Search NASASearch

SEARCH · Search NASA

Results for “ENGINE DESIGN”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Insights from Initial Engineering Designs of Point Source Capture at Industrial Facilities

Initial engineering design studies examining the application of state-of-the-art carbon capture technology at industrial plants contain generally overlooked real-world design considerations for near-term deployment of point source capture (PSC). The implementation of PSC across a wide range of industrial applications presents unique challenges associated with fluctuating CO<sub>2</sub> concentrations, flue gas composition, and utility and land availability. In this article, seven recent industrial retrofit PSC projects are reviewed to investigate the impact of site-specific factors on project design and cost. Across the seven projects, three capture technology classes and four industrial applications are considered, allowing insight into industry-specific opportunities for PSC technology synergy. Common challenges across projects and proposed design solutions are highlighted to propagate ideas and solutions to close the technology gaps and accelerate learning rates.

FEED Studies

Software For Advanced Large-scale Analysis Of Magnetic Confinement For Numerical Design, Engineering & Research (salamander)

As magnetic confinement fusion energy gains traction internationally to enable abundant energy production, designing components for fusion systems is a pressing challenge. During the planned lifetime of a fusion device, components evolve in extreme environments and must withstand large, repeated thermal loads and bombardment by 14 MeV neutrons, plasma ions, and neutral particles (deuterium, tritium, and helium), corrosive conditions, etc. All these physical processes take place simultaneously, interact in intricate ways, and impose important constraints that can affect performance. Experimental data is rare and costly to obtain, making design particularly challenging. Predictive computational frameworks must be an integral part of an accelerated and cost-effective design process by modeling fusion system performance in simulated environments. To better understand component degradation and operational impacts on their performance, the Software for Advanced Large-scale Analysis of MAgnetic confinement for Numerical Design, Engineering & Research (SALAMANDER) is designed as an open-source, fully integrated, multiphysics, multiscale, NQA-1 compliant framework facilitating 3D, high-fidelity fusion system modeling. To that end, SALAMANDER is a MOOSE-based framework, and therefore leverages MOOSE upstream libraries such as PETSc and libMesh to deliver sophisticated finite element, finite volume, and nonlinear solver technology for fusion energy simulations. SALAMANDER couples MOOSE physics module capabilities—such as thermal hydraulics, heat conduction, Navier-Stokes, and thermomechanics—with tritium transport via TMAP8, neutronics via Cardinal, and nascent particle-in-cell capabilities. Direct simulation Monte Carlo methods will be used to address neutral transport near the walls. By coupling all these physics in an integrated application, SALAMANDER will enable high-fidelity modeling of irradiation levels and plasma exposure conditions of plasma facing components and their impact on heat and tritium distributions, as well as the resulting mechanical constraints experienced by the plasma facing components and performance of blanket systems. Furthermore, SALAMANDER will be particularly suited for engineering studies thanks to the stochastic tool module readily available in MOOSE, allowing for extended uncertainty quantification and risk analysis studies. It is also able to use computer-aided design (CAD) meshes to model complex geometries, which is indispensable for fusion systems. SALAMANDER therefore supports design, safety, engineering, and research projects for magnetic confinement fusion systems

Simon, Pierre-Clement [Idaho National Laboratory (

Alaska Liquid Natural Gas Pipeline Front-End Engineering & Design (Final Technical Report)

The Alaska Gasline Development Corporation (AGDC) is Alaska’s natural gas infrastructure development corporation established in 2013. AGDC’s mission is to maximize the benefit of Alaska’s vast North Slope natural gas resources for Alaskans through the development of infrastructure necessary to move the gas into local and international markets. AGDC was identified for a Congressionally Directed Spending (CDS) project for funding in the Energy and Water Development and Related Agencies Appropriations Act, 2023 under the heading: “Congressionally Directed Energy Efficiency and Renewable Energy Projects.” The CDS included $\$$4,000,000 of direct funding, with required match funds, to move the project forward. Alaska’s North Slope holds America’s largest proven and conventional natural gas supply. The integrated Alaska LNG Project will deliver 3.5 billion cubic feet of natural gas per day from Alaska’s North Slope gas fields to Alaskans as well as to a marine terminal located at tidewater in Cook Inlet. Alaska LNG is an integrated gas infrastructure project with three major components: a gas treatment plant (GTP) located at Prudhoe Bay, an 807-mile (1,287 km) gas pipeline (Mainline Pipeline) to Southcentral Alaska with interconnections for in-state gas use, and a natural gas liquefaction facility (LNG Facility) in Nikiski, Alaska. The integrated Alaska LNG Project has several strategic advantages including proven gas resources, existing upstream infrastructure, an advantageous arctic climate for LNG production, proximity to LNG markets, a track record of reliability from a state that first began exporting LNG to Japan in 1969, and broad support from Alaskans. North Slope natural gas is a conventional resource and can be produced with minimal drilling at a fraction of the carbon dioxide emissions of shale gas from the Lower 48 states. Through the development of the Alaska LNG Project, Alaska can provide energy security to Alaskans and a stable source of LNG to the Asia-Pacific region for generations. The Alaska LNG Project has been progressed through Pre-Front-End Engineering Design (Pre-FEED) and has obtained all major federal and State of Alaska permits and authorizations to construct the project, including the Federal Energy Regulatory Commission (FERC) Order Granting Authorization Under Section 3 of the Natural Gas Act. On September 5, 2024, the U.S. Department of Energy (DOE), National Energy Technology Laboratory (NETL) awarded Project No. DE-FE0032307 to AGDC with the objective to progress the project to Front-End Engineering Design (FEED) entry for the Alaska LNG Project Phase 1 Pipeline. The award Start Date was made effective July 1, 2023, with a Period of Performance through June 30, 2025. On March 27, 2025, AGDC announced the execution of definitive commercial agreements with Glenfarne Alaska LNG, LLC, an affiliate of Glenfarne Group, LLC, (together as “Glenfarne”), to lead the development of the Alaska LNG Project and enter FEED for the Phase 1 Pipeline. Project activities are now funded and directed by this private sector partner who holds a 75% interest in 8 Star Alaska, LLC (8 Star). 8 Star holds the assets of the Alaska LNG Project. As planned, AGDC continues to hold 25% minority interest in 8 Star and will play a governance role moving forward with Alaska LNG. This definitive commercial agreement milestone led to the successful completion of AGDC’s Statement of Project Objectives (SOPO) for FEED entry and led to the completion of DOE Project No. DE-FE0032307. At conclusion of the SOPO, AGDC also reached the award’s maximum federal cost share of $\$$4,000,000. AGDC is, therefore, providing Final Technical Report to close out DOE Project No. DE-FE0032307.

02 PETROLEUM

Carbon Capture Plant Front-End Engineering Design Study for Cement Manufacturing

The objective of this project was to conduct a Front-End Engineering Design (FEED) study for capturing carbon dioxide (CO₂) from cement plant flue gas using non-aqueous solvents (NAS) with a 95% capture efficiency. The study aimed to develop AACE (Association for the Advancement of Cost Engineering) Class 3 cost estimates for a commercial-scale CO₂ capture system with a capacity of 2.4 million tonnes of CO₂ per year (t-CO₂/yr). The results will provide Cemex and the U.S. Department of Energy with reliable data to support investment decisions, evaluate economic feasibility, and guide future project development and implementation.

20 FOSSIL-FUELED POWER PLANTS

Scaleup and Site-Specific Engineering Design for Global Thermostat Direct Air Capture Technology

The overall goal of the project is completion of an initial design of a commercial-scale, Carbon Capture, Utilization, and Storage Direct Air Capture (CCUS-DAC) plant design at three different sites that captures a net of at least 100,000 tonnes per year (TPY) carbon dioxide (CO 2 ) from the atmosphere and considers compression and conditioning of the captured CO 2 for purpose of pipeline transportation to different geological formation sites for deep well injection and underground storage. In addition to the leading system consisting of a scaled-up Global Thermostat DAC unit, overall plant design includes a combined Heat and Power (CHP) unit integrated with a conventional liquid amine-based carbon capture system (90% capture) and compression facilities. These are considered balance of plant (BOP) systems and are required to provide low carbon-intensity steam and power to the DAC process. A second approach involving provision of DAC units modified to directly capture emissions from the CHP unit was initially assessed as an alternative and it was determined to be less mature than considered approach and not included in the scaled-up plant design efforts. Three geographically diverse continental United States locations were selected to better understand the effect of local/regional ambient conditions on scaled-up DAC system performance and project costs: Bucks, Alabama (hot wet climate), Odessa, Texas (dry hot climate), and Goose Creek, Illinois (mid continental climate). The team focused on initial engineering design activities, including the development of project design criteria, initiation of site-specific studies and investigations, completion of DAC system process and equipment design, and definition of balance of plant (BOP) engineering. The purpose of the activities were to develop Technoeconomic Analysis (TEA), Life-Cycle Analysis (LCA), and Environmental, Health, and Safety (EH&S) analysis, and Business Case Analysis (BCA) to validate that the project engineering and scale-up plans of the DAC systems, at each of the three distinct case studies considered, are technically, economically, and environmentally feasible for commercial-scale operation.

20 FOSSIL-FUELED POWER PLANTS

Engineering Design of D1/D3 Dipole Magnets for the Electron-Ion Collider (EIC)

Here, the Electron-Ion Collider (EIC) at Brookhaven National Laboratory (BNL) is designed to deliver a peak luminosity of 10 34 cm −2 s −1 . An electron storage ring (ESR) will be installed in the existing Relativistic Heavy Ion Collider (RHIC) tunnel and will store polarized electron beams from 5 to 18 GeV. The ESR will have 750 dipole magnets with varying field requirements, including 576 super-bend triplets consisting of two magnets D1/D3 and D2. This paper presents on the engineering design of the D1/D3 dipole magnets within the arcs, with special focus on the coil design that allows the magnet to be configured for variable ampere-turns per energy.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS

Findings on subtask 3.3 – applicability of automated brine chemistry determinations for treatment and recovery processes through facility automation/modularization: engineering design study

Under the Energy & Environmental Research Center’s (EERC’s) ~$\$$22 million Phase II Brine Extraction and Storage Test (BEST) Program, a multimillion-dollar brine treatment technology test bed facility was established in western North Dakota to provide a platform for evaluating developing technologies and approaches for brine treatment and volume reduction. The initial facility, and associated research effort, was funded by the U.S. Department of Energy (DOE), with in-kind contributions provided by several industry participants and the state of North Dakota. Since its opening, the Brine Technology Test Facility (BTTF) has supported performance evaluations of desalination technologies capable of treating high-salinity produced water (PW) and enabled data collection for multiple approaches of PW management and critical material recovery. As part of the decommissioning process for the original project, facility ownership and liability were transferred to Select Water, which is providing the EERC with a continuing site access option for state or federal research and/or commercial technology development. This report documents the findings from a design study conducted by the EERC and the engineering firm that was originally contracted to design and construct the facility (Advanced Engineering and Environmental Services, LLC [AE2S]) that evaluated the current status of BTTF and its systems and developed a retrofit design to increase the facility’s capabilities through automation and modularization of its PW treatment infrastructure. The proposed retrofit will provide DOE and industry with an expanded range of conditioned PW that can be produced at the facility for evaluating fit-for-purpose water treatment technologies, online instrumentation for brine chemistry determination, and systems that recover critical materials like lithium and magnesium. The current facility consists of an 9600-square-foot facility that includes a 40-foot by 65-foot Class 1, Division 2-rated demonstration area and associated control rooms and lab-ready space capable of sourcing oil and gas PW and wastewater from industrial sources or tailoring brine compositions up to 300,000 mg/L total dissolved solids (TDS) and supplying them at rates up to 25 gpm for extended-duration technology demonstrations. The colocation of the facility with Select Water’s water management facilities allows for access and unloading of more than 10,000 bbl/day of trucked water delivered to site and associated access to on-site Class I and Class II brine disposal wells and nearby hazardous waste landfills operated and/or contracted by Select Water to dispose of concentrate and/or effluents associated with the testing.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH

Combustion-Pele: An Exascale Capability for Improving Engine Design

Combustion, the complex chemical reaction made possible by igniting a mixture of fuel and oxygen to produce heat and light, serves as the nation’s primary source of power generation and the linchpin of the transportation industry. For more than 100 years, internal combustion engines (ICEs) have been converting energy from the burning of fuel—gasoline, for example—into a mechanical process that makes vehicles move. Recently, ICEs have come under heavy scrutiny for their contribution to greenhouse gas emissions, yet combustion-based systems are projected to dominate the marketplace for decades. Exascale systems are helping researchers design new high-efficiency, low-emission combustion engines that operate at much lower temperatures to maintain the nation’s energy security and limit negative environmental impacts.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH

ORNL Design Engineering Library: Validated Thermoelectric Digital Twins

Radioisotope thermoelectric generators (RTGs) serve a crucial role in supplying thermal and electrical energy for reliable and long-duration power in remote and extreme environments. The thermal energy is provided by the decay of radioisotopes and is converted into electrical energy using the steady-state thermoelectric process by exploiting the Seebeck effect. Maintaining a thermal gradient through the material is necessary to drive current production. Modern predictive multi-physics tools are able to effectively describe the complex and strongly coupled phenomena needed for accurate model-based system engineering efforts needed to develop higher performing RTGs. Experimental validation of model simulations is essential to confirm the accuracy, reliability, and applicability of predictive multiphysics tools. Validation fosters confidence among users, helps meet regulatory requirements, and contributes to the ongoing improvement of simulation techniques, ultimately leading to better, safer, and more efficient designs and processes. Validated models can then be used as digital twins and can be interrogated to understand and quantify the performance gaps between theoretical and physical systems. These insights can be used to build higher performing systems.

22 GENERAL STUDIES OF NUCLEAR REACTORS

Engineering Design Report: High-Pressure Safety Squib

This project encompassed the mechanical portion of the squib system and included the design and analysis of the valve body, selection of tube and tube fittings, valve mounting, and initiator/detonator selection. The electrical portion of the squib has already been designed by another team and is outside of the scope of the project. Electrical information and requirements provided are only for use in selecting a compatible detonator/initiator.

42 ENGINEERING

Alchemy: A Model-Based Approach for 2D to 3D Autonomous Nuclear System Design

Engineering design of nuclear power plant (NPP) piping and equipment systems frequently bypasses crucial 2D system planning, instead moving straight to 3D modeling. This often leads to designs that exceed building envelope constraints, forcing expensive and time-consuming redesigns. When 2D modeling is employed, it typically involves labor-intensive manual workflows that convert 2D drawings into 3D models, resulting in inefficiencies and errors across design iterations. These workflows further suffer from poor software interoperability and dependence on proprietary software ecosystems, thereby contributing to schedule delays and cost overruns. This paper presents Alchemy, an autonomous framework that transforms 2D system definitions into Industry Foundation Classes (IFC)-compliant 3D building information models (BIMs) for expediting nuclear facility design at the conceptual preliminary phase. Using a model-based approach, the framework treats the 2D system diagram as the central reference model employed to automatically generate all subsequent outputs, ensuring consistency between the system definition and the resulting physical design. A web-based interface enables engineers to define hierarchical system topologies including associated equipment, geometric properties, and connectivity requirements. A two-phase equipment layout optimization algorithm automatically computes collision-free spatial configurations within predefined building envelopes. An artificial intelligence (AI)-assisted pipe routing module then generates orthogonal, collision-free routing paths, allowing the user to select either an A* search-based method or an Ant Colony Optimization (ACO)-based method. All outputs are authored natively in IFC format, relying on open-source technologies and standardized formats in order to ensure extensibility and eliminate proprietary software dependencies. The proposed framework is validated on two representative pressurized-water reactor (PWR)-based case studies, for which it autonomously generates IFC-compliant 3D models in minutes, drastically reducing workflows that typically require hours of manual effort. The generated model demonstrates topologically correct equipment placement, physically plausible spatial relationships, and collision-free pipe routing consistent with known PWR loop configurations. This work represents a foundational step toward digital engineering for nuclear facility preliminary design, with future ongoing development targeting design code compliance and expanded system complexity.

97 - MATHEMATICS AND COMPUTING

Engineering design of a kW-scale continuous reactor-heat exchanger for high temperature discharge of particle-based thermochemical energy storage

This study investigates the theoretical design parameters and thermal performance of a kW-scale continuous oxidation reactor for high temperature (~1000 °C) thermochemical energy storage (TCES) applications. The concept comprises a counter-current particle-based system that includes a reaction zone with a heat exchanger to extract the heat produced from the oxidation reaction. Both above and below the hot reactive volume are sensible heat recuperation zones to enable the feed and removal of particles and oxidizing gas near ambient temperature during steady state operation. Two operation types for the reaction zone are studied, a fluidized bed reactor (FBR) and a moving bed reactor (MBR). The results of the parametric analysis suggest that the MBR requires a smaller volume per kW of heat produced, achieving power densities in excess of 2500 kW/m3 compared to ~ 900 kW/m 3 in the FBR. Additionally, the MBR achieves between 0.71 and 0.99 oxidation conversions compared to between 0.23 and 0.38 conversions in the FBR with the same volumes and flowrates. However, the FBR has the potential to maintain a uniform reactor temperature which can produce heat transfer fluid (HTF) outlet temperatures as high as the reactor temperature, i.e., ~1000 °C, whereas the MBR produces variable reactor temperatures that can create overheating zones and low HTF outlet temperatures (< 800 °C) depending on the operating conditions selected. Future work should aim at understanding the coupled fluid dynamics, heat and mass transfer, and thermochemical reaction for any given combination of reactor volume and contacting patterns. Here, these studies should be complemented by experimental work on particle-gas TCES reactors.

25 ENERGY STORAGE

Nuclear Thermal Energy Storage Configurations for Industrial Combined Heat and Power Supply: Conceptual Study and Engineering Designs

The industries examined in this report primarily rely on moderate-temperature heat provided by gas- or coal-fired boilers and combined heat and power (CHP) plants, delivered through standard process steam systems. High-temperature energy demands are often industry-specific and typically exceed the capabilities of high-temperature gas-cooled reactors (HTGRs). While it is technically feasible to replace process steam from fossil-based heat sources with nuclear energy, certain industries, such as methanol production and pulp and paper, face technoeconomic challenges in integrating nuclear energy without major changes or a technological shift. This is mainly due to the limited external energy demand remaining after the use of internal byproducts, waste heat recovery, and simple efficiency improvements. Achieving full decarbonization of these processes with nuclear energy would require significant technological advancements, involving experimental technology and substantial investments, making widespread adoption in existing industrial plants unlikely in the near term. This study reviews TES options in the context of enabling a flexible CHP supply while maintaining a steady nuclear heat input. Heat storage systems that interface between the reactor primary fluid and the CHP system offer superior performance and flexibility. Specifically, steam extraction downstream of the reheater with a two-tank molten-salt TES appears as the best solution regarding thermodynamic system benefits and system drawbacks. Using selected system configurations, a conceptual design of an industrial energy park was developed for industries with varying energy demands, such as steel production plants utilizing electric arc furnaces (EAFs) and chemical plants, as well as for those with constant energy demands, like petroleum refineries. This design highlights the capabilities of TES and explores its potential business cases. The study also conceptually develops the potential for integrating additional energy sources with nuclear systems through the implementation of TES. The potential of the HTGR-TES-CHP system was also evaluated considering key uncertainties such as industrial demand profiles, external grid access availability, and eligible tax credit levels, using the Holistic Energy Resource Optimization Network. Sensitivity of net present value to these uncertainties was analyzed to determine the optimal number of nuclear reactors (and CHP systems) and the suitable TES capacity. The results were interpreted from a decision-maker’s perspective, focusing on three key areas: deployment strategy (oversized units vs. undersized units with TES support), industrial process characteristics (thermal-intensive single profiles vs. electricity-intensive combined profiles), and operational goals (maximizing profits vs. minimizing natural gas (NG) consumption or external grid dependence). The optimization results indicate that the HTGR-TES-CHP system significantly reduces reliance on NG boilers for individual industrial processes by 9-60% (in NG capacity factor), with an average reduction of 38%, compared to standalone NG boiler operation case (Business As Usual [BAU]). For combined industrial processes, the reduction ranges from 37-77%, with an average of 60%. Additionally, the system greatly reduces dependence on external grids. In meeting industrial electrical demands, a 33-100% self-sufficient internal electricity supply is achieved for single industrial process, with an average of 74%, compared to the BAU scenario, where 100% of electricity is imported. For combined processes, 35-100% of internal electricity demands are met by the reactor, with an average of 73%. At last, the relative NG price levels at which the proposed HTGR-TES-CHP system can cost-effectively enter the market currently dominated by existing NG boilers were estimated. For a moderate HTGR CAPEX level ($\$$2500/kWth, $\$$6329/kWe), the analysis suggests that NG prices must be 2.5 to 7 times higher than HTGR variable operating and maintenance costs for single industrial process, and 5.5 to 9.5 times higher for a combined process scenario. Tax credit modeling shows that the Investment Tax Credit significantly reduces the price threshold needed to break even, making the system competitive with NG boilers in certain cases.

22 GENERAL STUDIES OF NUCLEAR REACTORS

Front-end engineering design (FEED) studies: a quantitative analysis

NETL has devised a methodology for normalizing FEED study metrics of interest and allowing cautious quantitative comparison across FEED studies. This presentation introduces the novel quantitative comparison methodology and presents results from utilizing this methodology to examine data presented in recent FEED study reports. The quantitative methodology developed for the examination of FEED study performance and cost also allows comparison of real-world performance and costs against NETL TEA model predicted performance and cost. Learnings from examining NETL model predicted performance and cost versus real world reported values are highlighted. These learnings provide insight into NETL TEA model uncertainty and highlight opportunities for further model development.

FEED Studies