Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

A risk-informed assessment tool to support review of license amendment requests for spent nuclear fuel dry cask storage systems

We report that while risk-informed safety evaluations are common methodologies used by the U.S. Nuclear Regulatory Commission (NRC), their application in the field of commercial spent nuclear fuel (SNF) dry storage has received limited attention. For instance, license amendment requests (LARs) for SNF dry cask storage systems (DCSSs) are evaluated according to U.S. NRC standard review plans (SRPs). However, risk-informed LAR review strategies could improve the understanding of critical system modifications, and lead to more predictable, efficient, and consistent LAR review processes. A methodology to develop a risk-informed LAR review tool is presented. Although focused on DCSSs, this methodology can be used to develop similar tools for a broad spectrum of safety-relevant systems. The end product (i.e., the tool) includes a tree diagram to help visualize the review risk significances assigned to a predefined set of system modifications and supporting rationale documentation. Instructions support correct tool application and provide the user with a path to incorporate currently unevaluated modifications in the tool structure. The demonstration of the methodology leads to the conclusion that risk-informed reviews of DCSS LARs are possible, although the tool precision could benefit from additional risk information. Further, the results indicate that many typical LARs involve low-risk or medium-risk modifications.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Safety-Related Instrumentation and Control Pilot Upgrade: Initial Scoping Phase Implementation and Lessons Learned

In May 2016, the U.S. Nuclear Regulatory Commission (NRC) staff provided a digital instrumentation and control (I&C) regulatory infrastructure integrated action plan to the NRC for approval. One of the objectives of that plan was to establish a clear regulatory structure with reduced regulatory uncertainty to enable the expanded safe use of digital I&C in commercial nuclear reactors while continuing to ensure safety and security. To achieve this end, the NRC, with collaboration from industry, developed a streamlined License Amendment Request Alternate Review (AR) process for safety-related (SR) digital I&C upgrades. In spite of this effort, the industry has remained reluctant to perform such I&C upgrades because of perceived regulatory and financial risks associated with being the first or an early adopter of the AR process for SR I&C upgrades. The U.S. Department of Energy Light Water Reactor Sustainability Program at the Idaho National Laboratory performed Initial Scoping Phase research to help break this impasse by supporting a SR I&C Pilot Upgrade, working with MPR Associates, ScottMadden Inc., and Exelon Generation. Exelon’s Limerick Generating Station (LGS) was selected as the target for this research. This paper summarizes the Initial Scoping Phase engineering and operations, licensing, and project management activities necessary to bound the scope, schedule, and estimated cost of the project sufficiently to enable utility management authorization of Conceptual Design Phase activities. These efforts and associated products are intended to provide a template to support larger industry efforts to perform similar upgrades as a foundation stone for a digital transformation that will improve plant safety, reliability, and operational performance while lowering plant total cost of ownership. As a result of the combined effort of Exelon Generation and research participants, Conceptual Design Phase activities for the subject upgrade at LGS were approved by Exelon. Further, the U.S. Department of Energy also awarded a $50 million cost share award to Exelon in order to pave the way for SR I&C modernization and associated control room upgrades across the U.S. nuclear fleet. Additional research reports are planned for the Conceptual Design Phase, Detailed Design Phase, and the Implementation Phase of the LGS project to document the process followed and promulgate lessons learned to industry.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Safety-Related Instrumentation and Control Pilot Upgrade: Conceptual - Detailed Design Phase Report and Lessons Learned

Historically, regulatory barriers have precluded nuclear plant safety-related (SR) Instrumentation and Control (I&C) system modernizations. These barriers have been largely addressed by industry and United States Nuclear Regulatory Commission (NRC) efforts, including development of the License Amendment Request (LAR) Alternate Review (AR) process for digital I&C upgrades. The U.S. Department of Energy (DOE) and the Idaho National Laboratory (INL) are supporting a SR I&C pilot upgrade at the Limerick Generating Station (LGS) to demonstrate this process and capturing associated lessons learned for the benefit of industry. In 2021, a paper summarizing lessons learned as captured in INL/EXT-20-59809, Safety Related Instrumentation & Control Pilot Upgrade Initial Scoping Phase Implementation Report and Lessons Learned was presented at the 12th NPIC & HMIT conference. It is recommended that readers of this paper review reference 1 or the associated Nuclear Journal paper for context. This paper summarizes activities performed and lessons learned for the conceptual design phase and portions of the detailed design phase as captured in INL/RPT-23-XXXX, “Safety-Related Instrumentation and Control Pilot Upgrade: Conceptual - Detailed Design Phase Report and Lessons Learned.” The portions of the effort covered by reference 2 include conceptual design phase activities from December 2020, through completion in November 2021, and detailed design activities through September 2022. These efforts and associated detailed documentation in reference 3 are intended to support similar industry upgrades as a foundation stone for a Digital Transformation that will improve plant safety, reliability, and operational performance while lowering plant total cost of ownership.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Light Water Reactor Sustainability Program Plant Modernization Technical Program Plan for FY 2021

This report presents the Technical Program Plan for FY 2019 for the Department of Energy Light Water Reactor Sustainability Program – Plant Modernization research pathway. A summary of the vision and strategy is provided to explain how this program addresses key issues and barriers for modernizing instrumentation and control technologies and infrastructure in domestic nuclear power plants. The report describes the pilot projects that have been formulated to develop and validate enabling technologies over the next several years that will result in digital alternatives to the legacy analog II&C systems in place today. This will allow much needed modernization of these systems to address reliability and obsolescence problems, as well as serve as a platform for substantial operational improvement. The report further describes key project resources and cooperative relationships, including the Electric Power Research Institute, the Nuclear Energy Institute )NEI), the Institute of Nuclear Power Operations (INPO), the IFE Halden Reactor Project, the Nuclear Regulatory Commission, and industry suppliers, that are instrumental to the success of the program. The report also lists the schedule for all program products, including the titles and report numbers for all published reports under this program.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗