Search NASA⌕ Search

SEARCH · Search NASA

Results for “EXHAUST STACKS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Analysis and Recommendation of Alpha-Beta Continuous Air Monitor Alarm Setpoints for the RPL Stack Exhaust

The Radiochemical Processing Laboratory (RPL) alpha-beta continuous air monitor (CAM) is used for real-time detection of “artificial” alpha-beta particulates from the stack exhaust. The CAM interfaces with software developed by the Pacific Northwest National Laboratory—called the “PNNL OS3300 Alpha-Beta Monitoring Software”—that provides real-time estimates of alpha-beta air concentrations and integrated activities that are calculated from measured CAM counts. The OS3300 software has alarm setpoints that can be used to provide an early indication of larger releases, that if allowed to persist, could approach defined dose limits. This report performs a detailed review of historical and current alarm setpoints used at RPL, including discussion of the technical basis used in their development, analysis of alarm frequencies using measured historical data, and performs a detailed dose assessment using more realistic release scenarios, meteorology, and adjustment factors used in estimating released stack activity. Based on the results, the alpha and beta air concentration alarm setpoints will remain 1.77 × 10 -8 µCi/ml and 3.47 × 10 -8 µCi/ml, respectively; and the alpha and beta integrated activity alarm setpoints will remain 70.22 µCi and 137.63 µCi, respectively. These setpoints achieve the right operational balance in identifying larger releases from planned radiological work at RPL, without being overly conservative so as to cause nuisance alarming. Furthermore, implied doses associated with these setpoints are below defined and regulatory limits.

325RPL↗

Analysis and Recommendation of Tritium Gas Continuous Air Monitor Alarm Setpoints for the RPL Stack Exhaust

The Radiochemical Processing Laboratory (RPL) tritium continuous air monitor (CAM) is used for near real-time detection of tritium gas (i.e., elemental tritium [HT] and tritiated water vapor [HTO]) in the stack exhaust. The CAM interfaces with software developed by the Pacific Northwest National Laboratory (PNNL)—called the “PNNL OS3700 Tritium Monitoring Software”—that provides near real-time estimates of tritium gas air concentrations and integrated daily activities that are calculated from measured CAM counts. The OS3700 software implements alarm setpoints to alert the facility of larger tritium gas releases that if allowed to persist, could begin to challenge permitted emission and established dose constraints. This report performs a detailed review of historical and current tritium alarm setpoints used at RPL, including discussion of the technical basis used in their development, analysis of alarm frequencies using measured historical data, and performs a detailed dose assessment using more realistic release scenarios and meteorology. Based on the results, the tritium air concentration and integrated daily tritium activity alarm setpoints will remain 2.0 × 10 -5 µCi/ml and 25 Ci/day, respectively. These setpoints achieve the right operational balance in identifying larger releases from planned tritium work at RPL, without being overly conservative so as to cause nuisance alarming. Furthermore, implied doses associated with these setpoints are well below defined and regulatory limits.

325RPL↗

Assessment of the 3420 Building Filtered Exhaust Stack Sampling Probe Location: Stack Verification Following Fan and Air Blender Additions

The Pacific Northwest National Laboratory (PNNL) 3420 Building, which is part of the Physical Sciences Facility (PSF), houses radiological capabilities that results in the requirement that emissions monitoring must be conducted for potential radionuclides in the exhaust air discharge of this building. The air monitoring system is required to conform to Title 40 of the Code of Federal Regulations part 61 (40 CFR 61) Subpart H, which in turns requires a sampling probe in the exhaust stream to conform to the criteria of American National Standards Institute / Health Physics Society (ANSI/HPS) N13.1-2011, Sampling and Monitoring Releases of Airborne Radioactive Substances from the Stack and Ducts of Nuclear Facilities. To support the air emissions permit for the 3420 Building on the PNNL campus, stack testing that used computational fluid dynamics (CFD) modeling as a surrogate stack and verification tests of velocity uniformity and flow angle on the retrofitted facility stack was performed. The ANSI/HPS N13.1-2011 criteria for the air monitoring probe location are that velocity uniformity, gaseous tracer uniformity, and particulate tracer uniformity must be less than or equal to 20%COV. Furthermore, no point in the sampling location may have a gaseous tracer concentration that varies from the mean concentration by more than 30%. Additionally, the flow angle at the sampling location must not be more than 20°. The CFD modeling of the stack, as reported by Recknagle et al. (2018) demonstrated that the stack meets the criteria at the probe location. The velocity uniformity and flow angle results from the 3420 stack verification tests, performed in October 2020, demonstrated that the CFD model results may be used to support the qualification of the stack sampling location. The measured velocity uniformity verification test result was 1.4%COV. This value is well within the uniformity criterion, which is that the velocity uniformity be =20%COV. Additionally, this value is well within the criterion that the actual stack measurement must be within 5% of the surrogate stack result of 2.1%COV when all four fans were operating. Additionally, the measured average flow angle at the 3420 stack monitor location was 15.5 degrees. Although this is higher than expected based on the CFD model, the result is =20 degrees, so the criterion is met. Based on these stack verification test results, the reconfigured 3420 Building filtered exhaust stack meets the qualification criteria given in the ANSI/HPS N13.1-2011 standard. Further changes to the system configuration or operating conditions that are outside the bounds described in this and the CFD report (Recknagle et al., 2018) may require additional tests and additional analysis to determine compliance with the standard.

3420 Building↗

Assessment of the 3430 Building Filtered Exhaust Stack Sampling Probe Location: Stack Verification Following Fan and Air Blender Additions

The velocity uniformity and flow angle results from the 3430 stack verification tests, performed in April 2023, demonstrated that the CFD model results may be used to support the qualification of the stack sampling location. The measured velocity uniformity verification test result was 2.1 %COV. This value is well within the uniformity criterion, which is that the velocity uniformity be =20 %COV. Additionally, this value is well within the criterion that the actual stack measurement must be within 5% of the surrogate stack (i.e., CFD modeled stack); in this case the CFD modeled average result of 2.85 %COV for the nominal operating range of 22,800 cfm to 62,400 cfm. Additionally, the measured average flow angle at the 3430 stack monitor location was 5.6 degrees. The result is =20 degrees, so the criterion is met.

3430 Building↗

Documentation of Air Emissions Source Term for Radionuclide NESHAP Compliance: TA-53 Building 0984 Isotope Production Facility

This paper will document the air emissions source term for the TA-53 Building 0984 Isotope Production Facility (IPF). The facility has historically been managed as a minor source under Radionuclide NESHAP regulations, but began using a wider variety of irradiation targets and a higher beam current. To support expanded generation of actinium-225 for medical diagnostic and therapeutic uses, IPF is now irradiating thorium targets and the beam current is planned to increase from 250 microamperes up to 600 microamperes. These changes merit a review of the anticipated source term under the new proposed operational conditions. The end result of the review indicates the main stack (Exhaust Stack ES-1) needs to be managed as a major source with continuous emissions monitoring. No additional advance notifications or permitting is required as a result of these operational changes.

54 ENVIRONMENTAL SCIENCES↗

Panel Session 4 and 15: Japan Fukushima Daiichi D and D Update and Technological Challenges at Japan Fukushima Daiichi D and D and Update on Nuclear Overview and Development in Japan - Nuclear Fuel Cycle

Sessions 4 and 15 represent a two-part panel series that discusses progress and challenges associated with cleanup at Fukushima. Severe limitations on availability of original panelists from Japan due to strict restrictions put in place to alleviate the spread of coronavirus necessitated changes to both panels. The result was a significantly modified panel for Session 04 (shown above) and the elimination of all panelists for Session 15. The 4 and 15 Panel Sessions provide an overview of activities related to both the progress and challenges of cleanup and decommissioning of the Fukushima Daiichi Nuclear Power Station (NPS) in Japan. Five panelists discussed perspectives of the cleanup following a Tokyo Electric Power Company (TEPCO) video showing the progress on site since the devastating Great East Earthquake and tsunami that caused the explosions at three of the six reactors on the site. Three of the five panelists discussed on-going work being performed for the effort, while the other two provided expert perspectives of on strategic efforts at the site. The panel was attended by over 80 technologists and policy makers spanning the globe and was opened by Dr. Monica Regalbuto of Idaho National Laboratory and a short video provided by TEPCO. The video described changes at the site that spanned the cleanup efforts from stabilizing water intrusion into the contaminated reactor buildings to construction of new administrative facilities. The video explained the processes underway to retrieve spent fuel rods and challenges in retrieval of the compromised fuel debris. The video highlighted working condition improvements that included establishment of rest housing and a small convenience store on the site, and the rollback of protective equipment around the site due to decreases contamination. Panelists with presentations: Revision of 'the Mid-and-Long-Term Road-map towards the Decommissioning of TEPCO's Fukushima Daiichi Nuclear Power Station' (Paul Dickman); Sharing UK experience at Fukushima Daiichi (Adrian Simper); SRNL Japan (Andrew Fellinger); ABLE's Initiative to Dismantle the Exhaust Stack (Daniel Walter); JAEA R and D in Fukushima (Tokio Fukahori); TEPCO - Overview and Update of the Fukushima Decommissioning Process (Monica Regalbuto); Toshiba's Involvement in the Decommissioning of the Fukushima Daiichi Nuclear Power Plant (Yasuhiro Yuguchi); Remote Dismantling of the Exhaust Stack At Fukushima Dai-ichi NPS (Takashi Okutsu)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

WIPP Safety Significant Confinement Ventilation System (SSCVS) HEPA Filtration System - 20165

Construction and major equipment fabrication are underway for a new ventilation exhaust system at the Waste Isolation Pilot Plant (WIPP). The new system will provide continuous High Efficiency Particulate Air (HEPA) filtration of the exhaust from the WIPP underground while meeting the ventilation demands for expanded waste emplacement and mining operations over the next 40 years. The integrated system design provides for reducing the salt, clay and diesel particulates from the exhaust airflow from the mine, prior to full filtration using Nuclear Safety Significant HEPA filters. The SSCVS design and equipment provides for continuous HEPA filtration over a wide range of operating and environmental conditions. The new exhaust system connects to the existing underground exhaust shaft, and the exhaust air flows from the underground through Salt Reduction Units (SRUs) to protect the final filter banks from excessive moisture and rapid salt/dust buildup. Each of the six (6) SRUs consists of a demister to remove entrained moisture, a dry salt remover unit to filter approximately 90% of the entrained salt/dust, and an automated water treatment system to periodically clean the demisters and to remove salt from the SRU filters. At the maximum expected exhaust flowrate of 540,000 Cubic Feet per Minute (CFM) / 255 Cubic Meters per Second (m{sup 3}/s), five (5) salt removal units will be in operation with one unit in standby or maintenance. An in-line variable frequency drive booster fan will offset pressure losses through each SRU and reduce the relative humidity of the air exiting the SRUs. In the event of a high radiation alarm from the underground Continuous Air Monitors (CAMs), the SRUs will be automatically bypassed, which places the SRS and building outside of the Safety Significant confinement boundary. From the SRUs, the exhaust is directed to the HEPA filter banks located in the New Filter Building. The exhaust system is designed to provide continuous HEPA filtration prior to release to the exhaust stack. There are 22 HEPA filter banks rated at 27,000 CFM / 12.75 m{sup 3}/s each. Each filter bank has two stages of pre-filters and two stages of HEPA filters. The filtered air from each of the 22 filter banks discharges into a common concrete plenum, which is maintained under a negative pressure by the main exhaust fans. Six 1,000 HP variable frequency drive exhaust fans are provided on the south side of the plenum. At the maximum expected exhaust flow of 540,000 CFM, four exhaust fans and twenty filter banks will be in operation. The fans discharge vertically to a separate concrete exhaust plenum. The filtered exhaust is routed from the exhaust plenum to a 125-foot-tall exhaust stack via a 13-foot diameter duct. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Decay Curve Correction Analysis Report

The decay curve analysis that is done on the short-lived radionuclide gas samples is used to differentiate between gaseous radionuclides that have the same characteristic gamma decay energy, 511 kiloelectron-volts (keV). A sample of stack gas is isolated and the total counts in the 511 keV peak are counted repeatedly in 10-second intervals to evaluate the decay rate of the sample over time. Analysis of this decay data required a series of steps. First, a raw data report is generated by the gamma acquisition system, based on an analysis template within the acquisition software. The data report file was then loaded into Microsoft Word, and a macro was used to perform minor formatting (remove colons and insert tabs between data columns) to allow analysis within Excel. The file is then saved as a text file at this point. The text file is then uploaded into Excel and a series of macros are used to add labels, calculate radioactive decay constants, and analyze the gamma decay data using linear regression techniques. The analysis template has been used since 1998 for stack 53000303 (TA-53, building 0003, exhaust stack 03) and 2000 for stack 53000702. The overall process, including the gamma report format and the macros used in Word and Excel for processing the report, had remained unchanged until 2015. In October of 2015, staff made a change to the report template in the gamma acquisition software which resulted in an error in the calculations later performed by the Excel macro. This error was not caught until a more in-depth review of the analysis took place regarding 2020 data. This report covers a much more complete review of the issue that occurred regarding the decay curve analysis, a review of the calculations completed to correct the issue, a review of the updated decay curve analysis process, and recommendations for moving forward.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Qualification of Mixing Criteria by Computational Fluid Dynamics Modeling for the 325 Building Stack Revision

Additional ventilation capacity has been designed for the 325 Building filtered exhaust stack system. The four (4) existing main facility exhaust fans are past the end of their useful life. The fans are being replaced to provide additional exhaust capacity for future growth and to provide a more robust system. Stack operations will involve running various fan combinations at any given time. The air monitoring system of the existing stack previously was found to comply with the American National Standards Institute/Health Physics Society (ANSI/HPS) N13.1-1999 standard. Full-scale, three-dimensional computational fluid dynamics (CFD) modeling was used to evaluate the modified four-fan system for compliance with the ANSI/HPS N13.1-2021 standard, which essentially is equivalent in mixing requirements to the ANSI/HPS N13.1-1999 standard (and ANSI/HPS N13.1-2011). The four mixing criteria evaluated are 1) flow angle, 2) velocity, 3) gas tracer, and 4) particle tracer. In addition to the evaluating the modified four-fan system a temporary single fan stack configuration was also evaluated with CFD modeling. The temporary stack is planned to be used while the four-fan system is being modified. Modeling of the modified four-fan design and temporary ductwork showed that flow angles, velocity uniformity, gas tracer, and particle tracer were acceptable.

42 ENGINEERING↗

Hanford Waste Treatment Plant Effluent Management Facility Stack Effluent Monitoring: Sampling Probe Location Qualification Evaluation

The Hanford Tank Waste Treatment and Immobilization Plant Effluent Management facility (EMF) stack monitor location was qualified using the LV-S1 scale model stack as a baseline, augmented by the LB-S1 and LV-S2 scale model stacks to address the Direct Feed Low Activity Waste Effluent Management Facility Vessel Vent Process (DVP) injection into the main Active Confinement Ventilation (ACV) system duct. As required by the American National Standards Institute/Health Physics Society (ANSI/HPS) N13.1-1999 standard, the scale models and its sampling locations were geometrically similar to the actual stack and the Reynolds numbers for both the actual and model stacks were >10,000. An additional criterion is that the product of the hydraulic diameter and mean velocity (DV) of the full-scale stack must be between 1/6 DV and 6 DV of the scale model stack tests. Verification tests of the EMF stack was performed at normal operating conditions. The minimum 1/6 DV value, along with the maximum 6 DV value from the scale model testing determines the range of stack flow rates for which the full-scale stack may be operated and remain in compliance with the stack verification criterion. Based on the LV-S1 scale model test DV values, the corresponding stack flow rates for the EMF stack are as listed in Table S1. Table S1. Effluent Management Facility Stack Qualified Flow Range. Stack Parameter EM-1 Minimum Qualified Stack Flow (scfm) 781 Maximum Qualified Stack Flow (scfm) 53,432 The remaining criteria for the stack verification to be considered valid involve the flow angle and velocity uniformity results. First, the flow angle at the full-scale stack must be =20°. Second, the velocity uniformity at the full-scale stack must be =20% coefficient of variance (COV). Finally, the velocity uniformity results for the actual and scale model stack tests must agree within 5% COV. These criteria were met through the full-scale stack test at the EMF. Flow angle results were less than 5°; all flow angle results were within the =20° criterion. The velocity uniformity results for each test condition ranged between 2.2% COV and 4.3% COV, which were all within the range of the target % COV values from the scale model tests on the LV-S1, LB-S1, and LV S2 scale models. Based on these stack verification test results, the EMF filtered exhaust stack sampling location meets the qualification criteria provided in the ANSI/HPS N13.1-1999 standard for all fan operating configurations. This includes each combination of ACV fan with the DVP exhausters. Further changes to the system configuration or operating conditions that are outside the qualified flow rates described in this report may require additional tests or analyses to determine compliance with the standard.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Hanford Waste Treatment Plant Effluent Management Facility Stack Effluent Monitoring: Sampling Probe Location Qualification Evaluation

The Hanford Tank Waste Treatment and Immobilization Plant Effluent Management Facility (EMF) stack monitor location was qualified using a combination of scale model stacks to mitigate the risk of identifying that the sampling location does not meet the qualification criteria on the full-scale stack. The LV-S1 scale model stack was used as a baseline, augmented by the LB-S1 and LV-S2 scale model stacks to address the Direct Feed Low Activity Waste Effluent Management Facility Vessel Vent Process (DVP) injection into the main Active Confinement Ventilation (ACV) system duct. As required by the American National Standards Institute/Health Physics Society (ANSI/HPS) N13.1-1999 standard, the scale model and its sampling locations were geometrically similar to the actual stack, and the Reynolds numbers for both the actual and model stacks were >10,000. An additional criterion is that the product of the hydraulic diameter and mean velocity (DV) of the full-scale stack must be between 1/6 DV and 6 DV of the scale model stack tests. The LV-S1, LB-S1, and LV-S2 scale model stack tests have met the criteria of the ANSI/HPS N13.1-1999 standard to demonstrate the stack sampling locations are well mixed. Verification tests of the EMF stack were performed at normal operating conditions. The minimum 1/6 DV value and the maximum 6 DV value from the scale model testing determine the range of stack flow rates for which the full-scale stack may be operated while remaining in compliance with the stack verification criterion. A practical range for the full-scale stack qualification uses the average DV through 6 DV from the scale model tests to compute the corresponding flow rates. Table S1 lists the operating flow rate along with the average and maximum qualified stack flow rate based on the LV-S1 scale model DV values. The operating flow is below the maximum qualified stack flow, which means that the scale model test results are acceptable for stack qualification. The remaining criteria for the stack verification to be considered valid involve the flow angle and velocity uniformity results. First, the flow angle at the full-scale stack must be ≤20°. Second, the velocity uniformity at the full-scale stack must be ≤20% coefficient of variance (COV). Finally, the velocity uniformity results for the actual and scale model stack tests must agree within 5% COV. These criteria were met through the full-scale stack test at the EMF. Flow angle results were <5°; all flow angle results were within the ≤20° criterion. The velocity uniformity results for each test condition ranged between 2.2% COV and 4.3% COV, all of which were within the range of the target % COV values from the scale model tests on the LV-S1, LB-S1, and LV S2 scale models. Based on these stack verification test results, the EMF filtered exhaust stack sampling location meets the qualification criteria provided in the ANSI/HPS N13.1-1999 standard for all planned fan operating configurations. This includes each combination of ACV fans with DVP exhausters. Further changes to the system configuration or operating conditions that are outside the qualified flow rates described in this report may require additional tests or analyses to determine compliance with the standard.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Hanford Waste Treatment Plant LAB Facility Stack Effluent Monitoring: Sampling Probe Location Qualification Evaluation

The WTP LAB stack monitor locations were qualified using scale model stacks to mitigate the risk of identifying that sampling locations do not meet the qualification criteria on the full-scale stack. As required by the ANSI/HPS N13.1-1999 standard, the scale model and its sampling location were geometrically similar to the actual stack and the Reynolds numbers for both the actual and model stacks were >10,000. An additional criterion is that the DV of the full-scale stack must be between 1/6 DV and 6 DV of the scale model stack tests. Verification tests of the LAB stacks were performed at normal operating conditions. The maximum 6 DV value from the scale model testing determines the maximum conditions for which the full-scale stack may be operated and remain in compliance with the stack verification criterion. The remaining criteria for the stack verification to be considered valid involve the flow angle and velocity uniformity results. First, the flow angle at the full-scale stack must be = 20°. Second, the velocity uniformity at the full-scale stack must be = 20% COV. Finally, the velocity uniformity results for the actual and scale model stacks must agree within 5% COV. In general, these criteria were met through the full-scale stack tests at the LAB facility. Some specific items for each scale model and full-scale stack comparison should be noted in assessing the validity of the verification tests. The LB-C2 scale model stacks were performed with single fan operations at then-minimum flow conditions. These conditions resulted in DV values that were too low to meet the DV range criterion, and therefore are unable to be used in qualifying single fan operations on the full-scale stack. However, the single fan operations demonstrated COV values for velocity uniformity as well as flow angles that were comparable to the dual-fan operations at high flows. Overall, the test conditions and test results were within the range of acceptable values based on current design flow rates. Single fan operations are expected to only occur infrequently for maintenance needs and is therefore not a planned operating condition at this time. The LB-S1 scale model stacks were performed at three fan combinations, and in each combination, at least one test was performed at the then-minimum flow conditions as well as at then-maximum flow conditions. While the then-minimum flow conditions result in a DV range that is lower than the verification test DV value, and therefore does not meet the criterion, these tests are un-necessary for the verification test acceptance. The normal and maximum flow conditions from the scale model stack tests meet the DV range criterion, and the velocity uniformity test results compare favorably with the full-scale stack results. The LB-S2 scale model stacks were performed at nominally the same maximum flow condition; however, the 6 DV value for Fan A operation was slightly lower than the full-scale stack test DV. The COV values from the scale model stacks were comparable between the Fan A and Fan B results, and the overall test conditions are within the range of acceptable values. The stack verification is therefore considered acceptable for both Fan A and Fan B operations. The verification tests were performed at flows that were appreciably higher than the design conditions, and further elevated flow rates would be beyond the range of acceptable DV. Based on these stack verification test results, the three LAB filtered exhaust stacks meet the qualification criteria provided in the ANSI/HPS N13.1-1999 standard. Further changes to the system configuration or operating conditions that are outside the bounds described in this and the scale model test reports (Glissmeyer, Flaherty, and Piepel (2001), Glissmeyer and Geeting (2013)) may require additional tests and additional analyses to determine compliance with the standard.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Hanford Waste Treatment Plant LAB Facility Stack Effluent Monitoring: Sampling Probe Location Qualification Evaluation

The Waste Treatment Plant laboratory (LAB) facility stack monitor locations were qualified using scale model stacks to mitigate the risk of identifying that sampling locations do not meet the qualification criteria on the full-scale stack. As required by the American National Standards Institute/Health Physics Society (ANSI/HPS) N13.1-1999 standard, the scale model and its sampling location were geometrically similar to the actual stack and the Reynolds numbers for both the actual and model stacks were >10,000. An additional criterion is that the product of the hydraulic diameter and mean velocity (DV) of the full-scale stack must be between 1/6 DV and 6 DV of the scale model stack tests. Verification tests of the LAB stacks were performed at normal operating conditions. The minimum 1/6 DV value, along with the maximum 6 DV value from the scale model testing determines the range of conditions for which the full-scale stack may be operated and remain in compliance with the stack verification criterion. Based on these DV values, the corresponding stack flow rates for each of the LAB stacks are 625 to 47,237 scfm for LB-C2, 1,704 to 103,131 scfm for LB-S1, and 467 to 18,088 scfm for LB-S2. The remaining criteria for the stack verification to be considered valid involve the flow angle and velocity uniformity results. First, the flow angle at the full-scale stack must be =20°. Second, the velocity uniformity at the full-scale stack must be =20% coefficient of variance (COV). Finally, the velocity uniformity results for the actual and scale model stack tests must agree within 5% COV. These criteria were met through the full-scale stack tests at the LAB facility. Flow angle results were primarily less than 10 degrees, except for the LB-C2 Fan A results, which were an average of 17.6 degrees; all flow angle results were within the =20° criterion. The velocity uniformity results for each test condition averaged between 1.5 and 3.5% COV, which were all within the range of the target %COV values from the scale model tests. Based on these stack verification test results, the three LAB filtered exhaust stack sampling locations meet the qualification criteria provided in the ANSI/HPS N13.1-1999 standard for all fan operating configurations. This includes single-fan as well as dual-fan operations for LB-C2, each of the dual-fan operating conditions for LB-S1, and each single-fan operating condition for LB-S2. Further changes to the system configuration or operating conditions that are outside the bounds described in this report may require additional tests or analyses to determine compliance with the standard.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Hanford Waste Treatment Plant Low Activity Waste Facility Stack Effluent Monitoring - Sampling Probe Location Qualification Evaluation

The Hanford Tank Waste Treatment and Immobilization Plant low activity waste (LAW) facility stack monitor locations were qualified using scale model stacks to mitigate the risk of identifying that sampling locations do not meet the qualification criteria on the full-scale stack. As required by the American National Standards Institute/Health Physics Society (ANSI/HPS) N13.1-1999 standard, the scale model and its sampling location were geometrically similar to the actual stack and the Reynolds numbers for both the actual and model stacks were >10,000. An additional criterion is that the product of the hydraulic diameter and mean velocity (DV) of the full-scale stack must be between 1/6 DV and 6 DV of the scale model stack tests. Verification tests of the LAW stacks were performed at normal operating conditions. The minimum 1/6 DV value, along with the maximum 6 DV value from the scale model testing determines the range of conditions for which the full-scale stack may be operated and remain in compliance with the stack verification criterion. Based on these DV values, the corresponding stack flow rates for each of the LAW stacks are 815–55,758 scfm for LV-S1, 980–112,078 scfm for LV-S2, 264–22,901 scfm for LV-S3, and 981–79,832 scfm for LV-C2. The remaining criteria for the stack verification to be considered valid involve the flow angle and velocity uniformity results. First, the flow angle at the full-scale stack must be =20°. Second, the velocity uniformity at the full-scale stack must be =20% coefficient of variance (COV). Finally, the velocity uniformity results for the actual and scale model stack tests must agree within 5% COV. These criteria were met through the full-scale stack tests at the LAW facility. Flow angle results were primarily less than 10°, except for one LV-S2 Fan A result, which was 13.2°; all flow angle results were within the =20° criterion. The velocity uniformity results for each test condition ranged between 1.5 COV and 9.2% COV, which were all within the range of the target % COV values from the scale model tests. Based on these stack verification test results, the four LAW filtered exhaust stack sampling locations meet the qualification criteria provided in the ANSI/HPS N13.1-1999 standard for all fan operating configurations. This includes single-fan operating conditions for LV-S1 and LV-S2, dual-fan operations for LV-S3 at both the continuous air monitor and record sampler locations, and both the single-fan as well as the dual-fan operations for LV-C2. Further changes to the system configuration or operating conditions that are outside the bounds described in this report may require additional tests or analyses to determine compliance with the standard.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Hanford Waste Treatment Plant LAB Facility Stack Effluent Monitoring: Sampling Probe Location Qualification Evaluation

The Waste Treatment Plant laboratory (LAB) facility stack monitor locations were qualified using scale model stacks to mitigate the risk of identifying that sampling locations do not meet the qualification criteria on the full-scale stack. As required by the American National Standards Institute/Health Physics Society (ANSI/HPS) N13.1-1999 standard, the scale model and its sampling location were geometrically similar to the actual stack, and the Reynolds numbers for both the actual and model stacks were >10,000. An additional criterion is that the product of the hydraulic diameter and mean velocity (DV) of the full-scale stack must be between 1/6 DV and 6 DV of the scale model stack tests. Verification tests of the LAB stacks were performed at normal operating conditions. The minimum 1/6 DV value, along with the maximum 6 DV value from the scale model testing, determines the range of conditions for which the full-scale stack may be operated and remain in compliance with the stack verification criterion. A practical range for the full-scale stack qualification uses the average DV through 6 DV from the scale model tests to compute the corresponding flow rates. Table S1 lists the operating flow rates along with the average and maximum qualified stack flow rates for each of the LAB facility stacks. For each stack, the operating flow is below the maximum qualified stack flow, which means that the scale model test results are acceptable for stack qualification. The remaining criteria for the stack verification to be considered valid involve the flow angle and velocity uniformity results. First, the flow angle at the full-scale stack must be ≤20°. Second, the velocity uniformity at the full-scale stack must be ≤20% coefficient of variance (COV). Finally, the velocity uniformity results for the actual and scale model stack tests must agree within 5% COV. These criteria were met through the full-scale stack tests at the LAB facility. Flow angle results were primarily less than 10°, except for the LB-C2 Fan A results, which were an average of 13.7°; all flow angle results were within the ≤20° criterion. The velocity uniformity results for each test condition averaged between 1.5 and 4.1% COV, which were all within the range of the target percent coefficient of variation values from the scale model tests. Based on these stack verification test results, the three LAB filtered exhaust stack sampling locations meet the qualification criteria provided in the ANSI/HPS N13.1-1999 standard for all fan operating configurations. This includes single-fan as well as dual-fan operations for LB-C2, each of the dual-fan operating conditions for LB-S1, and each single-fan operating condition for LB-S2. Further changes to the system configuration or operating conditions that are outside the bounds described in this report may require additional tests or analyses to determine compliance with the standard.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Stack Test Summary for TA-59-0001

The Radioactive Air Emissions Management (RAEM) team performed stack flow characterization tests at Technical Area (TA) 59 Building 0001 Exhaust Stack (ES) 8. These tests were completed in accordance with Title 40 of the Code of Federal Regulations (CFR), Part 61, Subpart H and the American National Standards Institute (ANSI) N13.1-1999 required by the Clean Air Act. Subpart H of the regulation is the National Emission Standards for Hazardous Air Pollutants (NESHAP) for radionuclides, which compliance with is maintained by the REAM team.

54 ENVIRONMENTAL SCIENCES↗

Aerosol Engineering Facility 2021-22 summary sheet [Slides]

The Aerosol Engineering Facility solves problems that involve radioactive particulates, including HEPA air filters, storage containers, exhaust stacks, and continuous air monitors. Other work includes silica dust sampling, bioaerosols, and insecticide sprays. Aerosol technology science describes the behavior of microscopic and nano-sized particles, in both molecular and continuum gas flow regimes.

36 MATERIALS SCIENCE↗

Qualification of ANSI/HPS N13.1-2011 Mixing Criteria by Computational Fluid Dynamics Modeling for the 3430 Building Fan Addition and Increased Ventilation Capacity

Additional ventilation capacity has been designed for the 3430 Building filtered exhaust stack system. The updated system will increase the number of fans from two to three and include new ductwork with a larger diameter to integrate the new fan into the existing stack. Stack operations will involve running various fan combinations at any given time. The air monitoring system of the existing two-fan stack previously was found to comply with the American National Standards Institute/Health Physics Society (ANSI/HPS) N13.1-1999 standard. Full-scale, three-dimensional computational fluid dynamics (CFD) modeling was used to evaluate the modified three-fan system for compliance with the ANSI/HPS N13.1-2011 standard, which essentially is equivalent to the ANSI/HPS N13.1-1999 standard. The four mixing criteria evaluated are 1) flow angle, 2) velocity, 3) gas tracer, and 4) particle tracer. Benchmarking of the CFD modeling methodology showed good agreement with previous testing used to qualify the stack, and modeling of the existing two-fan system showed good agreement with test data collected from the 3430 Building stack. Modeling was performed to develop a suitable three-fan design. Initial modeling of the three-fan design and basic ductwork showed that flow angles and velocity uniformity were acceptable; however, the gas tracer and particle tracer mixing results were not acceptable. To meet ANSI/HPS N13.1-2011 criteria, an air blender was added to the stack design.

42 ENGINEERING↗