Search NASA⌕ Search

SEARCH · Search NASA

Results for “MHI”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

Expanding the Cage of 2D Bromide Perovskites by Large A-Site Cations

Two-dimensional (2D) halide perovskites have outstanding optoelectronic properties, and they feature a variety of organic cation spacers and cage A-site cations that can be incorporated into their structures. It has recently been reported that the Goldschmidt tolerance factor can be relaxed and expanded in iodide 2D perovskites. Bromide 2D perovskites, whose multilayer structures and optical properties are much less studied, provide a great platform for studying structure-property relationships for 2D perovskites with large Asite cations. Herein, we report the synthesis and structure of three new 2D bromide perovskites-(BA)(2)(MHy)(2)Pb3Br10 (BA, butylammonium; MHy, methylhydrazinium), (BA)(2)(EA)(2)Pb3Br10 (EA is ethylammonium), and (BA)(2)(DMA)Pb2Br7 (DMA is dimethylammonium). We compared them with other 2D perovskites with different A-site cations but with the same spacer and layer thickness. Single-crystal structures show that the Pb-Br bonds are elongated to accommodate the large A-site cations. Additionally, the octahedra in (BA)(2)(MHy)(2)Pb3Br10 and (BA)(2)(EA)(2)Pb3Br10 are highly distorted, and their different stacking patterns of the inner and outer layers lead to the formation of the n = 3 phases. Density functional theory calculations show that 2D perovskites with larger A-site cations (e.g., DMA, MHy, and EA) have smaller band dispersions and larger effective masses than those with Cs+ and MA. (BA)(2)(MHy)(2)Pb3Br10 also exhibits one of the largest Rashba splittings in the literature. Structures with large cage cations also exhibit high band gaps within the same n number and short photoluminescence (PL) lifetimes. Temperature- and power-dependent PL measurements reveal that the broad shoulder in the PL peak originates from the trap states.

Emission↗

Topical Report – Findings on Subtask 2.7 – Wet ESP and Aerosol Testing at Coal Creek Station

Growing concerns over the impact of CO 2 emissions from combustion sources on global climate change have prompted numerous research and development projects aimed at developing cost-effective technologies for CO 2 capture. One family of technologies being demonstrated at pilot and full scale globally is postcombustion carbon capture (PCCC) systems that employ amine-based solvents. The captured CO 2 can be compressed and permanently stored underground or used for enhanced oil recovery. The proximity of North Dakota’s lignite-fired fleet of power plants to potential CO 2 storage options creates a unique atmosphere for PCCC within the state. However, the unique components present in lignite flue gas present a challenge for large-scale PCCC at North Dakota power plants by contributing to aerosol formation. Aerosols can negatively impact the long-term performance of amine-based solvents for CO 2 capture. Amine-based solvents are volatile, and flue gas particulate provides nucleation sites where amine vapors can condense as aerosols. Because aerosols cannot be easily captured at the column outlet using conventional technologies, the amine-laden aerosols escape the system and lead to accelerated solvent losses. Moreover, particulate components can chemically react with amines to form degradation products that can permanently deactivate the amine, cause fouling, and lead to hazardous emissions. Many of the elements that have been shown to catalyze solvent degradation are present in lignite coals and can exacerbate solvent replacement economics. Understanding this issue is critical to the implementation of solvent-based CO 2 capture systems as applied to lignite-fired generation systems. The Energy & Environmental Research Center (EERC) designed and carried out this project to fully characterize aerosol behavior with various control technologies installed to better optimize aerosol mitigation technology for CO 2 capture. To meet the goal of this project, the following objectives were identified: Determine the effectiveness of a wet electrostatic precipitator (WESP) on mitigating formation of problematic aerosols at Great River Energy’s Coal Creek Station, upstream of the PCCC system. Determine the effectiveness of the Mitsubishi Heavy Industries (MHI) proprietary amine emission reduction unit (AERU) as a postcapture solvent recovery system for reducing aerosol emissions and extending solvent life downstream of the PCCC system. Determine the impact of aerosols on the efficiency and degradation products of both commercial and advanced solvents within the PCCC system. Work was conducted at Coal Creek Station Unit 1 using a slipstream of flue gas from the outlet of the plant’s flue gas desulfurization (FGD) unit. Flue gas was routed through a pilot-scale FGD unit to remove SO 2 to very low levels (~1 ppm) and then through a direct contact cooler (DCC) to further cool the gas and to remove moisture. The gas exiting the DCC was then optionally routed through a WESP before passing to the CO 2 absorber columns. The MHI solvent was used to scrub CO 2 from the slipstream through a set of two absorber columns. The rich solvent was regenerated in a stripper column by heating to drive off captured CO 2 . Flue gas exiting the absorber column was routed to MHI’s proprietary AERU to recover entrained solvent. The system operated using a catch-and-release method where the CO 2 was separated to provide data on the process, but the captured CO 2 was released back into the host site stack. Particulate was measured, collected, and analyzed from multiple locations throughout the pilot-scale system. Unlike the performance observed in prior work, the inlet FGD and DCC did not remove significant particulate matter from the flue gas. This appears to be due to a difference in the nature of the particulate. The DCC seemed to increase particulate size and count, most likely owing to water condensing onto the surfaces of fly ash particles. When the WESP was operated, it achieved >95% particulate capture. Very little particulate matter or indications of solvent were detected at the AERU outlet. When operating with advanced KS 21 solvent, the particulate material at the AERU outlet was even further decreased. Solvent analysis showed that some species derived from flue gas and ash were slowly concentrating in the solvent over the duration of the test. The levels observed were reported to be within expected ranges and were not of concern to MHI. A high-level techno-economic assessment of installing CO 2 capture at Coal Creek Station suggested that, when using a standard monoethanolamine (MEA)-based solution with simple heat integration, the energy penalty to net generation would be 34%. The bulk of this was due to steam losses for regenerating solvent, followed by parasitic electrical demand for CO 2 compression and then by increased parasitic load for pushing flue gas through the absorber column. These demands could be decreased with a more advanced solvent that exhibits lower heat of regeneration and lower pressure drop than does a simple MEA solution. Further energy could be saved with more thorough heat integration to recover useful energy from the steam used for solvent regeneration. Installing a WESP was predicted to increase the cost of electricity by nearly $5/MWh. This would become cost-effective if solvent losses were roughly 10 times the baseline estimate when not using a WESP but could be returned to baseline by installing the WESP. Piping CO 2 for storage in more favorable geology could help with carbon capture and storage economics. Although storing off-site would necessitate construction of a CO 2 transport pipeline, the cost of this pipeline might be more than offset by reducing the number of wells required, the depths of the wells required, and the electrical demand for the CO 2 compressor. Additional factors that favor off-site storage costs include smaller expected CO 2 plume sizes, which translates to less monitoring and fewer landowner agreements. More detailed assessment of the specific geology in the region under and around Coal Creek Station would be needed to accurately assess the costs and benefits of different storage site options. This subtask was cofunded through the Energy & Environmental Research Center–U.S. Department of Energy Joint Program on Research and Development for Fossil Energy-Related Resources Cooperative Agreement No. DE-FE0024233. Nonfederal funding was provided by the North Dakota Industrial Commission.

Strege, Joshua↗

Slipstream Testing of Amine-Based Solvents at a Low-Rank Coal-Fired Power Plant

Conference presentation for 38th Annual International Pittsburgh Coal Conference, Virtual, September 20–23, 2021. To better assess mitigation strategies for aerosol reduction to extend solvent life, the University of North Dakota Energy & Environmental Research Center (EERC) installed a pilot-scale CO 2 absorption system at a lignite-fired plant in central North Dakota. The pilot-scale system was operated using both commercial KS-1™ solvent and advanced KS-21™ solvent provided by Mitsubishi Heavy Industries (MHI). MHI’s proprietary amine emission reduction unit (AERU™) technology was installed downstream of the absorber columns to reduce solvent losses by recovering amines at the system outlet. Fine particulate loading was measured throughout the capture system with and without a WESP operating and using both solvents. Captured particulate was brought back to the EERC to be analyzed for chemical composition and to be examined by scanning electron microscopy for particulate structure. These variables were then correlated to performance of particulate control devices in reducing aerosol formation and solvent losses.

01 COAL, LIGNITE, AND PEAT↗

Upwelling-Induced Primary Productivity in Coastal Waters of the Black Sea: Impact on Algorithms for Remote Sensing

This research program was a collaborative effort to investigate the impact of rapid changes in the water column during coastal upwelling, on biological and optical properties. These properties are important for constructing region or event-specific algorithms for remote sensing of pigment concentration and primary productivity and for comparing these algorithms with those used for the development of large scale maps from ocean color. We successfully achieved the primary objective of this research project which was to study in situ the dynamics of rapid spatial and temporal changes in properties of the water column during, coastal upwelling off the Crimean Coast in the Black Sea. The work was a collaborative effort between a group of biological and physical oceanographers from the Woods Hole Oceanographic Institution and from two oceanographic research institutions in the Crimea, Ukraine, located near the study site, the Marine Hydrophysical Institute (MHI) and the Institute of Biology of the Southern Seas (IBSS). The site was an ideal experimental model, both from a technical and economic standpoint, because of the predictable summer upwelling that occurs in the region and because of the availability of both a ship on call and laboratory and remote sensing facilities at the nearby marine institutes. We used a combination of shipboard measurements and remote sensing to investigate the physical evolution of rapid upwelling events and their impact on photoplankton and water column optical properties. The field work involved a two day cruise for mooring, deployment and a three day baseline survey cruise, followed by an eleven day primary cruise during, a summer upwelling event (anticipated by monitoring local winds and tracked by remote sensing imaging). An MHI ship was outfitted and used for these purposes.

Goldman, Joel C.↗

The MeerKAT Fornax Survey: II. The rapid removal of H I from dwarf galaxies in the Fornax cluster

We present MeerKAT Fornax Survey atomic hydrogen (H I) observations of the dwarf galaxies located in the central ~2.5 × 4 deg 2 of the Fornax galaxy cluster (R vir ~2°). The H I images presented in this work have a 3σ column density sensitivity between 2.7 and 50 × 10 18 cm –2 over 25 km s –1 for spatial resolution between 4 and 1 kpc. We are able to detect an impressive M HI = 5 × 10 5 M ⊙ 3σ point source with a line width of 50 km s –1 at a distance of 20 Mpc. We detected H I in 17 out of the 304 dwarfs in our field, with 14 out of the 36 late-type dwarfs (LTDs) and three out of the 268 early-type dwarfs (ETDs). The H I-detected LTDs have likely just joined the cluster and are on their first infall as they are located at large clustocentric radii, with comparable MHI and mean stellar surface brightness at fixed luminosity as blue, star-forming LTDs in the field. By contrast, the H I-detected ETDs have likely been in the cluster longer than the LTDs and acquired their H I through a recent merger or accretion from nearby H I. Eight of the H I-detected LTDs host irregular or asymmetric H I emission and disturbed or lopsided stellar emission. There are two clear cases of ram pressure shaping the H I, with the LTDs displaying compressed H I on the side closest to the cluster centre and a one-sided, starless tail pointing away from the cluster centre. The H I-detected dwarfs avoid the most massive potentials (i.e. cluster centre and massive galaxies), consistent with massive galaxies playing an active role in the removal of H I. We created a simple toy model to quantify the timescale of H I stripping in the cluster by reproducing the observed M r' –M HI relation. We find that a M HI = 10 8 M ⊙ dwarf is stripped in ~240 Myr. The model is consistent with our observations, where low-mass LTDs are directly stripped of their H I from a single encounter and more massive LTDs can harbour a disturbed H I morphology due to longer times or multiple encounters being required to fully strip their H I. This is the first time dwarf galaxies with M HI ≲ 1 × 10 6 M ⊙ have been detected and resolved beyond the local group and in a galaxy cluster.

79 ASTRONOMY AND ASTROPHYSICS↗

W.A. Parish Post-Combustion CO 2 Capture and Sequestration Demonstration Project (Final Technical Report)

The Petra Nova Project (Project) is a commercial scale post-combustion carbon capture project developed by a joint venture between NRG Energy, Inc. (NRG) and JX Nippon Oil Exploration (EOR) Limited (JX). The Project is designed to separate and capture carbon dioxide (CO2) from an existing coal-fired unit’s flue gas slipstream at NRG’s W.A. Parish Electric Generating Station (WAP) located southwest of Houston, Texas. The captured CO2 is dried, compressed, and transported via an 81-mile pipeline to the West Ranch oilfield (West Ranch) in Jackson County, Texas, where it is injected to boost oil production. The Project, which is partially funded by a grant (Grant) from the United States (U.S.) Department of Energy (DOE) under the Clean Coal Power Initiative (CCPI) Round 3, uses the Kansai Mitsubishi Carbon Dioxide Recovery advanced amine-based CO 2 absorption technology (KM-CDR Process®), which was jointly developed by Mitsubishi Heavy Industries, Ltd. (MHI) and the Kansai Electric Power Co. Inc., to treat and capture at least ninety percent (90%) of the CO 2 from a 240-megawatt equivalent (MWe) flue gas slipstream off of Unit 8 at WAP. When operating at full capacity, the Project captures approximately 5,200 short tons of CO 2 per day, which would otherwise be emitted into the atmosphere, representing the largest commercial scale deployment of post-combustion CO2 capture technology at a coal power plant to date. Under the Grant, the Project was managed in 3 phases: (1) Phase 1: Project Definition / Front End Engineering Design (FEED) (2) Phase 2: Detailed Engineering, Procurement & Construction (3) Phase 3: Demonstration and Monitoring. On December 29, 2016, commercial operation of the Project was achieved, ending Phase 2 and starting Phase 3, a 3-year demonstration period running from January 1, 2017 through December 31, 2019. The key objectives of Phase 3 were to (a) demonstrate the specific advanced technologies constructed during Phase 2 and (b) monitor the injected CO 2 at West Ranch to demonstrate technologies and protocols for monitoring, verification, and accounting (MVA). As of the end of Phase 3, Petra Nova captured 3,904,978 short tons of CO 2 (3,542,537 metric tons) that was transported to West Ranch. To support the DOE obligation to monitor, verify, and account for the sequestered CO 2 at West Ranch, Petra Nova contracted with the Bureau of Economic Geology (in the Jackson School of Geosciences at The University of Texas at Austin) to (a) design a monitoring program, (b) draft an MVA Plan for DOE review and approval, and (c) working with Petra Nova and the operator of West Ranch to manage and report on the MVA activity. This report discussed the technical aspects of the project during each of the 3 phases of the project as identified above.

01 COAL, LIGNITE, AND PEAT↗

SECARB 2020 Semi-Annual Field Review Reports - Anthropogenic Test

The Southern States Energy Board (SSEB) managed the overall Southeast Regional Carbon Sequestration Partnership (SECARB) Phase III project and the Electric Power Research Institute (EPRI) managed all activities associated with the Anthropogenic Test site. Advanced Resources International, Inc. (ARI) assisted EPRI with the management of site activities. EPRI and ARI followed reporting procedures that included monthly and quarterly technical progress reports, as well as periodic reporting on key field activities. Subsequent sections of this report catalog the field activities and are organized in a semi-annual chronology. The SECARB Anthropogenic Test was the largest demonstration of a fully integrated, pulverized coal-fueled carbon capture and storage (CCS) project in the United States as of 2012 and supports a commercial prototype of CO 2 capture; transportation; subsurface storage; and monitoring, verification, and accounting (MVA); and assessment. The demonstration-scale, post-combustion CO 2 capture facility at Alabama Power Company’s Plant Barry diverted flue gas (25MW equivalent) from its Unit #5 coal burning facility and captured the CO 2 using Mitsubishi Heavy Industries (MHI) KM-CDRTM advanced amine technology. The captured CO2 was compressed at Plant Barry and transported by pipeline to the injection location southeast of Citronelle, Alabama. The Citronelle Project’s geologic storage and MVA sites were located on the flanks of the Citronelle Dome, approximately three miles southeast of the city of Citronelle. The injection zone, the Paluxy Formation, a saline formation that occurs at approximately 9,400 feet and overlies the oil production horizon of the Citronelle oilfield, presents a favorable injection reservoir in terms of areal extent and petrophysical characteristics. The confining zone, the basal shale of the overlying Washita-Fredericksburg Formation, is persistent throughout the Citronelle area and possesses the appropriate criteria to act as an effective CO 2 seal.

01 COAL, LIGNITE, AND PEAT↗

Full-scale FEED Study for Retrofitting the Prairie State Generating Station with an 816 MWe Capture Plant using Mitsubishi Heavy Industries Post-Combustion CO 2 Capture Technology

A full front-end engineering design (FEED) study to for a carbon capture system for Unit #2 (816 MWe) at the Prairie State Generating Company’s (PSGC) Energy Campus in Marissa, IL based on the KM CDR Process CO 2 capture technology from Mitsubishi Heavy Industries (MHI) using their proprietary solvent KS-21TM. If built this carbon capture plant would be the world's largest to date. The cost of capture of 100 percent of the plant emissions was calculated to be $43.42 per metric tonne of CO 2 based on levelized costs for 30 years of operation (85% capacity factor), and includes Interest on Debt and Return on Equity During Operation.

01 COAL, LIGNITE, AND PEAT↗

Integrated Hydrogen Energy Storage System (IHESS) for Power Generation (Final Report)

GTI Energy partnered with Praxair Inc., a subsidiary of Linde PLC (Praxair), the Center for Electromechanics at the University of Texas at Austin (CEM), Entergy Corporation (Entergy), Quanta Services (Quanta) and Mitsubishi Heavy Industries (MHI) to perform a feasibility study that determines the economic and technical feasibility of low-carbon hydrogen energy storage integrated with a site-specific fossil fuel asset to decarbonize electricity production using the Integrated Hydrogen Energy Storage System (IHESS). The proposed IHESS concept is novel, as it sought to leverage the existing natural gas infrastructure, hydrogen production and pipelines, existing underground hydrogen storage system and power plants in the Gulf Coast region to reduce carbon emissions and generate lowcarbon electricity. This study has shown that IHESS has a promising commercial outlook as the concept leverages existing natural gas infrastructure assets and hydrogen production and storage that are unique to the Texas gulf coast region. A key hurdle with hydrogen supply and transportation has been capital investment. By storing hydrogen in underground storage and delivering it as a fuel source during peak demand using the existing infrastructure minimizes the capital investment. Regional petrochemical producers who are actively seeking opportunities to reduce costs and lower emissions should find the IHESS concept very appealing.

03 NATURAL GAS↗

Mitchell FEED Study Summary Report (Unlimited Rights Version) (Rev. D)

Heidelberg Materials (HM), Sargent & Lundy (S&L), and Mitsubishi Heavy Industries (MHI) completed a Front End Engineering Design (FEED) study for deployment of an amine-based CO 2 capture system at the Mitchell Cement Plant in Indiana. The project includes compression of captured CO 2 to a supercritical state for geological sequestration. The flue gases from 7,000 mtpd clinker plant combined with auxiliary boiler flue gases into the capture system. Auxiliary boiler supplies steam for solvent regeneration. The study developed an AACE Class 3 capital cost estimate (+30%/-20%) at approximately 30% design completion to evaluate the technical and economic feasibility of capturing up to 2 million tonnes of CO 2 per year.

42 ENGINEERING↗

2026 Innovating the Gas Turbine Supply Chain Workshop

The 2026 Innovating the Gas Turbine Supply Chain Workshop was convened at the Oak Ridge National Laboratory’s Manufacturing Demonstration Facility (MDF) in Knoxville, Tennessee, on March 31–April 1, 2026. Organized by ORNL, NETL, and the Gas Turbine Association (GTA) including gas turbine original equipment manufacturers (OEMs) GE Vernova, MHI, Siemens Energy, and Solar Turbines. The workshop brought together approximately 70 participants representing OEMs, supply chain companies, national laboratories, universities, and federal government agencies. Edgar Lara-Curzio (ORNL) served as Workshop Chair.

42 ENGINEERING↗

Global Precipitation Measurement (GPM) Safety Inhibit Timeline Tool

The Global Precipitation Measurement (GPM) Observatory is a joint mission under the partnership by National Aeronautics and Space Administration (NASA) and the Japan Aerospace Exploration Agency (JAXA), Japan. The NASA Goddard Space Flight Center (GSFC) has the lead management responsibility for NASA on GPM. The GPM program will measure precipitation on a global basis with sufficient quality, Earth coverage, and sampling to improve prediction of the Earth's climate, weather, and specific components of the global water cycle. As part of the development process, NASA built the spacecraft (built in-house at GSFC) and provided one instrument (GPM Microwave Imager (GMI) developed by Ball Aerospace) JAXA provided the launch vehicle (H2-A by MHI) and provided one instrument (Dual-Frequency Precipitation Radar (DPR) developed by NTSpace). Each instrument developer provided a safety assessment which was incorporated into the NASA GPM Safety Hazard Assessment. Inhibit design was reviewed for hazardous subsystems which included the High Gain Antenna System (HGAS) deployment, solar array deployment, transmitter turn on, propulsion system release, GMI deployment, and DPR radar turn on. The safety inhibits for these listed hazards are controlled by software. GPM developed a "pathfinder" approach for reviewing software that controls the electrical inhibits. This is one of the first GSFC in-house programs that extensively used software controls. The GPM safety team developed a methodology to document software safety as part of the standard hazard report. As part of this process a new tool "safety inhibit time line" was created for management of inhibits and their controls during spacecraft buildup and testing during 1& Tat GSFC and at the Range in Japan. In addition to understanding inhibits and controls during 1& T the tool allows the safety analyst to better communicate with others the changes in inhibit states with each phase of hardware and software testing. The tool was very useful for communicating compliance with safety requirements especially when working with a foreign partner.

Dion, Shirley↗

A Break In the Size-Stellar Mass Relation: Evidence for Quenching and Feedback in Dwarf Galaxies

Mapping stars and gas in nearby galaxies is fundamental for understanding their growth and the impact of their environment. This issue is addressed by comparing the stellar ‘edges’ of galaxies D stellar, defined as the outermost diameter where in situ star formation significantly drops, with the gaseous distribution parameterized by the neutral atomic hydrogen diameter measured at 1M⊙/pc2,DHI. By sampling a broad HI mass range 105M⊙< MHI<1011M⊙, we find several dwarf galaxies withMHI<109M⊙from the field and Fornax Cluster which are distinguished by D stellar>> DHI. For the cluster dwarfs, the average HI surface density near D stellar is∼0.3M⊙/pc2, reflecting the impact of quenching and outside-in gas removal from ram pressure and tidal interactions. In comparison, D stellar/DHI ranges between 0.5–2 in dwarf field galaxies, consistent with the expectations from stellar feedback. Only more massive disk galaxies in the field can thus be characterized by the common assumption that D stellar≲DHI. We discover a break in the D stellar−M⋆relation atm break∼4×108M⊙that potentially differentiates the low mass regime where the influence of stellar feedback and environmental processes more prominently regulates the sizes of nearby galaxies. Our results highlight the importance of combining deep optical and HI imaging for understanding galaxy evolution.

Scaling relations↗

ANS Winter 2022: ATF-2C Physics Safety and Scoping Analysis

ATF-2C comprises four tiers with six rodlets each. The experiment test train (TT) is situated in Loop 2A in the center flux trap (CFT) of the ATR, in which typical pressurized water reactor (PWR) conditions shall be approximated. Tier 1 (bottom) of the TT tests Framatome silicon carbide (SiC) cladding, containing molybdenum heater rods. Low-enriched uranium (LEU) Framatome rodlets with chrome-coated M5 cladding have been modeled in their place for the physics safety analysis to allow the substitution of this tier with fuel if needed. Tier 2 tests LEU Framatome rodlets with M5 cladding, which had irradiated in ATR in prior ATF experiments. Tier 3 tests General Atomics SiC composite cladding, also containing molybdenum heater rods. Tier 4/5/6 (top) tests the Japan Atomic Energy Agency (JAEA)/Mitsubishi Heavy Industries (MHI) fueled rodlets. This upper tier tests LEU rodlets with chrome-coated MDA cladding—several with temperature or pressure instrumentation. To flatten the axial power profile, lower portion of Tier 4/5/6 is surrounded by a hafnium (Hf) shroud, and the bottom two UO2 pellets are of natural enrichment. The ATF-2C TT is to be irradiated in the CFT of ATR (Fig. 1) for three or four 60-day cycles.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

SMR Carbon Capture Design and TEA (Final Technical Report)

This project sought to select a process configuration, select a commercial technology offering, and complete an initial engineering design of a carbon capture system that recovers and ultimately would store ~190,000 tonnes per year of CO 2 with 90%+ carbon capture efficiency from an existing steam methane reforming (SMR) plant at Phillips 66’s Rodeo Refinery.

03 NATURAL GAS↗