Search NASASearch

SEARCH · Search NASA

Results for “Pre-FEED”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

Pre-FEED Report on the Tampa Regional Intermodal Carbon Hub (T-RICH)

This report presents the findings of a year-long pre-FEED study into the feasibility of a CO 2 intermodal hub in Port Tampa Bay which would collect, store, and liquify captured CO 2 from major emitters across the State of Florida for marine transport out of the state. The proposed hub is called the Tampa Regional Intermodal Carbon Hub (T-RICH).

99 GENERAL AND MISCELLANEOUS

Enabling Production of Low Carbon Emissions Steel through CO 2 Capture from Blast Furnace Gases at Cleveland Cliffs’ 5 mtpa Steel Plant at Burns Harbor, Indiana

Dastur International Inc. has prepared a DOE-funded Pre-front-end engineering design (Pre-FEED) study to capture up to 2.8 mtpa of CO 2 from the available Blast Furnace (BF) gases at the Burns Harbor steel plant operated by Cleveland Cliffs in Burns Harbor, Indiana. The project consists of an amine solvent based pre-combustion carbon capture system, along with a unique BF gas conditioning process which significantly optimizes the project design and architecture in terms of higher volumes (2.8 mtpa vis-à-vis 1.6 mtpa without conditioning) & concentration (32 vol% in conditioned gas vs. 22% in raw BF gas) of CO 2 , which can be captured using a single train, resulting in reduced size and capital cost of the CO 2 capture island, and improved overall economics on a $\$$/tCO 2 captured basis.

42 ENGINEERING

Project-specific considerations for retrofitting carbon capture technology to power generating and industrial facilities

The National Energy Technology Laboratory (NETL) has previously reported on learnings from 7 FEED studies examining retrofitting power plants with capture. This presentation builds on this effort by highlighting learnings from 3 additional FEED studies examining retrofitting power plants with capture and 7 FEED and pre-FEED studies examining retrofitting industrial plants with capture. This includes a discussion of the design, performance, and cost implications associated with (1) site-specific considerations such as water availability, land availability, and site accessibility, and (2) host-plant-specific factors such as flue gas specifications, operational mode, and allowable degree of integration between the capture system and host plant.

FEED Studies

Alaska Liquid Natural Gas Pipeline Front-End Engineering & Design (Final Technical Report)

The Alaska Gasline Development Corporation (AGDC) is Alaska’s natural gas infrastructure development corporation established in 2013. AGDC’s mission is to maximize the benefit of Alaska’s vast North Slope natural gas resources for Alaskans through the development of infrastructure necessary to move the gas into local and international markets. AGDC was identified for a Congressionally Directed Spending (CDS) project for funding in the Energy and Water Development and Related Agencies Appropriations Act, 2023 under the heading: “Congressionally Directed Energy Efficiency and Renewable Energy Projects.” The CDS included $\$$4,000,000 of direct funding, with required match funds, to move the project forward. Alaska’s North Slope holds America’s largest proven and conventional natural gas supply. The integrated Alaska LNG Project will deliver 3.5 billion cubic feet of natural gas per day from Alaska’s North Slope gas fields to Alaskans as well as to a marine terminal located at tidewater in Cook Inlet. Alaska LNG is an integrated gas infrastructure project with three major components: a gas treatment plant (GTP) located at Prudhoe Bay, an 807-mile (1,287 km) gas pipeline (Mainline Pipeline) to Southcentral Alaska with interconnections for in-state gas use, and a natural gas liquefaction facility (LNG Facility) in Nikiski, Alaska. The integrated Alaska LNG Project has several strategic advantages including proven gas resources, existing upstream infrastructure, an advantageous arctic climate for LNG production, proximity to LNG markets, a track record of reliability from a state that first began exporting LNG to Japan in 1969, and broad support from Alaskans. North Slope natural gas is a conventional resource and can be produced with minimal drilling at a fraction of the carbon dioxide emissions of shale gas from the Lower 48 states. Through the development of the Alaska LNG Project, Alaska can provide energy security to Alaskans and a stable source of LNG to the Asia-Pacific region for generations. The Alaska LNG Project has been progressed through Pre-Front-End Engineering Design (Pre-FEED) and has obtained all major federal and State of Alaska permits and authorizations to construct the project, including the Federal Energy Regulatory Commission (FERC) Order Granting Authorization Under Section 3 of the Natural Gas Act. On September 5, 2024, the U.S. Department of Energy (DOE), National Energy Technology Laboratory (NETL) awarded Project No. DE-FE0032307 to AGDC with the objective to progress the project to Front-End Engineering Design (FEED) entry for the Alaska LNG Project Phase 1 Pipeline. The award Start Date was made effective July 1, 2023, with a Period of Performance through June 30, 2025. On March 27, 2025, AGDC announced the execution of definitive commercial agreements with Glenfarne Alaska LNG, LLC, an affiliate of Glenfarne Group, LLC, (together as “Glenfarne”), to lead the development of the Alaska LNG Project and enter FEED for the Phase 1 Pipeline. Project activities are now funded and directed by this private sector partner who holds a 75% interest in 8 Star Alaska, LLC (8 Star). 8 Star holds the assets of the Alaska LNG Project. As planned, AGDC continues to hold 25% minority interest in 8 Star and will play a governance role moving forward with Alaska LNG. This definitive commercial agreement milestone led to the successful completion of AGDC’s Statement of Project Objectives (SOPO) for FEED entry and led to the completion of DOE Project No. DE-FE0032307. At conclusion of the SOPO, AGDC also reached the award’s maximum federal cost share of $\$$4,000,000. AGDC is, therefore, providing Final Technical Report to close out DOE Project No. DE-FE0032307.

02 PETROLEUM

Non-catalytic pyrolysis of associated gas to zero CO 2 hydrogen and high value carbon black

The overall objective of this work is to perform a pre-Front End Engineering Design (pre-FEED) study of the conversion of associated gas produced at an active oil pad of a Bakken oil field producer, to high value carbon black and hydrogen using the Microwave Plasma Pyrolysis of Associated Gas (MPP-AG) process developed by H Quest Vanguard, Inc (HQV). The University of North Dakota’s Center for Process Engineering Research (CPER) collaborated with HQV to complete a design and techno-economic analysis for the MPP-AG deployed at an active Bakken well site flaring an average of 54,000 standard cubic feet per day of AG. The proposed design consists of: • A Microwave Pyrolysis Unit (MPU) which consists of H Quest’s proprietary MPP technology • A patent-pending Gas Conditioning Unit (GCU) designed by the University of North Dakota to condition intermittent and variable flow gas prior to pyrolysis. • An auxiliary unit running on the associated gas to power the GCU and MPU in an “island mode” configuration.

03 NATURAL GAS

Insights from Initial Engineering Designs of Point Source Capture at Industrial Facilities

Initial engineering design studies examining the application of state-of-the-art carbon capture technology at industrial plants contain generally overlooked real-world design considerations for near-term deployment of point source capture (PSC). The implementation of PSC across a wide range of industrial applications presents unique challenges associated with fluctuating CO<sub>2</sub> concentrations, flue gas composition, and utility and land availability. In this article, seven recent industrial retrofit PSC projects are reviewed to investigate the impact of site-specific factors on project design and cost. Across the seven projects, three capture technology classes and four industrial applications are considered, allowing insight into industry-specific opportunities for PSC technology synergy. Common challenges across projects and proposed design solutions are highlighted to propagate ideas and solutions to close the technology gaps and accelerate learning rates.

FEED Studies

Front-end engineering design (FEED) studies: a quantitative analysis

NETL has devised a methodology for normalizing FEED study metrics of interest and allowing cautious quantitative comparison across FEED studies. This presentation introduces the novel quantitative comparison methodology and presents results from utilizing this methodology to examine data presented in recent FEED study reports. The quantitative methodology developed for the examination of FEED study performance and cost also allows comparison of real-world performance and costs against NETL TEA model predicted performance and cost. Learnings from examining NETL model predicted performance and cost versus real world reported values are highlighted. These learnings provide insight into NETL TEA model uncertainty and highlight opportunities for further model development.

FEED Studies

Wyoming Trails Carbon Hub (WyoTCH)

The Wyoming Trails Carbon Hub (WyoTCH) project completed a front-end engineering and design (FEED) study for a commercial-scale, open-access carbon dioxide (CO 2 ) transport pipeline in Wyoming under U.S. Department of Energy (DOE) Award DE&#x2;FE0032347, funded through the Bipartisan Infrastructure Law Carbon Capture Technology Program and administered by the National Energy Technology Laboratory. The project’s approach of designing a multi-source, multi-destination pipeline, rather than a dedicated line serving a single project, would lower the barrier to entry for individual CO 2 projects. The projects would leverage Wyoming's concentrated industrial and power generation CO 2 sources, its existing CO 2 pipeline infrastructure, and its extensive CO 2 storage and utilization capacity. This is the project's final technical report.

01 COAL, LIGNITE, AND PEAT