Inverter Reliability Estimation for Advanced Inverter Functionality

In the near future, grid operators are expected to regularly use advanced distributed energy resource (DER) functions, defined in IEEE 1547-2018, to perform a range of grid-support operations. Many of these functions adjust the active and reactive power of the device through commanded or autonomous modes, which will produce new stresses on the grid-interfacing power electronics components, such as DC/AC inverters. In previous work, multiple DER devices were instrumented to evaluate additional component stress under multiple reactive power setpoints. We utilize quasi-static time-series simulations to determine voltage-reactive power mode (volt-var) mission profile of inverters in an active power system. Mission profiles and loss estimates are then combined to estimate the reduction of the useful life of inverters from different reactive power profiles. It was found that the average lifetime reduction was approximately 0.15% for an inverter between standard unity power factor operation and the IEEE 1547 default volt-var curve based on thermal damage due to switching in the power transistors. For an inverter with an expected 20-year lifetime, the 1547 volt-var curve would reduce the expected life of the device by 12 days. This framework for determining an inverter's useful life from experimental and modeling data can be applied to any failure mechanism and advanced inverter operation.

component degradation↗

Experimental Characterization Test of a Grid-Forming Inverter for Microgrid Applications

Standardized experimental testing protocols for grid forming (GFM) inverters to ensure expected operation under both normal and contingency conditions do not exist. Such protocols increase the confidence of system owner/operators that an inverter deployed in a proposed system will engage in typical behaviors to ensure interoperability with other units and ancillary equipment (e.g. protection equipment). This paper presents systematic and comprehensive test protocols to evaluate the performance of GFM inverters under the following operational configurations: islanded operation, heterogeneous islanded operation (parallel with a synchronous generator), grid-connected operation, and transition operation. A commercial GFM inverter is used to verify the test protocols and to understand the inverter's performance and functionalities. In particular, required configuration and tuning of the inverter will be explained in the full paper to enrich the testing protocol.

black start↗

Accelerating Simulation for High-Fidelity PV Inverter System Reliability Assessment with High-Performance Computing

The overall cost of photovoltaic (PV) systems has shown a downward trend during the last decade; however, PV inverter failures account for the highest cost of operation and maintenance. To address this, reliability tools with powerful computation and better accuracy are required for the lifetime prediction and degradation evaluation of PV inverters. This paper proposes an event-driven parallel computing-based simulator. The proposed simulator applies high-performance computing techniques and other accessory optimization techniques-including cluster merging, adaptive model updates, and steady-state identification-to make reliability assessments for PV inverters under given input mission profiles and operating conditions with high efficiency and high fidelity. The main idea of the simulator and its workflow are introduced. Then, a demo PV inverter system simulator is implemented, and the speedup of the total simulations of the switching model reaches 123.03 times.

high-performance computing↗

Bulk Power System Dynamics with Varying Levels of Synchronous Generators and Grid-Forming Power Inverters

Inverters using phase-locked loops for control depend on voltages generated by synchronous machines to operate. This might be problematic if much of the conventional generation fleet is displaced by inverters. To solve this problem, grid-forming control for inverters has been proposed as being capable of autonomously regulating grid voltages and frequency. Presently, the performance of bulk power systems with massive penetration of grid-forming inverters has not been thoroughly studied as to elucidate benefits. Hence, this paper presents inverter models with two grid-forming strategies: virtual oscillator control and droop control. The two models are specifically developed to be used in positive-sequence simulation packages and have been implemented in PSLF. The implementations are used to study the performance of bulk power grids incorporating inverters with gridforming capability. Specifically, simulations are conducted on a modified IEEE 39-bus test system and the microWECC test system with varying levels of synchronous and inverter-based generation. The dynamic performance of the tested systems with gridforming inverters during contingency events is better than cases with only synchronous generation.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Grid Strength Assessment for High Levels of Inverter-based Resources in the Puerto Rico Power

A system-wide assessment of the Puerto Rico power system grid strength is studied when considering high levels of inverter-based resource penetration. This study is carried out in PSSE and assesses the impact of inverter-based resource (IBR) contributions in response to three-phase ground faults. A hypothetical 100% inverter-based generation scenario is created to assess the extreme impact on short circuit levels and a realistic scenario is considered to assess the impact to short circuit ratios. The overall conclusion is that short circuit capacity and current will drastically decrease in a high IBR scenario, an effect that is quantified in this paper. The short circuit ratio metric is typically used to assess the impact of IBR but generally overestimates grid strength due to not accounting for the impact from multiple IBRs. Other methods such as equivalent circuit based short circuit ratio and weighted short circuit ratio offer a more comprehensive consideration for multiple IBRs and can better account for their mutual interactions. The work presented in this paper is part of the PR100 study.

inverter based resources, PR100, grid strength↗

State-Constrained Grid-Forming Inverter Control for Robust Operation of AC Microgrids

The control of grid-forming inverters has become an important problem to achieve high efficiency, reliability, and resilience of the future power grid. The distributed control that utilizes a sparse communication network has been proposed for AC microgrids, in which each DG only has access to the information of a small number of its neighboring DGs, reducing the computational complexity and improving the resiliency to faults and unknown parameters. However, these approaches have not provided a clear analysis of the coupling between active/reactive power injections and the voltage magnitude/frequency or a distributed updating law with a solid theoretical foundation. Additionally, in the existing approaches, tracking the references from the secondary control may violate operational constraints.

Xu, Ying↗

Photovoltaic Inverter Momentary Cessation: Recovery Process is Key

Momentary cessation refers to an inverter control mode. When the inverter terminal voltage falls below (or exceeds) a certain level, the inverter ceases to output any current, but attempts to maintain (or quickly regain) phase-locked loop synchronization to allow for quick reinjection of current when the voltage recovers to a certain point. This paper presents a photovoltaic (PV) momentary cessation model developed in PSS/E. Simulations are presented for a high voltage transmission line fault contingency in the Hawaiian island of Oahu power system on a validated PSS/E model, modified to include a custom distributed PV inverter model, and different near-future distributed PV penetration levels. Simulations for the island power system include different penetration levels of PV, and different recovery times (ramp rates and delays) after momentary cessation. The results indicate that during low voltage events, such as faults, momentary cessation can produce severe under frequency events, causing significant load shed and shortly thereafter, in some cases, over frequency events that cause generation to trip offline. The problem is exacerbated with higher penetration levels of PV. If momentary cessation is used (as is typically the case for distribution-connected resources), the recovery process after momentary cessation should be carefully considered to minimize impacts to bulk power system stability.

14 SOLAR ENERGY↗

Methods to Determine Recommended Feeder-Wide Advanced Inverter Settings for Improving Distribution System Performance

This paper describes methods that a distribution engineer could use to determine advanced inverter settings to improve distribution system performance. These settings are for fixed power factor, volt-var, and volt-watt functionality. Depending on the level of detail that is desired, different methods are proposed to determine single settings applicable for all advanced inverters on a feeder or unique settings for each individual inverter. Seven distinctly different utility distribution feeders are analyzed to simulate the potential benefit in terms of hosting capacity, system losses, and reactive power attained with each method to determine the advanced inverter settings.

14 SOLAR ENERGY↗

PV Inverter Fault Response Including Momentary Cessation, Frequency-Watt, and Virtual Inertia

This paper presents two photovoltaic (PV) inverter control methods and an analysis of the two under a significant three-phase transmission line fault contingencies in the Hawaiian island of Oahu power system. Simulations are presented for the two control methods on the island power system with a high penetration of PV generation, approximately 40% of the total. The two control methods discussed are similar: one is a proportional frequency-watt controller, and the second is a proportional-derivative controller, a frequency-watt controller with virtual inertia. Both methods can be beneficial for fast frequency support. The inverter model also emulates inverter fault response including 'momentary cessation' and recovery during low voltage events. The study presented in this paper utilizes a validated power system model of the Hawaiian island of Oahu, modified to include PV resources with the two custom developed control models. Dynamic simulations with PSS/E are presented during a significant transmission line three-phase fault contingency. Simulations are presented with and without PV reserve margin. In addition, a parameter sensitivity analysis is presented for the control methods. Results indicate both methods can significantly improve system response during fault events. Findings indicate that transmission faults can produce severe frequency events, and that fast recovery from momentary cessation is crucial to mitigate severity.

14 SOLAR ENERGY↗

IEEE 1547-2018 Based Interoperable PV Inverter with Advanced Grid-Support Functions

Grid integration of photovoltaic (PV) inverters has been increasing in the past decade. As a result of the uncertainties introduced with high penetrations of PV, better monitoring and control of the PV inverters becomes crucial for improving overall system stability. This paper focuses on the communications capability of the inverter controller and on enabling interoperability. Multiple standards are available to enable interoperability in PV inverters. In this paper, an interoperable controller, enabled by Distributed Network Protocol 3 (DNP3) communications protocols, is developed for a grid-connected, three-phase PV inverter. The DNP3 server for the PV inverter is programmed on the real-time layer of the field-programmable gate array (FPGA)-based inverter controller. Set points for advanced inverter control functions, such as volt/VAr curves, ride-through curves, are sent from a DNP3 client, a simulated distribution management system application, to the PV inverter through DNP3. This communications capability of the inverter controller is validated using a controller-hardware-in-the-loop experimental setup. The code developed to achieve the interoperability is available in the public domain through open-source software licensing. This interoperability will enable smoother grid integration of smart PV inverters with advanced grid-support functions as well as allow better monitoring and control of PV inverters for grid stability.

14 SOLAR ENERGY↗

Experimental Evaluation of PV Inverter Anti-Islanding with Grid Support Functions in Multi-Inverter Island Scenarios

As PV and other DER systems are connected to the grid at increased penetration levels, island detection may become more challenging for two reasons: 1.) In islands containing many DERs, active inverter-based anti-islanding methods may have more difficulty detecting islands because each individual inverter's efforts to detect the island may be interfered with by the other inverters in the island. 2.) The increasing numbers of DERs are leading to new requirements that DERs ride through grid disturbances and even actively try to regulate grid voltage and frequency back towards nominal operating conditions. These new grid support requirements may directly or indirectly interfere with anti-islanding controls. This report describes a series of tests designed to examine the impacts of both grid support functions and multi-inverter islands on anti-islanding effectiveness. Crucially, the multi-inverter anti-islanding tests described in this report examine scenarios with multiple inverters connected to multiple different points on the grid. While this so-called 'solar subdivision' scenario has been examined to some extent through simulation, this is the first known work to test it using hardware inverters. This was accomplished through the use of power hardware-in-the-loop (PHIL) simulation, which allows the hardware inverters to be connected to a real-time transient simulation of an electric power system that can be easily reconfigured to test various distribution circuit scenarios. The anti-islanding test design was a modified version of the unintentional islanding test in IEEE Standard 1547.1, which creates a balanced, resonant island with the intent of creating a highly challenging condition for island detection. Three common, commercially available single-phase PV inverters from three different manufacturers were tested. The first part of this work examined each inverter individually using a series of pure hardware resistive-inductive-capacitive (RLC) resonant load based anti-islanding tests to determine the worst-case configuration of grid support functions for each inverter. A grid support function is a function an inverter performs to help stabilize the grid or drive the grid back towards its nominal operating point. The four grid support functions examined here were voltage ride-through, frequency ride-through, Volt-VAr control, and frequency-Watt control. The worst-case grid support configuration was defined as the configuration that led to the maximum island duration (or run-on time, ROT) out of 50 tests of each inverter. For each of the three inverters, it was observed that maximum ROT increased when voltage and frequency ride-through were activated. No conclusive evidence was found that Volt-VAr control or frequency-Watt control increased maximum ROT. Over all single-inverter test cases, the maximum ROT was 711 ms, well below the two-second limit currently imposed by IEEE Standard 1547-2003. A subsequent series of 244 experiments tested all three inverters simultaneously in the same island. These tests again used a procedure based on the IEEE 1547.1 unintentional islanding test to create a difficult-to-detect island condition. For these tests, which used the two worst-case grid support function configurations from the single-inverter tests, the inverters were connected to a variety of island circuit topologies designed to represent the variety of multiple-inverter islands that may occur on real distribution circuits. The interconnecting circuits and the resonant island load itself were represented in the real-time PHIL model. PHIL techniques similar to those employed here have been previously used and validated for anti-islanding tests, and the PHIL resonant load model used in this test was successfully validated by comparing single-inverter PHIL tests to conventional tests using an RLC load bank.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Effects of Reactive Power on Photovoltaic Inverter Reliability and Lifetime

This paper performs research on predicting Photovoltaic (PV) inverters reliability and lifetime based on thermal cycling. Thermal cycling is considered the most important stressors in an inverter system. In order to achieve this, a detailed electro-thermal model of the PV inverter will be developed along with their controllers capable of providing voltage support through reactive power. An in-house inverter was built, and a PV inverter model was developed to match the physical inverter. The PV inverter electrothermal model was validated for different ambient temperatures to match the in-house inverter hardware. The in-house inverter was placed inside a thermal chamber to emulate different ambient temperatures and their losses and temperature rises within the system were measured. After the validation of the model, a reduced order model of the inverter will be implemented to translate the mission profile of ambient temperature and solar irradiance into load profile of junction temperatures of the switches. The junction temperature data will be used to identify the reliability indices and hence predict the useful lifetime of the inverter system. Along with the model to predict useful lifetime of the system, the impact of reactive power on the overall reliability of the system will be studied. The key observation in this paper shows that lifetime of the inverter decreases as the operating power factor moves away from unity.

14 SOLAR ENERGY↗

Development and Validation of a SiC Based 50 kW Grid-Connected PV Inverter: Preprint

In this digest a 50kW string PV inverter formed using all SiC semiconductor devices is presented. The inverter design includes additively manufactured power block, symmetrical Y-core inductors for ac side filter, and advanced inverter functionality for grid support. This inverter utilizes the conventional three-phase Voltage Source Inverter topology and optimizes the design for SiC based devices. This paper presents the full functional validation of the designed inverter along with quantification of the efficiency and power density. The performance of the inverter for high dc-bus voltage without multi-level topology to exploit SiC advantages is also presented in this digest. The full paper will include details of inverter design, optimization and further experimental validation.

14 SOLAR ENERGY↗

Residential Advanced Photovoltaic Inverter Pilot Study Results for Select Distribution Secondaries in Hawai'i

Penetration levels of residential rooftop solar photovoltaic (PV) generation on the Hawaiian island of O'ahu have increased significantly in recent years, with many circuits now at the limits of their PV hosting capacity. NREL and Hawaiian Electric have used this opportunity to deploy advanced inverters at new customer installations that would not otherwise have been approved, as a pilot study to gain first-hand operational field data and experience on the impact of inverter-based grid support functions. At each customer location, the deployed advanced inverters were remotely controlled and monitored. Additionally, customer AMI (smart meter) and secondary distribution transformer data was also available for the analysis. The analysis focused on quantifying the customer behind-the-meter voltage rise due to PV production, determining the customer voltage rise with advanced inverters in unity power factor as well as advanced grid support function modes, and estimating the curtailment when inverters have Volt-VAR and Volt-Watt enabled. The results show that: 1) Behind-the-meter voltage rise is often not negligible. 2) An inverter's operating point on a Volt-VAR/Volt-Watt curve depends strongly on the design of the secondary system on which it is installed. 3) The mitigation of voltage rise on the secondary system using Volt-VAR may not be effective if only a small proportion of inverters have grid support enabled, or if the reactance/resistance (X/R) ratio of the grid is low. 4) Volt-Watt curtailment can be estimated using co-located irradiance sensors but there may be opportunities to estimate it using inverter internal electrical measurements. 5) Estimated curtailment is very low for the locations analyzed to date.

14 SOLAR ENERGY↗

Design of a Non-PLL Grid-Forming Inverter for Smooth Microgrid Transition Operation

This paper develops a controller for a grid-forming (GFM) inverter that is capable of operating as either a GFM or grid-feeding source that can improve the operation of a microgrid during on-off grid transitions through use of a novel synchronization approach. Furthermore, this controller avoids use of a phase-locked loop (PLL) and the inverter is able to synchronize with the grid with self-generated voltage and frequency. This prevents the inverter from replicating any grid voltage disturbances in its output—a key disadvantage of many grid-connected inverters that use a PLL. To enable fast synchronization, active synchronization control is adopted both during inverter start-up and microgrid reconnection operation and a method of coordinating synchronization of the inverter with a microgrid controller and grid interconnection circuit breaker is presented. Simulation results for multiple microgrid transition operations and unplanned islanding events demonstrate that the developed non-PLL grid-connected GFM inverter controller and synchronization method are effective in synchronizing the inverter and microgrid to the grid, avoiding phase jump during microgrid transition operation, and improving microgrid islanding transients versus a traditional configuration.

27 ARPA - Advanced Research Projects Agency-Energy↗

Enhanced Large-Signal Stability Method for Grid-Forming Inverters During Current Limiting: Preprint

Grid-forming (GFM) inverters are a promising technology for the widespread integration of renewable energy sources in future power systems. As a key element of GFM inverter control, the primary controller governs the internal reference voltage and angle. During contingencies in the grid---such as faults, voltage drops, or frequency and phase jumps---an inverter can be forced into a current-limiting mode of operation modulating inverter dynamics, and, as a result, it is prone to losing synchronism with the grid. In this paper, we propose a novel GFM primary control method with an additional synchronization term that naturally activates during contingencies to improve the dynamic response. The method allows the inverter to remain synchronized with the grid, which improves the inverter's dynamic behavior both during and after current-limiting grid conditions and enhances grid support, including voltage support using full current capacity. The method is demonstrated for voltage, frequency, and phase jumps both in a single-machine-to-infinite-bus and a network-wide electromagnetic transient simulation of the IEEE 14-bus system with 5 GFM inverters. The simulations provide insights into the proposed synchronization method and confirm the high potential of the method, which robustly secures synchronism under severe contingencies.

current limiting↗

Universal Passive Synchronization Method for Grid-Forming Inverters Without Mode Transition

Power systems are transforming with increasing levels of inverter-based resources (IBRs). This transformation requires critical roles of grid-forming (GFM) inverters replacing synchronous generators for bulk power system stabilization and ancillary services, also allowing flexible power system operation, such as microgrid that is operated by multiple GFM IBRs to achieve system resilience against contingencies. To realize the resilient power systems allowing flexible in-and-out operation of GFM IBRs potentially programmed with different primary controls, a synchronization method universally applicable, i.e., independent of control types, would be beneficial to ease the integration process, but it has not been actively studied. To fill the gap, this paper proposes a universal synchronization method that achieves a passive synchronization to enable a smooth transition in a grid with off-nominal system parameters, i.e., voltage and frequency. The logic proposed requires no modification on the primary control, thus applicable to any type of GFMs with a voltage reference input. To validate the concept, a simulation of an IEEE 13-bus benchmark system modified with 3 GFM inverters is presented. It simulates an inverter-driven black start scenario in which GFM inverters autonomously turn on and connect to the grid under heavy loading, using the synchronization logic. The case study demonstrates that GFM inverters can tune their voltage reference to smoothly synchronize without severe transients, and contribute to a seamless black start of the grid under unbalanced load conditions. Two GFM methods - Droop and dispatchable virtual oscillator control - are used for the demo to validate feasibility and interoperability of the passive synchronization.

black start↗