PLANNING FOR NUCLEAR TESTING AFTER CORE INTERNALS CHANGEOUT #6 IN THE ADVANCED TEST REACTOR

A series of physics tests were planned for the Advanced Test Reactor (ATR) after the sixth Core Internals Changeout (CIC) in 2021. These tests verify nuclear characteristics of the new reflector and shim mechanisms and are validation cases for core models. This work describes planning for these tests and compares the physics tests with those performed previously in ATR. This work also identifies unique characteristics of ATR that result in the need for unique tests.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Completion of Nuclear Testing after Core Internals Changeout #6 in the Advanced Test Reactor

A series of physics tests were conducted in 2022 for the Advanced Test Reactor (ATR) after the sixth Core Internals Changeout (CIC) in 2021. These tests verify nuclear characteristics of the new reflector and shim mechanisms and are validation cases for core models. This work describes the results of these tests and compares the physics tests with those performed previously in ATR and updates previous work reporting on planning for nuclear testing and on preliminary results of several low-power tests. This work also identifies unique characteristics of ATR that result in the need for unique tests.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Nuclear Requalification of the New ATR Core

The Advanced Test Reactor (ATR) creates a unique high neutron flux materials testing environment that subsequently causes neutron embrittlement damage to its beryllium reflector eventually requiring a replacement during a reactor Outage. Concurrently, a piece-for-piece core replacement is conducted to maintain reactor functionality called a core internals changeout (CIC). Once changeout is complete, ATR Reactor Engineering utilizes previous CIC data to model and predict criticality scenarios for the new unirradiated core. However, CIC data has been inconsistently reported over the years making it difficult to find data trends that could be useful for the modeling and prediction process. So nuclear requalification testing is conducted using different flux and irradiation tests to accurately verify the models and to recalibrate nuclear monitoring instrumentation in the ATR core allowing for safe re-start of normal operations.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Nuclear Requalification of the ATR Core

The Advanced Test Reactor (ATR) creates a unique, high neutron flux materials testing environment that subsequently causes neutron embrittlement damage to its beryllium reflector. The reflector is eventually required to be replaced during a reactor Outage. Concurrently, a piece-for-piece core replacement is conducted to maintain reactor functionality called a core internals changeout (CIC). Once changeout is complete, ATR Reactor Engineering utilizes previous CIC data, notably 1977-1994 CIC data, to conduct predictive criticality analysis on the new, unirradiated core. However, CIC data has been inconsistently reported over the years making it difficult, and in some cases impossible, to utilize. These inconsistencies arise in various forms of not using correct units, inconsistent diagram usage, and not portraying the same kind of data similarly across the reports. To work around this inconsistency issue, Reactor Engineering is implementing the use of several new neutronic modeling codes that utilize modern computation speeds and methods to model the new core in different criticality environments. Further validation is then conducted by nuclear testing and bringing the reactor critical and conducting various irradiation tests. Upon completion and certification that the reactor passed all testing requirements, ATR can once again re-start normal operations.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Reactor Walkway Design for Gear Box Support Beam Removal

The walkway over the reactor is intended to be used in the core internal changeout (CIC) outage to replace the gear box suport beams. (GBSB) The current configuration of the in-tank platform prevents easily discharging the GBSB to the canal through the drop chute. The walkway's purpose is to increase operators access to the south irration deck, where the GBSB will be put into discharge cans, as well as the drop chute.

42 ENGINEERING↗

ATR Fuel Management

The sixth Core Internals Changeout (CIC) of ATR was completed on March 21, 2022, and Nuclear Testing (NT) commenced shortly thereafter. In support of NT, 235U flux wires were attached to flux wands using electrical tape and installed in water channels 2, 6, 11, 15 and 19 in each of the 40 ATR Mark VII fuel elements that comprise an ATR core to perform low power flux measurements during ATR Cycle 170CIC NT-3. The flux wands were fabricated from Poly (Methyl Methacrylate), or PMMA. Irradiated cobalt capsules were loaded in the ATR Northeast Irradiation Housing Assembly (NEIHA), the East Flux Trap (EFT), South Flux Trap (SFT), inboard A-positions and various H-positions as a 170CIC NT-3 core reactivity hold-down mechanism. The PMMA flux wands received significant gamma dose from the irradiated cobalt during NT-3 which caused discoloration, embrittlement and swelling of the flux wands. The removal of the degraded flux wands from the 0.078 in. wide by 50 in. long fuel element coolant channels has been a unique challenge. This presentation summarizes the cleaning techniques used to remove the flux wand debris from the elements, an aggressive PMMA irradiation experiment performed concomitantly with initial cleaning efforts, and planned inspection and qualification techniques that will be applied in the future to potentially requalify the impacted elements for re-use.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Interoffice Memorandum RE-04-21 "Advanced Test Reactor Power History Through Cycle 169A-1"

Table 1 lists the Advanced Test Reactor (ATR) N-16 constrained power history data since the Beryllium VI Core Internals Changeout (CIC) Cycle 134A-1 through Cycle 169A-1. The powers tabulated for Cycles 159A-1, 163A-1, and 167A-1 are higher than powers observed during operation, because powers are computed from cycle exposure, which for these cycles includes operation during the low-power “soak” portion of each cycle; whereas cycle length in Effective Full Power Days (EFPD) includes only the high-power “casualty” portion occurring after NF is established. Table 2 lists the accumulated N-16 lobe and total core exposure, as obtained from the ATR Data Acquisition System (RDAS) for Cycles 134A-1 through 169A-1. Table 3 lists the startup and shutdown dates and times, as obtained from logbooks or RDAS, depending on availability. The ATR power history prior to Cycle 134A 1 is presented in references (a) through (d).

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Gamma Irradiation of NaCl-UCl 3 Salt for the Molten Chloride Fast Reactor

This report documents the results of the gamma ray irradiation of NaCl-UCl 3 eutectic salt in the Advanced Test Reactor (ATR) spent fuel pool gamma tube and subsequent analysis of capsules utilizing the Gas Assay Sample and Recharge (GASR) system. NaCl-UCl 3 salt capsules at four different temperatures, 75C, 150C, 300C and 600C, were irradiated shortly after the core internal changeout (CIC) of the ATR, beginning April 28 th of 2021, and ending on August 18 th of 2021. Re-positioning of the fuel elements in the spent fuel pool to move more fresh fuel elements around the gamma tube occurred on May 11 th of 2021, resulting in an approximate 20% increase in the dose rate and consequently the total absorbed dose. In total, the salt-filled capsules underwent 2638 hours of gamma irradiation from the adjacent freshly discharged ATR spent fuel. Capsule internal pressure measurements were taken via the Gas Assay Sample and Recharge (GASR) system in the INL Hot Fuels Examination Facility (HFEF) following completion of the irradiation. Based on the GASR analysis results, the primary conclusion from this experiment to-date is that radiolytic generation of chlorine gas is insignificant for the dose rates and total absorbed dose that these samples experienced. To elucidate more detailed effects of radiolysis on NaCl-UCl 3 eutectic salts and reach a more definitive conclusion, further advanced analyses such as electron microscopy, simultaneous thermal analysis, and electron paramagnetic resonance are recommended to analyze the capsule wall and salt samples.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

ATR Complex and Plant Modifications 2020 2021

Allow myself to email Scott Ullsperger the training document to allow him to become more familiar with what was updated with the Core Internal Change out (CIC) for ATR. Scott is currently working on getting set up as a sub contractor. Scott Ullsperger is a retired BEA employee who has a thorough knowledge of the reactor. Scott has been selected to participate in the MSA for reactor start up.