Search NASA⌕ Search

SEARCH · Search NASA

Results for “IE”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Application of FARM to an IES scenario within the FORCE ecosystem

The FARM (Feasible Actuator Range Modifier) software module is a component of the RAVEN-based FORCE framework for analysis of Integrated Energy Systems (IES). FARM supports the HERON software module in the evaluation of the optimal dispatch by evaluating feasible set-points for the different IES unit components. Set-points are required to satisfy limits on both production variables (i.e., the variables to be optimized such as the electrical power, the hydrogen production rate, etc.) and process variables tied to the service life of equipment (e.g., steam flowrate, vessel pressure, turbine firing temperature, etc.). This problem is addressed by adopting a two-stage approach. First, the HERON power dispatcher determines set-points that meet the constraints on the former variables (e.g., power levels and power ramp rate limits). These constraints are called explicit constraints. Then, FARM adjusts these set-points to ensure the respect of the limits on the latter variables given the knowledge of the system physics acquired through machine learning algorithms. These constraints are called implicit constraints. From this standpoint, FARM constitutes a bridge between the HERON power dispatcher that adopts a simplified description of the IES unit (low-resolution physics) and the HYBRID high-fidelity models (high-resolution physics). The original version of the FARM software module (FARM-Alpha) was released by Argonne National Laboratory in January 2021. In the latest version of the code released in July 2022 (FARM-Delta), the Reference Governor (RG) algorithm was upgraded to a Multi-Input Multi-Output version from its original Single-Input Single-Output form. The RG algorithm acts to enforce constraints. With this improvement an IES unit is now treated as a single dynamic system from the standpoint of control. The crosstalk among components in an IES unit is now fully considered thereby ensuring a true optimization is obtained for those units that have multiple set-points. In this report, the capabilities of FARM-Delta operating within the FORCE ecosystem are demonstrated for an IES test case. The specific configuration of IES unit for this case was selected by the IES team with consultation from the Advanced Reactor IES Expert Group. A full TEA analysis that invoked HERON, HYBRID, FARM, and RAVEN was performed and serves to demonstrate how the latest modification to FARM algorithms (i.e., state variable selection, state-space matrices derivation, set-point verification) can shape setpoints that might otherwise compromise the health of equipment through accelerated wear and tear. In this specific test case, it was demonstrated that these algorithms ensure a more efficient utilization of steam resources to be shared by two different subsystems, namely Balance of Plant (BOP) and High-Temperature Steam Electrolysis (HTSE). Finally, some code improvements that can further enhance the user-friendliness are suggested.

97 MATHEMATICS AND COMPUTING↗

Development of Control System Functional Capabilities within the IES Plug-and-Play Simulation Environment

The concept of an Integrated Energy System (IES) is meant to combine different energy technologies in synergistic ways to achieve a more secure and economical energy supply. The RAVEN-based HYBRID framework is used to find the optimal installed capacity and the optimal economical dispatch of each component of the IES. A new RAVEN (Risk Analysis Virtual ENvironment) plugin for grid and capacity optimization (HERON) has been developed for optimizing the production variables of the IES given the demand profile. Currently, only the limits that affect the production variables and their corresponding time rates of change are considered (explicit constraints). However, other variables are additionally subject to constraints, but the associated limits are not accounted for (implicit constraints). In particular, for the power dispatch problem, the optimization algorithm takes into account the limits on the electrical power output and the corresponding hourly power variations but does not consider other constraints on process variables whose response effects the service life of the IES. This report describes a scheme that allows accounting for implicit constraints without increasing the size of the optimization problem. The Reference Governor (RG) algorithm is traditionally used for enforcing state and control constraints by modifying the set-point trajectories supplied to the feedback regulators. In our application, the RG is coupled within an iterative loop with the HERON-power dispatcher to generate optimal trajectories that ensure the operational constraints are met. A data-driven procedure to derive a representation of the dynamics of the controlled system was developed. First, the variables that represented the state of the system are selected (PCA-based approach), and then state-space representation matrices are derived from the collected measurements (DMDc algorithm). A preliminary version of the developed workflow based on Linear Time Invariant matrices was assessed by adopting a two-unit test case. More sophisticated versions of this workflow foreseeing the on-line derivation of system matrices will be deployed in FY 2021. Finally, a “plug-and-play” library of controllers and state observers was developed in Dymola. Some aspects of the current configuration of the IES unit components, e.g., the encapsulation of the control schemes into dedicated blocks, are consistent with the “plug-and-play” philosophy. Other features, e.g., the system buses collecting the input and the output variables, are not. For this reason, once listed and described the limits of the current configuration, necessary modifications to the plant model interface are presented. As a test-case, the interfaces of the SES model in the RAVEN-based HYBRID framework were reworked accordingly, and two different control schemes were applied to the same plant model.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Validation and Demonstration of Control System Functional Capabilities within the IES Plug-and-Play Simulation Environment

The concept of an integrated energy system (IES) is meant to combine different energy technologies in synergistic ways to achieve a more secure and economical energy supply. The RAVEN-based HYBRID framework is used to find the optimal installed capacity and the optimal economical dispatch of each component of the IES. The new RAVEN plugin for grid and capacity optimization (HERON) only addresses the limits that affect the production variables and the corresponding rates of variation (explicit constraints). However, other variables are subject to constraints, and the associated limits should be accounted for (implicit constraints). In particular, for the power dispatch problem, the optimization algorithm takes into account the limits on the electrical power output and the corresponding hourly power variations but does not consider other constraints on process variables whose response affects the service life of the IES. This report describes a scheme that allows accounting for implicit constraints without increasing the size of the optimization problem. To obtain a more accurate approximation of the nonlinear dynamic behavior, a parametric version of the dynamic mode decomposition with control (DMDc) algorithm was developed to derive the state-space representation matrices of the IES components at different scheduling parameter. Thanks to this approach, a more accurate approximation of the system response can be obtained, the limits imposed by thermal mechanical implicit constraints can be translated into power dispatch limits, and the feedbacks to HERON power dispatcher can be provided. To assess the developed methodology, a power dispatching test case composed of three power generating and storage units (Balance of Plant, Secondary Energy Source, Thermal Energy Storage) was developed. The power output of each one of the three units was optimized to meet the imposed time-dependent load demand trajectory and to maximize the IES profitability by meeting both the explicit and implicit constraints.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Roadmap for IES Modeling and Simulation Activities

Since inception of the DOE-NE Integrated Energy Systems (IES) program, several program and modeling visions and roadmaps have been published. In 2017, the last modeling and simulation capability development plan was published. In 2020, a comprehensive roadmap for the DOE-NE Integrated Energy Systems program has been published. The current report is meant to update the 2017 modeling and simulation capability roadmap and complement the IES overall program roadmap published in 2020. The role of modeling and simulation within IES is to support the demonstration of new coupled integrated technologies along every step of the technology maturation from the strategic analysis of preferred system architecture to preliminary design, to laboratory testing, up to full commercial testing and integration. To achieve this role, modeling and simulation must be able to assess the technical performance and the economic viability of potential IES. Also, modeling and simulation must provide support for experimental evaluations, i.e., support component design and real time operations of experimental demonstration systems. Finally, modeling and simulation can help scale-up experimental systems to the final commercial systems. This report details the current state of the modeling and simulation efforts within IES for the above-mentioned areas, provides a gap analysis and proposes next steps for a time horizon over the next 4 to 5 years.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Roadmap for IES Modeling and Simulation Activities: Update 2023

Since inception of the DOE-NE Integrated Energy Systems (IES) program, several program and modeling visions and roadmaps have been published. In 2020, a last comprehensive roadmap for the DOE-NE Integrated Energy Systems program was published. In 2017, a separate modeling and simulation capability development plan was published that was extensively updated in 2022. The current report incrementally updates the 2022 modeling and simulation capability roadmap. This is not a new report, but individual sections have been updated to reflect recent accomplishments and new directions of the program. The role of modeling and simulation within IES is to support the demonstration of new coupled integrated technologies along every step of the technology maturation from the strategic analysis of preferred system architecture to preliminary design, to laboratory testing, up to full commercial testing and integration. To achieve this role, modeling and simulation must be able to assess the technical performance and the economic viability of potential IES. Also, modeling and simulation must provide support for experimental evaluations (i.e., support component design and real-time operations of experimental demonstration systems). Finally, modeling and simulation can help scale-up experimental systems to the final commercial systems. This report details the current state of the modeling and simulation efforts within IES for the above-mentioned areas, provides a gap analysis, and proposes next steps for a time horizon over the next years.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Summary of INL Integrated Energy Systems Research for the Global National Laboratories Consortium on IES

The DOE Office of Nuclear Energy (DOE-NE) program on Integrated Energy Systems (IES) is led by researchers at Idaho National Laboratory (INL), and work is conducted in partnership with an array of other DOE laboratories, industry, and academia. IES research and development activities are additionally complimented by the DOE-NE Light Water Reactor Sustainability (LWRS) program, where work under the Flexible Plant Operations & Generation pathway supports analysis of opportunities for non-electric applications of current fleet nuclear plants and collaborates with multiple plants on near-term hydrogen production demonstration opportunities. The DOE-NE programs additionally partner with the Hydrogen and Fuel Cell Technologies Office under the DOE Office of Energy Efficiency and Renewable Energy to jointly fund the development of analysis tools, technologies, and nuclear-integrated hydrogen demonstration projects. This document provides a brief, high-level summary of IES work as contribution to the annual report for the Global National Laboratories Consortium on IES.

08 HYDROGEN↗

Integrate FARM with PID controllers: IES Simulation Ecosystem Control System Development

The FARM (Feasible Actuator Range Modifier) software module is a component of the RAVEN-based FORCE framework for analysis of Integrated Energy Systems (IES). FARM was designed to support the HERON software module in the solution of the optimal dispatch problem for IES units. As the result of HERON-FARM dispatch simulation, the set-point trajectories are optimized to meet constraints on both the production variables (i.e., the variables to be optimized such as the electrical power, the hydrogen production rate, etc.) and the process variables tied to the service life of equipment (e.g., steam flowrate, vessel pressure, turbine firing temperature, etc.) at a coarse time resolution (every 10 or 100 seconds) over long time horizons (several days or weeks). In case the operational constraints need to be met at finer time resolution, the computational burden of HERON-FARM would linearly increase with the sampling rate, and sub-optimal solutions might be obtained. System responses characterized by overshoots and damped oscillations temporarily violating the imposed constraints might occur during abrupt power transients. In this report, a hierarchical control system architecture for the operation of the Dynamic Energy Technology and Integration Laboratory (DETAIL) facility constructed at INL was proposed. First, the preliminary studies on the proposed control strategy for operating the facility and the designed PI controllers were reviewed. In particular, the current approach for generating the set-point trajectories was studied, and its limits were identified. To this aim, the inclusion of a Supervisory Control layer embedding a modified version of the FARM algorithm for preserving the system safe operation over both long and real-time horizons was proposed. In this way, FARM would be applied twice, i.e., the original version (“FARM Validator”) aiding the solution of the power dispatch problem, and the modified version (“FARM Supervisory” coordinating the PI controllers to address the real-time control tasks. Despite the kernel of the two modules is the same algorithm, their roles, tasks, and capabilities are quite different. A detailed description of the role of FARM at addressing low-level control tasks is provided, along with tentative operational procedures for training the models embedded into the algorithm by using the collected experimental data.

42 ENGINEERING↗

Demonstrate FARM supervisory capabilities for a thermal energy storage problem for the DETAIL facility: IES Simulation Ecosystem Control System Development

The goal of the power dispatch problem for an Integrated Energy System (IES) is to adjust the power output and the heat flow of each component to maximize the profitability of the whole unit. Facilities that can integrate real-time digital signals, mock nuclear power, thermal energy storage and industrial heat use via high-temperature electrolysis were constructed at INL to support the research activities. The Dynamic Energy Technology and Integration Laboratory (DETAIL) houses the Microreactor Agile Non-nuclear Experimental Test Bed (MAGNET) and the Thermal Energy Distribution System (TEDS). In this report, the hierarchical control system architecture proposed in June 2023 milestone for the flexible operation of DETAIL facility is finalized and demonstrated. A brief description of the components and the corresponding Dymola models from the HYRBID repository is first provided. Then, the current control strategy is presented. In particular, the approach for generating the set-point trajectories to be fed to the PI controllers is analyzed, and its limits were identified. To preserve safe operation over both long-time and real-time horizons, the integration of a Supervisory Control layer embedding a modified version of FARM (Feasible Actuator Range Modifier) module is proposed. FARM is a component of the RAVEN-based FORCE framework designed to support HERON module at optimizing the operation of IES units. The proposed control system for DETAIL foresees FARM to be applied twice, i.e., the original version (“FARM-Validator”) aiding the solution of the power dispatch problem, and a modified version (“FARM-Supervisory”) coordinating the PID controllers. Despite the kernel of the two modules is the same, their tasks are quite different. The former intervenes at the beginning of each hour to prevent constraint violations over long time periods, the latter addresses real-time control tasks and monitors the response of constrained variables at a much finer time resolution. A tentative procedure for training the embedded Digital Twins with the experimental data is also proposed. Finally, the capabilities of the designed architecture and the impact of the added Supervisory Control layer are demonstrated by simulating a representative power dispatch scenario.

25 ENERGY STORAGE↗

Analytical evaluation of a surface integral expressing the coupling between interior and exterior volumes in a FE-IE approach

Recently an approach which combines the finite element technique and an integral equation to determine the fields scattered by inhomogeneous bodies of complicated shape has been proposed. Basically, a mathematical surface which encloses the scatterers is introduced, thus dividing the space into an interior and an exterior volume, in which the finite element technique and an integral equation for EM scattering, respectively, are applied. The integral equation is set up for the tangential components of the fields at the surface, while the interior volume the unknowns are the total fields. Continuity of the tangential fields at the boundary, as required by Maxwell's equations, is imposed, thus coupling the two methods to obtain a consistent solution. The coupling term is expressed by a surface integral formed by the dot product of a FE basis function and an IE testing function, or viceversa. By choosing the boundary to be a surface of revolution and by making a convenient selection of IE basis (testing) functions, it is possible to evaluate the integrals analytically on surfaces such as curved triangles, curved quadrilaterals and curved pentagons. We will illustrate the salient steps involved in setting up and carrying out these integrals and discuss what class of basis (testing) functions and analytic surfaces of revolution they are applicable to. Analytic calculations offer the advantage of better accuracy than purely numerical ones, and, when combined with them, often shed light on issues of numerical convergence and limiting values. Furthermore, they may reduce computation time and storage requirements.

Zuffada, C.↗

Imaging Electron Spectrometer (IES) Electron Preprocessor (EPP) Design

The Aerospace Corporation developed the Electron PreProcessor (EPP) to support the Imaging Electron Spectrometer (IES) that is part of the RAPID experiment on the ESA/NASA CLUSTER mission. The purpose of the EPP is to collect raw data from the IES and perform processing and data compression on it before transferring it to the RAPID microprocessor system for formatting and transmission to the CLUSTER satellite data system. The report provides a short history of the RAPID and CLUSTER programs and describes the EPP design. Four EPP units were fabricated, tested, and delivered for the original CLUSTER program. These were destroyed during a launch failure. Four more EPP units were delivered for the CLUSTER II program. These were successfully launched and are operating nominally on orbit.

Fennell, J. F.↗

Immune checkpoint analysis of T‐cell responses to pp65 and IE‐1 antigens in end‐stage lung diseases

Abstract Lung transplant (LTX) patients are at high risk of cytomegalovirus (CMV) infection, which is often associated with high mortality and morbidity. Reactivation of CMV causes cell injury due to the cytopathic effect of viral replication and triggering of T cell immunity. The aim of this study was to compare expression of immune checkpoints (ICs) (PD‐1, CTLA‐4, LAG‐3 and TIGIT) in CD4, CD8 and CD56 and activation markers CD137, CD154 and CD69 of end‐stage patients awaiting lung transplant. Eighteen pre‐LTX positive for anti‐CMV IgG titres and 18 healthy subjects were enrolled. IC and activation markers have been evaluated through flow cytometric analysis in HC and pre‐LTX patients. Reactive (QF+) and unreactive (QF−) patients were stratified according to QuantiFERON‐CMV assays. ICs' and activation markers' expression were determined before and after in vitro stimulation with pp‐65 and IE‐1 antigens. Lower expression of PD‐1 was observed in CD4 and CD8 cells of pre‐LTX patients than controls, whereas CTLA4 appeared upregulated in CD56 and CD8 cells. TIGIT is increased on the surface of CD4, CD8 and NK cells after peptide stimulation in QF‐negative patients and PD‐1 is only downregulated after stimulation in the QF‐positive patients. This study provides new evidence of immune dysregulation in patients with end‐stage lung disorders, particularly in relation to immune checkpoint cell biology. The change in QF+ mostly happens on cytotoxic cells NK and CD8, while the changes in QF− were observed in adaptive immune cells, including CD4 and CD8.

Bergantini, Laura↗

On the Extended Emission of the Anomalous X-ray Pulsar IE 1547.0-5408

We present an analysis of the extended emission around the anomalous X-ray pulsar IE 1547.0-5408 using four XMM-Newton observations taken with the source in varying states of outburst as well as in quiescence. We find that the extended emission flux is highly variable and strongly correlated with the flux of the magnetar. Based on this result, as well as on spectral and energetic considerations, we conclude that the extended emission is dominated by a dust-scattering halo and not a pulsar wind nebula (P-VVN), as has been previously argued. We obtain an upper limit on the 2-10 keV flux of a possible PWN of 4.7 x 10(exp -14) erg/s/sq cm, three times less than the previously claimed value, implying an efficiency for conversion of spin-down energy into nebular luminosity of <9 x 10(exp -4) .

Olausen, S. A.↗

Forward-Looking IED Detector Ground Penetrating Radar

There have been many developments of mine or metal detectors based on ground penetrating radar techniques, usually in hand-held or rover-mounted devices. In most mine or metal detector applications, conditions are in a stationary mode and detection speed is not an important factor. A novel, forward-looking, stepped-frequency ground penetrating radar (GPR) has been developed with a capability to detect improvised explosive devices (IEDs) at vehicular speeds of 15 to 20 mph (24 to 32 km/h), 10 to 20 m ahead of the vehicle, to ensure adequate time for response. The GPR system employs two horn antennas (1.7 to 2.6 GHz, 20 dBi) as transmit and receive. The detector system features a user-friendly instantaneous display on a laptop PC and is a low-power-consumption (3 W) compact system with minimal impact on vehicle operations. In practice, the whole GPR system and a laptop PC can be powered by plugging into a cigarette lighter of a vehicle. The stepped-frequency continuous-wave (CW) radar scans frequency from 1.7 to 2.6 GHz in 1,000 steps of 0.9 MHz, with the full frequency scan in 60 ms. The GPR uses a bi-static configuration with one horn antenna used as a transmitter and the other used as a receiver so that isolation between transmitter and receiver is improved. Since the horn antennas (20 dBi) are mounted on the roof of a vehicle at a shallow inclination angle (15 to 25 with respect to horizontal), there is a first-order reduction in ground reflection so that a significant amount of the total reflected power received by the GPR comes from the scattering of RF energy off of buried objects. The stepped-frequency technique works by transmitting a tone at a particular frequency, while the received signal is mixed with the transmitted tone. As a result, the output of the mixer produces a signal that indicates the strength of the received signal and the extent to which it is in phase or out of phase with the transmitted tone. By taking measurements of the phase relationship between the transmitted and received signals over a wide frequency range, an interference pattern is produced showing all target reflections. When a Fourier transform is performed on this pattern, the result is a time-domain representation of targets. Among the advantages of this technique over impulse radar is the ability to transmit and receive much more total energy, and to use non-damped, highly focused horn antennas. The novelty of the IED detector GPR has been achieved by miniaturization of GPR electronics (single electronics board, 10x5x2 cm), low power consumption (3 W), faster signal processing capability, and minimal impact on vehicle operations.

Kim, Soon Sam↗

Digital Engineering and Cybersecurity Decision Analysis in Early Phases of SMR-Driven IES Projects

Considerable efforts are underway to ensure cybersecurity is integrated into the systems engineering lifecycle. Cyber-informed engineering and security-by-design frameworks are intended to identify and engineer out cybersecurity risks throughout the lifecycle. While these approaches are valuable for promoting the need to include cybersecurity considerations in early design phases to create more secure systems, they may not consider the entirety of digital risks. Digital risks in a digital instrumentation and control system include adversarial and unintentional risks from internal and external factors, such as human performance errors, design flaws, environmental conditions, and equipment degradation or failure. This report provides a detailed discussion on digital risk prior to describing the background and concept of operations for a small modular reactor-driven integrated energy system connected to industrial applications. The challenges of competing objectives and competing stakeholder requirements are discussed and the impacts on digital engineering, security considerations, and interdependencies are evaluated for mission-level, facility-level, and system-level decisions.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

Status Report on IES Plug-and-Play Framework

This report discusses the status of the flexible plug-and-play framework development currently ongoing that aims to integrate Modelica/Dymola with the Risk Analysis and Virtual ENviroment (RAVEN) software in terms of both Functional Mock-Up Interface (FMI)/Functional Mock-Up Unit (FMU) construction and repository structures that aim to ease the sharing and simulation of complex dynamic models. This report provides discusses the FMI/FMU adaptors that have been created within the HYBRID repository to allow users to quickly export models as FMUs. Several examples are shown that highlight the step-by-step process of converting an existing Modelica model into an FMU for use within the Dymola platform. Simulation results demonstrate that, while minor differences may occur, the overall control, trends, and solution integrity is maintained between standard Modelica simulation and FMU simulation results. However, it is worth noting that, for small systems, the FMU results have a slower simulation time than the Modelica only simulation. Using this process, a company can provide models that contain proprietary information to entities without disclosing any of the information about the model that could be considered business sensitive. Such an ability would allow institutions to bypass the necessity of “whitewashing” data. In addition to the investigative work being conducted on FMUs and FMIs, a series of updates to the hybrid repository has been completed. These updates include the addition of Modelica system-level regression tests and software quality assurance documentation that ensure that modifications to the Modelica models do not alter system-level model results. Overall, extensive work has been completed on developing FMUs and FMIs from existing models, understanding the requirements and limitations of FMUs, and opensourcing the HYBRID repository with an integrated regression system.

99 GENERAL AND MISCELLANEOUS↗

Development of the IES Plug-and-Play Framework

This report discusses the status of the flexible plug-and-play framework development currently ongoing that aims to integrate Modelica/Dymola with the Risk Analysis and Virtual ENvironment (RAVEN) software in terms of both Functional Mock-Up Interface (FMI)/Functional Mock-Up Unit (FMU) construction and repository structures that aim to ease the sharing and simulation of complex dynamic models. This report aims to provide an overview of all the performed activities resolving around the deployment of methods, software infrastructures, guidelines and workflow for the construction and usage of models, encapsulated using the FMI/FMU protocols and standards. In particular, the report is organized in three main macro-subjects, which are connected to each other: - FMI/FMU adaptors for modelica models - HYBRID repository new structure and open-source deployment - RAVEN FMI/FMU exporting capabilities and Artificial Intelligence (AI)-based analysis acceleration. The first part of the report discusses the FMI/FMU adaptors that have been created within the HYBRID repository to allow users to quickly export models, such as FMUs. Several examples are shown that highlight the step-by-step process of converting an existing Modelica model into an FMU for use within the Dymola platform. Simulation results demonstrate that, while minor differences may occur, the overall control, trends, and solution integrity are maintained between standard Modelica simulation and FMU simulation results. However, it is worth noting that, for small systems, the FMU results have a slower simulation time than the Modelica only simulation. Using this process, a company can provide models that contain proprietary information to entities without disclosing any of the information about the model that could be considered business sensitive. Such an ability would allow institutions to bypass the necessity of “whitewashing” data. In the second part of the report, the new structure of the HYBRID repository is discussed with a major focus on the series of updates that has been completed. These updates include the addition of Modelica system-level regression tests and software quality assurance documentation that ensure that modifications to the Modelica models do not alter system-level model results. The third and final part of the report aims to report the work that has been performed for the deployment of methods and workflows for the construction of RAVEN AI-based models compliant with the FMI/FMU standard. Such development represents the key for the deployment of the concept of “Flexible ecosystem” since it allows for the replacement of high-fidelity modelica models (or any other FMI/FMU compliant model) with RAVEN generated AI surrogate models. Overall, extensive work has been completed on developing FMUs and FMIs from existing models, understanding the requirements and limitations of FMUs, and open-sourcing the HYBRID repository with an integrated regression system.

42 ENGINEERING↗

Development of the IES Plug-and-Play Framework

This report discusses the status of the flexible plug-and-play framework development currently ongoing that aims to integrate Modelica/Dymola with the Risk Analysis and Virtual ENvironment (RAVEN) software in terms of both Functional Mock-Up Interface (FMI)/Functional Mock-Up Unit (FMU) construction and repository structures that aim to ease the sharing and simulation of complex dynamic models. This report aims to provide an overview of all the performed activities resolving around the deployment of methods, software infrastructures, guidelines and workflow for the construction and usage of models, encapsulated using the FMI/FMU protocols and standards. In particular, the report is organized in three main macro-subjects, which are connected to each other: - FMI/FMU adaptors for modelica models - HYBRID repository new structure and open-source deployment - RAVEN FMI/FMU exporting capabilities and Artificial Intelligence (AI)-based analysis acceleration. The first part of the report discusses the FMI/FMU adaptors that have been created within the HYBRID repository to allow users to quickly export models, such as FMUs. Several examples are shown that highlight the step-by-step process of converting an existing Modelica model into an FMU for use within the Dymola platform. Simulation results demonstrate that, while minor differences may occur, the overall control, trends, and solution integrity are maintained between standard Modelica simulation and FMU simulation results. However, it is worth noting that, for small systems, the FMU results have a slower simulation time than the Modelica only simulation. Using this process, a company can provide models that contain proprietary information to entities without disclosing any of the information about the model that could be considered business sensitive. Such an ability would allow institutions to bypass the necessity of “whitewashing” data. In the second part of the report, the new structure of the HYBRID repository is discussed with a major focus on the series of updates that has been completed. These updates include the addition of Modelica system-level regression tests and software quality assurance documentation that ensure that modifications to the Modelica models do not alter system-level model results. The third and final part of the report aims to report the work that has been performed for the deployment of methods and workflows for the construction of RAVEN AI-based models compliant with the FMI/FMU standard. Such development represents the key for the deployment of the concept of “Flexible ecosystem” since it allows for the replacement of high-fidelity modelica models (or any other FMI/FMU compliant model) with RAVEN generated AI surrogate models. Overall, extensive work has been completed on developing FMUs and FMIs from existing models, understanding the requirements and limitations of FMUs, and open-sourcing the HYBRID repository with an integrated regression system.

14 SOLAR ENERGY↗