Lunar Surface Thermal Analysis Roadmap
Explore the source record for details and available documents.
SEARCH · Search NASA
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
The Lunar Environment Monitoring Station (LEMS) is an autonomous, survive-the lunar-night seismic suite to be deployed on the Lunar surface by the Artemis III crew and designed to operate continuously for two years. It will see the extremes of the Lunar south pole thermal environment where surface temperatures range from -200°C to +20°C and where nighttime duration is at least 354 hours. Given power and mass constraints, the thermal system is limited to 2.5 Watts of heat during the lunar night. Presented is the system thermal vacuum test plan and configuration to validate the thermal control system performance in a flight-like environment. The test will measure the nighttime heat leaks for the bus and 18 seismometers to ensure lunar night survival and operability.
The Lunar Environment Monitoring Station (LEMS) is an autonomous, survive-the-lunar-night seismic suite to be deployed on the Lunar surface by the Artemis III crew and designed to operate continuously for two years. It will see the extremes of the Lunar south pole thermal environment where surface temperatures range from -200°C to +20°C and where nighttime duration is at least 354 hours. Given power and mass constraints, the thermal system is limited to 2.5 Watts of heat during the lunar night. The electrical harnessing named the Signal and Power Passthrough (SAPP) was designed to minimize heat loss while meeting power and signal integrity requirements. To mitigate risk due to uncertainty associated with the harnessing materials, routing, and tie-downs, a flight-like thermal conductance test was performed to measure the heat loss. The test methodology, results, and model correlation are presented.
Power availability remains one of the primary constraints for lunar surface science. This talk reviews power requirements from previously flown instruments to help prepare future payloads for upcoming CLPS opportunities and highlights the testing and environmental simulation capabilities at NASA JSC that enable reliable lunar payload development. It also outlines the power needs, environmental challenges, and emerging technologies required to support sustained human and robotic operations on the lunar surface as part of NASA’s Moon to Mars strategy. Key challenges include variable solar illumination at polar and equatorial regions, extreme thermal environments, and dust driven degradation that limit current surface power systems. The science data needed for resource identification and landing site planning will allow for the successful preparation of crewed Artemis activities and long-term presence. Building on recent missions, current test infrastructure, and emerging power technology pathways, this presentation equips industry, academia, and government teams with the information needed to design robust lunar payloads, reduce development risk, and fully leverage the increasing cadence of CLPS missions. These developments will form a critical technical foundation for long duration lunar presence and future Mars exploration.
Preparing payloads for the lunar surface requires rigorous testing that accurately captures the extreme environmental and operational conditions. This presentation provides an overview of the lunar relevant test capabilities at NASA JSC’s Astromaterials Research and Exploration Science (ARES) laboratories as well as the Energy System Test Area (ESTA) Lunar Development and Test Facility. These facilities allow teams to assess hardware performance in dusty vacuum environments, characterize interactions with high fidelity lunar regolith simulants, evaluate mechanical and thermal durability, and understand the effects of micrometeoroid and orbital debris impacts—critical factors for certifying payloads that will operate on the lunar surface or in orbit. While Lunar power challenges such as variable illumination, extreme temperatures, and dust driven degradation will be briefly summarized, the focus of this talk is on how JSC’s test infrastructure enables developers to validate designs, reduce mission risk, and ensure compatibility with CLPS and Artemis objectives. NASA JSC’s expertise and experience help industry, academic, and government teams prepare robust hardware ready for successful delivery and operation on the surface of the Moon.
Explore the source record for details and available documents.
Development of the Moon Base will enable a home away from home for astronauts who will live and work at humanity’s first lunar outpost. In this effort, NASA’s Moon Transportation Office is responsible for enabling the transformational missions required to deliver habitats, supplies, science payloads, and all other elements needed to cultivate a permanent presence on the Lunar Surface. The Mission Concept (MC) is characterized through evaluation of an end-to-end architecture that can successfully deliver a generalized heavy large-volume payload, in excess of 4000 kg, to a precision landing and touchdown on the lunar surface. The mission architecture utilizes a single launch configuration of a Lunar Lander (LL) with a unique propellant system. The LL has an integral orbital transfer capability and features jettisonable elements. The design circumvents the need for prop transfer on orbit and multiple launch configurations. The launch vehicle (LV) for this work will assume the capability to deliver a payload in excess of 40,000 kg to orbit, affording multiple LV solutions. Considerations for the LL and payload deployment from the fairing are assumed to be handled through compliance with a launch providers’ Interface Requirements Document (IRD). The MC will span from launch at Kennedy Space Center (KSC) to terminal descent and touchdown on the lunar surface, requiring a total ΔV on the order of 6 km/s beyond what is required to get the vehicle stack to a 200 km circular Low Earth Orbit (LEO). Major mission phases include: launch and launch vehicle separation, transfer operations, pre-landing navigation, and lunar descent and touchdown. A Concept of Operations (ConOps) is used as the primary design driver for defining architecture of the vehicles necessary to achieve final payload delivery. Numerous ground rules and assumptions will be provided for each phase of the mission. Concept designs for the LL is presented. An emphasis of the design maximizes a feasible path for maturation, manufacturing, and operation. A self-imposed practical consideration for this effort is the incorporation of legacy designed hardware to minimize expensive, time-intensive, and high-risk hardware development cycles. The propulsion system of the LL adopts a conventional storable bipropellant configuration of monomethyl hydrazine (MMH) and mixed oxides of nitrogen (MON3). This effort will showcase a unique propellant delivery system to minimize the reliance on propellant management devices (PMDs) during descent. Numerous key constraints have been considered, across the multiple segments of the mission. These include the unique aspects of center of gravity (CG) management, thruster plume effects including self-impingement, propulsion system hardware limitations, navigation during multiple mission phases, and landing gear geometry for uneven terrain. These constraints shape the trades necessary for precision landing of heavy cargo and ensure compatibility with broader Moon Base Transportation concepts. The resulting insights inform future transportation strategies for the Moon and beyond; directly contributing to the development of cargo‑delivery standards that will support the long‑term buildup of a sustainable, continuously inhabited Moon Base.
NASA’s long-term goal is to deploy humans to the Moon and, from there, advance human exploration to Mars, with Artemis missions as pivotal milestones. Raman spectroscopy can uniquely identify minerals, compounds, water states, and other materials, providing distinctive fingerprints for classification. A Raman instrument has been successfully deployed and utilized on the Mars surface via the Perseverance rover, but has not yet been utilized at the lunar surface The SUCR DALI project is working towards developing a Raman spectroscopy instrument to be applied in various lunar mission concepts, including within the Artemis program. The objective of my research is to assist in the maturation of the proposed SUCR DALI lunar Raman instrument through the development of an autonomous detection and classification model capable of identifying minerals and water states on the Moon’s surface.
Establishing and maintaining a sustained presence on the lunar and/or Martian surfaces will require a diverse portfolio of surface elements (e.g., habitation, mobility, power generation, etc.). Many of these systems generate excess heat that must be rejected across a wide range of magnitudes, temperatures, and duty cycles and under variable environmental conditions. To identify the most promising heat rejection approaches for this diverse portfolio, a heat rejection trade study was conducted to evaluate the performance of different technology approaches across a spectrum of surface environments and heat-load requirements. The trade study consisted of three stages: (1) development of a parametric-based modeling framework, (2) creation of a database of heat rejection technologies, surface elements, and environmental conditions for the Moon and Mars, and (3) execution of a quantitative analysis of various heat rejection technologies across different operating conditions and surface elements. The modeling framework is developed in Python and Excel to prioritize small model size and hence low computational cost to enable large parametric sweeps while avoiding the reliance on proprietary software. Individual heat rejection processes are represented as simple Excel models, and a centralized Python script interfaces with the models to coordinate the parametric study. These simple sizing models were developed to take heat load requirements and environmental parameters as inputs and compute mass, power, and volume as outputs. Rather than assess each heat rejection technology separately for each surface element, a unified parametric space was developed to evaluate all technologies across all elements. This parametric space includes factors related to heat load (e.g., magnitude or temperature) and environment (e.g., surface temperature, sky temperature, solar flux). This effort generated a database containing information on over 60 heat rejection technologies and 30 surface elements. For each surface element, the expected heat rejection requirements were documented and analyzed to determine the most common needs shared across all elements. Environmental conditions at various lunar and Martian latitudes were also established for worst-case hot and worst-case cold scenarios. High-fidelity heat rejection models are currently under development. Preliminary trades between heat rejection technologies including radiators, venting technologies, convective coolers, and more have been conducted to identify promising options. This presentation will summarize the preliminary trade results and provide an overview and discussion of the expected heat loads and thermal environments for sustained surface operations on the Moon and Mars.
NASA Talks - Exploration drives technology, and as NASA works toward sustained operations on the lunar surface for a permanent moonbase, it is critical to understand how the location drives what’s needed to accomplish these goals. This is especially important as we land on the lunar South Pole, which will be different and riskier than the previous Apollo landing sites. The thermal conditions will be much colder, the lighting environment is challenged with low sun angles, the regolith holds a charge in the plasma sheath, and the radiation is significantly higher than in low Earth orbit (LEO). Stephanie Sipila, Deputy Manager of Extravehicular Activity and Human Surface Mobility Program (EHP) Technology, Integration and Partnerships Office, provided knowledge and insight into the game-changing technologies NASA is exploring to mitigate these risks.
Regenerative fuel cells (RFCs) are an attractive energy storage solution for lunar missions as a technology capable of providing a higher specific energy (i.e., W∙h/kg) than state-of-the-art packaged Li-ion battery systems. An RFC consists of the (1 & 2) electrochemical stacks (chemical to electrical energy conversion to supply electricity to an external load, i.e. the fuel cell reaction, and electrical to chemical energy conversion of supplied electrical power to dissociate water into hydrogen and oxygen gases, i.e. water electrolysis), (3) fluidic conditioning, (4) reactant storage, (5) avionics, (6) power management and distribution (PMAD), and (7) thermal management. NASA’s Glenn Research Center has designed, assembled, and tested a breadboard RFC sys-tem capable of operating autonomously for multiple simulated lunar day/night cycles in a laboratory environment. The system is comprised of a non-flow through proton exchange membrane (PEM) fuel cell stack and a liquid-anode feed PEM electrolyzer (EZ) stack designed to electrochemically compress the reactants at balanced pressures up to 12.4 MPa (1800 psia). The fluidic conditioning, avionics, PMAD, and thermal management sub-systems are largely comprised of commercial-off-the-shelf components for this system-level development effort. The hardware is controlled by a CubeSat space processor running an operational program based on core flight architecture that can control the RFC hardware autonomously through a state machine with fault monitoring. The testing results highlighted here were completed with the system in an open-loop configuration such that reactants generated through water electrolysis were vented while gas cylinders supplied fuel cell operation. The breadboard operated autonomously, but there were five unplanned transitions to a safe state that required a manual restart after reviewing the data, determining a root cause, and implementing a solution. Four of the transitions were caused by the thermal management subsystem and the fifth was caused by a water management control issue in the EZ sub-system. The RFC system operated for over 550 hours with the final cycle being slightly abbreviated due to reasons unrelated to system performance.