage. However, the maximum design temperature in API 650 is 260 °C. As such, solar projects have typically adopted a hybrid Code approach, in which allowable material stresses are taken from ASME Section II Materials. Further, since the tanks experience daily changes in temperature and in (static) pressure, and since portions of the tank can operate at stresses beyond the elastic range, the low cycle fatigue life of the tank is conducted using the rules of Section VIII Division 2. However, in a recent study by NREL, the principal damage mechanism was identified as creep rather than fatigue. Further, design stresses permitted under Section VIII Division 2, corresponding to a fatigue life of 30 years, result in projected creep lifetimes of only 2 to 5 years. An alternate design approach, prescribed by the Owner, would be based on Code sections intended for high temperature service in the creep regime. A candidate is Section III Division 5. Granted, this is a nuclear code section, and it’s use would not likely be mandated by local jurisdictions. However, the effects of creep have been deemed to be of sufficient importance that one nuclear project developer, and one central receiver project developer, have stipulated in the tank design specification that the equipment be designed to the requirements of Section III Division 5.

14 SOLAR ENERGY↗

Flexible Fuel Electric Hybrid Glass Furnace Demonstration

The furnace contractor completed General Arrangement (GA) layouts and Piping and Instrumentation Diagrams (P&ID) for both furnaces during this reporting period. Preliminary equipment lists accompanied this work. Control system architecture in progress. Key furnace design elements and deliverables on track to be complete by end of phase. The facilities design and integration contractor completed a 3D scan and modeling of the facility. The work during this period focused on preliminary design with a focus on overall project scope and feasibility. This key work supports the overall project deliverables for 30% preliminary engineering and Preliminary Design Report (PDR) which are on track to be complete by the end of the phase. These deliverables are approximately 50% complete through the end of this reporting period. The batch house operations design contractor continues development of site plan and General Arrangement (GA) layout to support the 30% preliminary engineering and design package. This work is 60% complete by the end of this reporting period and is on track to be complete by the end of the phase.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Staged Z-Pinch Modeling with Hydra and Chicago Codes (CRADA Final Report)

This was a collaborative effort between Lawrence Livermore National Security, LLC (“Contractor”), as manager and operator of Lawrence Livermore National Laboratory (“LLNL”) and Magneto Inertial Fusion Technologies, Inc. ("MIFTI" or "Participant"), to develop staged Z-pinch (SZP) modeling with HYDRA and CHICAGO codes. The contractor performed numerical simulations of the SZP to reproduce and validate Participant’s MACH2 simulations. Contractor used the state-of-the-art, radiation-magneto-hydrodynamic code HYDRA, as well as the hybrid particle-in-cell code CHICAGO. This work helped assess the physical and numerical uncertainties associated with the simulations and the overall fusion scheme. HYDRA is a well-established and validated code. This work has helped to independently assess the SZP concept to give confidence to the Participant and to the broader fusion community.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

SPC-71123 Rev 1 MARVEL Control Drum Actuator Torsional Spring

Idaho National Laboratory (INL) is developing a microreactor to produce electrical power utilizing a small nuclear core under the Microreactor Application Research Validation and Evaluation (MARVEL) program. This specification defines the requirements for the procurement and factory acceptance testing of the MARVEL control drum actuator torsional spring. The purpose of this specification is to define the requirements to procure the MARVEL control drum actuator torsional spring component and witness a torsional spring rate Factory Acceptance Test (FAT) at the subcontractor’s facility with the contractor present. Any conflict between this specification and referenced Codes and Standards, or any supplementary specifications in the procurement documents requires written clarification from the Contractor prior to proceeding with any work. Any deviation from the procurement documents requires approval by the Contractor with the change request process.

21 - SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLAN↗

The Building Business Network (B-Biz): Addressing Gaps in the High-Performance Building Technology Market, Especially for Underserved Customers

Increased market intelligence and business model innovation is needed to build contractor confidence in high-performance building technologies in order to increase the speed and scale of adoption to meet the U.S. Department of Energy's building stock decarbonization goals. Although there have been important innovations in energy efficiency, affordability, and decarbonization of building technologies, consumers are not purchasing these technologies at the necessary speed and scale partially due to a gap in institutional understanding around barriers contractors face in providing and servicing these technologies. Small businesses in this market must mitigate risk around high-performance building technologies, limiting their opportunities in the market and impacting the rate of adoption. The Building Business Network (B-Biz) aims to provide high-performance building technology solutions to underserved customers by collaborating with local small businesses that provide and service high-performance building technologies in communities with the lowest rates of adoption. This research explores the current market, the importance of business models, and the opportunity to utilize small businesses to address market gaps in underserved communities.

B-Biz↗

Incentivizing Cold-Climate Efficiency in Juneau (Final Report)

This is the final technical report for the DOE EERE BTO project Incentivizing Cold-Climate Efficiency in Juneau. The project implemented a community energy campaign to deploy heat pumps and efficiency for residents of Juneau, in Southeast Alaska. The project helped Juneau make progress towards its renewable energy goal of reaching 80% renewable energy for space heating by 2045. The Incentivizing Cold-Climate Efficiency in Juneau (ICE-Juneau) project began in 2020 and concluded three years later in 2023. During that time, a group of implementation partners and a research advisory team instituted a beneficial electrification campaign to promote energy savings and carbon reduction in residences of Juneau, Alaska. The campaign, Thermalize Juneau, focused on the installation of single head ductless mini-split heat pumps along with other efficiency upgrades. Thermalize Juneau was the first campaign of its kind in Alaska. After several months of planning, registration opened to the public in early 2021, and over the course of six months 164 participants enrolled. Campaign staff provided education to homeowners on heat pumps and efficiency, and each participant received a one-on-one heat pump assessment using a custom Microsoft Excel-based calculator that estimated energy savings for their residence based on building characteristics and past utility bills. Participants could also obtain a free energy audit from one of the two local energy auditors to further inform their decision. A heat pump installer, electrician, and builder were selected via a competitive RFP process. Participants who felt ready to install a heat pump or other efficiency upgrades received a site visit and custom quote from each of these contractors free of charge, and if they still felt energy upgrades were right for them, could move forward with an individual contract. Participants received a $400 heat pump installation rebate, offered by the installer if 40 heat pump installations occurred through the campaign. Overall, the campaign facilitated 75 heat pump installations (including participants that went with another contractor or heat pump model) and 30 efficiency upgrades (including participants that went with another builder or did DIY upgrades). The campaign created 3 new jobs as the heat pump installer hired an administrative assistant and two apprentices over the course of the campaign. It also helped Juneau work toward achieving its renewable energy goal of 80% renewable energy for space heating by 2045 by upgrading houses from fuel oil to heat pumps powered by the hydropower electric grid. Researchers conducted four surveys to inform Thermalize Juneau and future energy campaigns. The first surveyed existing and prospective heat pump owners in Juneau to identify barriers the campaign could address and inform recruitment efforts. Entry and exit surveys provided information on participant demographics, goals, outcomes, and suggestions for improving future campaigns. And a final survey of community members who had not participated in Thermalize Juneau gave insight on ways future campaigns could include a greater diversity of participants so they could realize similar benefits. Researchers also used pre-campaign energy modeling to predict energy savings, which was then compared to the savings estimated through aggregation of heat pump assessments and energy audits, and later to actual energy savings of 10 participants who installed a heat pump and were able to provide complete energy use data sets. In addition to energy savings, and to assist the electric utility in future planning efforts, researchers analyzed the overall change in electric use across participants with energy data and heat pump installations. They also completed a life cycle cost analysis, showing positive net present values for those displacing a fuel oil appliance, and a more mixed case for those switching from electric baseboard. This project proved the feasibility of energy campaigns, with a goal of beneficial electrification, in cold, remote locations. The Thermalize Juneau team compiled a Guidebook to Thermalize Campaigns, available online. In addition to documenting what occurred in Alaska’s first thermalize campaign, it provides tips and resources for other communities wishing to implement a similar program.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Science-Based Acceleration of the Full Value Stream for Metal Additive Manufacturing: Expedited Powder Development and Additive Manufacturing Deployment in the Areas of Ni-Base Superalloy and Custom Alloy Powders for AM (Final Report)

The overall Science-based Acceleration of the Full Value Stream for Metal Additive Manufacturing (AM): Expedited Powder Development and Additive Manufacturing Deployment (“X-P4AM”) project objective is to drastically reduce the time-to-market barriers for new additive alloys of interest in automotive and aerospace applications, through computational alloy design with rapid screening and down- selection via synthesis of candidate alloys with rapid solidification. The project will also refine the technology in high pressure gas atomization to improve the production of commercial quantities of selected powders with high powder yields and enhanced powder quality. Production of modified nickel-based superalloys and a Ni-containing alloy based on a high entropy composition, enhanced powder production methods, and optimized AM build parameterization provided critical steps in widespread adoption of AM technology for aerospace applications, in this case. The individual backgrounds and capabilities of the Parties are ideally suited to the successful execution of this work. The included work enhanced the Contractors’ AM capabilities, a core competency of the Contractors, and develop a close working relationship with the Participant in the area of nickel-based powder superalloys and custom alloys and their end use.

36 MATERIALS SCIENCE↗

Science-based Acceleration of the Full Value Stream for Metal Additive Manufacturing: Expedited Powder Development in the Area of Aluminum Powder Alloys and their End Use (Final Report)

The overall Science-based Acceleration of the Full Value Stream for Metal Additive Manufacturing (AM): Expedited Powder Development (“X-P4AM”) project objective is to drastically reduce the time-to-market barriers for new additive alloys of interest in automotive and aerospace applications, through computational alloy design with rapid screening and down- selection via synthesis of candidate alloys with rapid solidification. The project will also refine the technology in high pressure gas atomization to improve the production of commercial quantities of selected powders with high powder yields and enhanced powder quality. A new aluminum (Al) alloy based on high entropy composition, enhanced powder production, and optimized AM build parameterization provided a critical step in widespread adoption of AM technology for automotive applications, in this case. The individual backgrounds and capabilities of the Parties are ideally suited to the successful execution of this work. The included work enhanced the Contractors’ AM capabilities, a core competency of the Contractors, and develop a close working relationship with the Participant in the area of aluminum powder alloys and their end use.

36 MATERIALS SCIENCE↗

Science-based Acceleration of the Full Value Stream for Metal Additive Manufacturing (AM): Expedited Powder Development and Additive Manufacturing Deployment in the Area of Aluminum Alloys for AM Powder Production (Final Report)

The overall Science-based Acceleration of the Full Value Stream for Metal Additive Manufacturing (AM): Expedited Powder Development and Additive Manufacturing Deployment (“X-P4AM”) project objective is to drastically reduce the time-to-market barriers for new additive alloys of interest in automotive and aerospace applications, through computational alloy design with rapid screening and down- selection via synthesis of candidate alloys with rapid solidification. The project will also refine the technology in high pressure gas atomization to improve the production of commercial quantities of selected powders with high powder yields and enhanced powder quality. A new aluminum (Al) alloy based on an Al-Ce-X composition, enhanced powder production, and optimized AM build parameterization provided a critical step in widespread adoption of AM technology for automotive applications, in this case. The individual background and capabilities of the Party are ideally suited to the successful execution of this work. The included work enhanced the Contractors’ AM capabilities, a core competency of the Contractors, and developed a close working relationship with the Participant in the area of aluminum powder alloys and their end use.

36 MATERIALS SCIENCE↗