Search NASA⌕ Search

SEARCH · Search NASA

Results for “Number of Crew”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Logging Crew Attributes by Region in the Southeast USA

Urbanization, shrinking markets, and reduced forestry investment may affect harvesting efficiency in regions of the US South. To monitor these conditions, logging businesses have been tracked by surveys conducted by universities and trade associations. This project used a sampling approach coordinated with FIA utilization studies to sample logging crews based on a harvesting location. The approach was used to develop relationships among firm attributes and site attributes in six southeastern states (AL, GA, FL, NC, SC, and VA) from 2011 to 2018. The data included harvest attributes (location, harvest size and stand type) and logging firm attributes (production, crew labor, crew number, the number of machines by type, and machine age). For crew capital value, an equation was developed for this study using machine number and average machine age. The data from logging crews on 419 harvests were analyzed by region, harvest size, and stand type. Mean values for crew labor ranged from 3.1 to 7.1 workers. The average capital value per crew ranged from $\$220,000$ to $\$524,000$ per crew in the Coastal Plain with a narrower range in the Piedmont. In the Coastal Plain, higher productivity was detected for larger harvests and pine versus hardwood and mixed stands; however, in the Piedmont those trends were less obvious. Ratio of feller-bunchers, skidders and loaders were mostly 1:1:1 or 1:2:1 with 41% and 24% of samples, respectively. There were notable trends among Coastal Plain loggers regarding capital value and productivity with evidence supported by a production function. The differences in Piedmont (e.g., ownership size, market access, terrain, population density, etc.) may combine to limit daily production and labor productivity.

54 ENVIRONMENTAL SCIENCES↗

RePOWERD: Restoration of Power Outage from Wide-area Severe Weather Disruptions

The purpose of the RePOWERD project is to develop a probabilistic and a simulation based power restoration forecasting model for tropical storms based on geographic utility service areas, impacts to energy infrastructures and transportation networks, time-varying customer outage number, crew information (i.e., crew size, crew staging requirements), and utility restoration plans. Energy infrastructure is a critical lifeline essential for the United States’ national and economic security. Like other critical infrastructures, this infrastructure is aging and is at a high risk of damages from extreme weather events. Based on the number of reported outages in EAGLE-I during 2020 and 2021, it is evident that the current energy infrastructure is not equipped to handle extreme event impacts and will contribute to significant outages. From a resilience perspective, it is essential to forecast restoration time in the event of a severe weather induced power outage to assist the US Department of Energy, emergency managers, and first responders with resource planning. This project contributes to this crucial need. This report details the models, that were developed in this pilot study, to determine the rate of restoration and estimated time of restoration (ETR) during tropical storm events within counties and utility service areas based on damage to energy infrastructures and total number of customers experiencing outages.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Tools And Methods to Analyze Plant Outage Schedule and Assist Schedulers in Improving Outage Resilience

Refueling outages of nuclear power plants (NPPs) are considered one of the most critical phases throughout the plant lifetime. In such instances, tens of thousands of activities (e.g., maintenance, surveillance) are performed in a short amount of time (typically 2-3 weeks unless major backfitting or modernization projects are carried out) by a large number of crews (e.g., electricians, mechanics) that are hired as contractors. As a consequence, a plant outage can be expensive not only in terms of costs (e.g., contractor labor, material), but also in terms of loss generation since the plant is taken off the grid during the full outage duration (an indicative metric is about 1.2M$/day of loss of revenue). Thus, there is a continuous need to decrease the economic impact of outages on plant finances. This can be done by: decreasing the frequency of plant outages (e.g., from 18 to 24 months), reducing the time to complete the outage, and reducing the risk of outage delays. The Optimization of Outage Activities project under the Risk Informed Systems Analysis Pathway (RISA) sponsored by Department of Energy (DOE) Light Water Reactor Sustainability (LWRS) Program focuses on developing tools and methods to support NPPs with outage schedule optimization. The developed tools and methods are designed to analyze plant outage schedule with the goal of identify critical elements in the schedule that might pose a high risk of delays. These methods and tools can be considered resource-centric in the sense that they address outage challenges as a resource optimization problem. In this context, resources are either time and crews; outage delays occurs when either (or both) resources are insufficient to complete the set of tasks assigned at a specific time instant of the outage. This report provides details on how plant resources (time and crews) can be allocated in such a way that delays are minimized. In this respect, two classes of methods have been developed: the first one focuses on the time resource and how variability of the time to complete outage tasks may impact outage delays. The second one integrates available resources to assess when dailies activities should be performed such that the risk of outage delays are minimized.

97 MATHEMATICS AND COMPUTING↗

Co-optimization of repairs and dynamic network reconfiguration for improved distribution system resilience

In this work, a post-disaster distribution system repair and restoration (DSRR) strategy is proposed to improve distribution system resilience. The DSRR strategy is formulated as a two-stage optimization. The first stage is a comprehensive co-optimization of repair crew scheduling, dynamic network reconfiguration, and distributed energy resource (DER) dispatch based on the forecast load profile. The goal is to minimize the accumulative operating cost caused by the load reduction payment as well as DER operating cost. In particular, since the number of available repair crews is usually smaller than the number of faulted lines after a disaster event, the DSRR strategy determines the optimal scheduling for repairing faulted lines. The second stage is a re-dispatch of the DER power output and load shedding based on the real-time load demand of each bus. The proposed algorithm is validated by case studies of the IEEE 33-bus and 123-bus test systems. We consider those scenarios in which faults occur in multiple heavy-loaded feeders. The simulation results demonstrate that the DSRR strategy effectively coordinate the repair scheduling, network reconfiguration and load shedding to minimize the operating cost.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Multi-Agent Simulation Based Framework for Power Restoration Time Estimation at Distribution Level

The growing frequency of power outages has prompted increased interest in developing a more resilient power grid that can quickly recover from weather-related damage. At the distribution level, power restoration is a complex, multi-stage process involving multiple response entities. Providing utility stakeholders, government regulators, and the public with information about outage duration and estimated time to restoration is crucial. The research employs a multi-agent simulation approach, which allows for the simulation of decision-making behaviors among different entities and the incorporation of various uncertainties. Specifically, the study uses the open-source simulation package Mesa-Geo in conjunction with the Python language and constructs a road network using the open-source network extension pgRouting for routing queries. The research design includes several experiments focused on Florida as a case study, comparing repair crew sizes, power outage numbers, and road damage scenarios. The findings could offer valuable managerial guidance on resource allocation in the restoration process.

Chen, Yang↗

Small Penetrator Instrument Concept for the Advancement of Lunar Surface Science

Fundamental scientific objectives concerning the surface and subsurface material and dynamics of the Moon are the drivers for the use and advancement of penetrators, which emplace a suite of scientific instruments by impact into a planetary surface, typically at velocities of dozens to hundreds of meters per second. Small lunar penetrators are poised to become a valuable new tool for lunar science and exploration during the next decade. These low-cost ballistic probes can be deployed in large numbers from orbit, or from descending robotic or crewed vehicles, in order to explore and characterize the diversity of extreme lunar shallow subsurface environments. In this paper, we describe the general overview of penetrator objectives, potential instrumentation, and how these would benefit the advancement of lunar science at various extreme environments.

47 OTHER INSTRUMENTATION↗

Stochastic pre-event preparation for enhancing resilience of distribution systems

Extreme weather events are the common causes for power supply interruptions and power outages in electrical distribution systems. Improving the distribution system and enhancing its resilience is becoming crucial due to the increased frequency of extreme weather events. Preparation and allocation of multiple flexible resources, such as mobile resources, fuel resources, and labor resources before extreme weather events can mitigate the effects of extreme weather events and enhance the resilience of power distribution systems. Here, in this paper, a two-stage stochastic mixed-integer linear programming (SMILP) is proposed to optimize the preparation and resource allocation process for upcoming extreme weather events, which leads to faster and more efficient post-event restoration. The objective of the proposed two-stage SMILP is to maximize the served load and minimize the operating cost of flexible resources. The first stage in the optimization problem selects the amounts and locations of different resources. The second stage considers the operational constraints of the distribution system and repair crew scheduling constraints. The proposed stochastic pre-event preparation model is solved by a scenario decomposition method, Progressive Hedging (PH), to ease the computational complexity introduced by a large number of scenarios. Furthermore, to show the impact of solar photovoltaic (PV) generation on system resilience, three types of PV systems are considered during a power outage and the resilience improvements with different PV penetration levels are compared. Numerical results from simulations on a large-scale (more than 10,000 nodes) distribution feeder have been used to validate the effectiveness and scalability of the proposed method.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Switching Device-Cognizant Sequential Distribution System Restoration

This paper presents an optimization framework for sequential reconfiguration using an assortment of switching devices and repair process in distribution system restoration. Compared to existing studies, this paper considers types, capabilities and operational limits of different switching devices, making it applicable in practice. We develop a novel multi-phase method to find the optimal sequential operation of various switching devices and repair faulted areas. We consider circuit breakers, reclosers, sectionalizers, load breaker switches, and fuses. The switching operation problem is decomposed into two mixed-integer linear programming (MILP) subproblems. The first subproblem determines the optimal network topology and estimates the number of steps to reach that topology, while the second subproblem generates a sequence of switching operations to coordinate the switches. For repairing the faults, we design an MILP model that dispatches repair crews to clear faults and replace melted fuses. After clearing a fault, we update the topology of the network by generating a new sequence of switching operations, and the process continues until all faults are cleared. To improve the computational efficiency, a network reduction algorithm is developed to group line sections, such that only switchable sections are present in the reduced network. The proposed method is validated on the IEEE 123-bus and 8500-bus systems.

distribution system↗

GHEP WIBT (Guidelines for Home Energy Professionals Weatherization Installer Badges Toolkit) [SWR-20-69]

The National Renewable Energy Laboratory (NREL) and the U.S. Department of Energy's (DOE) Weatherization Assistance Program (WAP) are collaborating with the home energy retrofit industry to support the development of skilled workers. The Installer Badges Toolkit provides a flexible, customizable, and voluntary approach to training and skills recognition for WAP implementers, utility programs, private-sector workers, and contractors. In Fiscal Year 2018, DOE, along with the Crew Leader scheme committee, determined the Retrofit Installer Technician (RIT) Job Task Analysis (JTA) could be eliminated and its tasks inserted in the Crew Leader JTA. The RIT tasks became the basis of the Installer Badges. The Badges Toolkit was updated in 2020 to add licensing and copyright agreements. Users must cite the copyright information when using or distributing copies of the Badges Toolkit in any way. The technical content has remained unchanged from previous versions of the Badges Toolkit. The Toolkit for home retrofits consists of 25 Badges, each representing different energy efficiency tasks that an installer could perform on a home. Each Badge defines the desired outcome, criteria to verify, applicable material requirements, and references to Standard Work Specifications (SWS) or other relevant standards. The Badges provide a consistent approach to training by ensuring that installers in different regions are learning the same skills nationwide. Organizations can also customize the Toolkit by choosing only those Badges that are relevant to their program. The Badges Toolkit includes five pieces: "How to Use the Badges Toolkit" provides a brief overview of how a Grantee, Subgrantee, or training provider may approach using the toolkit. The "Badges Toolkit: Worksheet" includes what to consider when determining whether and how to best incorporate the Badges into a weatherization assistance program. The "Crew Leader Job Task Analysis Spreadsheet" indicates how the Badges align with specific areas of the JTA. The "Installer Badges Passport" features separate pages for each Badge, which include places for the installer and the supervisor/trainer to record the number of times a task has been successfully completed. The "Installer Badges Verification Criteria" includes sample inspection checklists for each Badge. These can be modified as needed based on approved variance requests or more stringent requirements. They also provide a basis for consistent inspections and awarding of Badges. Note: All elements of the Badges Toolkit are designed for use by potential program implementers. They are not off-the-shelf products intended for immediate deployment. Program implementers must review and modify as needed, revise verification criteria to match local requirements, complete worksheets, and otherwise define the parameters of their own badging program.

Desai, Jal↗

Q-Learning-Based Impact Assessment of Propagating Extreme Weather on Distribution Grids

The increasing number of power outage events due to extreme weather conditions is hampering us socioeconomically. Preparing in advance for the extreme weather event is critical. It can help utility operators to reduce grid damages, restore grid service quickly, allocate energy resources and repair crews strategically, and hence dramatically increase grid resilience. In this paper, we propose a method to identify the sequence of worst impact zones in the power grid caused by extreme weather events based on Q-learning (a reinforcement learning algorithm). To quantity the weather severity and its effect on the grid, we model the impact of extreme weather on the grid as a function of intensity, vulnerability, and exposure. A modified IEEE 123-node distribution feeder is presented in a mesh grid and experimented for sequences of zones identification. Finally, simulation results present the identified sequences and their associated impacts on the grid caused by extreme weather events.

distribution system↗

Q-Learning Based Impact Assessment of Propagating Extreme Weather on Distribution Grids: Preprint

Increasing number of power outage events due to extreme weather condition is hampering us socioeconomically. Preparing in advance for the extreme weather event is critical and can help utility operators to reduce grid damages, restore grid service quickly, allocate energy resources and repair crews strategically, and hence dramatically increase grid resilience. In this paper, we propose a method to identify the sequence of worst impact zones in the power grid caused by extreme weather events based on Q-learning (a reinforcement learning algorithm). To quantify weather severity and it’s effect on the grid, we model the impact of extreme weather on the grid as a function of intensity, vulnerability and exposure. A modified IEEE 123-node distribution feeder is presented in a mesh grid and experimented for sequences of zones identification. Finally, simulation results present the identified sequences and their associated impacts on the grid caused by the extreme weather events.

distribution system↗

Systems and methods for improved aircraft safety

Methods and system for improved aircraft safety are described herein. A machine learning model may be trained using historical flight data for a number of previously flown flights where an automation function autonomously disengaged. The trained machine learning model may be used to generate probabilistic alert rules. The probabilistic alert rules may be used by a computing device onboard an aircraft to provide contextual information to flight crew relating to engagement status for one or more automation functions of the aircraft.

Sherry, Lance↗

Data Analytics Methods to Measure Plant Outage Resilience

Every 18 or 24 months nuclear power plants (depending on plant configuration, pressurized or boiling water reactor respectively) undergo a period of outage where the plant is taken offline and a large number of maintenance and surveillance activities (that cannot be performed while plant is running) are performed in typically 2–3 weeks. Planning of a plant outage is very challenging since all the activities are required to be performed in the shortest amount of time given available resources (typically contractor crews hired for the duration of the outage). Consequently, plant outages can be costly due the actual loss of power generation and crew costs and, because of it, there is a need to maximize resource usage in the outage planning phase and reduce the risk of outage delays. This paper is addressing these needs by providing a set of analytical methods designed to analyze plant outage schedule and identify critical elements based on available resources (time and crews). These methods are based on natural language processing and optimization algorithms. In this respect, two classes of methods have been developed: one that focuses on the time resource and how variability in the time to complete outage tasks may impact outage delays, and one that minimizes the risk of outage delays by integrating available resources to assess when daily activities should be performed.

97 - MATHEMATICS AND COMPUTING↗

Potential Advantages to Employing an Onsite Laboratory at FUSRAP Sites Contaminated with Radionuclides and Metals - 20353

Various factors that support an evaluation of the relative costs, advantages and disadvantages of utilizing an onsite laboratory or an offsite laboratory for remediation of Formerly Utilized Sites Remedial Action Program (FUSRAP) sites contaminated with radionuclides and metals are presented. In terms of how much more quickly an onsite laboratory provides results versus an offsite laboratory, the results of this study provide tools for calculating the amount of cost savings per day for excavation of contaminated soils for various scenarios including: - State, municipal or local property remediation where the remediation schedule becomes time-critical due to the extra cost and inconvenience to the town or municipality caused by the need for increased security and safety personnel, possible road closures and detours, and the inconvenience to the public due to modified or decreased services of State or municipal facilities; - Residential property where the remediation schedule becomes time-critical due to the inconvenience to the homeowner as well as the importance of maintaining good community relations; - Commercial property where the remediation schedule becomes time-critical due to the hardship and potential loss of revenue endured by the property owner; - Open area where treatment of excavation water is required, and - Open area where treatment of excavation water is not required. For every scenario, the number of matrices, radionuclide and metal contaminants of concern and the project duration are important factors. The costs for the onsite laboratory included the capital costs associated with setting up the lab such as trailer(s) or building(s), power and water hookup, analytical testing equipment, balances, computers, desks and bookcases; support equipment such as hot plates, filtration assemblies, safety equipment, ovens, etc.; and supplies such as glassware, pipettes, filters, etc. and ongoing costs such as labor, chemicals and reagents, standards, cost of the laboratory obtaining certification and maintenance. Offsite laboratory sample testing costs are generally very competitive and typically substantially lower than onsite laboratory costs if only the sample testing costs are considered. The great disadvantage of using an offsite laboratory is that they often cannot guarantee rapid turnaround times for results which creates project delays associated with the remediation process including delays determining the completeness of the characterization and remediation processes, delays in backfilling a property and additional costs for treating wastewater (excavation water, stormwater or both). These costs will vary greatly depending upon the area of the country in which the project is located due to the wide range of labor costs for the onsite laboratory and field workers, as well as the contaminants of interest, matrices and most importantly the size of the impacted area and the number of properties located in that area. This paper provides guidelines for calculating the cost savings that may be realized if an onsite laboratory can generate results more quickly than an offsite laboratory by estimating the costs associated with the remediation process for the various scenarios noted above such as work crew labor costs, excavator and dump truck equipment rentals, wastewater treatment costs (if applicable) and the additional costs incurred by homeowners, commercial property owners and towns/municipalities that are reimbursed by the potentially responsible parties. Key assumptions involve the typical quickest turnaround time provided by the onsite and offsite laboratories. Costs for the operation of a wastewater treatment system and the remediation of a site area or property were provided by personnel who have been involved in the operation of a large FUSRAP site in New Jersey for many years. This study provides valuable information for determining the most cost-effective approach for analysis of project samples and therefore may be used on upcoming FUSRAP projects. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Use of the Manuela 3D/Radiation Scanning Tool at Nuclear Facilities - 20437

Licensees, facility operators and decommissioning contractors have a need for comprehensive, accurate and precise radiological and topographical data to plan and execute safe and efficient Decontamination and Decommissioning (D and D) projects. Traditional approaches rely greatly upon labor and administratively intensive data collection methods that require considerable time and effort to glean the relevant data to plan and perform work in a radiological work area. Orano Decommissioning Services has developed and utilized at French nuclear facilities a lightweight portable scanning instrument called MANUELA (Mobile Apparatus for Nuclear Expertise Localization Assistance). Recently Orano conducted demonstrations at two United States nuclear facilities using MANUELA that may prove useful in areas of the fuel cycle including: - ALARA (As Low As Reasonably Achievable) planning during facility operations; - Scoping and site characterization during the D and D planning phase; - Remedial action support during active decommissioning work; - Radiation and modeling planning for plant modifications; - Support Final Status Survey and demonstration of 'end state' compliance for license termination. MANUELA is currently being evaluated for use during decommissioning of nuclear facilities and could aide in demonstrating compliance with end state criteria after decommissioning. Of particular interest are decommissioning projects planned for various sites across the United States. Most of these sites present unique challenges and opportunities to safely and efficiently decommission in a regulatory compliant manner. The two demonstration site's current conditions of relatively low radiation levels inside containment proved to be ideal platforms to deploy the MANUELA instrument for evaluation of the complex geometries typically found in a nuclear facility. The MANUELA instrument was able to precisely identify local hot spots of the reactor system's primary equipment and was able to simultaneously overlay the dose information onto the scanned 3D images. Using data like this, a licensee would be able to make informed technical and personnel decisions on methods to remediate, shield or properly dispose of the radioactive source term. MANUELA can be used throughout the decommissioning process to validate progress and continue to refine the work activities to optimize the efforts of the crew which reduces downtime waiting for survey results, whereas traditional survey methodology relies on a physical survey to be performed and the data transcribed onto survey maps that are only two dimensional. The traditional format tends to be inaccurate and difficult to interpret the precise location(s) of hot spots or generalized dose rates. The resultant scan also allows the user to know the exact extent of the survey versus transposing information onto a map with only a portion of the map area scanned. MANUELA also compiles all of the relevant survey data into a downloadable table format which includes the measurement identification number, time stamp, point space location on the XYZ plane, and the dose rate value. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

SolarAPP+ Performance Review: 2021 Data

Accelerating rooftop solar photovoltaic (PV) deployment has strained the capacity of local authorities responsible for permitting, inspection, and interconnection (PII). Given the ongoing expansion of rooftop PV, a growing number of authorities having jurisdiction (AHJs) and utilities are reforming PII processes to reduce delays. AHJs could significantly reduce PII timelines through reforms such as expedited reviews for small-scale systems, online customer portals, and over-the-counter permitting. However, independent reforms do not resolve issues associated with PII variability across AHJs, and many AHJs lack the resources to implement reforms. In response to these challenges, the National Renewable Energy Laboratory (NREL) developed the Solar Automated Permit Processing Plus (SolarAPP+) platform, in collaboration with local governments, code development organizations, and industry stakeholders. This report shows SolarAPP+ performance in 2021 across AHJs.

14 SOLAR ENERGY↗

Cloud Droplet Measurement System for the ARM Tethered Balloon System (TBS) Field Campaign Report

The Mesa Photonics' cloud droplet measurement system (CDMS) performs in situ measurement of droplet size distribution and droplet number density in clouds. These characteristics are important cloud microphysical properties that are critical input parameters for atmospheric models and are also useful for proper calibration and validation of performance of other atmospheric measurement instrumentation. This small campaign was the first project (out of two) that involved integration of the CDMS into the U.S. Department of Energy (DOE) Atmospheric Radiation Measurement (ARM) user facility’s tethered balloon system (TBS) and its initial testing at the ARM Southern Great Plains (SGP) atmospheric observatory. The follow-up campaign (AFC07016) involved testing of the CDMS under relevant conditions at the third ARM Mobile Facility (AMF3) at Oliktok Point, Alaska and making in situ measurements in clouds. The goal of this small field campaign was to deploy the CDMS on the ARM TBS, demonstrate its integrity and compatibility with the TBS, and test the wireless telecommunication system in preparation for subsequent in-cloud measurements at ARM’s North Slope of Alaska (NSA) observatory at Utqiagvik (formerly Barrow). The specific technical objectives included: (1) Integration of the Mesa Photonics' CDMS into the ARM TBS, (2) testing of the wireless telecommunication system of the CDMS, (3) evaluating the data acquisition software and image processing algorithms especially under high-background-illumination conditions, and (4) testing the ruggedness of the instrument's optical alignment and other performance characteristics. All objectives have been successfully met. The mounting hardware was designed and built mostly at Sandia National Laboratories (SNL), which allowed reliable mounting of the CDMS on the TBS and co-locating the CDMS with other instruments. The field tests were performed by the principal investigator (PI) in collaboration with the TBS operational crew led by D. Dexheimer. The field testing demonstrated good compatibility of the CDMS with the TBS. During the TBS flights, the crew did not experience any operational issues with the CDMS. The instrument demonstrated reliable operational characteristics, including sufficient battery life and good thermal management. The wireless telecommunication system has been successfully tested at TBS flight altitudes of up to 1000 m. During all flights, the CDMS raw data were wirelessly transmitted to the ground station and processed in real time. The ruggedness of the instrument's optical alignment was evaluated by performing calibration of the CDMS (using Mesa Photonics' fixed-size monodisperse droplet generator) before and after the campaign. The calibration was stable within the instrument's measurement precision. In summary, the campaign demonstrated good compatibility of the Mesa Photonics' CDMS with the ARM TBS. The flight tests confirmed the mechanical integrity of the CDMS and stability of its optical layout, as well as reliability of the wireless telecommunication system. Successful completion of this campaign provided a solid basis for the next campaign (AFC07016, November 2020), that involved testing of the CDMS during in-cloud TBS flights at AMF3 at Oliktok Point.

54 ENVIRONMENTAL SCIENCES↗

First Sagittarius A* Event Horizon Telescope Results. V. Testing Astrophysical Models of the Galactic Center Black Hole

In this paper we provide a first physical interpretation for the Event Horizon Telescope's (EHT) 2017 observations of Sgr A*. Our main approach is to compare resolved EHT data at 230 GHz and unresolved non-EHT observations from radio to X-ray wavelengths to predictions from a library of models based on time-dependent general relativistic magnetohydrodynamics simulations, including aligned, tilted, and stellar-wind-fed simulations; radiative transfer is performed assuming both thermal and nonthermal electron distribution functions. We test the models against 11 constraints drawn from EHT 230 GHz data and observations at 86 GHz, 2.2μm, and in the X-ray. All models fail at least one constraint. Light-curve variability provides a particularly severe constraint, failing nearly all strongly magnetized (magnetically arrested disk (MAD)) models and a large fraction of weakly magnetized models. A number of models fail only the variability constraints. We identify a promising cluster of these models, which are MAD and have inclination i ≤ 30°. They have accretion rate (5.2–9.5) × 10$^{−9}$ M $_{⊙}$ yr$^{−1}$, bolometric luminosity (6.8–9.2) × 10$^{35}$ erg s$^{−1}$, and outflow power (1.3–4.8) × 10$^{38}$ erg s$^{−1}$. We also find that all models with i ≥ 70° fail at least two constraints, as do all models with equal ion and electron temperature; exploratory, nonthermal model sets tend to have higher 2.2μm flux density; and the population of cold electrons is limited by X-ray constraints due to the risk of bremsstrahlung overproduction. Finally, we discuss physical and numerical limitations of the models, highlighting the possible importance of kinetic effects and duration of the simulations.

79 ASTRONOMY AND ASTROPHYSICS↗