Search NASA⌕ Search

SEARCH · Search NASA

Results for “Hydropower Components”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

A Novel Surface Restoration Method for Hydropower Steel Components: Plasma Gouging and Inconel Cold Spray Coating for Material Repair

A novel surface restoration approach combining plasma gouging with subsequent cold spray deposition is demonstrated in this study. Plasma gouging effectively removes the damaged steel surface, leaving grooves and forming a plasma gouging affected zone up to ~300?µm thick. Within this zone, a hardened martensitic layer with a peak hardness of ~370?HV—almost twice that of the base substrate (~200?HV)—is produced. Following plasma gouging, cold spray deposition is applied to rebuild the surface. Experimental results reveal that cold spray coatings deposited at low energy suffer from delamination, whereas high energy cold spray deposits yield a well-bonded coating. Microstructural analysis further shows that the martensitic layer formed by plasma gouging undergoes dynamic recrystallization during cold spray, reducing the hardness to 317?HV. These findings demonstrate the feasibility of this hybrid method for effective surface restoration of damaged steel components.

Wang, Tianhao↗

Feasibility of Nitrogen as a Carrier Gas for Inconel Cold Spray in Hydropower Application

Cold spray deposition of Inconel nickel alloys has emerged as a promising strategy for mitigating cavitation erosion in hydropower facilities. Most prior developments employ helium (He) as the carrier gas because it enables high particle velocities and the formation of dense coatings. However, He is nearly two orders of magnitude more expensive than nitrogen (N2), which limits its widespread adoption in the hydropower sector. Although He-based cold spray can be justified for high value repairs, the lower cost and broad availability of N2 make it an attractive alternative. This study assesses the feasibility of N2-based cold spray of Inconel 625 powders for hydropower applications. Cavitation erosion testing shows that He-based coating exhibits cavitation resistance of ~398% relative to the 304L stainless steel (SS304L) substrate. In contrast, N2-based coating shows substantially lower cavitation resistance, reaching only ~69% of the SS304L substrate, even when higher carrier gas temperature and pressure are applied. When the Inconel 625 powder size is reduced from 44 to 22 µm under N2-based cold spray conditions, cavitation resistance increases significantly to ~148% of the SS304L substrate. Additional improvement can be obtained by incorporating fine chromium carbide powders into the feedstock, resulting in cavitation resistance of ~172% of the SS304L substrate. Overall, with optimized feedstock design, N2-based cold spray offers a practical and cost-effective approach for producing cavitation resistant coatings on hydropower components, although He-based cold spray continues to deliver higher cavitation resistance.

Wang, Tianhao↗

Hydropower Supply Chain Gap Analysis

In 2022, DOE conducted supply chain "deep dives" for renewable energy technologies, including hydropower (Uria-Martinez, Hydropower Industry Supply Chain Deep Dive Assessment 2022). The deep dive identified several challenges in the current hydropower supply chain. In addition, Nguyen et. al (2022) conducted an analogous deep-dive assessment on large (> 100-MW) power transformers (LPTs), a critical component of hydropower installations, and concluded that the LPTs as well as several upstream components and materials also have domestic supply chain challenges. These deep dives were the initial high-level assessments of these supply chains and were focused on identifying the biggest issues. Both recommended further investigation. In the two years since the deep dives were published, the Water Power Technologies Office (WPTO) has focused on improving our understanding of the hydropower supply chain and developing strategies for addressing these challenges. Because the challenges outlined above are most acute for large hydropower systems, most of the report and specifically, this report concentrates on the larger > 100-MW hydropower systems. Early in 2023, DOE's Secretary of Energy asked the Water Power Technologies Office (WPTO) to engage the hydropower community and seek input on strategies to secure and encourage domestic manufacturing. WPTO has established three focus areas for engagement: 1) Define the market for planned rehabilitations and new construction of the domestic fleet, 2) Provide insights for policies, incentives, loan programs, and technology investments to encourage domestic content, and 3) Define the existing and required domestic hydropower manufacturing capabilities and workforce. This report summarizes these efforts and complements the earlier work by further exploring the identified challenges and identifying potential actions to address these challenges. Furthermore, we conducted a detailed gap analysis of the domestic hydropower supply chain, down to the component level. From this analysis, we then make specific, actionable recommendations for closing these gaps. Section 2 of the report summarizes recent (i.e., since 2021) legislation impacting hydropower deployment and/or its supply chain. It then describes the efforts of WPTO to assess and improve the hydropower supply chain since the publication of the deep-dive assessments. In Section 3, the report updates the earlier supply chain and market studies, identifying specific capabilities by company and location. Section 4 outlines the hydropower demand signal for both new builds due to clean energy goals as well as refurbishments and upgrading of the current domestic fleet. Section 5 is a detailed gap analysis while Section 6 provides actionable recommendations for closing the gaps. Section 7 concludes the report by linking the recommendations to the identified gaps and discusses future efforts.

13 HYDRO ENERGY↗

Leveraging Hydropower Multi-Sensor Data for Inference and Age-Informed Modeling

Increased demand of operational flexibility such as faster ramp up/down in generation, and more frequent start/stops are putting hydropower plants and their associated components in unprecedented stress. Consequently, these plants are at the high risk of extended and more frequent outage to accommodate unscheduled, and unexpected maintenance. Therefore, hydropower plants are in critical need of data driven and age-informed analysis for their regular and unscheduled operation. Yet not all hydropower plants are exhaustively equipped with sensors and/or measurement streams for their respective components – demanding solutions on how to detect, identify, and locate the cause of any event from the unobservable. Idaho National Laboratory (INL) analyzed the anonymized measurements and event records from the Hydropower Research Institute (HRI) to address this issue, as part of the Water Power Technologies Office (WPTO) funded one year multi-lab project. First, we investigated how time series of multiple sensor measurements can be leveraged to identify an event “root cause” as well as to develop an inference (i.e., estimate the unobservable) problem. INL also investigated how individual hydropower components’ reaction or response times vary across the pre-event, during event, and post-event conditions – enabling the hydropower dynamic models to be age-informed. Finally, the impact of clustering multi-sensor time series on short-term vibration prediction is analyzed. INL will present key findings from these analyses and recommend next steps for stakeholder adoption.

13 HYDRO ENERGY↗

Hydropower Black Start: A Guidebook for Retrofitting Grid Dependent Hydropower

Not all United States (US) hydropower plants were designed to provide black start, but they are increasingly needed to uphold resilience in the evolving electric grid. This guidance is designed to help understand the minimal retrofits required for grid dependent hydropower (GDH) plants behind the point of interconnection (POI). For distribution connected hydropower plants or those with dedicated cranking paths, such upgrades can be sufficient for the plant to provide black start. For others, more coordination with the transmission system operator will be needed. This guidebook answers a number of questions relevant to retrofitting hydropower plants with black start capabilities. For example, the guidebook answers: • How flexible do the wicket gate controls need to be? • Who needs to do hydro governor model validation, why, and how? • How robust and flexible do the excitation and AVR controls need to be? • What protection settings need to be adjusted? • What relay(s) will need to be bypassed or overridden and at what risk? • What is the electrical energy demand of the station load or auxiliary power systems? • What should the strategy to energize transformer(s) along cranking path to address inrush currents be? • How should the critical load restoration be sequenced? In addition to outlining the specifications that hydropower plants need to meet for each component to be able to perform black start, this guidebook provides a set of case studies for specific upgrades needed at actual plants. Between the case studies of plants that have already performed black start retrofits and the examples of how this guidebook can be applied to scope future retrofits, five key themes have been identified for retrofit needs. 1. Protection needs “black start” mode: hydropower plants that are not designed with black start capabilities will have protections that prevent them from interconnecting to a “dead bus.” These protections will need to be overridden in every retrofit case and a separate black start mode should be established so that operators can safely switch between black start and grid connected modes, minimizing the risk to the plant. 2. Wicket gates need modern controls: digital governors accelerate the parameter tuning process and gate position sensors improve controllability, so plants with mechanical governors should be upgraded. Furthermore, a black start and islanding mode should be established for controls to maximize plant performance. 3. Robust excitation support: the DC system or excitation generator needs to be reliable enough to form and sustain the rotor electromagnetic field. These systems are typically undersized in plants that were not designed for black start, so they will need to be upgraded. 4. Turbine-governor model validation and operator training: validation of a standard hydro governor model is needed to characterize the dynamic response (i.e., inertial and primary frequency response) of the GDH. This is required for control development and old hydropower plants often have outdated or incorrect models. Operator training is also typically required to ensure the hardware retrofits are utilized correctly during the black start process. 5. Transformer and cranking path energization: any upgradation and control adjustment in front of the POI will depend upon the existing interconnection. Coordination with the transmission or distribution operator may be required.

13 HYDRO ENERGY↗

Assessing the Costs of Hydropower at Non-Powered Dams Using a Reference Site Model

Hydropower capacity in the United States currently stands at approximately 103 GW, and there are remaining water resources that could help meet the rapidly increasing demand for electricity and ancillary grid services. Existing dams that do not generate power, known as non-powered dams, are a near-term solution to enhance the contribution of hydropower to the US power grid. However, there are thousands of such sites, and the lack of detailed information about their specific characteristics and associated costs presents significant challenges for stakeholders. This study addresses these challenges by developing a reference site model to evaluate the potential costs of hydropower at non-powered dams using currently available technologies. An application of the model reveals a wide range of estimates for capacity, capital costs, levelized cost of electricity, and cost components. While many sites are competitive with current technologies, the majority would need cost-reducing innovations to be viable. Despite the limited available information, the model offers valuable insights into the relative competitiveness of hydropower projects at non-powered dams. The simulation results highlight the need for continued technological advancements in hydropower and provide a basis for evaluating the benefits of new innovations.

cost drivers↗

Large Power Transformer Supply Chain Gap Analysis and Domestic Content Strategies for Hydropower Rehabilitation: Supplemental Report

Large Power Transformers (LPTs) are indispensable to U.S. hydropower operations, serving as generator step-up (GSU) units that interconnect hydro facilities to the transmission grid. Yet the LPT supply chain faces mounting stress from aging infrastructure, limited domestic production, and long lead times. Currently, more than 80% of LPT demand is met through imports, with primary suppliers including Mexico, South Korea, Brazil, Austria, and Canada. Domestic manufacturers supply only about 20% of units, constrained by bottlenecks in high-grade Grain-Oriented Electrical Steel (GOES), copper conductors, bushings, and on-load tap changers (OLTCs). Hydropower rehabilitation projects in particular face additional challenges due to custom design requirements, remote siting, and regulatory needs around domestic content. Regional cost disparities, driven by transportation logistics, labor markets, and import price volatility, further exacerbate project risks. To address these vulnerabilities, coordinated action is required: strengthening domestic capacity for GOES and secondary components, developing near-site assembly hubs, and leveraging IRS domestic content safe harbors to incentivize U.S. manufacturing. This addendum refines the 2024 NREL Hydropower Supply Chain Gap Analysis by focusing specifically on critical issues related to LPT domestic manufacturing capacity and key considerations for hydropower developers and asset owners.

13 HYDRO ENERGY↗

A Reduced-form Cost Model for Prefeasibility Analysis of Hydropower at Non-Powered Dams

This study presents a reduced-form model to support a better understanding of the capacity potential and drivers of costs for hydropower development at U.S. non-powered dams (NPD), which are existing dams that are not currently used for hydropower. With information on nineteen reference sites, a set of reduced-form design and cost equations were estimated to enable rapid assessments of aggregate costs and their components for a large number of NPD sites. The model was then applied to 36,000+ potential U.S. NPD sites using the limited data commonly available. Although the cost estimates span a wide range, there exists a significant amount of U.S. NPD hydropower capacity potential, which are considered cost-competitive in the current market using baseline technologies.

13 HYDRO ENERGY↗

Evaluation of Global Climate Models for Use in Energy Analysis

The interplay between energy, climate, and weather is becoming more complex due to increasing contributions of renewable energy generation, energy storage, electrified end uses, and the increasing frequency of extreme weather events. Energy system analyses commonly rely on meteorological inputs to estimate renewable energy generation and energy demand; however, these inputs rarely represent the estimated impacts of future climate change. Climate models and publicly available climate change datasets can be used for this purpose, but the selection of inputs from the myriad of available models and datasets is a nuanced and subjective process. In this work, we assess datasets from various global climate models (GCMs) from the Coupled Model Intercomparison Project Phase 6 (CMIP6). We present evaluations of their skills with respect to the historical climate and comparisons of their future projections of climate change for two climate change scenarios. We present the results for different climatic and energy system regions and include interactive figures in the accompanying software repository. Previous work has presented similar GCM evaluations, but none have presented variables and metrics specifically intended for comprehensive energy systems analysis including impacts on energy demand, thermal cooling, hydropower, water availability, solar energy generation, and wind energy generation. We focus on GCM output meteorological variables that directly affect these energy system components including the representation of extreme values that can drive grid resilience events. The objective of this work is not to recommend the best climate model and dataset for a given analysis, but instead to provide a reference to facilitate the selection of climate models and scenarios in subsequent work.

14 SOLAR ENERGY↗

Pumped Storage Hydropower Potential and Opportunities

Pumped storage hydropower (PSH) is a flexible energy storage technology with the potential to improve grid reliability, resiliency, and stability in the electric grid of the future. NREL has developed a range of data and tools to help understand opportunities for new PSH deployment, including nationwide resource assessment data, a bottom-up component-level cost model, and a lifecycle greenhouse gas emissions calculator. These datasets can then be used to inform grid planning models, analysis, and decision making to understand the role PSH can play in the power sector.

cost↗

Lower Snake River Dams Contribution to Grid Services

Hydroelectric generation and water storage have long been components of the clean energy mix, providing both reliable steady output and operational flexibility. As variable renewable energy sources such as wind and solar increasingly replace traditional generation, the role of all flexible resources—including hydropower—in balancing supply and demand continues to evolve. This study examined the contribution of the Lower Snake River (LSR) Dam plants to Bonneville Power Administration grid services in maintaining power system reliability within the Western Interconnection. By analyzing publicly available data, the study evaluated various reliability services through performance metrics including energy capacity, balancing and ramping, voltage and reactive power support, frequency response, and transmission impact. Results indicated that the LSR plants deliver services as expected based on their size, contributing to the balancing process, ramping capabilities, and operational reserves, particularly during peak load conditions and weather events, while also providing measurable frequency and voltage support to the grid.

13 HYDRO ENERGY↗

IrrigationViz: A Geospatial Visualization Application to Facilitate Irrigation Modernization

Irrigation water delivery infrastructure, such as canals and pipelines, are essential to agriculture in the Western U.S., yet many of these systems are reaching the end of their useful lives. Reinvestment can achieve a wide variety of benefits, from water conservation to energy savings or renewable energy generation. Modernization requires significant planning, design, and implementation funding which can be a challenge for many irrigation districts. Here, this paper introduces IrrigationViz, a web-based mapping application designed to help irrigation districts visualize and generate high-level cost and benefit estimates for infrastructure modernization projects. These estimates can help water managers identify projects that benefit from additional engineering resources and ultimately obtain funding. IrrigationViz includes map interactions, graphs, and visualization components to facilitate planning and communication to stakeholders and funders. IrrigationViz combines user-provided information about a water-delivery system with public datasets and basic engineering formulas to generate estimates of the benefits of reinvestment. Estimates include the amount of water seepage in earthen canals, potential hydropower generation associated with replacing a canal with a pressurized pipe, and pipe size recommendations. We found that hydropower generation estimates compared favorably with real world projects, but seepage loss estimates showed high variability relative to on-the-ground measurements

99 - GENERAL AND MISCELLANEOUS↗

Pumped Storage Hydropower Operation & Maintenance Cost Estimation

The National Laboratory of the Rockies (NLR) develops and hosts a pumped storage hydropower (PSH) cost model that is the most detailed bottom-up PSH cost model available to the public. It is available both as a spreadsheet and an interactive web tool, enabling users with a variety of PSH interests to transparently characterize costs of alternative PSH sites and designs. The NLR PSH cost model was designed originally to consider only upfront capital costs only. This slide deck describes methodology to expand the cost model to include operations and maintenance (OM) costs. OM costs are characterized as five distinct components with unique sources and methods for cost estimation. By combining methods for each of these components into a cumulative OM cost estimate, these methods allow a more complete estimation of total OM costs that agrees with existing literature values. The methods are scalable and transparent, allowing them to be readily to applied to any prospective PSH facility for a representative preliminary OM cost estimate in advance of detailed site-specific engineering and other studies.

13 HYDRO ENERGY↗

Juvenile Salmon and Their Habitats in the Columbia River Estuary: A Review and Synthesis of Knowledge Development 2000–2025

[This is a 90% discussion draft.] This is the third Synthesis Memorandum funded by the U.S. Army Corps of Engineers and developed for the Columbia Estuary Ecosystem Restoration Program (CEERP) on the topic of habitat restoration in the Columbia River Estuary (CRE) from Bonneville Dam to the river mouth. While the first two were developed by PNNL and NOAA without the benefit of stakeholder participation, for the current memo, two key activities were initiated: (1) review, by the Expert Regional Technical Group (ERTG), of status and trends monitoring and action effectiveness monitoring funded by CEERP, and (2) a workshop including representatives of the Bonneville Power Administration and the U.S. Army Corps of Engineers (the action agencies [AAs]), the National Oceanic and Atmospheric Administration (NOAA), major research agencies contributing to CEERP, and sponsors who implement CEERP restoration actions. A systematic literature review was conducted using ClarivateTM Web of ScienceTM database. The topics of interest for CRE relevant research included salmon ecology, physical processes, and wetland habitats, and therefore required the use of broad search terms. Our final search criteria included a combination of Boolean operators and an approach to combine different sets of search terms. The final search result yielded 669 records. The records were classified by groups and assigned to the relevant disciplinary expert for review. The review identified substantive advances in understanding the provision of salmon habitat functions through spatiotemporally dynamic physical and ecological processes, and the use of CRE habitats by numerous stocks of juvenile salmon. It also uncovered heretofore unincorporated historical documentation of riparian habitats across the CRE. The characterization of the structural components of floodplain habitat including plant associations and channel networks has advanced considerably, together with the understanding of seasonal changes and long-term trends. The relative influence of salmon-habitat location in the CRE as compared with temporal factors, mainly season, has been well described, which affects the prioritization of restoration. Stressors on the ecosystem and fish, and the drivers of these stressors, have been more carefully elucidated and predictive models are in various stages of development. The vision, aims, and design of restoration projects have advanced together with methods of data collection, analysis, and modeling that have seen substantial improvements. Experiments intended to inform the design of restoration projects are underway or have been completed. An important outstanding area of research that has lagged behind the advances in fundamental understanding of the ecosystem and salmon habitat functions remains the peer-reviewed documentation of the outcomes of restoration for both habitats and fish functions.

estuary↗

Financial Analysis of the Smallmouth Bass Flows implemented at the Glen Canyon Dam during Water Year 2024

The Glen Canyon Dam (GCD) is a Colorado River Storage Project (CRSP) power resource that is a component of the Salt Lake City Area Integrated Projects (SLCA/IP). The 2016 record of decision (ROD) for the GCD long-term experimental and management plan (LTEMP) final Environmental Impact Statement (EIS) specifies criteria for GCD monthly water releases, daily and hourly operating limits, and experimental releases. This report presents a financial analysis of the Smallmouth bass (Micropterus dolomieu) (SMB) flows implemented at GCD during Water Year (WY) 2024. These bypass flows were introduced by the U.S. Bureau of Reclamation (USBR) as an emergency response to the growing threat posed by invasive SMB in the Colorado River ecosystem downstream of the dam. SMB are a non-native predatory species that pose a significant threat to native fish populations, including the endangered humpback chub (Gila cypha). The thermal regime below GCD, typically cold due to hypolimnetic releases from Lake Powell, has historically served as a thermal barrier limiting SMB establishment. However, persistently low reservoir levels in recent years have reduced stratification in Lake Powell, allowing warmer water to be released downstream. This has enabled SMB to spawn successfully below the dam, prompting urgent ecological concerns. To mitigate the risk of SMB proliferation, the USBR implemented a series of bypass flows in WY 2024. Drawn from a lower elevation than the penstocks, the bypass structures released cooler water downstream. These short-duration bypass flows aimed to keep temperatures cool enough to prevent SMB from spawning, thereby reducing the ecological threat posed by this invasive species. Although motivated by ecological objectives, these bypass flows came with financial tradeoffs. Releasing water through the bypass structures instead of the turbines at GCD reduced hydropower generation, resulting in a significantly lower financial position for Western Area Power Administration (WAPA), which is responsible for marketing the electricity produced by the GCD Powerplant. This report analyzes the financial impact of the SMB flows implemented from July to November 2024. These experimental releases led to an estimated financial cost of approximately $18.9 million, primarily driven by the substantial volume of water diverted through the bypass structures. This study applies an integrated set of tools to estimate WAPA financial impacts by simulating GCD under two types of cases; namely, (1) a “With Experiment” case that mimics the water operations that actually occurred, including the SMB bypass flows, and (2) a “Without Experiment” case that simulates operations under the assumption that the SMB flows did not occur. Both cases comply with LTEMP hourly and daily operating criteria, and the monthly water release volumes are assumed to be identical under both cases. The Colorado River Storage Project Python-based model (CRiSPPy) model was the main modeling tool used to simulate the dispatch of the GCD hydropower plant and associated water releases from Lake Powell. In the modeling process, the research team used extensive data sets and historical information on SLCA/IP power plant characteristics, hydrologic conditions, and WAPA’s power purchases and sales prices.

13 HYDRO ENERGY↗

Financial Analysis of the High Flow Experiment conducted at the Glen Canyon Dam during Water Year 2023

The Glen Canyon Dam (GCD) is a Colorado River Storage Project (CRSP) power resource that is a component of the Salt Lake City Area Integrated Projects (SLCA/IP). The 2016 record of decision (ROD) for the GCD long-term experimental and management plan (LTEMP) final Environmental Impact Statement (EIS) specified criteria for GCD monthly water releases, daily and hourly operating limits, and experimental releases. This report examines the financial implications of the high flow experiment (HFE) conducted at GCD during the spring of Water Year (WY) 2023 as required by the LTEMP HFE Protocol. This report is part of a series of reports that describe the financial costs of LTEMP experimental releases since the 2016 ROD was adopted in January 2017. Previous reports analyzed the impact of several past HFEs and Bug Flow Experiments. This report focuses on the HFE conducted in April 2023. For this experimental release, financial costs of approximately $1.33 million were incurred because the HFE required sustained water releases exceeding the power plant’s maximum turbine flow rate. In addition, during the experiment, operators were not allowed to shape GCD power production, either to follow Firm Electric Service (FES) customer day-ahead energy deliveries or to respond to market prices. This study identifies the main factors contributing to the HFE costs and examines the interdependencies among these factors. It applies an integrated set of tools to estimate Western Area Power Administration (WAPA) financial impacts by simulating GCD under two types of cases; namely, (1) a “With Experiment” case that mimics the operations that actually occurred and (2) a “Without Experiment” case that simulates operations under the assumption that the HFE did not occur. The “With Experiment” case mimics operations during the HFE and the entire month the HFE occurred. It complies with LTEMP hourly and daily operating criteria. The “Without Experiment” case assumes that the HFE did not occur. The monthly water release volume is assumed to be identical under both cases. The Colorado River Storage Project Python-based model (CRiSPPy) model was the main modeling tool used to simulate the dispatch of the GCD hydropower plant and associated water releases from Lake Powell. In the modeling process, the research team used extensive data sets and historical information on SLCA/IP power plant characteristics, hydrologic conditions, and WAPA’s power purchases and sales prices. In addition to estimating the financial impact of the HFE, the team used the CRiSPPy model to gain insights into the interplay among ROD operating criteria, exceptions made to criteria to accommodate the HFE, and WAPA operating practices.

13 HYDRO ENERGY↗