Search NASASearch

SEARCH · Search NASA

Results for “RENDEZVOUS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

Manned Lunar Landing Via Rendezvous

In any mission description, the vehicles, the flight profiles, and the astrionics hardware to im- plement the mission are all tightly interwoven things. A final result evolves only after many iterations to the solution are made. This paper will describe one of these iterations in the Saturn C-5 Earth Orbit Rendezvous approach to the Manned Lunar Landing Program. Since the iter- ation to be described in an nthone, there exists some basis for the hope that the perturbation from the final solution is small. This paper is not concerned with the landing itself, but only with those operations leading to injection of the space craft into the lunar trans- fer trajectory. However, as is to be expected, it is the target conditions which set the pace for the overall operation. The entire operation must be sized to culminate at a time and place which places the lunar target in an attainable position. The procedure would call for a burst of activity lasting over a relatively short time as compared to the long and extensive preparations leading up to it. The activity must be aimed at the opening of the lunar "launch window". Figure 1 illustrates the variation in the velocity increment required to launch a vehicle into a lunar transfer trajectory from a 485 kilometer earth orbit. The minima are at irregularly spaced intervals and are a func- tion of the inclination of the lunar and the earth satellite planes and of the position of the moon in its orbit around the earth (i. e. , the day of the month). In an operations analysis these spacings will influence the number of vehicles on the launch pad (primary and back-up) , their state of readi- ness, the firing rate, and also the flight profile to be chosen. Whether it is decided to go by "con- necting" or by "tanking" mode, the objective must be to get the spacecraft in the launch ready state at the opening of one of these launch windows. It may be desired that the first vehicle be capable of remaining in a functionally capable state even after bridging one or more of the gaps between the windows. This consideration will influence the design of the vehicles as well as the operational modes to be designed into the flight control hard- ware. For example, a sleep switch may be de- sirable from the standpoint of savings in battery we ight.

LUNAR LANDING

Legacy of the Asteroid Redirect Robotic Mission (ARRM)

NASA’s proposed Asteroid Redirect Robotic Mission (ARRM) began with the recognition in a 2010 NASA study that emerging high-power solar electric propulsion technology could be used to rendezvous with, capture, and return an entire, very small (~10,000 kg), near Earth asteroids to the International Space Station. A 2011 workshop by the Keck Institute for Space Studies (KISS) extended the earlier NASA study to asteroid masses of order 500,000 kg by returning them to cislunar space. Subsequent detailed NASA studies in 2013-2014 confirmed the feasibility of this concept. This led to the establishment of the Asteroid Redirect Mission program that consisted of a robotic mission to return multiple tons of asteroid material to cislunar space and a crewed mission to rendezvous with the robotic vehicle, perform two extra vehicular activities (EVAs), collect samples of the asteroid material, and return this material to Earth. Implementation of ARRM got midway through Phase B before being cancelled in April 2017. Although ARRM was cancelled, it has left a near-term legacy of positive impacts to the human spaceflight community, the planetary defense community, the deep space science community, and asteroid mining interests.

John R Brophy

NASA Small Spacecraft and Distributed Systems: Recent and Upcoming Technology Demonstrations and Development Efforts

NASA’s Small Spacecraft & Distributed Systems (SSDS) program strengthens U.S. ability to conduct unique missions by rapidly developing and demonstrating capabilities for SmallSat exploration, science, and commercial space. In collaboration with NASA Centers, other government agencies, commercial industry, and academia, SSDS advances next generation SmallSat technologies like power, processing, propulsion, communications, autonomous navigation, architectures (swarms), and applications (AI/ML/Edge Computing)—to extend missions beyond LEO into cislunar and planetary space. Various investment mechanisms exist for SSDS to select and fund projects that will ultimately advance NASA’s Moon to Mars Architecture. Presented here are the latest achievements and findings from recently completed SSDS projects, along with updates from ongoing efforts and planned future work. Successful missions like Starling and CAPSTONE continue to demonstrate their capability after several years on-orbit. Advancements in next generation swarm configurations are being implemented by Starling for space traffic monitoring and management applications. Findings from recent SSDS flight projects are discussed: DiskSat, a unique SmallSat platform alternative to canisterized nanosatellites, launched December 2025 and is gathering data; the PTD series of missions concluded in December 2025. Current SSDS efforts are focused on addressing NASA Shortfalls relating to rendezvous and proximity operations, neuromorphic computing, and space situational awareness.

Roger Hunter

NASA Small Spacecraft and Distributed Systems Program - Recent and Upcoming Technology Demonstrations and Development Efforts

NASA’s Small Spacecraft & Distributed Systems (SSDS) program strengthens U.S. ability to conduct unique missions by rapidly developing and demonstrating capabilities for SmallSat exploration, science, and commercial space. In collaboration with NASA Centers, other government agencies, commercial industry, and academia, SSDS advances next generation SmallSat technologies like power, processing, propulsion, communications, autonomous navigation, architectures (swarms), and applications (AI/ML/Edge Computing)—to extend missions beyond LEO into cislunar and planetary space. Various investment mechanisms exist for SSDS to select and fund projects that will ultimately advance NASA’s Moon to Mars Architecture. Presented here are the latest achievements and findings from recently completed SSDS projects, along with updates from ongoing efforts and planned future work. Successful missions like Starling and CAPSTONE continue to demonstrate their capability after several years on-orbit. Advancements in next generation swarm configurations are being implemented by Starling for space traffic monitoring and management applications. Findings from recent SSDS flight projects are discussed: DiskSat, a unique SmallSat platform alternative to canisterized nanosatellites, launched December 2025 and is gathering data; the PTD series of missions concluded in December 2025. Current SSDS efforts are focused on addressing NASA Shortfalls relating to rendezvous and proximity operations, neuromorphic computing, and space situational awareness.

Roger C Hunter

Spacecraft Conceptual Design for Returning Entire Near-Earth Asteroids

In situ resource utilization (ISRU) in general, and asteroid mining in particular are ideas that have been around for a long time, and for good reason. It is clear that ultimately human exploration beyond low-Earth orbit will have to utilize the material resources available in space. Historically, the lack of sufficiently capable in-space transportation has been one of the key impediments to the harvesting of near-Earth asteroid resources. With the advent of high-power (or order 40 kW) solar electric propulsion systems, that impediment is being removed. High-power solar electric propulsion (SEP) would be enabling for the exploitation of asteroid resources. The design of a 40-kW end-of-life SEP system is presented that could rendezvous with, capture, and subsequently transport a 1,000-metric-ton near-Earth asteroid back to cislunar space. The conceptual spacecraft design was developed by the Collaborative Modeling for Parametric Assessment of Space Systems (COMPASS) team at the Glenn Research Center in collaboration with the Keck Institute for Space Studies (KISS) team assembled to investigate the feasibility of an asteroid retrieval mission. Returning such an object to cislunar space would enable astronaut crews to inspect, sample, dissect, and ultimately determine how to extract the desired materials from the asteroid. This process could jump-start the entire ISRU industry.

solar electric propulsion

Space Mission Options for Reconnaissance and Mitigation of Asteroid 2024 YR4

Near-Earth asteroid 2024 YR 4 was discovered on 2024-12-27 and its probability of Earth impact in December 2032 peaked at about 3% on 2025-02-18. Additional observations ruled out Earth impact by 2025-02-23. However, the probability of lunar impact in December 2032 then rose, reaching about 4% by the end of the apparition in May 2025. James Webb Space Telescope (JWST) observations on 2025-03-26 estimated the asteroid's diameter at 60 +/- 7 m. Studies of 2024 YR 4 's potential lunar impact effects suggest lunar ejecta could increase micrometeoroid debris flux in low Earth orbit up to 1000 times above background levels over just a few days, possibly threatening astronauts and spacecraft. In this work, we present options for space missions to 2024 YR 4 that could be utilized if lunar impact is confirmed. We cover flyby & rendezvous reconnaissance, deflection, and robust disruption of the asteroid. We examine both rapid-response and delayed launch options through 2032. We evaluate chemical and solar electric propulsion, various launch vehicles, optimized deep space maneuvers, and gravity assists. Re-tasking extant spacecraft and using built spacecraft not yet launched are also considered. The best reconnaissance mission options launch in late 2028, leaving only approximately three years for development at the time of this writing in August 2025. Deflection missions were assessed and appear impractical. However, kinetic robust disruption missions are available with launches between April 2030 and April 2032. Nuclear robust disruption missions are also available with launches between late 2029 and late 2031. Finally, even if lunar impact is ruled out there is significant potential utility in deploying a reconnaissance mission to characterize the asteroid.

Asteroid Disruption

Physical Parameters of Space Mission Asteroid Targets

Ground-based characterization of asteroids that are planned or potential targets of space missions provides important data on their physical parameters and properties. Knowledge of the properties of mission targets is important especially during mission preparation and planning, as it serves to select best or suitable targets for specific purpose of a given mission, to prepare mission plans, to constrain possible mission scenarios, and to design mission experiments. Such characterization efforts may be particularly critical for flyby missions that take only limited data during the high-speed flybys of their target asteroids, but they also provide very crucial data for targets of rendezvous missions. Moreover, long-term observations taken from Earth also allows the modelling of, or constraining, processes acting on the asteroids over extended time scales. Over the past years and decades we have obtained rich data on physical parameters of 82 asteroids that are planned or potential targets of space missions. Our primary observing technique is time-resolved (lightcurve) photometry, but we use also data obtained with other techniques, such as spectroscopy, thermal or radar observations. 15 of the 82 characterized asteroids are planned or possible targets of several space missions that are in flight or preparation, such as ESA’s Hera, RAMSES and PRIAMOS, NASA’s OSIRIS-APEX, JAXA’s Hayabusa2#, DESTINY+ and Next Generation Sample Return (NGSR), the Emirates Mission to Asteroids (EMA), and Karman+’s High Frontier, but we have also characterized 67 asteroids that are potential targets of space missions for their low delta-V’s and were announced as being “of interest to NASA” in the Small-Bodies-Observations- NASA mailing list or listed on the NHATS page of “Accessible NEAs”. The sample of asteroid targets span 3 orders of magnitude in size, with absolute magnitudes H from 12.57 to 26.8, corresponding to diameters from about 10 m to about 10 km. The sample contains a variety of taxonomic types and physically or dynamically interesting objects. Among them, we have identified 5 binary asteroids and 20 tumblers (i.e., asteroids in excited, non-principal axis rotation states). Rotation periods of the characterized asteroids range from 1.45 min to 280 h, reflecting diversity of their properties and formation/evolution paths. We will present an overview of the data set and highlight several representative cases.

Petr Pravec

Ares I-X Ground Diagnostic Prototype

Automating prelaunch diagnostics for launch vehicles offers three potential benefits. First, it potentially improves safety by detecting faults that might otherwise have been missed so that they can be corrected before launch. Second, it potentially reduces launch delays by more quickly diagnosing the cause of anomalies that occur during prelaunch processing. Reducing launch delays will be critical to the success of NASA's planned future missions that require in-orbit rendezvous. Third, it potentially reduces costs by reducing both launch delays and the number of people needed to monitor the prelaunch process. NASA is currently developing the Ares I launch vehicle to bring the Orion capsule and its crew of four astronauts to low-earth orbit on their way to the moon. Ares I-X will be the first unmanned test flight of Ares I. It is scheduled to launch on October 27, 2009. The Ares I-X Ground Diagnostic Prototype is a prototype ground diagnostic system that will provide anomaly detection, fault detection, fault isolation, and diagnostics for the Ares I-X first-stage thrust vector control (TVC) and for the associated ground hydraulics while it is in the Vehicle Assembly Building (VAB) at John F. Kennedy Space Center (KSC) and on the launch pad. It will serve as a prototype for a future operational ground diagnostic system for Ares I. The prototype combines three existing diagnostic tools. The first tool, TEAMS (Testability Engineering and Maintenance System), is a model-based tool that is commercially produced by Qualtech Systems, Inc. It uses a qualitative model of failure propagation to perform fault isolation and diagnostics. We adapted an existing TEAMS model of the TVC to use for diagnostics and developed a TEAMS model of the ground hydraulics. The second tool, Spacecraft Health Inference Engine (SHINE), is a rule-based expert system developed at the NASA Jet Propulsion Laboratory. We developed SHINE rules for fault detection and mode identification. The prototype uses the outputs of SHINE as inputs to TEAMS. The third tool, the Inductive Monitoring System (IMS), is an anomaly detection tool developed at NASA Ames Research Center and is currently used to monitor the International Space Station Control Moment Gyroscopes. IMS automatically "learns" a model of historical nominal data in the form of a set of clusters and signals an alarm when new data fails to match this model. IMS offers the potential to detect faults that have not been modeled. The three tools have been integrated and deployed to Hangar AE at KSC where they interface with live data from the Ares I-X vehicle and from the ground hydraulics. The outputs of the tools are displayed on a console in Hangar AE, one of the locations from which the Ares I-X launch will be monitored. In a previous publication, we discussed how we selected the three tools based primarily on their ability to be certified for human spaceflight and described our plans for the prototype. This abstract is due October 23, 2009, and the Ares I-X launch is currently scheduled for October 27, 2009. If this abstract is accepted, then the full paper will describe how the prototype performed before the launch. It will include an analysis of the prototype's accuracy, including false-positive rates, false-negative rates, and receiver operating characteristics (ROC) curves. It will also include a description of the prototype's computational requirements, including CPU usage, main memory usage, and disk usage. If the prototype detects any faults during the prelaunch period then the paper will include a description of those faults. Similarly, if the prototype has any false alarms then the paper will describe them and will attempt to explain their causes. Also, the paper will describe the three tools and how they are used in the prototype. It will include a description of the TEAMS models of the Ares I-X first-stage TVC and associated ground hydraulics and how we adapted the TVC model for use in real-time diagnostics. It will describe the SHINE rules used for fault detection and mode identification and the software architecture that interfaces the various pieces of existing software that are part of the prototype to one another. It will describe how we selected the sensor values and commands that were used to train the IMS model and how we optimized the number of clusters in the IMS model. It will include screen shots of the graphical display that we developed in Java to display the outputs of the three tools. Because Ares I-X data was not yet available to us while we were developing the prototype, we used historical data from the Space Shuttle's Solid Rocket Booster (SRB) TVCs and the associated ground hydraulics to train IMS and to test the entire prototype. Because most of the failure modes that we modeled have never occurred in the Shuttle we inserted simulated failures into the Shuttle data. The Ares I-X first-stage TVC is very similar to the SRB TVC and we expect the data will be very similar. After the launch, we will determine how similar the data actually is and report how any differences in the data affected the diagnostic accuracy of the prototype. Finally, although we did not get the prototype certified, we designed it in a way that it could be certified and wrote a preliminary certification plan. The paper will include a brief summary of how we considered the need for certification in the design of the prototype, how we tested the prototype before deploying it to Hangar AE, and how we would propose to get it certified if it were deployed as an operational system. The paper will conclude with a description of some of the challenges we faced and some of the lessons learned in developing and deploying the prototype.

International Space Station