Search NASA⌕ Search

SEARCH · Search NASA

Results for “MPR Associates”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

Advancements Toward ASME Nuclear Code Case for Compact Heat Exchangers

Our research team proposes to advance the state of the ASME section III code (nuclear service) for Compact Heat Exchangers (CHX). This work will improve the technical state of CHXs and lay the foundation necessary for these heat exchangers to be certified for use in nuclear service. During the course of this work, we will advance the understanding of the performance, integrity, and lifetime of the CHXs for use in any industrial application, making their use more attractive and accessible to the industry. We will do this by developing qualification and inspection procedures that utilize Non-destructive evaluation (NDE) and advanced in-service inspection techniques, with insight from the industrial utility leader EPRI. We have enlisted colleagues at MPR Associates (MPR), an elite nuclear code consulting firm, who are experts on the ASME section III code and who, with input from members of the ASME section III committee, will direct the testing and help develop a series of documents that define the rules and regulations for use of the CHX. Colleagues at North Carolina State University (NCSU) and Oregon State University (OSU) will conduct extensive tensile, creep, and fatigue experiments on diffusion bonded samples (manufactured by US-based Vacuum Process engineering) along with modeling using the elastic perfectly plastic assumptions and comprehensive full inelastic finite element analysis (FEA). This work will allow analysis by design and confidence in the strength of different internal structures. To ensure industry acceptance and long term confidence, team members at the University of Wisconsin–Madison (UW), University of Michigan (UM), Georgia Tech (GT), and the University of Idaho (UI) will extensively test prototypic heat exchangers manufactured by US-based manufactures CompRex and Vacuum Process Engineering (VPE), a leader in the development of advanced CHX. This testing will include the use of various working fluids (salt, sodium, helium, and sCO2) to evaluate operational issues as well as structural integrity under the most severe conditions. Post-test analysis of the tested CHXs coupled with pre/in-service/post NDE (ultrasonic and radiography) led by the Electric Power Research Institute (EPRI) will be incorporated into the development of the rules and regulations for their use in nuclear service.

42 ENGINEERING↗

Safety-Related Instrumentation and Control Pilot Upgrade: Initial Scoping Phase Implementation and Lessons Learned

In May 2016, the U.S. Nuclear Regulatory Commission (NRC) staff provided a digital instrumentation and control (I&C) regulatory infrastructure integrated action plan to the NRC for approval. One of the objectives of that plan was to establish a clear regulatory structure with reduced regulatory uncertainty to enable the expanded safe use of digital I&C in commercial nuclear reactors while continuing to ensure safety and security. To achieve this end, the NRC, with collaboration from industry, developed a streamlined License Amendment Request Alternate Review (AR) process for safety-related (SR) digital I&C upgrades. In spite of this effort, the industry has remained reluctant to perform such I&C upgrades because of perceived regulatory and financial risks associated with being the first or an early adopter of the AR process for SR I&C upgrades. The U.S. Department of Energy Light Water Reactor Sustainability Program at the Idaho National Laboratory performed Initial Scoping Phase research to help break this impasse by supporting a SR I&C Pilot Upgrade, working with MPR Associates, ScottMadden Inc., and Exelon Generation. Exelon’s Limerick Generating Station (LGS) was selected as the target for this research. This paper summarizes the Initial Scoping Phase engineering and operations, licensing, and project management activities necessary to bound the scope, schedule, and estimated cost of the project sufficiently to enable utility management authorization of Conceptual Design Phase activities. These efforts and associated products are intended to provide a template to support larger industry efforts to perform similar upgrades as a foundation stone for a digital transformation that will improve plant safety, reliability, and operational performance while lowering plant total cost of ownership. As a result of the combined effort of Exelon Generation and research participants, Conceptual Design Phase activities for the subject upgrade at LGS were approved by Exelon. Further, the U.S. Department of Energy also awarded a $50 million cost share award to Exelon in order to pave the way for SR I&C modernization and associated control room upgrades across the U.S. nuclear fleet. Additional research reports are planned for the Conceptual Design Phase, Detailed Design Phase, and the Implementation Phase of the LGS project to document the process followed and promulgate lessons learned to industry.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Coronado Generating Station Repowering Evaluation - Siting Evaluation

The purpose of this initial siting evaluation is to consider the suitability of the Salt River Project (SRP) owned land at/near Coronado Generating Station (CGS) for a nuclear generating station (including advanced light water reactors, light water small modular reactors, and non-light-water designs1) and to assess if there are any exclusionary or avoidance factors associated with coal to nuclear repowering at CGS. This initial siting evaluation considers several characteristics (e.g., environmental conditions, seismic concerns, site footprint, water use, etc.) and highlights favorable/preferred characteristics as well as potential risks to feasibility. The results are intended to inform SRP on the strengths and weaknesses associated with the CGS site and inform the selection of candidate nuclear technologies for the CGS site that align with SRP’s mission and business objectives. This report relies on industry-recognized siting guidance, including Electric Power Research Institute’s (EPRI’s) Siting Guide (Reference 1) 2 and Nuclear Regulatory Commission’s (NRC’s) Regulatory Guide (RG) 4.7 (Reference 3), as well as nuclear domain expertise within the Gateway for Accelerated Innovation in Nuclear (GAIN), MPR Associates, Inc. (MPR), and the Idaho National Laboratory (INL).

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

TECHNICAL BACKGROUND FOR THE UPDATE AND EXTENSION OF THE TIME-DEPENDENT ALLOWABLE STRESSES OF TYPE 304H AND 316H STAINLESS STEELS

Type 304H and 316H stainless steels are codified in the ASME Boiler and Pressure Vessel Code for Section III, Division 5, Class A construction for up to 1500F (816C) and 300,000 hours. Extension of the design lifetimes to 500,000 hours has been undertaken by various research projects and by the ASME Section III, Division 5 Code Committees. Due to a long-standing issue related to non-classical creep behavior on the use of the time to the onset of tertiary creep as one of the time-dependent allowable stress criteria, little progress was made in the extension of the time-dependent allowable stresses for Type 304H and 316H stainless steels. A recent effort by Dabrow and Nestell (Impact of Tertiary Creep on Time Dependent Allowable Stresses for Type 304H and 316H Stainless Steels, Report 0300-0003-RPT-001, MPR Associates, Alexandria, VA, 2020) has provided a rational method for the treatment of the highly variable data for the time to onset of tertiary creep. In this paper, the background formulas for determining the time-dependent allowable stress values of Type 304H and 316H stainless steels, as assembled from relevant project work, are presented. These updates and extensions are being recommended to the ASME Code committees for approval, and are subject to change upon feedback from ASME Section III Code committees.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Vendor-Independent Design Requirements for a Boiling Water Reactor Safety System Upgrade

This Vendor-Independent License Amendment Request (LAR) Framework Document is a research product developed for the Idaho National Laboratory Light Water Reactor Sustainability (LWRS) Program. It was developed by MPR Associates, Inc. with technical input from LWRS and Exelon Generation personnel. To accomplish the purpose of this research, an operating plant (Limerick Generating Station [LGS]) was used as a reference to provide a concrete example and to present a "top-down" view of design concepts consistent with functional requirements baseline documents (references X and Y) also developed for this research. While this document is written in a framework to support a complete LAR submittal, its purpose is to communicate research concepts and provide an example of how to present digital information necessary to address expectations with regard to leveraging the Alternate Review Process as provided in Digital Instrumentation and Controls Interim Staff Guidance #06, Revision 2, Licensing Process. To leverage that process, this research document presupposes that a utility would select a vendor platform which has been prequalified for safety-related by the United States Nuclear Regulatory Commission. While this document is written using the Exelon Generation Limerick Generating Station (LGS) Units 1 and 2 as a baseline, this document is a research product. This document contains no commitments and makes no binding design decisions for Exelon Generation. Exelon Generation is leveraging this research to support their in-progress LGS Plant Protection System (PPS) upgrade efforts and plans to leverage it for their Redundant Reactor Control System (RRCS) replacement. The LWRS Program appreciates the research support provided by Exelon Generation in the generation of this document.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

TECHNICAL BACKGROUND FOR THE UPDATE AND EXTENSION OF THE TIME-DEPENDENT ALLOWABLE STRESSES OF TYPE 304H AND 316H STAINLESS STEELS

Type 304H and 316H stainless steels are codified in the ASME Boiler and Pressure Vessel Code for Section III, Division 5, Class A construction for up to 1500F (816C) and 300,000 hours. Extension of the design lifetimes to 500,000 hours has been undertaken by various research projects and by the ASME Section III, Division 5 Code Committees. Due to a long-standing issue related to non-classical creep behavior on the use of the time to the onset of tertiary creep as one of the time-dependent allowable stress criteria, little progress was made in the extension of the time-dependent allowable stresses for Type 304H and 316H stainless steels. A recent effort by Dabrow and Nestell (Impact of Tertiary Creep on Time Dependent Allowable Stresses for Type 304H and 316H Stainless Steels, Report 0300-0003-RPT-001, MPR Associates, Alexandria, VA, 2020) has provided a rational method for the treatment of the highly variable data for the time to onset of tertiary creep. In this paper, the background formulas for determining the time-dependent allowable stress values of Type 304H and 316H stainless steels, as assembled from relevant project work, are presented. These updates and extensions are being recommended to the ASME Code committees for approval, and are subject to change upon feedback from ASME Section III Code committees.

304/316 life extension↗

Mars Pathfinder Landing Site: Evidence for a Change in Wind Regime from Lander and Orbiter Data

Surface features related to the wind are observed in the vicinity of the Mars Pathfinder (MPR landing site data from the lander and in data from orbit by the Viking Orbiter and Mars Global Surveyor missions. Features seen from the surface include wind tails associated with small rocks, barchanoid duneforms, ripplelike patterns, and ventifact flutes cut into some rocks. Features seen from orbit include wind tails associated with impact craters, ridges inferred to be duneforms, and modified crater rims interpreted to have been eroded and mantled by windblown material. The orientations of these features show two prevailing directions. One is inferred to represent winds from the northeast, which is consistent with strongest winds predicted by a general circulation model to occur during the Martian northern winter under current conditions. A second wind blowing from the ESE was responsible for modifying the crater rims and cutting some of the ventifacts. The two wind regimes could reflect a change in climate related to Mars' obliquity or some other, unknown factor. Regardless of the cause, the MPF area has been subjected to a complex pattern of winds and supply of small particles, and the original surface formed by sedimentary processes from Tiu and Ares Vallis flooding events has been modified by repeated burial and exhumation.

Greeley, Ronald↗