Search NASA⌕ Search

SEARCH · Search NASA

Results for “FAST DERMS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Federated Architecture for Secure and Transactive Distributed Energy Resource Management Solutions (FAST-DERMS)

This document provides system-level specifications for a federated architecture for secure and transactive distributed energy resource management solutions (FAST-DERMS), presents a solution, and describes operational concepts for the proposed solution. FAST-DERMS enables the provision of reliable, resilient, and secure transmission and distribution (T&D) grid services through the scalable aggregation and near-real-time management of utility-scale and small-scale distributed energy resources (DERs). We first present the principles and objectives of FAST-DERMS. Then, after discussing important system concepts, we present the specifications for FAST-DERMS and a solution that employs a distributed and federated control methodology in which the DERs connected to a single point of common coupling with the rest of the system, such as individual substations, are optimized coordinately to provide system-level grid services. FAST-DERMS aims to aggregate and coordinate the operations of DERs to support T&D grid operations. The key optimization and control component of this FAST-DERMS reference implementation is a flexible resource scheduler (FRS) that aggregates the DERs within a substation service area. These FRSs operate at the substation level and perform constrained economic dispatch of DERs, either directly or through a transactive market or aggregator, as shown in Figure ES-1. An FRS Coordinator at the distribution system operator (DSO) level aggregates distribution substations operated by FRSs and interfaces with the transmission system operator (TSO) to provide transmission services. FAST-DERMS also allows for the integration of the FRS Coordinator with an existing distribution utility management system that could be employed by the DSO to enhance distribution grid operations.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Grid Architecture Guidance Specification for FAST-DERMS (V.1.0)

This document provides grid architecture guidance to support the Grid Modernization Laboratory Consortium (GMLC) Federated Architecture for Secure and Transactive Distributed Energy Resource Management Solution (FAST-DERMS) project. The FAST-DERMS project seeks to develop an architecture and reference implementation solution that enables the provision of reliable, resilient, and secure transmission and distribution (T&D) grid services through the scalable aggregation and near-real-time management of utility-scale and small-scale distributed energy resources (DERs).

24 POWER TRANSMISSION AND DISTRIBUTION↗

Flexible Resource Scheduler for FAST-DERMS (FRS-FASTDERMS) v0.9

The Flexible Resource Scheduler is a hierarchical controller that manages the distributed energy resources in a distribution substation or distribution feeder to provide a firm commitment of power flow at the substation or feeder head to be scheduled in transmission-level markets as an aggregated demand resource. It is the reference controller for the FAST-DERMS Architecture, developed in tandem with the architecture under the DOE FAST-DERMS project. It is comprised of a day-ahead stochastic optimization, which schedules substation power flow and reserves, a intra-hour MPC, which generates dispatch base points for DER, and a real-time PID controller maintaining that dispatches DER to maintain the substation power around the base points. The repository also includes a representative aggregator controller, and all of the necessary components to run a simulation using PNNL's GridAPPS-D software with the controller.

MacDonald, Jason [Lawrence Berkeley National Labor↗

An Introduction to the Federated Architecture for Secure and Transactive Distributed Energy Management Solutions (FAST-DERMS)

Deployment and capability of distributed energy resources (DER) in power systems is growing rapidly. These resources present an opportunity for low-cost provision of energy and grid services. The Federal Energy Regulatory Commission recently provided rulings to enable market participation of these distribution-connected resources, but the prevailing strategies for their management may not scale well to meet future needs. This paper introduces the Federated Architecture for Secure and Transactive Distributed Energy Management Solutions (FAST-DERMS) which was designed to address this need. In it we describe the architectural features of the approach, and a reference controls implementation employing a hierarchical coordination that includes stochastic optimization, model predictive control, and a simple real-time management scheme. Sample results from simulation show firm transmission-level service provision measured at the distribution substation.

grid architecture↗

An Introduction to the Federated Architecture for Secure and Transactive Distributed Energy Management Solutions (FAST-DERMS): Preprint

Deployment and capability of distributed energy resources (DER) in power systems is growing rapidly. These resources present an opportunity for low-cost provision of energy and grid services. The Federal Energy Regulatory Commission recently provided rulings to enable market participation of these distribution-connected resources, but the prevailing strategies for their management may not scale well to meet future needs. This paper introduces the Federated Architecture for Secure and Transactive Distributed Energy Management Solutions (FASTDERMS) which was designed to address this need. In it we describe the architectural features of the approach, and a reference controls implementation employing a hierarchical coordination that includes stochastic optimization, model predictive control, and a simple real-time management scheme. Sample results from simulation show firm transmission-level service provision measured at the distribution substation.

DERMS↗

Federated Architecture for Secure and Transactive Distributed Energy Resource Management Solutions

There are fewer conventional, dispatchable generation resources and more variable renewable energy (VRE) and distributed energy resources (DERs). There is more uncertainty from bulk-level VRE and net demand from distribution systems with high DER levels. FAST-DERMS aims to develop and demonstrate a scalable solution for managing uncertainties in supply and demand at the grid edge. We propose that distribution system operators (DSOs) provide firm net load forecasts to the bulk system operator's energy management system (EMS).

distributed energy resources↗

ARIES and ADMS Test Bed Overview and Updates

This presentation provides an overview and updates on the National Renewable Energy Laboratory's Advanced Research on Integrated Energy Systems (ARIES) platform and Advanced Distribution Management System (ADMS Test Bed).

ADMS↗

Performance Evaluation of Distributed Energy Resource Management Algorithm in Large Distribution Networks

This paper presents performance evaluation of hierarchical optimization and control for distributed energy resource management system (DERMS) in large distribution networks via an advanced hardware-in-the-loop (HIL) platform. The HIL platform provides realistic testing in a laboratory environment, including the accurate modeling of a full-scale distribution system of 11,000 nodes, the DERMS software controller, and 90 power hardware photovoltaics (PVs) and battery inverters. The applied DERMS algorithm is designed based on a realtime optimal power flow algorithm and implemented with acceleration design that performs fast dispatch of simulated PVs and real physical hardware DER devices every 4 seconds.

DERMS↗

Hardware-in-the-Loop Evaluation of an Advanced Distributed Energy Resource Management Algorithm

This paper presents the laboratory performance evaluation of voltage regulation under a new distributed energy resource management system (DERMS) algorithm via an advanced hardware-in-tbe-loop (HIL) platform. The HIL platform provides realistic testing in a laboratory environment, including the accurate modeling of a full-scale real-world distribution system from a utility partner, the DERMS software controller, and power hardware photovoltaic (PV) inverters. The new DERMS algorithm is developed based on online multiobjective optimization (OMOO) algorithms that perform fast dispatch of distributed solar PV simulated in a real-time digital simulator and real physical hardware devices. Experimental tests confirm the correct functioning of the HIL platform for evaluating controller algorithms and satisfactory voltage regulation performance of the developed OMOO algorithms.

41 EE - Solar Energy Technologies Office (EE-4S)↗

Hardware-in-the-Loop Evaluation of an Advanced Distributed Energy Resource Management Algorithm: Preprint

This paper presents the laboratory performance evaluation of voltage regulation under a new distributed energy resource management system (DERMS) algorithm via an advanced hardware-in-tbe-loop (HIL) platform. The HIL platform provides realistic testing in a laboratory environment, including the accurate modeling of a full-scale real-world distribution system from a utility partner, the DERMS software controller, and power hardware photovoltaic (PV) inverters. The new DERMS algorithm is developed based on online multiobjective optimization (OMOO) algorithms that perform fast dispatch of distributed solar PV simulated in a real-time digital simulator and real physical hardware devices. Experimental tests confirm the correct functioning of the HIL platform for evaluating controller algorithms and satisfactory voltage regulation performance of the developed OMOO algorithms.

41 EE - Solar Energy Technologies Office (EE-4S)↗

Performance Evaluation of Distributed Energy Resource Management Algorithm in Large Distribution Networks

This paper presents performance evaluation of hierarchical optimization and control for distributed energy resource management system (DERMS) in large distribution networks via an advanced hardware-in-the-loop (HIL) platform. The HIL platform provides realistic testing in a laboratory envi-ronment, including the accurate modeling of a full-scale dis-tribution system of 11,000 nodes, the DERMS software con-troller, and 90 power hardware photovoltaics (PVs) and bat-tery inverters. The applied DERMS algorithm is designed based on a real-time optimal power flow algorithm and im-plemented with acceleration design that performs fast dis-patch of simulated PVs and real physical hardware DER devices every 4 seconds.

distributed energy management system (DERMS)↗