At least 19 records

INL Human Performance Improvement Guide, GDE-863

Guidance on Integrating Human Performance Improvement including guidance on Developing Area Specific Implementation Plans, Tool Usage, and Building the Capacity for Resiliency aka Failing Safely.

99 GENERAL AND MISCELLANEOUS↗

Human Performance Improvement Task Group Task 21-1 Best Practice: Using virtual capabilities or options for HPI application (to reduce errors, strengthening defenses, strengthening the organization, and/or increasing capacity)

In 2020 the world was impacted by COVID-19. How work is done was dramatically changed for a large portion of the workforce. Many have made the abrupt shift to working from their home while others have adapted to COVID protocols (such as social distancing and wearing facemasks). Fundamentally, Human and Organizational Performance Improvement concepts and science did not change – only the delivery method changed (in some cases). The primary effect has been to accelerate dynamics already present in society – from e-commerce to online education to remote healthcare. Change is never easy for humans. However, remote work should be viewed as an opportunity; not a fix to a problem. In this Best Practice paper, you’ll get practical suggestions to help you reduce errors and improve Human Performance in remote, socially-distanced “work-from-home” environments.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Savannah River Remediation Liquid Waste Operations Making the Workplace Safer - Lean and Human Performance Improvement Initiatives - 17244

The Savannah River Site, a U.S. Department of Energy facility, contracted Savannah River Remediation (SRR) to manage its liquid waste project, which is a unique, high hazard nuclear waste treatment and disposal facility consisting of 51, one million gallon underground waste tanks, a solvent extraction processing unit, a vitrification facility for the highest radioactive waste, and a grout solidification and disposal facility for a decontaminated salt solution. Our Project mission is to treat the nuclear waste and close the associated storage and treatment facilities, of which, 8 of the 51 tanks have been closed to date. Over the past three years, SRR implemented a Lean Business Management System to address site inefficiencies, aging infrastructure concerns and budget constraints. The Lean philosophy started with the work of W. Edwards Deming and his contemporaries. In more recent years the process has matured in the Toyota Production System and migrated into fields as diverse as services industries, health-care, and now the DOE complex. Like safety, continuous improvement is a fundamental core business value that starts at the top. The Lean Business System, led by our executive management team, drives quality, production and waste elimination by focusing on People using a structured Process that allows the workforce to identify and fix problems in their workplace. Many inefficiencies and quality related issues start with the desire to make systems fail-safe without defining the core requirements for which that process or program was created. This leads to added complexity and latent or inherent human performance issues embedded within our processes. While Lean can't fix all problems, a combination of strong nuclear safety culture, robust conduct of operations, active human performance improvement process, and a business practice of continuously looking for improvements leads to excellence across our industry and creates a culture that is worthy of promoting. Without strong management, our systems fail because no one sponsors or encourages those attributes we covet. Leadership starts at the top with our customer defining what provides 'value' to them, and filters down through to the organization and ultimately the workforce in day to day conduct of operations. It is imperative that our customer drives these desirable ideals through recognition and contractual requirements to encourage and support those behavioral traits that are critical to our ongoing success.This paper focuses on how the Lean Business Management System supports those attributes that we value: a strong nuclear safety culture; disciplined conduct of operations; and a culture of robust human performance and continuous improvement. These attributes in our daily work environment propel a safer, more consistent, more efficient workplace. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Using recordings of brain activity to predict and improve human performance

This project investigated methods for using recordings of event-related potentials (ERPs) to predict and improve human memory performance. In a series of experiments, the ERPs related to good and poor memory performance were characterized and a computational model was developed in which the ERPs recorded while a person studied words were used to predict whether that person would be a high performer or a low performer on a subsequent memory test. These experiments provide the first demonstration of ERPs used to predict subsequent memory performance. Additional experiments investigated the effects of different types of memory training (learning a memory strategy such as mental imagery or increasing memory capacity through working memory training) on memory performance and the associated brain activity.

Matzen, Laura E.↗

EFCOG Human Performance Improvement Task Group: Task 20-2, Asking Better Error Precursor Questions for Effective Job Planning, Pre-Job Briefs, and Event Investigations

The second principle of human performance states: “error-likely situations are predictable, manageable, and preventable.” An error-likely situation comes into play when task-related factors exceed the capabilities of the individual, creating a mismatch at the point when the individual is “touching” either the physical or the paper plant. The simple presence of adverse conditions cannot be error-likely unless a specific action is to occur within that set of adverse conditions.

99 GENERAL AND MISCELLANEOUS↗

Integrating Mindfulness with Human Performance in High Complexity Environments - 19498

This paper includes a survey of both scientific and technical literature studies of mindfulness interventions in a variety of industries and populations and proposes potential applications in complex nuclear waste operations. Mindfulness training techniques have been utilized in various forms for decades in high consequence work in both public and private enterprise. The traditional safety nomenclature has simply used different words to describe many of the same concepts that mindfulness practice addresses. Historically, human performance improvement (HPI) has focused on task, mission and error-likely conditions. These safety programs recognize that human behavior is the source of most errors and focus on identification of specific error precursors (mind not on task, incorrect mental picture, etc.). Workers in nuclear and related industries have been trained to recognize these error precursors but have received little training on what to do about them. The techniques of mindfulness align well with HPI programs currently utilized in commercial and government nuclear operations. Indeed, Chapter 5 of the Department of Energy Human Performance Improvement Handbook (DOE-HDBK-1028-2009) includes a discussion of mindfulness with respect to human performance. Mindfulness training supplements current performance improvement efforts by giving workers the tools to not just recognize error-likely conditions within themselves, but also gives them methods to mitigate them. The mindfulness practices presented here focus on self-awareness rather than task-awareness. Workers can apply these techniques in all aspects of their lives which in turn addresses many of the distractions previously identified as error precursors (stress at home or at work, physical discomforts, mind not on task, etc.). The application of mindfulness techniques through integration with established Integrated Safety Management Systems (ISMS) has the potential to improve the safe performance of nuclear waste operations and increase the breadth of organizational safety culture. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Mentoring Human Performance - 12480

Although the positive effects of implementing a human performance approach to operations can be hard to quantify, many organizations and industry areas are finding tangible benefits to such a program. Recently, a unique mentoring program was established and implemented focusing on improving the performance of managers, supervisors, and work crews, using the principles of Human Performance Improvement (HPI). The goal of this mentoring was to affect behaviors and habits that reliably implement the principles of HPI to ensure continuous improvement in implementation of an Integrated Safety Management System (ISMS) within a Conduct of Operations framework. Mentors engaged with personnel in a one-on-one, or one-on-many dialogue, which focused on what behaviors were observed, what factors underlie the behaviors, and what changes in behavior could prevent errors or events, and improve performance. A senior management sponsor was essential to gain broad management support. A clear charter and management plan describing the goals, objectives, methodology, and expected outcomes was established. Mentors were carefully selected with senior management endorsement. Mentors were assigned to projects and work teams based on the following three criteria: 1) knowledge of the work scope; 2) experience in similar project areas; and 3) perceived level of trust they would have with project management, supervision, and work teams. This program was restructured significantly when the American Reinvestment and Recovery Act (ARRA) and the associated funding came to an end. The program was restructured based on an understanding of the observations, attributed successes and identified shortfalls, and the consolidation of those lessons. Mentoring the application of proven methods for improving human performance was shown effective at increasing success in day-to-day activities and increasing confidence and level of skill of supervisors. While mentoring program effectiveness is difficult to measure, and return on investment is difficult to quantify, especially in complex and large organizations where the ability to directly correlate causal factors can be challenging, the evidence presented by Sydney Dekker, James Reason, and others who study the field of human factors does assert managing and reducing error is possible. Employment of key behaviors-HPI techniques and skills-can be shown to have a significant impact on error rates. Our mentoring program demonstrated reduced error rates and corresponding improvements in safety and production. Improved behaviors are the result, of providing a culture with consistent, clear expectations from leadership, and processes and methods applied consistently to error prevention. Mentoring, as envisioned and executed in this program, was effective in helping shift organizational culture and effectively improving safety and production. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Performance improvement and human resources transition management in D and D projects - 15440

Power generation and other nuclear facilities production is mainly characterized by stable working environment, with continuous efforts for improvement based on previous achievements, constant workload, foreseeable and established organizational hierarchy; and generation of cash. In contrary to normal production - when phasing down the facility for final shutdown, decommissioning and dismantling - one has to manage a new, highly dynamic working environment, with decreasing workload, new skills required; and consumption of cash. The key to successful transition is to recognize the need for establishing an explicit performance improvement program with an effective change management process in order to address this profound evolution as early as possible in the project. AREVA owns and operates large nuclear material processing facilities. This includes the responsibility for their end of life up to final Decommissioning and Dismantling (D and D). Faced with this transitional challenge, AREVA took example from well-known management methods (Lean Management, 6 Sigma, TPM...) successfully applied by the non-nuclear production industry with the corresponding philosophy of Operational Excellence. These methods were adapted to the specifics of nuclear decommissioning projects. Furthermore, specific computerized tools were developed to assist managers in implementing measures for re-deploying, re-training and re-qualifying personnel as well as re-organizing the work structure while maintaining safety and social consensus. Significant improvements in the dismantling works as well as in the management of generated waste were achieved early after start of the implementation of the performance improvement programs. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Advanced Outage and Control Center: Strategies for Nuclear Plant Outage Work Status Capabilities

The research effort is a part of the Light Water Reactor Sustainability (LWRS) Program. LWRS is a research and development program sponsored by the Department of Energy, performed in close collaboration with industry to provide the technical foundations for licensing and managing the long-term, safe and economical operation of current nuclear power plants. The LWRS Program serves to help the US nuclear industry adopt new technologies and engineering solutions that facilitate the continued safe operation of the plants and extension of the current operating licenses. The Outage Control Center (OCC) Pilot Project was directed at carrying out the applied research for development and pilot of technology designed to enhance safe outage and maintenance operations, improve human performance and reliability, increase overall operational efficiency, and improve plant status control. Plant outage management is a high priority concern for the nuclear industry from cost and safety perspectives. Unfortunately, many of the underlying technologies supporting outage control are the same as those used in the 1980’s. They depend heavily upon large teams of staff, multiple work and coordination locations, and manual administrative actions that require large amounts of paper. Previous work in human reliability analysis suggests that many repetitive tasks, including paper work tasks, may have a failure rate of 1.0E-3 or higher (Gertman, 1996). With between 10,000 and 45,000 subtasks being performed during an outage (Gomes, 1996), the opportunity for human error of some consequence is a realistic concern. Although a number of factors exist that can make these errors recoverable, reducing and effectively coordinating the sheer number of tasks to be performed, particularly those that are error prone, has the potential to enhance outage efficiency and safety. Additionally, outage management requires precise coordination of work groups that do not always share similar objectives. Outage managers are concerned with schedule and cost, union workers are concerned with performing work that is commensurate with their trade, and support functions (safety, quality assurance, and radiological controls, etc.) are concerned with performing the work within the plants controls and procedures. Approaches to outage management should be designed to increase the active participation of work groups and managers in making decisions that closed the gap between competing objectives and the potential for error and process inefficiency.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Human performance benefits gained by dynamic instructions compared to smart PDFs

Human performance benefits gained by dynamic instructions compared to smart PDFs In recent years multiple nuclear utilities have deployed an electronic work management solution to replace the traditional paper-based processes. There are many benefits of electronic work management solutions compared to paper processes, such as a more streamlined review and approval process of work packages and a better way to track and resolve any potential bottlenecks causing delays in the review process. These benefits have been recognized where electronic work management solutions have been successfully deployed. However the utilities also hoped the new solution would help the field worker conduct his/her job more efficiently, correctly, and safely. Unfortunately, the industry is now realizing that the deployed solutions did not fully help them reach that goal. The electronic work management solutions present the work instructions as an electronic copy (i.e., a portable document format (PDF)) of the paper instruction. The PDF versions used in these electronic work management solutions have some ability for data input, notes, and mark-ups, but are unable to provide many additional benefits compared to using paper. In fact, conducting work using a PDF on a tablet can be more cumbersome than with a paper instruction. For example, flipping back and forth in a paper instruction can be time consuming, but it is not at all as frustrating as scrolling back and forth on a tablet or continuously having to navigate between tabs. The researchers at Idaho National Laboratory (INL) approached the next step beyond smart PDFs from a human factors perspective. In close collaboration with multiple utilities they investigated how to present instruction content and how to design the interaction with the instruction to improve the workers performance and efficiency. Their solution is a dynamic presentation of the instruction that guides the worker through the correct path as well as ensuring the worker is on the correct component. The solution also automatically validates input and provides guidance if unexpected conditions are identified. A well-designed solution has the opportunity to vastly reduce the risk of human errors in the field, such as preventing actions on incorrect component or unintentionally skipping steps. The human factors researchers at INL leveraged their expertise, existing human performance tools, and a great amount of involvement from field workers in multiple utilities to develop and evaluate design concepts that will provide the human performance and efficiency benefits that the electronic work management solutions fall short to deliver. This paper will describe in detail how these new design concepts improve human performance.

47 OTHER INSTRUMENTATION↗

Long-Term Instrumentation, Information, and Control Systems (II&C) Modernization Future Vision and Strategy (Revision 1)

Life extension beyond 60 years for the U.S operating nuclear fleet requires that instrumentation and control (I&C) systems be upgraded to address aging and reliability concerns. It is impractical for the legacy systems based on 1970's vintage technology operate over this extended time period. Indeed, utilities have successfully engaged in such replacements when dictated by these operational concerns. However, the replacements have been approached in a like-for-like manner, meaning that they do not take advantage of the inherent capabilities of digital technology to improve business functions. And so, the improvement in I&C system performance has not translated to bottom-line performance improvement for the fleet. Therefore, wide-scale modernization of the legacy I&C systems could prove to be cost-prohibitive unless the technology is implemented in a manner to enable significant business innovation as a means of off-setting the cost of upgrades. A Future Vision of a transformed nuclear plant operating model based on an integrated digital environment has been developed as part of the Advanced Instrumentation, Information, and Control (II&C) research pathway, under the Light Water Reactor (LWR) Sustainability Program. This is a research and development program sponsored by the U.S. Department of Energy (DOE), performed in close collaboration with the nuclear utility industry, to provide the technical foundations for licensing and managing the long-term, safe and economical operation of current nuclear power plants. DOE's program focus is on longer-term and higher-risk/reward research that contributes to the national policy objectives of energy security and environmental security. The Advanced II&C research pathway is being conducted by the Idaho National Laboratory (INL). The Future Vision is based on a digital architecture that encompasses all aspects of plant operations and support, integrating plant systems, plant work processes, and plant workers in a seamless digital environment to enhance nuclear safety, increase productivity, and improve overall plant performance. The long-term goal is to transform the operating model of the nuclear power plants (NPP)s from one that is highly reliant on a large staff performing mostly manual activities to an operating model based on highly integrated technology with a smaller staff. This digital transformation is critical to addressing an array of issues facing the plants, including aging of legacy analog systems, potential shortage of technical workers, ever-increasing expectations for nuclear safety improvement, and relentless pressure to reduce cost. The Future Vision is based on research is being conducted in the following major areas of plant function: (1) Highly integrated control rooms; (2) Highly automated plant; (3) Integrated operations; (4) Human performance improvement for field workers; and (5) Outage safety and efficiency. Pilot projects will be conducted in each of these areas as the means for industry to collectively integrate these new technologies into nuclear plant work activities. The pilot projects introduce new digital technologies into the nuclear plant operating environment at host operating plants to demonstrate and validate them for production usage. In turn, the pilot project technologies serve as the stepping stones to the eventual seamless digital environment as described in the Future Vision.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Long-Term Instrumentation, Information, and Control Systems (II&C) Modernization Future Vision and Strategy

Life extension beyond 60 years for the U.S operating nuclear fleet requires that instrumentation and control (I&C) systems be upgraded to address aging and reliability concerns. It is impractical for the legacy systems based on 1970’s vintage technology operate over this extended time period. Indeed, utilities have successfully engaged in such replacements when dictated by these operational concerns. However, the replacements have been approached in a like-for-like manner, meaning that they do not take advantage of the inherent capabilities of digital technology to improve business functions. And so, the improvement in I&C system performance has not translated to bottom-line performance improvement for the fleet. Therefore, wide-scale modernization of the legacy I&C systems could prove to be cost-prohibitive unless the technology is implemented in a manner to enable significant business innovation as a means of off-setting the cost of upgrades. A Future Vision of a transformed nuclear plant operating model based on an integrated digital environment has been developed as part of the Advanced Instrumentation, Information, and Control (II&C) research pathway, under the Light Water Reactor (LWR) Sustainability Program. This is a research and development program sponsored by the U.S. Department of Energy (DOE), performed in close collaboration with the nuclear utility industry, to provide the technical foundations for licensing and managing the long-term, safe and economical operation of current nuclear power plants. DOE’s program focus is on longer-term and higher-risk/reward research that contributes to the national policy objectives of energy security and environmental security . The Advanced II&C research pathway is being conducted by the Idaho National Laboratory (INL). The Future Vision is based on a digital architecture that encompasses all aspects of plant operations and support, integrating plant systems, plant work processes, and plant workers in a seamless digital environment to enhance nuclear safety, increase productivity, and improve overall plant performance. The long-term goal is to transform the operating model of the nuclear power plants (NPP)s from one that is highly reliant on a large staff performing mostly manual activities to an operating model based on highly integrated technology with a smaller staff. This digital transformation is critical to addressing an array of issues facing the plants, including aging of legacy analog systems, potential shortage of technical workers, ever-increasing expectations for nuclear safety improvement, and relentless pressure to reduce cost. The Future Vision is based on research is being conducted in the following major areas of plant function: 1. Highly integrated control rooms 2. Highly automated plant 3. Integrated operations 4. Human performance improvement for field workers 5. Outage safety and efficiency. Pilot projects will be conducted in each of these areas as the means for industry to collectively integrate these new technologies into nuclear plant work activities. The pilot projects introduce new digital technologies into the nuclear plant operating environment at host operating plants to demonstrate and validate them for production usage. In turn, the pilot project technologies serve as the stepping stones to the eventual seamless digital environment as described in the Future Vision.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Minimizing Error Potential Using Computer Applications - 18498

Many Savannah River Site (SRS) liquid waste facility operations depend upon repetitive engineering calculations and operator actions. Although these calculations and actions are formalized in technical reports and paper procedures, they can still be vulnerable to data entry errors, calculation errors, equipment alignment errors, and occasional changes caused by different people performing these activities. Savannah River Remediation (SRR) is using computer automation to reduce these error precursors by standardizing repetitive calculations and by performing plant alignment checks for repetitive operation processes. Data entry can be automated, calculation methodologies can be standardized, and computers can check to see that predefined plant conditions exist before equipment operation. In addition to improving quality, the time required for these activities to generate technical reports, to perform independent reviews, and to perform equipment alignment checks can be significantly reduced. In the case of operator-performed calculations, error precursors involve distractions that can occur over a multi-page paper procedure, confusing displays and controls from equipment, mathematical errors, complacency, and unfamiliarity with the procedure among many others. Repetitive engineering calculations suffer from similar error precursors and are often compounded by high workloads, lack of proficiency, lack of standard methodology, mental shortcuts, and biases. Web-based computer applications can eliminate many of these precursors through standardization. Calculation methods are fixed, inputs are fixed, and computer checks can highlight potentially wrong inputs and outputs. Automated calculations are performed almost instantaneously once input is provided. Operators and engineers can spend more time focusing on the results than on the process to achieve the results. Similarly, when operators use repetitive procedures involving equipment manipulation, the same error precursors apply. Automated operation sequences and equipment checks can be programmed into the distributed control system to provide standard operating processes that reduce and eliminate error precursors. This paper describes how SRR incorporates Human Performance Improvement (HPI) principles when automating calculations and operation processes. Computer applications will be reviewed in detail, highlighting the software development life-cycle that includes requirements gathering, prototyping, design, development, testing, and implementation. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Elucidating regulatory processes of intense physical activity by multi-omics analysis

Abstract Background Physiological and biochemical processes across tissues of the body are regulated in response to the high demands of intense physical activity in several occupations, such as firefighting, law enforcement, military, and sports. A better understanding of such processes can ultimately help improve human performance and prevent illnesses in the work environment. Methods To study regulatory processes in intense physical activity simulating real-life conditions, we performed a multi-omics analysis of three biofluids (blood plasma, urine, and saliva) collected from 11 wildland firefighters before and after a 45 min, intense exercise regimen. Omics profiles post- versus pre-exercise were compared by Student’s t -test followed by pathway analysis and comparison between the different omics modalities. Results Our multi-omics analysis identified and quantified 3835 proteins, 730 lipids and 182 metabolites combining the 3 different types of samples. The blood plasma analysis revealed signatures of tissue damage and acute repair response accompanied by enhanced carbon metabolism to meet energy demands. The urine analysis showed a strong, concomitant regulation of 6 out of 8 identified proteins from the renin-angiotensin system supporting increased excretion of catabolites, reabsorption of nutrients and maintenance of fluid balance. In saliva, we observed a decrease in 3 pro-inflammatory cytokines and an increase in 8 antimicrobial peptides. A systematic literature review identified 6 papers that support an altered susceptibility to respiratory infection. Conclusion This study shows simultaneous regulatory signatures in biofluids indicative of homeostatic maintenance during intense physical activity with possible effects on increased infection susceptibility, suggesting that caution against respiratory diseases could benefit workers on highly physical demanding jobs.

59 BASIC BIOLOGICAL SCIENCES↗

Performance Analysis: Work Control Events Identified January - August 2010

This performance analysis evaluated 24 events that occurred at LLNL from January through August 2010. The analysis identified areas of potential work control process and/or implementation weaknesses and several common underlying causes. Human performance improvement and safety culture factors were part of the causal analysis of each event and were analyzed. The collective significance of all events in 2010, as measured by the occurrence reporting significance category and by the proportion of events that have been reported to the DOE ORPS under the ''management concerns'' reporting criteria, does not appear to have increased in 2010. The frequency of reporting in each of the significance categories has not changed in 2010 compared to the previous four years. There is no change indicating a trend in the significance category and there has been no increase in the proportion of occurrences reported in the higher significance category. Also, the frequency of events, 42 events reported through August 2010, is not greater than in previous years and is below the average of 63 occurrences per year at LLNL since 2006. Over the previous four years, an average of 43% of the LLNL's reported occurrences have been reported as either ''management concerns'' or ''near misses.'' In 2010, 29% of the occurrences have been reported as ''management concerns'' or ''near misses.'' This rate indicates that LLNL is now reporting fewer ''management concern'' and ''near miss'' occurrences compared to the previous four years. From 2008 to the present, LLNL senior management has undertaken a series of initiatives to strengthen the work planning and control system with the primary objective to improve worker safety. In 2008, the LLNL Deputy Director established the Work Control Integrated Project Team to develop the core requirements and graded elements of an institutional work planning and control system. By the end of that year this system was documented and implementation had begun. In 2009, training of the workforce began and as of the time of this report more than 50% of authorized Integration Work Sheets (IWS) use the activity-based planning process. In 2010, LSO independently reviewed the work planning and control process and confirmed to the Laboratory that the Integrated Safety Management (ISM) System was implemented. LLNL conducted a cross-directorate management self-assessment of work planning and control and is developing actions to respond to the issues identified. Ongoing efforts to strengthen the work planning and control process and to improve the quality of LLNL work packages are in progress: completion of remaining actions in response to the 2009 DOE Office of Health, Safety, and Security (HSS) evaluation of LLNL's ISM System; scheduling more than 14 work planning and control self-assessments in FY11; continuing to align subcontractor work control with the Institutional work planning and control system; and continuing to maintain the electronic IWS application. The 24 events included in this analysis were caused by errors in the first four of the five ISMS functions. The most frequent cause was errors in analyzing the hazards (Function 2). The second most frequent cause was errors occurring when defining the work (Function 1), followed by errors during the performance of work (Function 4). Interestingly, very few errors in developing controls (Function 3) resulted in events. This leads one to conclude that if improvements are made to defining the scope of work and analyzing the potential hazards, LLNL may reduce the frequency or severity of events. Analysis of the 24 events resulted in the identification of ten common causes. Some events had multiple causes, resulting in the mention of 39 causes being identified for the 24 events. The most frequent cause was workers, supervisors, or experts believing they understood the work and the hazards but their understanding was incomplete. The second most frequent cause was unclear, incomplete or confusing documents directing the work. Together, these two causes were mentioned 17 times and contributed to 13 of the events. All of the events with the cause of ''workers, supervisors, or experts believing they understood the work and the hazards but their understanding was incomplete'' had this error in the first two ISMS functions: define the work and analyze the hazard. This means that these causes result in the scope of work being ill-defined or the hazard(s) improperly analyzed. Incomplete implementation of these functional steps leads to the hazards not being controlled. The causes are then manifested in events when the work is conducted. The process to operate safely relies on accurately defining the scope of work. This review has identified a number of examples of latent organizational weakness in the execution of work control processes.

99 GENERAL AND MISCELLANEOUS↗