Search NASA⌕ Search

SEARCH · Search NASA

Results for “Phase outage”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Computationally Robust Line Outage Detection and Identification in Three-Phase Networks

Detection and identification of individual phase outages remains a challenging problem due to insufficient metering in three-phase unbalanced power networks. This problem was tackled for the transmission systems in our previous work as documented in [1]. In this paper, this work is extended to detect phase outages in three-phase unbalanced systems using only the sparse estimation method. In addition, further improvements are introduced to increase the estimation accuracy for the virtual power injections at the terminal buses of disconnected lines, once the disconnected line is identified by sparse estimation methods. Simulation results are provided to experimentally validate the increased accuracy in detecting phase outages while decreasing the computational time by using the proposed approach.

Sparse Estimation, Line Outage, Phase Outage, LASS↗

Data Analytics Methods to Measure Plant Outage Resilience

Every 18 or 24 months nuclear power plants (depending on plant configuration, pressurized or boiling water reactor respectively) undergo a period of outage where the plant is taken offline and a large number of maintenance and surveillance activities (that cannot be performed while plant is running) are performed in typically 2–3 weeks. Planning of a plant outage is very challenging since all the activities are required to be performed in the shortest amount of time given available resources (typically contractor crews hired for the duration of the outage). Consequently, plant outages can be costly due the actual loss of power generation and crew costs and, because of it, there is a need to maximize resource usage in the outage planning phase and reduce the risk of outage delays. This paper is addressing these needs by providing a set of analytical methods designed to analyze plant outage schedule and identify critical elements based on available resources (time and crews). These methods are based on natural language processing and optimization algorithms. In this respect, two classes of methods have been developed: one that focuses on the time resource and how variability in the time to complete outage tasks may impact outage delays, and one that minimizes the risk of outage delays by integrating available resources to assess when daily activities should be performed.

97 - MATHEMATICS AND COMPUTING↗

A Robust Parallel Distributed State Estimation for Large Scale Distribution Systems

The growing need and interest in real-time monitoring of large distribution networks motivated by the rapid population of renewable sources, EVs and etc. demand a computationally efficient state estimation framework. Furthermore, this paper presents an improved computational framework for implementing a robust state estimator using a multi-core processor. The main contribution of the paper is the proposed computational framework along with two partitioning strategies which enable fast and robust state estimation for large scale radial and/or meshed distribution systems. Formulation of the proposed method and its implementation are described in detail. Performance of the estimator is tested by simulations first using a small 84-bus radial distribution system. Then the method’s scalability is demonstrated by simulations on two very large scale distribution networks one configured radially and the other meshed each containing over 12,500 buses.

42 ENGINEERING↗

Tools and Methods for Optimization of Nuclear Plant Outages

Refueling outages are one of the most challenging phases in a nuclear power plants (NPP) operating cycle. Refueling outages are extremely costly for a NPP due to the large amount of required resources and because of lost revenue due to plant being off the grid. Outage durations have steadily decreased across the industry over that last few decades primarily due to improved planning and coordination, but there are still many plants that struggle to meet the performance metrics accomplished by other utilities. Schedule resilience is one of the issues. NPP outages require scheduling thousands of activities in a duration of around 30 days on average. Outage staff begin working on the schedule more than a year ahead of the outage start and make every effort to build a robust schedule. Despite the robust and detailed planning, once the outage starts, numerous emergent issues typically appear along with schedule delays requiring continuous replanning and adjusting. When schedule disruption occurs during an outage, plant staff make urgent efforts to recover but often not able to maintain the planned outage duration. These outage delays can cost a utility several million dollars per day. Tools that could help outage schedulers create a more resilient schedule and allow them to optimally reschedule emergent work could significantly reduce outage delays. One key aspect of creating a resilient schedule is to have accurate estimates for activity duration. Another important outage scheduling capability is the ability to schedule emergent work with minimal disruption. The Optimization of Outage Activities project under the Risk-Informed Systems Analysis Pathway (RISA) sponsored by Department of Energy (DOE) Light Water Reactor Sustainability (LWRS) program focuses on developing tools and methods to support nuclear power plants with optimization of outage schedules. The goal of the outage optimization is the completion of all planned and emergent outage activities as fast as possible while maintaining highest level of safety. This report describes the initial development of tools to support outage management that leverage computational and machine learning methods developed in other RISA and LWRS projects.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Methods and Tools To Assess Robustness of Nuclear Plant Outages

Refueling outages are one of the most challenging phases in a nuclear power plant (NPP) operating cycle. Refueling outages are extremely costly for an NPP due to the large amount of required resources and because of lost revenue due to plant being off the grid. Outage durations have steadily decreased across the industry over that last few decades primarily due to improved planning and coordination, but there are still many plants that struggle to meet the performance metrics accomplished by other utilities. Schedule resilience is one of the issues. NPP outages require scheduling thousands of activities within 30 days on average. Despite detailed planning, once the outage starts, numerous emergent issues typically appear along with schedule delays requiring continuous replanning and adjustment. When schedule disruption occurs during an outage, plant staff make urgent efforts to recover but are often not able to maintain the planned outage duration. These outage delays can cost a utility several million dollars per day. Tools that could help outage schedulers create a more resilient schedule and allow them to optimally reschedule emergent work could significantly reduce outage delays. One key aspect of creating a resilient schedule is to have accurate estimates for activity duration. Another important outage scheduling capability is the ability to schedule emergent work with minimal disruption. This paper focuses on developing tools and methods to support NPPs with outage schedule optimization and it describes the initial development of tools to support outage management that leverage computational and machine learning methods.

97 - MATHEMATICS AND COMPUTING↗

Integrated Framework of Multisource Data Fusion for Outage Location in Looped Distribution Systems

Accurate outage location is essential for expediting post-outage power restoration, minimizing outage duration, and enhancing the resilience of distribution networks. With the advent of advanced metering infrastructure, data-driven outage location methods have significantly advanced beyond traditional approaches that rely on manual inspections. However, existing methods still face critical challenges, like reliance on single-source data, limited ability to handle partially observable systems or difficulties with loop networks. To the best of our knowledge, no single approach has comprehensively addressed all of these challenges at once. To this end, this paper proposes a comprehensive multisource data fusion framework for outage locations via probabilistic graph networks. The framework consists of three key phases. First, a novel method for reconstituting distribution networks with loops is developed, transforming looped networks into multiple radial subnetworks that retain all outage causalities of the original network. Second, Bayesian network (BN) models are established for each subnetwork, integrating multiple data sources and network structures. Finally, a joint Gibbs sampling mechanism, featuring forward and backward information flow, is designed to merge data from separate BN models and maximize the utilization of limited evidence, ensuring accurate outage location identification. In conclusion, the framework was validated on two modified public test systems, and comparative studies confirmed its effectiveness.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Real-Time Detection and Localization of Line Trip Event Via Relative Phase Angles

Line trip events widely exist in power systems. They can result in power outages and a huge economic loss if not promptly detected and localized. To provide a fast and precise solution, this paper presents a Complete Coverage of Voltage Measurement (CCVM)-based line trip event detection algorithm and a Relative Phase Angle (RPA)-based line trip event localization algorithm. First, frequency and relative phase angle features during a line trip event are calculated. Then, the CCVM-based algorithm is proposed from both frequency and rate of change of frequency estimation algorithm aspects. Additionally, the RPA-based algorithm is presented, and two cases are studied to demonstrate the uniqueness of the proposed algorithm. Various experiments are conducted, where the simulation results demonstrate that the proposed CCVM-based algorithm can detect a line trip event as short as 2.07 ms. In addition, the RPA-based algorithm has 1.26 times higher localization accuracy compared with the frequency magnitude-based and phase angle-based algorithms. In conclusion, the experiment results on the examples from two interconnected power systems in the U.S. verified the performance of the proposed algorithms in wide-area power systems.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Tools And Methods to Analyze Plant Outage Schedule and Assist Schedulers in Improving Outage Resilience

Refueling outages of nuclear power plants (NPPs) are considered one of the most critical phases throughout the plant lifetime. In such instances, tens of thousands of activities (e.g., maintenance, surveillance) are performed in a short amount of time (typically 2-3 weeks unless major backfitting or modernization projects are carried out) by a large number of crews (e.g., electricians, mechanics) that are hired as contractors. As a consequence, a plant outage can be expensive not only in terms of costs (e.g., contractor labor, material), but also in terms of loss generation since the plant is taken off the grid during the full outage duration (an indicative metric is about 1.2M$/day of loss of revenue). Thus, there is a continuous need to decrease the economic impact of outages on plant finances. This can be done by: decreasing the frequency of plant outages (e.g., from 18 to 24 months), reducing the time to complete the outage, and reducing the risk of outage delays. The Optimization of Outage Activities project under the Risk Informed Systems Analysis Pathway (RISA) sponsored by Department of Energy (DOE) Light Water Reactor Sustainability (LWRS) Program focuses on developing tools and methods to support NPPs with outage schedule optimization. The developed tools and methods are designed to analyze plant outage schedule with the goal of identify critical elements in the schedule that might pose a high risk of delays. These methods and tools can be considered resource-centric in the sense that they address outage challenges as a resource optimization problem. In this context, resources are either time and crews; outage delays occurs when either (or both) resources are insufficient to complete the set of tasks assigned at a specific time instant of the outage. This report provides details on how plant resources (time and crews) can be allocated in such a way that delays are minimized. In this respect, two classes of methods have been developed: the first one focuses on the time resource and how variability of the time to complete outage tasks may impact outage delays. The second one integrates available resources to assess when dailies activities should be performed such that the risk of outage delays are minimized.

97 MATHEMATICS AND COMPUTING↗

Preventive Power Outage Estimation Based on a Novel Scenario Clustering Strategy

The increasing occurrence of extreme weather events is challenging power grid operation. For extreme weather events, the system operator is responsible for estimating the power outages and scheduling the restoration resources. This paper proposes an outage evaluation framework to identify the possible unserved load profiles, vulnerable areas, and mobile energy adequacy. The outputs of an outage prediction model tool are used to generate numerous faulted line scenarios. Next, each scenario's nodal unserved load profile is obtained by solving a three-phase restoration model that considers repair crews and mobile energy resources (MERs). Then, a novel scenario clustering strategy is developed to cluster the unserved load profiles into multiple representative profiles which the system operator can focus on. Finally, case studies on a distribution system evaluate the damage caused by an extreme weather event and verify the effectiveness of the proposed scenario clustering strategy.

MATHEMATICS AND COMPUTING,POWER TRANSMISSION AND D↗

Operating and Managing a Backup Control Center

Due to the criticality of continuous mission operations, some control centers must plan for alternate locations in the event an emergency shuts down the primary control center. Johnson Space Center (JSC) in Houston, Texas is the Mission Control Center (MCC) for the International Space Station (ISS). Due to Houston s proximity to the Gulf of Mexico, JSC is prone to threats from hurricanes which could cause flooding, wind damage, and electrical outages to the buildings supporting the MCC. Marshall Space Flight Center (MSFC) has the capability to be the Backup Control Center for the ISS if the situation is needed. While the MSFC Huntsville Operations Support Center (HOSC) does house the BCC, the prime customer and operator of the ISS is still the JSC flight operations team. To satisfy the customer and maintain continuous mission operations, the BCC has critical infrastructure that hosts ISS ground systems and flight operations equipment that mirrors the prime mission control facility. However, a complete duplicate of Mission Control Center in another remote location is very expensive to recreate. The HOSC has infrastructure and services that MCC utilized for its backup control center to reduce the costs of a somewhat redundant service. While labor talents are equivalent, experiences are not. Certain operations are maintained in a redundant mode, while others are simply maintained as single string with adequate sparing levels of equipment. Personnel at the BCC facility must be trained and certified to an adequate level on primary MCC systems. Negotiations with the customer were done to match requirements with existing capabilities, and to prioritize resources for appropriate level of service. Because some of these systems are shared, an activation of the backup control center will cause a suspension of scheduled HOSC activities that may share resources needed by the BCC. For example, the MCC is monitoring a hurricane in the Gulf of Mexico. As the threat to MCC increases, HOSC must begin a phased activation of the BCC, while working resource conflicts with normal HOSC activities. In a long duration outage to the MCC, this could cause serious impacts to the BCC host facility s primary mission support activities. This management of a BCC is worked based on customer expectations and negotiations done before emergencies occur. I.

Marsh, Angela L.↗

Optimization of the effective GPS data rate

Ohio University's Avionics Engineering Center is performing research directed towards the integration of the NAVSTAR Global Positioning System (GPS) and the Inertial Navigation System (INS) for attitude and heading determination. The integration of GPS/INS offers synergistic benefits. INS gyro drift error can be compensated by the long-term stability of GPS by means of an in-flight data monitoring algorithm. Using GPS data as a reference is more advantageous than implementing an additional INS since GPS offers a dissimilar redundancy to the attitude and heading determination configuration. In converse, the short-term stability of the INS can be used to correct or substitute for faulty GPS data due to tracking loop phase lag or data gaps because of satellite shielding. The optimization of the effective GPS data rate is essential for the proper execution of an integrated GPS/INS in-flight algorithm. GPS attitude and heading information must be consistently available during INS outages. Present research efforts involve the development of an in-flight algorithm that maximizes the potential of integrated GPS/INS. This algorithm determines the acceptable limits of phase lag that the GPS tracking loop introduces to the flight control system (FCS) during the transmission of information. Once these calculated limits are exceeded, INS data are used to insure the continuous availability of attitude and heading information to the flight control system.

Mcintyre, David S.↗

Thermodynamic Cloud Phase Classifications Using Machine Learning at NSA and ANX

Vertically resolved thermodynamic cloud phase classifications are essential for studies of atmospheric cloud and precipitation processes. The Department of Energy (DOE) Atmospheric Radiation Measurement (ARM) THERMOCLDPHASE Value-Added Product (VAP) uses a multi-sensor approach to classify thermodynamic cloud phase by combining lidar backscatter and depolarization, radar reflectivity, Doppler velocity, spectral width, microwave radiometer-derived liquid water path, and radiosonde temperature measurements. The measured voxels are classified as ice, snow, mixed-phase, liquid (cloud water), drizzle, rain, and liq_driz (liquid+drizzle). We use this product as the ground truth to train three machine learning (ML) models to predict the thermodynamic cloud phase from multi-sensor remote sensing measurements taken at the ARM North Slope of Alaska (NSA) observatory: a random forest (RF), a multilayer perceptron (MLP), and a convolutional neural network (CNN) with a U-Net architecture. Evaluations against the outputs of the THERMOCLDPHASE VAP with one year of data show that the CNN outperforms the other two models, achieving the highest test accuracy, F1-score, and mean Intersection over Union (IOU). Analysis of ML confidence scores shows ice, rain, and snow have higher confidence scores, followed by liquid, while mixed, drizzle, and liq_driz have lower scores. Feature importance analysis reveals that the mean Doppler velocity and vertically resolved temperature are the most influential datastreams for ML thermodynamic cloud phase predictions. The ML models’ generalization capacity is further evaluated by applying them at another Arctic ARM site in Norway using data taken during the ARM Cold-Air Outbreaks in the Marine Boundary Layer Experiment (COMBLE) field campaign. Finally, we evaluate the ML models’ response to simulated instrument outages and signal degradation.

54 ENVIRONMENTAL SCIENCES↗

Communications Blackout Prediction for Atmospheric Entry of Mars Science Laboratory

When a supersonic spacecraft enters a planetary atmosphere with v >> v(sub sound), a shock layer forms in the front of the body. An ionized sheath of plasma develops around the spacecraft, which results from the ionization of the atmospheric constituents as they are compressed and heated by the shock or heated within the boundary layer next to the surface. When the electron density surrounding the spacecraft becomes sufficiently high, communications can be disrupted (attenuation/blackout). During Mars Science Laboratory's (MSL's) atmospheric entry there will likely be a communication outage due to charged particles on the order of 60 to 100 seconds using a UHF link frequency looking out the shoulders of the wake region to orbiting relay asset. A UHF link looking out the base region would experience a shorter duration blackout, about 35 seconds for the stressed trajectory and possibly no blackout for the nominal trajectory. There is very little likelihood of a communications outage using X-band (however, X-band is not currently planned to be used during peak electron density phase of EDL).

entry descent landing↗

Preventive Power Outage Estimation Based on A Novel Scenario Clustering Strategy: Preprint

The increasing occurrence of extreme weather events is challenging the power grid operation. In front of the extreme weather, the system operator is responsible for estimating the power outage and scheduling the restoration resources. This paper proposes an outage evaluation framework to identify the possible unserved load profiles, vulnerable areas, and mobile energy adequacy. The predicted vulnerable lines of an outage prediction model tool are utilized to generate numerous faulted line scenarios. Next, each scenario's nodal unserved load profile is obtained by solving a three-phase restoration model that considers the schedule of repair crews and mobile energy resources. Then, a novel scenario clustering strategy is developed to cluster the unserved load profiles into multiple representative ones for straightforward analysis. Finally, case studies on a distribution system evaluate the damage level brought by extreme weather and verify the effectiveness of the proposed scenario clustering strategy.

mobile energy resources↗

An Efficient Approach for the Reliability Analysis of Phased-Mission Systems with Dependent Failures

We consider the reliability analysis of phased-mission systems with common-cause failures in this paper. Phased-mission systems (PMS) are systems supporting missions characterized by multiple, consecutive, and nonoverlapping phases of operation. System components may be subject to different stresses as well as different reliability requirements throughout the course of the mission. As a result, component behavior and relationships may need to be modeled differently from phase to phase when performing a system-level reliability analysis. This consideration poses unique challenges to existing analysis methods. The challenges increase when common-cause failures (CCF) are incorporated in the model. CCF are multiple dependent component failures within a system that are a direct result of a shared root cause, such as sabotage, flood, earthquake, power outage, or human errors. It has been shown by many reliability studies that CCF tend to increase a system's joint failure probabilities and thus contribute significantly to the overall unreliability of systems subject to CCF.We propose a separable phase-modular approach to the reliability analysis of phased-mission systems with dependent common-cause failures as one way to meet the above challenges in an efficient and elegant manner. Our methodology is twofold: first, we separate the effects of CCF from the PMS analysis using the total probability theorem and the common-cause event space developed based on the elementary common-causes; next, we apply an efficient phase-modular approach to analyze the reliability of the PMS. The phase-modular approach employs both combinatorial binary decision diagram and Markov-chain solution methods as appropriate. We provide an example of a reliability analysis of a PMS with both static and dynamic phases as well as CCF as an illustration of our proposed approach. The example is based on information extracted from a Mars orbiter project. The reliability model for this orbiter considers the various phases of Launch, Cruise, Mars Orbit Insertion, and Orbit. Some of the CCF for the orbiter in this mission include environmental effects, such as micrometeoroids, human operator errors, and software errors.

reliability analysis↗

Automating Detection and Diagnosis of Faults, Failures, and Underperformance in PV Plants

The project developed hybrid physics-based and machine-learning methods for near-real-time detection of balance-of-system faults (e.g., string, combiner, and tracker outages) in utility-scale Photovoltaic plants, achieving over 50% true positive rates with under 10% false positives and significantly reducing engineering setup time. In the extended phase, the scope expanded to plant-level underperformance analysis and industry benchmarking through the SUPER.epri.com platform. SUPER standardizes data processing and performance metrics across more than 9 GWac and 120+ plants, enabling robust comparisons and insights into loss rates, inverter downtime, and capacity degradation.

14 SOLAR ENERGY↗

Analysis of GPS Data Collected on the Greenland Ice Sheet

For several years, GPS observations have been made year round at the Swiss Camp, Greenland. The GPS data are recorded for 12 hours every 10-15 days; data are stored in memory and downloaded during the annual field season. Traditional GPS analysis techniques, where the receiver is assumed not to move within a 24 hour period, is not appropriate at the Swiss Camp, where horizontal velocities are on the order of 30 cm/day. Comparison of analysis strategies for these GPS data indicate that a random walk parameterization, with a constraint of 1-2 x 10(exp -7) km/sqrt(sec) minimizes noise due to satellite outages without corrupting the estimated ice velocity. Low elevation angle observations should be included in the analysis in order to increase the number of satellites viewed at each data epoch. Carrier phase ambiguity resolution is important for improving the accuracy of receiver coordinates.

Larson, K.↗

Analytic Spacecraft Attitude and Rate Estimation Performance During Attitude Sensor Outages

Analytic expressions for spacecraft attitude and rate estimation performance of an attitude estimation filter in terms of sensor specifications are useful tools for spacecraft design. Farrenkopf (1978) famously found analytic expressions for steady-state pre-update and post-update attitude and gyro bias estimate error variances for an attitude estimation filter for a single-axis spacecraft with a Rate Output Gyro (ROG). Markley and Reynolds (2000) extended the analysis for a Rate-Integrating Gyro (RIG) with angle white noise. These expressions allow for the rapid evaluation of system performance during preliminary mission design phases. One contribution of this paper is the analytic calculation of the steady-state pre-update and post-update angular rate estimate uncertainty for both the ROG and RIG cases. The primary contribution of this paper is the extension of the results for both the ROG and the RIG cases to the situation of an attitude sensor outage. This situation arises frequently in practice; for example when a star sensor’s field of view is occluded, when a star sensor’s readings are unreliable during a thruster burn that vibrates the spacecraft, or during star sensor outages due to radiation upsets. Analytic expressions for the attitude estimate uncertainty, gyro bias estimate uncertainty, and angular rate estimate uncertainty are given in terms of the attitude sensor outage interval, the star tracker measurement noise, and gyro noise parameters. Validity of the analytic results is demonstrated via Monte Carlo simulation.

Galante, Joseph M.↗