At least 19 records

Space station human productivity study. Volume 5: Management plans

The 67 Management Plans represent recommended study approaches for resolving 108 of the 305 Issues which were identified. Each study Management Plan is prepared in three formats: Management Plan Overview (lists the subsumed Issues, study background, and related overview information); Study Plan (details the study approach by tasks, lists special needs, and describes expected study products); Schedule-Task Flow (provides a time-lined schedule for the study tasks and resource requirements). The Management Relationships Matrix, included in this volume, shows the data input-output relationships among all recommended studies. A listing is also included which cross-references the unresolved requirements to Issues to management plans. A glossary of all abbreviations utilized is provided.

Source record

Space Transportation System Cargo projects: inertial stage/spacecraft integration plan. Volume 1: Management plan

The Kennedy Space Center (KSC) Management System for the Inertial Upper Stage (IUS) - spacecraft processing from KSC arrival through launch is described. The roles and responsibilities of the agencies and test team organizations involved in IUS-S/C processing at KSC for non-Department of Defense missions are described. Working relationships are defined with respect to documentation preparation, coordination and approval, schedule development and maintenance, test conduct and control, configuration management, quality control and safety. The policy regarding the use of spacecraft contractor test procedures, IUS contractor detailed operating procedures and KSC operations and maintenance instructions is defined. Review and approval requirements for each documentation system are described.

Source record

Space shuttle program: Shuttle Avionics Integration Laboratory. Volume 7: Logistics management plan

The logistics management plan for the shuttle avionics integration laboratory defines the organization, disciplines, and methodology for managing and controlling logistics support. Those elements requiring management include maintainability and reliability, maintenance planning, support and test equipment, supply support, transportation and handling, technical data, facilities, personnel and training, funding, and management data.

Source record

HRP Data Management Plan

The purpose of Human Research Program Data Management Plan (DMP) is to define the processes and activities required for the overall management of the research data collected and managed by HRP throughout their life cycle. New updates to the Data Management Plan in 2023 include 1. CAPABILITIES AND SERVICES Data Repositories. Principal Investigators (PIs) funded by HRP may be asked to submit data to one of several NASA data repositories. HRP archives data in the NASA Life Sciences Portal (NLSP) that it considers to be unique and high value. This includes data from human subjects in space flight (ISS and commercial flights) and ground analogs to spaceflight; spaceflight tech demos involving humans; human omics data including the microbiome; parabolic flight studies; and the NASA Space Radiation Laboratory (NSRL). The Open Science Data Repository (OSDR) includes The Ames Life Sciences Data Archive (ALSDA), used to archive non-human biological data (e.g., animal) generated by the Human Research program, and GeneLab, available to HRP PIs to archive non-human omics data. Catalog for search and retrieval. A catalog of non-human HRP life science experiments, with all associated descriptions (mission, payload, hardware, and personnel related information), and biospecimens is provided on the NLSP public web site for search and retrieval. 2. IRB ROLE IN RETURN OF INDIVIDUAL RESEARCH RESULTS The NASA IRB manages the process for incidental findings and for returning results to subjects for studies for which NASA IRB is the IRB of record. Omics data, especially genomics data, may generate information significant to the health of or risk to a research subject. These data potentially hold the keys to understand lifetime risks of chronic diseases, such as cancer, as well as risks associated with exposures common in space flight. 3. UPDATE OF TERMS – IDENTIFIABLE AND ATTRIBUTABLE DATA HRP now follows Federal and NASA policy by using “identifiable” instead of “attributable” for Personally Identifiable Information (PII). 4. POLICY ABOUT INTERNAL NON-RESEARCH USE OF DATA The HRP Chief Scientist grants access to data from HRP-funded research for non-research internal use that includes program management, customer facilitation, strategic planning, and risk research planning. Typical HRP personnel granted access to HRP research data for internal use include the Element Scientist, Subject Matter Experts (SME), and Data/bioinformatics Scientists. If data accessed for Internal Use is provided to an intramural or extramural scientist for hypothesis driven research, all Federal and NASA regulations (e.g., IRB review) regarding human subject research apply.

Data Management Plan

Earth Observing System (EOS)/Advanced Microwave Sounding Unit-A (AMSU-A): Calibration management plan

This is the Calibration Management Plan for the Earth Observing System/Advanced Microwave Sounding Unit-A (AMSU-A). The plan defines calibration requirements, calibration equipment, and calibration methods for the AMSU-A, a 15 channel passive microwave radiometer that will be used for measuring global atmospheric temperature profiles from the EOS polar orbiting observatory. The AMSU-A system will also provide data to verify and augment that of the Atmospheric Infrared Sounder.

Source record

GOES-R L1b Readiness Implementation and Management Plan

A complement of Readiness, Implementation and Management Plans (RIMPs) to facilitate management of post-launch product test activities for the official Geostationary Operational Environmental Satellite (GOES-R) Level 1b (L1b) products have been developed and documented. Separate plans have been created for each of the GOES-R sensors including: the Advanced Baseline Imager (ABI), the Extreme ultraviolet and X-ray Irradiance Sensors (EXIS), Geostationary Lightning Mapper (GLM), GOES-R Magnetometer (MAG), the Space Environment In-Situ Suite (SEISS), and the Solar Ultraviolet Imager (SUVI). The GOES-R program has implemented these RIMPs in order to address the full scope of CalVal activities required for a successful demonstration of GOES-R L1b data product quality throughout the three validation stages: Beta, Provisional and Full Validation. For each product maturity level, the RIMPs include specific performance criteria and required artifacts that provide evidence a given validation stage has been reached, the timing when each stage will be complete, a description of every applicable Post-Launch Product Test (PLPT), roles and responsibilities of personnel, upstream dependencies, and analysis methods and tools to be employed during validation. Instrument level Post-Launch Tests (PLTs) are also referenced and apply primarily to functional check-out of the instruments.

Validation Readiness

San Juan National Forest Land Management Planning Support System (LMPSS) requirements definition

The role of remote sensing data as it relates to a three-component land management planning system (geographic information, data base management, and planning model) can be understood only when user requirements are known. Personnel at the San Juan National Forest in southwestern Colorado were interviewed to determine data needs for managing and monitoring timber, rangelands, wildlife, fisheries, soils, water, geology and recreation facilities. While all the information required for land management planning cannot be obtained using remote sensing techniques, valuable information can be provided for the geographic information system. A wide range of sensors such as small and large format cameras, synthetic aperture radar, and LANDSAT data should be utilized. Because of the detail and accuracy required, high altitude color infrared photography should serve as the baseline data base and be supplemented and updated with data from the other sensors.

Werth, L. F.

Development of Level 1b Calibration and Validation Readiness, Implementation and Management Plans for GOES-R

A complement of Readiness, Implementation and Management Plans (RIMPs) to facilitate management of post-launch product test activities for the official Geostationary Operational Environmental Satellite (GOES-R) Level 1b (L1b) products have been developed and documented. Separate plans have been created for each of the GOES-R sensors including: the Advanced Baseline Imager (ABI), the Extreme ultraviolet and X-ray Irradiance Sensors (EXIS), Geostationary Lightning Mapper (GLM), GOES-R Magnetometer (MAG), the Space Environment In-Situ Suite (SEISS), and the Solar Ultraviolet Imager (SUVI). The GOES-R program has implemented these RIMPs in order to address the full scope of CalVal activities required for a successful demonstration of GOES-R L1b data product quality throughout the three validation stages: Beta, Provisional and Full Validation. For each product maturity level, the RIMPs include specific performance criteria and required artifacts that provide evidence a given validation stage has been reached, the timing when each stage will be complete, a description of every applicable Post-Launch Product Test (PLPT), roles and responsibilities of personnel, upstream dependencies, and analysis methods and tools to be employed during validation. Instrument level Post-Launch Tests (PLTs) are also referenced and apply primarily to functional check-out of the instruments.

Validation

ICESat (GLAS) Science Processing Software Document Series: Science Software Management Plan - Volume 1

This document provides the Software Management Plan for the GLAS Standard Data Software (SDS) supporting the GLAS instrument of the EOS ICESat Spacecraft. The SDS encompasses the ICESat Science Investigator-led Processing System (I-SIPS) Software and the Instrument Support Terminal (IST) Software. For the I-SIPS Software, the SDS will produce Level 0, Level 1, and Level 2 data products as well as the associated product quality assessments and descriptive information. For the IST Software, the SDS will accommodate the GLAS instrument support areas of engineering status, command, performance assessment, and instrument health status.

Hancock, David W., III

ICESat (GLAS) Science Processing Software Document Series: Science Data Management Plan - Volume 2

This document provides the Data Management Plan for the GLAS Standard Data Software (SDS) supporting the GLAS instrument of the EOS ICESat Spacecraft. The SDS encompasses the ICESat Science Investigator-led Processing System (I-SIPS) Software and the Instrument Support Facility (ISF) Software. This Plan addresses the identification, authority, and description of the interface nodes associated with the GLAS Standard Data Products and the GLAS Ancillary Data.

Jester, Peggy L.

Automated Procurement System (APS): Project management plan (DS-03), version 1.2

The National Aeronautics and Space Administration (NASA) Marshall Space Flight Center (MSFC) is implementing an Automated Procurement System (APS) to streamline its business activities that are used to procure goods and services. This Project Management Plan (PMP) is the governing document throughout the implementation process and is identified as the APS Project Management Plan (DS-03). At this point in time, the project plan includes the schedules and tasks necessary to proceed through implementation. Since the basis of APS is an existing COTS system, the implementation process is revised from the standard SDLC. The purpose of the PMP is to provide the framework for the implementation process. It discusses the roles and responsibilities of the NASA project staff, the functions to be performed by the APS Development Contractor (PAI), and the support required of the NASA computer support contractor (CSC). To be successful, these three organizations must work together as a team, working towards the goals established in this Project Plan. The Project Plan includes a description of the proposed system, describes the work to be done, establishes a schedule of deliverables, and discusses the major standards and procedures to be followed.

Murphy, Diane R.

Lightning Mapper Sensor Lens Assembly S.O. 5459: Project Management Plan

Kaiser Electro-Optics, Inc. (KEO) has developed this Project Management Plan for the Lightning Mapper Sensor (LMS) program. KEO has integrated a team of experts in a structured program management organization to meet the needs of the LMS program. The project plan discusses KEO's approach to critical program elements including Program Management, Quality Assurance, Configuration Management, and Schedule.

Zeidler, Janet

Guidelines for developing NASA (National Aeronautics and Space Administration) ADP security risk management plans

This report presents guidance to NASA Computer security officials for developing ADP security risk management plans. The six components of the risk management process are identified and discussed. Guidance is presented on how to manage security risks that have been identified during a risk analysis performed at a data processing facility or during the security evaluation of an application system.

Tompkins, F. G.

Configuration and Data Management Plan for the Thermophysics Facilities

This document establishes the Configuration and Data Management Plan for the Thermophysics Facilities Branch (TSF) and describes the implementation of the plan within the organization. Its intent is to control and document changes to facility hardware, software, and facility operating procedures; to control changes to Quality System documents; to ensure that all documents and drawings are current; and to provide for quick retrieval of facility information and documentation while safeguarding original records and documents.

Jeanne A Dominguez