Search NASA⌕ Search

SEARCH · Search NASA

Results for “RITE”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

RITE Gen5 KHPS Performance - Period A

Includes Kinetic Hydropower System (KHPS) Turbine performance data from the RITE Gen5 KHPS turbine at the 5 meter size. This data was collected over Period A which was a 39 day span ending on 11/12/2021. This data was collected under the European Marine Energy Centre (EMEC) power performance assessment. Along with performance data, the data includes setup data, project metadata, and characteristic data for RITE Gen5 KHPS (5m) turbine.

16 TIDAL AND WAVE POWER↗

RITE Gen5 KHPS Performance - Period B

Includes Kinetic Hydropower System (KHPS) Turbine performance data from the RITE Gen5 KHPS turbine at the 5 meter size. This data was collected over 16 days in May 2021 during Period B operation. Along with performance data, the data includes setup data, project metadata, and characteristic data for RITE Gen5 KHPS (5m) turbine.

16 TIDAL AND WAVE POWER↗

RITE Gen5 KHPS Levelized Cost of Energy

Levelized Cost of Energy analysis for Verdant Power Gen5 KHPS utilizing annualized AEP based on actual energy generation at the RITE Project during 2020-21. The WEC devices analyzed include attenuator, point absorber, oscillating wave surge converter, oscillating water column, overtopping/terminator device, submerged pressure differential, bulge wave, and rotating mass type wave energy converter devices. The CEC devices analyzed include horizontal axis turbine, vertical axis turbine, oscillating hydrofoil, enclosed tips (Venturi), Archimedes screw, and tidal kite type current energy converter devices.

16 TIDAL AND WAVE POWER↗

Structural Characterization of Deployed Thermoplastic and Thermoset Composite Tidal Turbine Blades

The National Renewable Energy Laboratory worked with Verdant Power to manufacture, and characterize, novel thermoplastic composite blades on their Gen5d 5 m diameter turbines at the Roosevelt Island Tidal Energy (RITE) site in the East River in N.Y. to demonstrate a low-cost manufacturing process for marine energy structures. Verdant had designed, manufactured, and deployed epoxy thermoset composite blades on three Gen5d turbines in October 2020. At a maintenance cycle in May 2021, a Gen5d turbine equipped with the NREL thermoplastic blades was deployed and retrieved in October 2021. Modal, static and fatigue structural characterization was performed on both blade types before and after the deployment. The static and modal test results showed that the thermoplastic blades were slightly stiffer than the epoxy blades both dry and after the deployment. The epoxy blades had about 8% increase in strain at the applied load after the deployment, whereas the thermoplastic blade strains were not changed significantly. Ultimately the thermoplastic blade failed during fatigue testing due to a crack which is thought to have initiated between the internal foam and the laminate at the location of the internal instrumentation. The Verdant Power Gen5d epoxy blades did not have this internal instrumentation and did not have this failure, performing adequately through the operational period. A lack of design information and fatigue data for both the thermoplastic laminates and the adhesive used means that further work is needed to fully understand his failure and the root cause analysis is ongoing. This paper provides details on the thermoplastic blade manufacturing, materials, test methodology and results.

17 WIND ENERGY↗

Accelerated Lifetime Testing of Main Shaft Seals for Tidal Turbine Rotors

This document will briefly discuss the observations and results from an NREL conducted accelerated lifetime testing of the main shaft seal for the Verdant Power fifth generation Gen5 underwater Tidal Energy Converter (TEC) turbine, which successfully performed at the RITE project in 2020-2021. In order to evaluate a 5-year Service Interval ( SI) for this component, testing at NREL operated the main shaft seal nearly continuously for over 135 (text says 130 days on page 5 and 125 days on page 7 and 137 days on page 11) days at a rotational velocity of 160 rpm while the test stand recorded water pressure, barrier fluid pressure, temperature, and number of cycles., representing ~ 40% of the SI. An additional separate test was conducted to measure the aging behavior of the rubber drive rings. The water pressure reservoir was held constant as 29 psi. Barrier fluid pressure remained relatively constant throughout the duration of the test but was seen to sink to as low as 10.1 psi. No barrier fluid leakage was observed throughout the test. A sudden failure occurred within the seal after the power to test machine was interrupted for a scheduled building maintenance procedure. Upon restarting, the main shaft seal lost all ability to prevent water ingress. The exact cause is not known but is believed to be either a seal assembly issue or a change in the alignment of the seal components during or following the power outage. Following seal disassembly, significant wear was seen on one of the graphite sealing rings. Based on these results it is recommended that a follow-on TEAMER be conducted to rectify protocol and assembly issues to further evaluate SI of this component. The support and participation of Verdant Power Inc, Dovetail Solutions LLC and Garlock Manufacturing Inc were instrumental in understanding the results. NREL thanks them for their significant effort.

13 HYDRO ENERGY↗

L'Arlesienne de ROOT

Over many years, ROOT users have repeatedly stumbled over—and loudly rediscovered—the infamous 1 GB limit on individual I/O operations, a constraint that somehow survived long past the era when anyone thought a gigabyte was “a lot.” As experiments embraced ever-larger objects and collections, this limit became an increasingly unavoidable rite of passage. This contribution recounts the sustained, multi-year quest by ROOT I/O developers to finally retire this relic, navigating a maze of legacy APIs, memory-management assumptions, and integer boundaries that seemed determined to preserve the status quo. We describe how internal interfaces were carefully modernized to introduce fully 64-bit–capable code paths without breaking the mountains of existing user code that would definitely have noticed. With the limit now lifted, ROOT can finally handle multi-gigabyte objects in a single read or write operation, even when splitting them into an RNTuple is not an option (we’re looking at you, large RooWorkspaces and giant histograms), liberating users from yet another “fun” debugging adventure and clearing the way for the massive analyses of the HL-LHC and beyond.

Canal, Philippe G. [Fermilab] (ORCID:0000000277487↗

L'Arlesienne de ROOT

Over many years, ROOT users have repeatedly stumbled over—and loudly rediscovered—the infamous 1 GB limit on individual I/O operations, a constraint that somehow survived long past the era when anyone thought a gigabyte was “a lot.” As experiments embraced ever-larger objects and collections, this limit became an increasingly unavoidable rite of passage. This contribution recounts the sustained, multi-year quest by ROOT I/O developers to finally retire this relic, navigating a maze of legacy APIs, memory-management assumptions, and integer boundaries that seemed determined to preserve the status quo. We describe how internal interfaces were carefully modernized to introduce fully 64-bit–capable code paths without breaking the mountains of existing user code that would definitely have noticed. With the limit now lifted, ROOT can finally handle multi-gigabyte objects in a single read or write operation, even when splitting them into an RNTuple is not an option (we’re looking at you, large RooWorkspaces and giant histograms), liberating users from yet another “fun” debugging adventure and clearing the way for the massive analyses of the HL-LHC and beyond.

Canal, Philippe G. [Fermilab] (ORCID:0000000277487↗

TriFrame Mount Structural Performance - Period A

Long-Term TriFrame Monitoring System (LTTFMS) data collected during Period A (13 days - 10/22/20 - 11/4/20). The central component of the Verdant Power Free Flow System is a three-bladed horizontal-axis turbine. The turbine is equipped with a composite rotor with three fixed-pitch blades that rotate at a slow and regular rate (approx. 32 rpm), well below normal water vessel propeller speeds and conventional hydropower turbine blade speeds. The TriFrame mount is the structural mount that holds the three Verdant Power three-bladed horizontal-axis turbines.

16 TIDAL AND WAVE POWER↗