Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Space Station Mission Planning Study (MPS) development study. Volume 3: Software development plan

A software development plan is presented for the definition, design, and implementation of the Space Station (SS) Payload Mission Planning System (MPS). This plan is an evolving document and must be updated periodically as the SS design and operations concepts as well as the SS MPS concept evolve. The major segments of this plan are as follows: an overview of the SS MPS and a description of its required capabilities including the computer programs identified as configurable items with an explanation of the place and function of each within the system; an overview of the project plan and a detailed description of each development project activity breaking each into lower level tasks where applicable; identification of the resources required and recommendations for the manner in which they should be utilized including recommended schedules and estimated manpower requirements; and a description of the practices, standards, and techniques recommended for the SS MPS Software (SW) development.

Klus, W. L.↗

The 30/20 GHz flight experiment system, phase 2. Volume 4: Experiment system development plan

The development plan for the 30/20 GHz flight experiment system is presented. A master program schedule with detailed development plans for each subsystem is planned with careful attention given to how technology items to ensure a minimal risk. The work breakdown structure shows the organization of the program management with detailed task definitions. The ROM costs based on the development plan are also given.

Bronstein, L.↗

Avionics test bed development plan

A development plan for a proposed avionics test bed facility for the early investigation and evaluation of new concepts for the control of large space structures, orbiter attached flex body experiments, and orbiter enhancements is presented. A distributed data processing facility that utilizes the current laboratory resources for the test bed development is outlined. Future studies required for implementation, the management system for project control, and the baseline system configuration are defined. A background analysis of the specific hardware system for the preliminary baseline avionics test bed system is included.

Harris, L. H.↗

Quiet, Efficient Fans for Spaceflight: An Overview of NASA's Technology Development Plan

A Technology Development Plan to improve the aerodynamic and acoustic performance of spaceflight fans has been submitted to NASA s Exploration Technology Development Program. The plan describes a research program intended to make broader use of the technology developed at NASA Glenn to increase the efficiency and reduce the noise of aircraft engine fans. The goal is to develop a set of well-characterized government-owned fans nominally suited for spacecraft ventilation and cooling systems. NASA s Exploration Life Support community will identify design point conditions for the fans in this study. Computational Fluid Dynamics codes will be used in the design and analysis process. The fans will be built and used in a series of tests. Data from aerodynamic and acoustic performance tests will be used to validate performance predictions. These performance maps will also be entered into a database to help spaceflight fan system developers make informed design choices. Velocity measurements downstream of fan rotor blades and stator vanes will also be collected and used for code validation. Details of the fan design, analysis, and testing will be publicly reported. With access to fan geometry and test data, the small fan industry can independently evaluate design and analysis methods and work towards improvement.

Koch, L. Danielle↗

Systems design study of the Pioneer Venus spacecraft. Volume 2. Preliminary program development plan

The preliminary development plan for the Pioneer Venus program is presented. This preliminary plan treats only developmental aspects that would have a significant effect on program cost. These significant development areas were: master program schedule planning; test planning - both unit and system testing for probes/orbiter/ probe bus; ground support equipment; performance assurance; and science integration Various test planning options and test method techniques were evaluated in terms of achieving a low-cost program without degrading mission performance or system reliability. The approaches studied and the methodology of the selected approach are defined.

Source record↗

Turnaround Operations Analysis for OTV. Volume 3: Technology Development Plan

An integrated technology development plan for the technologies required to process both GBOTVs and SBOTVs are described. The plan includes definition of the tests and experiments to be accomplished on the ground, in a Space Shuttle Sortie Mission, on an Expendable Launch Vehicle, or at the Space Station as a Technology Development Mission (TDM). The plan reflects and accommodates current and projected research and technology programs where appropriate.

Source record↗

Mission planning and analysis division development plan for STS-2 through STS-4

The baseline products, schedules, and resource requirements for the Mission Planning and Analysis Division's support of Space Transportation System flights 2, 3, and 4 are presented. Major functions addressed are: orbiter software, Mission Control Center software, flight design, flight operations support, simulation tools, and postflight analysis.

Source record↗

Prairie State Generating Company Site: Storage Field Development Plan

This Storage Field Development plan presents the Storage Complex characterization results, construction, monitoring, operational plans, and costs associated with the proposed Prairie State Energy Campus - Carbon Capture and Storage (PSEC-CCS) project in Washington County, Illinois, near Marissa. The proposed storage complex, known as the St. Peter-Everton Storage Complex, comprises the St. Peter Sandstone and Everton sandstone reservoirs, with the Maquoketa Shale serving as the primary confining unit and the Knox Group as lower confining unit. The lowermost Underground Source of Drinking Water (USDW) identified for the site is the Pennsylvanian section.

01 COAL, LIGNITE, AND PEAT↗

NASCOM system development plan: System description, capabilities, and plans, FY 94-2

The Nascom System Development Plan (NSDP) for FY 94-2 contains 17 sections. It is a management document containing the approved plan for maintaining the Nascom Network System. Topics covered include an overview of Nascom systems and services, major ground communication support systems, low-speed data system, voice system, high-speed data system, Nascom support for NASA networks, Nascom planning for NASA missions, and network upgrade and advanced systems developments and plans.

Source record↗

Fly-by-light flight control system technology development plan

The results of a four-month, phased effort to develop a Fly-by-Light Technology Development Plan are documented. The technical shortfalls for each phase were identified and a development plan to bridge the technical gap was developed. The production configuration was defined for a 757-type airplane, but it is suggested that the demonstration flight be conducted on the NASA Transport Systems Research Vehicle. The modifications required and verification and validation issues are delineated in this report. A detailed schedule for the phased introduction of fly-by-light system components has been generated. It is concluded that a fiber-optics program would contribute significantly toward developing the required state of readiness that will make a fly-by-light control system not only cost effective but reliable without mitigating the weight and high-energy radio frequency related benefits.

Chakravarty, A.↗

SEDAC data and applications development plan V(1)

This Data and Applications Development Plan describes how the Socioeconomic Data and Applications Center (SEDAC) at the Consortium for International Earth Science Information Network (CIESIN) is responding to SEDAC's mission to develop new applications and information products that synthesize earth science and socioeconomic data in ways that support decision making. The SEDAC data and applications development effort is a primary means by which the Earth Observing System Data and Information System (EOSDIS) program can help to ensure that the scientific investment embodied in NASA's Mission to Planet Earth (MTPE) program leads to tangible benefits to the American people. The Plan describes the major issues concerned with global climate change, identifies important decision makers and other users who would benefit from improved data and information, and assesses key opportunities for responding to the needs of these users and the scientists who work with them. It then details specific plans for developing selected integrated data products and services and for making them available to the target users on an operational basis. This report provides a summary of the activities performed in connection with NASA/GSFC Letter Contract NAS5-3263 for the period shown.

Chen, Robert S.↗

Nascom System Development Plan: System Description, Capabilities and Plans

The NASA Communications (Nascom) System Development Plan (NSDP), reissued annually, describes the organization of Nascom, how it obtains communication services, its current systems, its relationship with other NASA centers and International Partner Agencies, some major spaceflight projects which generate significant operational communication support requirements, and major Nascom projects in various stages of development or implementation.

Source record↗

Storage Field Development Plan: One Earth Energy

This Storage Field Development plan presents the Storage Complex characterization results, construction, monitoring, and operational plans, and costs associated with the proposed One Earth Sequestration Carbon Capture and Storage (OES-CCS) site in McLean County, Illinois, near Gibson City. The proposed storage complex, known as the Mt. Simon Storage Complex, comprises the Cambrian Mt. Simon Sandstone reservoir and the primary seal, the Cambrian Eau Claire Formation. The lowermost Underground Source of Drinking Water (USDW) identified for the site is the Ordovician St. Peter Sandstone. Geologic characterization of the Mt. Simon Storage Complex at the OES-CCS site was performed by the Illinois Storage Corridor CarbonSAFE Phase III project, which also prepared and submitted three UIC Class VI applications to construct three injection wells; the permit applications were submitted and are in the federal EPA review process. A characterization well, OEE #1, was drilled to collect site-specific data. These data were analyzed and used to develop the UIC Class VI applications. The OEE #1 well will be converted to an in-zone monitoring (IZM) well for the injection phase. The proposed buildout for the OES-CCS site includes (1) three injection wells (OES #1, OES #2, and OES #3), (2) two IZM wells, (3) two above confining zone (ACZ) monitoring wells, one of which will be used to monitor the lowermost USDW, (4) capture and compression facilities, and (5) transportation facilities, i.e., pipelines. A pre-operational testing program was proposed in the Class VI permit application and will be employed at the site pending approval. Additional pre-injection (baseline), syn-injection, and post-injection monitoring and site care procedures will be followed by OES to ensure that injection activities are protective of human health and the environment. Injection is scheduled to begin in 2025, distributed across the three injection wells in accordance with the permit operating conditions. One Earth Sequestration intends to inject up to 90 million tonnes of CO 2 over a period of approximately 20 years. Injection will begin at approximately 0.5 million tonnes of CO 2 annually and ramp up to a maximum of 4.5 million tonnes annually. Daily injection rates are expected to range from 1,400 to 1,500 tonnes per day initially and reach a maximum of approximately 4,225 tonnes per day, depending on site geology and injectivity at each injection well location, and CO 2 availability. The costs associated with the OES-CCS project include pre-operational costs (e. g. additional seismic data acquisition and well drilling), capture and transportation facility and equipment costs, predicted field operating expenditures (OpEx), and decommissioning and post-injection site care (PISC) costs. The risks associated with project activities, such as site construction, injection operations, and verification of secure storage were evaluated, and mitigation strategies proposed to alleviate those risks.

09 BIOMASS FUELS↗