Search NASA⌕ Search

SEARCH · Search NASA

Results for “EVSEs”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

EVSE Characterization: V2G EVSE Comparison

As part of the U.S. Department of Energy EVs@Scale consortium Next-Generation Profiles project, results and analysis from the characterization of high-power conductive and wireless charging infrastructure are presented. This characterization is conducted over a wide range of direct current (DC) current and DC voltage operation for nominal test conditions and off-nominal test conditions. Test plans and procedures were developed to define the test configurations and requirements, measurement parameters, and test procedures used throughout testing. Results from a 2024 study conducted on electric vehicle supply equipment (EVSE) characterization by the Idaho National Laboratory (INL) include two bi-directional vehicle-to-grid (V2G) capable EVSEs. These EVSE are referred to as V2G-EVSE9 and V2G-EVSE10. Laboratory testing is conducted at nominal test conditions to characterize the power transfer capabilities, efficiency, power factor, and other power quality metrics of the two DC EVSEs capable of V2G bi-directional power transfer. Results from testing show the performance is consistent for V2G-EVSE9 and V2G-EVSE10 when comparing charging to discharging performance, except for V2G-EVSE10 for power transfer when operating above 70% of the rated DC current. V2G-EVSE10 efficiency is >98% while charging and <91% while discharging at the same operating conditions, near maximum-rated current, at 300VDC. In contrast, V2G-EVSE9 results are consistent for charging and discharging. This EVSE is nearly 96% efficient while charging or discharging when operating over 50% of rated AC power. V2G EVSE performance is also characterized during off-nominal AC grid conditions involving AC voltage deviation (426 VAC to 518 VAC), AC frequency deviation of +2% (58.8 Hz to 61.2 Hz), and AC voltage harmonics injection. Many test conditions have little-to-no impact on performance characteristics of the two EVSEs; however, there are a few notable findings with significant power transfer capability impacts. AC voltage harmonics injection resulted in negative impacts on power quality attributes for both EVSEs, but with no impact on power transfer capability. Off-nominal AC voltage and frequency conditions resulted in unstable or lack of power transfer capability for both EVSEs. V2G-EVSE9 is unable to transfer power when AC voltage is >300V L-N. V2G-EVSE10 is unable to transfer power when AC frequency deviation exceeds +0.8%. V2G energy management system transient response and latency are quantified during laboratory testing. V2G-EVSE9 and V2G-EVSE10 utilize cloud-based V2G energy management systems that command the power transfer level between the EVSE and EV. The latency and response characteristics of the entire systems (web-based user interface, V2G energy management system, cellular communications, and EVSE response) are quantified through laboratory testing for V2G-EVSE9 and V2G-EVSE10. V2G-EVSE9 latency ranges from 0.8 to 1.8 seconds, whereas V2G-EVSE10 latency ranges from 3.4 to 8.8 seconds. The ramp rate to a change in power transfer request also differs between the two EVSEs. V2G-EVSE10 ramp rate ranges from 50% to -250% of rated AC power per second, whereas V2G-EVSE9 rate ranges from 95% to -95% of rated AC power per second. At the highest rate of change in power transfer, V2G-EVSE10 can change from full charge power to full discharge power in less than one second. The V2G EVSE characterization presented in this report provides valuable insights and results for use by numerous entities. This includes modeling and simulation organizations, decision makers, fleet planning, industry stakeholders, and many others involved with the development and deployment of electrified transportation technologies. Additional high-power DC chargers, bidirectional chargers, and inductive power transfer EVSE characterization results are anticipated from additional EVSE brands and models, which will be detailed in future publications in support of the U.S. Department of Energy EVs@Scale consortium Next-Gen Profiles project.

25 ENERGY STORAGE↗

Soft costs and EVSE – Knowledge gaps as a barrier to successful projects

There has been a recent push to increase access to electric vehicle (EV) charging infrastructure. The National Electric Vehicle Infrastructure (NEVI) program, part of the Bipartisan Infrastructure Law (BIL) has made significant funding available for major charging infrastructure projects along state thruways, and many state and local incentives exist for EV owners to install chargers in their homes. However, deployment of these chargers has not kept up with demand, primarily due to issues in project planning, permitting processes, and unforeseen delays. This paper serves as a review of the current understanding of these and other non-hardware costs in EV charging infrastructure projects (collectively known as “soft costs”). We found that soft costs in EV charging infrastructure projects are not well understood. Specifically, there is little agreement on how soft costs should be categorized and tracked, and less agreement still on best practices for controlling these costs and lowering barriers to infrastructure deployment. A broader review of EV charging infrastructure cost analyses shows that these costs can have significant impacts on project outcomes. EV charging infrastructure projects may be able to examine the success of the solar industry in lowering soft costs, and a similar effort may lower project costs significantly. Further work on standardizing and collecting data on EV charging infrastructure costs is required to begin addressing and controlling these costs.

32 - ENERGY CONSERVATION, CONSUMPTION, AND UTILIZA↗

Assessment and Coordination of EVSE Cybersecurity Standards

Cybersecurity certification programs for Electric Vehicle Supply Equipment (EVSE) are fragmented due to no single certification covering all aspects of the device and additionally the existence of multiple programs and under different levels of regulation. These devices are also confronted by the intricate assembly of product software, firmware, and hardware. Devices contain both logical and physical interfaces. These multifaceted devices have vulnerabilities at many levels and interconnect with other potentially vulnerable systems including the electric vehicle, the cloud where data and payment information are stored, and the electric grid and electric grid equipment including utilities. Of the EVSE certification programs that are found, none are directly for the cybersecurity of EVSE. Many standards are for safety, specifically battery safety, some are cybersecurity standards for other types of equipment and can be modeled for EVSE. In specific, ISA/IEC 62443 is found to be significantly in line with EVSE security needs and will be used in future testing to certify EVSE and help guide the project to demonstrate where gaps exist, where strengths lie in the standard and how this can be used to lead the certification efforts in harmonizing EVSE cybersecurity standards. In addition, there are multiple efforts that are currently seeking to build EVSE standards or revise existing standards to address gaps. This effort is seeking to establish a cybersecurity program for EVSE that will inform customers and help increase the level of security across products and state EVSE procurements to achieve consistency across different jurisdictions.

33 ADVANCED PROPULSION SYSTEMS↗

EVSE Characterization

NextGen Profiles' EVSE characterization efforts explored performance variability in production EVSE through the use of EV emulation equipment and assessed how different operational conditions influence charging behavior. Data were collected at a frequency of 10 Hz from both the EV emulator and EVSE during each charge session and stored in a time-series database for further analysis. As part of the NextGen Profiles project, characterization of high-power EVSE was performed on both conductive and wireless charging infrastructure; however, only conductive charging data are currently included in this repository. This EVSE characterization was performed over a range of DC output currents and voltages, covering both nominal and off-nominal test conditions. This EVSE characterization dataset includes high-power charging data from two types of 350-kW-capable EVSE using liquid-cooled Combined Charging System-1 (CCS1, North American version) cables and connectors. To protect confidentiality, all EVSE metadata are anonymized, and the publicly released datasets are metered at 10-Hz frequency.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

EVSE Characterization, A Next-Gen Profiles Project Report

As part of the U.S. DOE EVs@Scale consortium Next-Generation Profiles project, results and analysis from the characterization of high-power conductive and wireless charging infrastructure are presented. This characterization was conducted over a wide range of DC output current and DC voltage charging for nominal test conditions and off-nominal test conditions. Test plans and procedures were developed to define the test configurations and requirements, measurement parameters, and test procedures used throughout testing. Results from a 2023 study conducted on electric vehicle supply equipment (EVSE) characterization by Idaho National Laboratory (INL) and Oak Ridge National Laboratory (ORNL) include one 350 kW capable EVSE using a liquid-cooled combined charging system-1 (CCS-1, North American version) cable and connector and an ORNL-developed 100-kW polyphase wireless charger. Characterization results during nominal operation show the AC-to-DC power transfer efficiency for the 350kW conductive EVSE is 95.1% peak and is >92% when the AC power is at least 50 kW. The power quality of the 350 kW conductive EVSE is also measured during nominal conditions. The power factor is >0.91 for power transfer above 50 kW AC input during nominal conditions with a maximum power factor of 0.975. The AC current harmonics produced by the EVSE as measured at the AC input connection to the EVSE is <25% harmonics for power transfer greater than 50 kW and <10% harmonics for power transfer greater than 180 kW.

25 ENERGY STORAGE↗

Standardization and Recommendations for EVSE Cybersecurity Standards

Currently, there is an absence of cybersecurity certification programs specifically for EVSE. Many existing standards focus primarily on safety, such as battery safety, while others provide cybersecu rity guidelines for different types of equipment, which could be adapted for EVSE. Among these, ISA/IEC 62443 has been identified as highly aligned with EVSE security needs. This report is a follow on to the previous research published (“Assessment and Coordination of EVSE Cybersecurity Standards,”). This report aims to find appropriate strategies for closing the gaps found in the aforementioned report and continue to work towards a comprehensive cybersecurity certification program for EVSE. Future testing will leverage this standard to assess EVSE security gaps and strengths, providing valuable insights to support certification development and harmonization of cybersecurity standards.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Electric Vehicle Supply Equipment (EVSE) Site Assessment Report for the U.S. Army Corps of Engineers Chena Site Near Fairbanks, Alaska

This report presents an analysis of the requirements for charging station installation and electric vehicle operation at the US Army Corps of Engineers - Chena Site, located in a cold weather climate in the Fairbanks North Star Borough, AK. The report includes findings from a site visit, and a detailed electric vehicle (EV) charging site plan with cost estimates. Cost for three 50-ampere pedestal chargers located on the edge of the existing parking lot is estimated at $\$$53,100, and the cost of three 80-ampere chargers is estimated at $\$$89,400. The authors did not assess the cost of a heated garage. The USACE Chena site reaches extreme cold temperatures of -40 Degrees Celsius (-40 Degrees Fahrenheit) and below in a typical winter, often for days on end. Considerations of operating EVs as well as electrical vehicle supply equipment (EVSE) at this site can be applicable to other cold or extremely cold locations. Interviews with EV users in cold climates and a literature review indicated that EVs operate well but have significantly decreased range compared to 21 Degrees Celsius (70 Degrees Fahrenheit) operations. Some strategies such as prewarming the vehicle while it is plugged in and using heated seats and steering wheel instead of cabin heat, can improve cold weather performance. Storing the EV in a garage would mean the battery and cabin are automatically preheated, the battery would not age as rapidly as when the vehicle is stored outside, and problems with charging the vehicle are less likely. Lowest temperate-rated Electric Vehicle Supply Equipment (EVSE), as electric vehicle chargers are known as, are rated to -40 Degrees Celsius (-40 Degrees Fahrenheit), and sometimes malfunction. No EVSE is rated to the temperatures that USACE Chena site experienced for more than a week in winter 2023-4, of -50 Degrees Celsius (-45 Degrees Fahrenheit) and which are typical for the area. If reliability is a must, entities may want to consider a heated garage to minimize potential problems with charging equipment. There is a companion technical report to this titled "Electric Vehicle and Charging Infrastructure Assessment in Cold-Weather Climates: A Case Study of Fairbanks, Alaska" that examines the data on EV and EVSE cold-weather functionality in more detail. (Esparza, Truffer Moudra, and Hodge 2024).

33 ADVANCED PROPULSION SYSTEMS↗

Camp Lejeune Federal Fleet Tiger Team EVSE Site Assessment

The National Renewable Energy Laboratory (NREL) was contracted by the Department of Defense (DOD) Environmental Security Technology Certification Program (ESTCP) and the Department of Energy (DOE) Federal Energy Management Program (FEMP) to develop a web tool and complete pilot assessments for the installation of Electric Vehicle Supply Equipment (EVSE). NREL has deployed Tiger Teams comprising engineers and fleet experts to support DOD and DOE on several EVSE site assessments since 2015. However, the advancements developed in support of this report, including a cost-estimation tool and geospatial mapping tool, will enable a user-driven path to assess EVSE needs. This report details the site design recommendations for Camp Lejeune, North Carolina.

ADVANCED PROPULSION SYSTEMS,ENERGY PLANNING, POLIC↗

EVs@Scale: NextGen Profiles EVSE Characterization 2025

As part of the U.S. DOE EVs@Scale consortium, the Next-Generation Profiles (NextGen Profiles [NGP]) project presents analysis and results from the characterization of high-power conductive and wireless charging infrastructure. High Power Charging equipment is capable of recharging electric vehicle traction batteries at power levels of 200KW and above. Electric Vehicle Service Equipment (EVSE) characterization involves testing over a wide range of DC charging currents and voltages during nominal and off-nominal conditions. This testing allows for a better understanding of the impact that high-power charging will have on the electric grid. A common set of standard test plans, procedures, and data requirements were applied to the characterization in this document with minor updates and improvements. This report covers all conductive characterization activities performed between October 2024 and September 2025 on the Delta Electronics 350KW Electric Vehicle Charging System, consisting of power cabinet model EIDN-U350KTA01 and dispenser model EIDD-U350SSUUAEG-350.Key Findings include: Output regulation, Efficiency and power factor, Load management, Grid Resilience, Smart Charge Management (SCM) performance, Thermal control system performance, Multi-port simultaneous charging performance, and Selected performance comparisons with other EVSEs characterized in the NextGen Profiles project. Hot and cold temperature testing was not conducted on the Delta 350KW due to laboratory limitations. Future research could include continued testing the Delta hardware under off-nominal temperature conditions including multi-port/multi-session simultaneous charge testing, in addition to collecting data on other high-power conductive chargers to augment.

25 ENERGY STORAGE↗

Electric Vehicle Supply Equipment (EVSE) Study for Vernon County, Wisconsin [Slides]

Viroqua is a town in Wisconsin with a population of approximately 4,500. The Vernon County Energy district is a local nonprofit in Viroqua that provides energy education, individualized energy consulting and coaching to residents and businesses. They have a very good relationship with our county government and wish to support their efforts. The Vernon County government is currently working on a comprehensive plan and would like to include planning for electric vehicle (EV) charging infrastructure in the plan. They are seeking guidance on logical phases for implementation and identifying the best locations for Level 2 and Level 3 EV chargers. NREL provided technical input on strategic planning for electric vehicle (EV) adoption and electric vehicle supply equipment (EVSE) expansion in Vernon County through the Clean Energy to Communities (C2C) Expert Match technical assistance program. NREL provided strategic planning support for EV expansion planning in Vernon County and siting considerations for locating EVSE.

24 POWER TRANSMISSION AND DISTRIBUTION↗

EVSE DERMS Controls [SWR-26-010]

An MQTT (Message Queuing Telemetry Transport) and OCPP (Open Charge Point Protocol) based remote smart charging controller framework for AC Electric Vehicle Supply Equipments (EVSEs). The code in this repo allows for the National Laboratory of the Rockies (NLR) controls to interface with the real Distributed Energy Resource Management System (DERMS) and EVSEs in NLR's ESIF Optimization and Control Laboratory (OCL). Different charge management algorithms can be tested to determine which power allocation method is most effective with the overall goal of demonstrating clear and well documented test results as well as providing functional control algorithms which could be utilized to provide effective smart charge management (SCM) at EV charging stations. Different power allocation methods are programmed in lab_demo_controller.py and include allocation based on first come first served, equal sharing, state of charge (SOC), priority factors, and behind the meter control methods.

Panossian, Nadia [National Laboratory of the Rocki↗

EVs@Scale NextGen Profiles: EVSE Characterization 2024

As part of the U.S. Department of Energy's EVs@Scale consortium, the Next-Generation Profiles (NextGen Profiles) project presents analysis and results from the characterization of high-power conductive and wireless charging infrastructure. High power charging equipment is capable of recharging electric vehicle traction batteries at power levels of 200KW and above. EVSE characterization was conducted over a wide range of DC output current and DC voltage charging for nominal and off-nominal test conditions. Test plans and procedures were developed and refined to define the test configurations and requirements, measurement parameters, and test procedures used throughout NextGen Profiles testing.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

EVSE Soft Costs

This presentation is an overview of the VTO Annual Merit Review for EVSE soft costs project.

ADVANCED PROPULSION SYSTEMS↗

INTERFUEL: FAST -- Fueling Center and EVSE Reporting Process Changes

This presentation presents an overview of coming changes to how federal agencies with motor vehicles will submit required information about fueling centers and electric vehicle supply equipment (EVSE) inventory through the Federal Automotive Statistical Tool (FAST). Historically, information covering these two areas has been provide during two separate data submissions, but is now being consolidated and simplified into a single submission due by December 15 of each year. The presentation provides background on the process, a re-cap of how the information is currently submitted, and describes the new approach for organizations to submit the required information. This presentation is intended for delivery via WebEx/GoToMeeting at the July 8, 2020 meeting of the DOE-sponsored INTERFUEL working group. FAST is a web-based information management tool developed by INL and funded by GSA's Office of Government-wide Policy and DOE's Federal Energy Management Program.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

INTERFUEL: FAST - Fueling Center / EVSE Inventory Reporting Update [Slides]

This presentation presents an overview of coming changes to how federal agencies with motor vehicles will submit required information about fueling centers and electric vehicle supply equipment (EVSE) inventory through the Federal Automotive Statistical Tool (FAST). The presentation provides background on the process, a re-cap of how the information is currently submitted, and describes the new approach for organizations to submit the required information this year. This presentation is intended for delivery via WebEx/GoToMeeting at the August 11, 2021 meeting of the DOE-sponsored INTERFUEL working group. FAST is a web-based information management tool developed by INL and funded by GSA's Office of Government-wide Policy and DOE's Federal Energy Management Program.

99 GENERAL AND MISCELLANEOUS↗

Federal Automotive Statistical Tool: Updates to EVSE Reporting (Federal Electric Vehicle Agency Round-table, October 2023) [Slides]

This presentation presents an overview of coming changes to how federal agencies with motor vehicles will submit required information about the electric vehicle supply equipment (EVSE) inventory and planned deployments through the Federal Automotive Statistical Tool (FAST). This presentation is intended for delivery via WebEx/GoToMeeting at the October 2023 meeting of the DOE-organized Federal Electric Vehicle Agency Round-table (FEVAR). FAST is a web-based information management tool developed and maintained by Idaho National Laboratory and funded by GSA's Office of Government-wide Policy and DOE's Federal Energy Management Program.

33 ADVANCED PROPULSION SYSTEMS↗

EV-EVSE Fault Study: An Analysis of Thermal Events Caused by Electrical Faults during DC Charging

This report outlines multiple avenues of analysis of electrical faults associated with electric vehicles (EVs) during charging, focusing specifically on the interactions between EVs and EV supply equipment (EVSE). Key concerns include the identification and mitigation of overtemperature events that can result in fires, which are commonly initiated by localized heating of connectors, wiring, or high-impedance fault current paths.

42 - ENGINEERING↗