Search NASA⌕ Search

SEARCH · Search NASA

Results for “Ft. St. Vrain”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

Candidate Structural Materials for In-Core VHTR Application

Graphite moderated gas cooled reactors led the way into the nuclear age with the Chicago Pile-1 reactor, which provided the first sustained critical reaction in December, 1942. The first commercial nuclear plant, Calder Hall in the UK, went critical in 1956 with an outlet gas temperature of {approx}345 C. As depicted in Fig. 1, in five decades since Calder Hall, outlet temperature increased rapidly, reaching a plateau of {approx}950 C. This apparent ceiling is in large part due to limitations in the structural materials utilized within the core (e.g. control systems) and primary loop (hot duct, heat-exchangers etc.) Simply, the operating temperatures of Generation III (HTGR's) are very near performance limits of the structural alloys used, both in terms of elevated temperature and as-irradiated properties. This limitation remains today and is the reason the outlet temperature of the Generation IV Very High Temperature Reactor (VHTR) continues to be revised downward from the original optimistic goal of {approx}1200 C, to it's current target outlet temperature of {approx}950 C, a temperature consistent with the previous generation of HTGR's. An example of the challenges facing Generation IV VHTR is found by considering the control rods. For the Fort St. Vrain Reactor the control system consisted of thirty tubes each containing B4C control material. Alloy 800, originally developed by Inco in the 1950's under the trade-name Incoloy 800 and 800H had found widespread application is steam generators, turbines and was selected for this control rod application. These materials are included for Class 1 Nuclear Component by ASME section III. In addition to Ft. St Vrain, alloy 800H has found control rod application in the German HTR and Japanese HTTR reactors and is the primary choice Pebble Bed Modular Reactor (a HTGR) reactivity control system. Figure 2 gives the ASME allowed stress for Alloy 800H. Due to the loss in creep rupture strength, the allowed design stress for decreases substantially above {approx}500 C. For the operating temperature (and current maximum code temperature) of the Fort St. Vrain reactor ({approx}760 C) the control rod designed from Alloy 800H would be allowed approximately 20 MPa primary stress. For the anticipated temperature of the VHTR that stress would likely be under 10 MPa in the non-irradiated condition. Selection of VHTR in-core structural material will depend on the ability for the material to withstand extreme temperatures and irradiation. The use of Alloy 800H for control rod applications is preferred, but will require designing with a relatively low strength material which becomes brittle upon modest irradiaton. Presently, more fidelity in both design and the available Alloy 800H database are required to judge the lifetime this alloy will have in service. The only currently envisioned alternative to Alloy 800H are the CFC and SiC/SiC composites, which are currently challenged by code qualification issues. As with Alloy 800H, the composite irradiation data-base is inadequate, though it appears that the CFC service lifetime will be limited due to its anisotropic dimensional change under irradiation to doses somewhat higher than Alloy 800H (1-5 x 10{sup 25} n/m{sup 2}), while SiC/SiC composites appear to retain their mechanical properties to doses in excess of the VHTR lifetime dose. As the path to qualification of both CFC and SiC/SiC are similar, it appears that SiC/SiC is more attractive for high-dose Gen IV application unless high thermal conduction is required.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Drop Analysis of a Department of Energy Standard Canister Containing Fort Saint Vrain SNF

DOE manages over 300 types of SNF, many of which are located at the INL site. Managing this large variety of SNF for storage, transportation, and disposal poses a challenge to DOE. The Idaho Cleanup Project and INL are collaborating on the DOE SNF Road-Ready Demonstration (“Road-Ready Demonstration”), which will develop and demonstrate the designs, technology, processes, and regulatory framework for packaging DOE-managed SNF for “road-ready dry storage.” Road-ready dry storage (RRDS) is an SNF management concept in which SNF is packaged into dry, sealed canisters that are then placed in on-site storage in anticipation of later transport and disposition. The forward-looking goal of the Road-Ready Demonstration is to establish the foundation for a large-scale RRDS program at the INL site. One critical aspect of RRDS is the ability to certify the DOE Standard Canister and its associated transportation package in accordance with 10 CFR 71 for offsite transportation. Depending on the SNF type and transportation strategy, DOE Standard Canisters may be required to maintain structural integrity under hypothetical accident scenarios (e.g., drop events). The DOE Standard Canisters have been tested and analyzed under various SNF loading configurations and accident drop events in support of the Idaho Spent Fuel Facility and other DOE programs; however, no analysis has yet been completed in support of the recently initiated Road-Ready Demonstration. This paper presents preliminary results from a finite element analysis of the Ø45.7 cm × 4.6 m (Ø18 in. × 15 ft) DOE Standard Canister under the 9 m drop at 80 degrees off-vertical drop scenario considered in previous INL tests and analyses. It considers the Fort St. Vrain spent nuclear fuel loading configuration proposed for the Road-Ready Demonstration, uses updated material properties, and applies the strain-based acceptance criteria established in ASME Boiler and Pressure Vessel Code’s Section III, Division 3 rules for storage and transportation spent nuclear fuel containments. This updated analysis is compared to previous DOE Standard Canister drop analyses. Preliminary results from the updated analysis show that certain regions of the containment exceed the allowable limits during the accidental drop event. However, these regions are limited to components performing a non-structural function. While further work on this analysis will be pursued, this analysis serves as the foundation for formal calculations used to support applicable certification efforts of the RRDS system at INL.

42 ENGINEERING↗

Drop Analysis of a Department of Energy Standard Canister Containing Fort Saint Vrain SNF– 24138

DOE manages over 300 types of SNF, many of which are located at the INL site. Managing this large variety of SNF for storage, transportation, and disposal poses a challenge to DOE. The Idaho Cleanup Project and INL are collaborating on the DOE SNF Road-Ready Demonstration (“Road-Ready Demonstration”), which will develop and demonstrate the designs, technology, processes, and regulatory framework for packaging DOE-managed SNF for “road-ready dry storage.” Road-ready dry storage (RRDS) is an SNF management concept in which SNF is packaged into dry, sealed canisters that are then placed in on-site storage in anticipation of later transport and disposition. The forward-looking goal of the Road-Ready Demonstration is to establish the foundation for a large-scale RRDS program at the INL site. One critical aspect of RRDS is the ability to certify the DOE Standard Canister and its associated transportation package in accordance with 10 CFR 71 for offsite transportation. Depending on the SNF type and transportation strategy, DOE Standard Canisters may be required to maintain structural integrity under hypothetical accident scenarios (e.g., drop events). The DOE Standard Canisters have been tested and analyzed under various SNF loading configurations and accident drop events in support of the Idaho Spent Fuel Facility and other DOE programs; however, no analysis has yet been completed in support of the recently initiated Road-Ready Demonstration. This paper presents preliminary results from a finite element analysis of the Ø45.7 cm × 4.6 m (Ø18 in. × 15 ft) DOE Standard Canister under the 9 m drop at 80 degrees off-vertical drop scenario considered in previous INL tests and analyses. It considers the Fort St. Vrain spent nuclear fuel loading configuration proposed for the Road-Ready Demonstration, uses updated material properties, and applies the strain-based acceptance criteria established in ASME Boiler and Pressure Vessel Code’s Section III, Division 3 rules for storage and transportation spent nuclear fuel containments. This updated analysis is compared to previous DOE Standard Canister drop analyses. Preliminary results from the updated analysis show that certain regions of the containment exceed the allowable limits during the accidental drop event. However, these regions are limited to components performing a non-structural function. While further work on this analysis will be pursued, this analysis serves as the foundation for formal calculations used to support applicable certification efforts of the RRDS system at INL.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗