Search NASA⌕ Search

SEARCH · Search NASA

Results for “Reliability Target Allocation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Investigation and Demonstration of Reliability Target Allocation to Support Reliability and Integrity Management Program

Nuclear energy is the most reliable and environmentally sustainable energy source available today. In the United States (U.S.), nuclear-generated power accounts for approximately 20% of total electricity and over 55% of clean energy. New advanced reactors have enormous potential to help further decarbonize the energy market, enhance grid resiliency, create new jobs, and build a stronger economy. More than 50 new reactors are being developed in the U.S., and the federal government realizes an urgent need to deploy nuclear technologies to meet the country’s energy, environmental, and national security goals. As such, the U.S. Department of Energy (DOE) launched multiple programs to support advanced reactor deployment. The research described in this report explores implementation strategies for the Reliability and Integrity Management Program that directly supports the DOE goal to enable the near-term deployment of the advanced reactor technologies. The project is conducted under the Regulatory Development Program for advanced reactors sponsored by the DOE.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Management of Risks Associated with Application of Novel Materials in Novel Operating Environments in Novel Reactor Designs

There is currently no widely agreed, detailed general method for licensing a novel plant incorporating novel materials (or materials being deployed in novel environments); in many such situations, there are no directly applicable engineering code cases for decision-makers (including regulators) to rely on. This paper discusses a framework for solving this problem that is based on the Reliability and Integrity Management (RIM) approach delineated in ASME BPVC Section XI Division 2. NRC Regulatory Guide 1.246, Rev. 0, endorses, with conditions, the subject portion of the ASME Code. The proposed framework is meant to support development of a licensing case by addressing certain technical challenges. The framework discussed here is compatible with the Licensing Modernization Project, but applying it in a specific case will call for advances in the state of practice, if not the state of the art. The RIM approach calls for applicants to (a) allocate reliability targets to plant structures, systems, and components (SSCs), (b) show that they are able to relate the currently observed physical condition of each SSC in the program to its failure probability well enough to determine whether the target reliability allocations are being satisfied, allowing for uncertainty related to the novelty of the materials/designs/operating environments, and (c) be able to demonstrate that the proposed program of surveillances will reliably detect unacceptable degradation of an SSC before SSC failure occurs. These challenges are discussed in the paper, and a potentially applicable modeling approach based on cumulative damage rather than failure rates is briefly illustrated.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

ACCELERATED DEPLOYMENT OF NOVEL MATERIALS BASED ON RELIABILITY INTEGRITY MANAGEMENT USING CUMULATIVE DAMAGE MODELING

There is currently no widely agreed, detailed general method for licensing a novel plant incorporating novel materials (or materials being deployed in novel environments); in many such situations, there are no directly applicable engineering code cases for decision-makers (including regulators) to rely on. This paper discusses a framework for solving this problem that is based on the Reliability and Integrity Management (RIM) approach delineated in ASME BPVC Section XI Division 2. NRC Regulatory Guide 1.246, Rev. 0, endorses, with conditions, the subject portion of the 2019 ASME Code. The proposed framework is meant to support development of a licensing case by addressing certain remaining technical challenges. The framework discussed here is compatible with the Licensing Modernization Project, but applying it in a specific case will call for advances in the state of practice, if not the state of the art. The RIM approach calls for applicants to (a) allocate reliability targets to plant structures, systems, and components (SSCs), (b) show that they are able to relate the currently observed physical condition of each SSC in the program to its failure probability well enough to determine whether the target reliability allocations are being satisfied, allowing for uncertainty related to the novelty of the materials/designs/operating environments, and (c) be able to demonstrate that the proposed program of surveillances will reliably detect unacceptable degradation of an SSC before SSC failure occurs. A modeling approach potentially applicable to item (b), based on cumulative damage modeling rather than failure rates, is briefly illustrated.

22 - GENERAL STUDIES OF NUCLEAR REACTORS↗

Relating Measured Component Damage to Assessed Component Reliability in Reliability Integrity Management (RIM)

There is currently no widely agreed detailed general method for licensing a novel plant incorporating novel materials (or materials being deployed in novel environments); in many such situations, there are no directly applicable engineering code cases for decision-makers (including regulators) to rely on. It may be possible to develop an approach to licensing such a plant that is based on the Reliability and Integrity Management (RIM) approach delineated in ASME BPVC Section XI Division 2. NRC Regulatory Guide 1.246, Rev.0, endorses, with conditions, the subject portion of the ASME Code. But that portion of the ASME code is written at a very high level, and there are fundamental technical challenges associated with applying it literally to licensing a real plant. In the RIM approach, applicants need to do the following (among other things): • Allocate target reliabilities to structures, systems, and components (SSCs) that collectively support the top-level plant safety and availability objectives; • Understand failure modes of those SSCs, and the degradation mechanisms that could lead to those failure modes; • Develop and propose a program of surveillances that will identify degradation prior to failure of SSCs; • Provide a means of reporting results, taking actions for anomalous or undesirable conditions, and give the regulator assurance of continued safe operations. Applying RIM in a specific case will call for advances in the state of practice of relating physical observables to functional reliability of certain component types. Except where a given level of damage corresponds to a failed (or nearly failed) state, it is not practical to establish a precise quantitative relationship between physical observables and reliability. This paper focuses on managing risk of passive component failures based on observable damage parameters. A simple approach to cumulative damage modeling will be illustrated with a view to possible use in RIM applications.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Reliability of photovoltaic modules

In order to assess the reliability of photovoltaic modules, four categories of known array failure and degradation mechanisms are discussed, and target reliability allocations have been developed within each category based on the available technology and the life-cycle-cost requirements of future large-scale terrestrial applications. Cell-level failure mechanisms associated with open-circuiting or short-circuiting of individual solar cells generally arise from cell cracking or the fatigue of cell-to-cell interconnects. Power degradation mechanisms considered include gradual power loss in cells, light-induced effects, and module optical degradation. Module-level failure mechanisms and life-limiting wear-out mechanisms are also explored.

Ross, R. G., Jr.↗

Reliability and Integrity Management Scoping Study

The U.S. Nuclear Regulatory Commission (NRC) is developing the regulatory framework and technical expertise to support regulatory review of advanced non-light water reactor (ANLWR) designs. The NRC staff expects most of these designs to use the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code (BPVC) Section XI, Division 2 “Requirements for Reliability and Integrity Management (RIM) Programs for Nuclear Power Plants” for developing and implementing pre-service inspection (PSI) and in-service inspection (ISI) programs. The NRC recently endorsed ASME BPVC Section XI, Division 2 (BPV XI-2) in Regulatory Guide (RG) 1.246. This new ASME code is yet to be used in any applications submitted for NRC review. This report provides an overview of the current state of knowledge and practices within the industry for the use of BPV XI-2 for the development and implementation of a PSI and ISI program for non-light water reactors.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Optimizing multiple reliable forward contracts for reservoir allocation using multitime scale streamflow forecasts

Streamflow forecasts at multiple time scales provide a new opportunity for reservoir management to address competing objectives. Market instruments such as forward contracts with specified reliability are considered as a tool that may help address the perceived risk associated with the use of such forecasts in lieu of traditional operation and allocation strategies. A water allocation process that enables multiple contracts for water supply and hydropower production with different durations, while maintaining a prescribed level of flood risk reduction, is presented. The allocation process is supported by an optimization model that considers multitime scale ensemble forecasts of monthly streamflow and flood volume over the upcoming season and year, the desired reliability and pricing of proposed contracts for hydropower and water supply. It solves for the size of contracts at each reliability level that can be allocated for each future period, while meeting target end of period reservoir storage with a prescribed reliability. The contracts may be insurable, given that their reliability is verified through retrospective modeling. The process can allow reservoir operators to overcome their concerns as to the appropriate skill of probabilistic forecasts, while providing water users with short–term and long–term guarantees as to how much water or energy they may be allocated. An application of the optimization model to the Bhakra Dam, India, provides an illustration of the process. In conclusion, the issues of forecast skill and contract performance are examined. A field engagement of the idea is useful to develop a real–world perspective and needs a suitable institutional environment.

54 ENVIRONMENTAL SCIENCES↗

Reliability and availability requirements analysis for DEMO: fuel cycle system

The Demonstration Power Plant (DEMO) will be a fusion reactor prototype designed to demonstrate the capability to produce electrical power in a commercially acceptable way. Two of the key elements of the engineering development of the DEMO reactor are the definitions of reliability and availability requirements (or targets). The availability target for a hypothesized Fuel Cycle has been analysed as a test case. The analysis has been done on the basis of the experience gained in operating existing tokamak fusion reactors and developing the ITER design. Plant Breakdown Structure (PBS) and Functional Breakdown Structure (FBS) related to the DEMO Fuel Cycle and correlations between PBS and FBS have been identified. At first, a set of availability targets has been allocated to the various systems on the basis of their operating, protection and safety functions. 75% and 85% of availability has been allocated to the operating functions of fuelling system and tritium plant respectively. 99% of availability has been allocated to the overall systems in executing their safety functions. The chances of the systems to achieve the allocated targets have then been investigated through a Failure Mode and Effect Analysis and Reliability Block Diagram analysis. The following results have been obtained: 1) the target of 75% for the operations of the fuelling system looks reasonable, while the target of 85% for the operations of the whole tritium plant should be reduced to 80%, even though all the tritium plant systems can individually reach quite high availability targets, over 90% - 95%; 2) all the DEMO Fuel Cycle systems can reach the target of 99% in accomplishing their safety functions. (authors)

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Hybrid Energy Systems: Opportunities for Coordinated Research

This chapter presents a baseline assessment of DOE’s current portfolio related to hybrid systems that produce electricity as their only output (Track 1), within the context of the key challenges facing these systems. Of particular importance is that this chapter is focused on understanding what makes a hybrid different from two standalone technologies, both in terms of the research being performed and the challenges that ongoing and planned research will seek to overcome. The purpose of summarizing and describing current research areas is to identify opportunities DOE could consider supporting in the near term. DOE encompasses several offices, each of which has unique objectives and is financially constrained. Additionally, the emergence of low-cost hybrid resources presents an array of new opportunities for the electricity sector, including better managing and allocating risk, improving operating performance, reducing system costs, and enhancing reliability and resilience. Realizing these opportunities will require overcoming barriers to the deployment of hybrids through targeted R&D which multiple DOE offices can invest in and benefit from.

42 ENGINEERING↗

Reliability-Informed Economic and Energy Evaluation for Bi-Level Design for Remanufacturing: A Case Study of Transmission and Hydraulic Manifold

Abstract Design for remanufacturing (DfRem) is one attractive strategy that encourages the reuse of a product and extends the product's life cycle. Traditional design processes often only consider product reliability at an early design stage. However, from the perspective of environmental sustainability, it is becoming increasingly important to evaluate the long-term economic and environmental impacts of design decisions during early-stage design. We propose a bi-level DfRem framework consisting of system-level reusability allocation and component-level design tradeoff analysis, considering reliability and product warranty policy. First, a system-level reusability allocation problem aims at a theoretical exploration of the design space where all the components comprising the system are allocated certain reuse rates to achieve target energy savings with minimum cost. Following the theoretical exploration at the system level, a component-level analysis looks at practical design options for each component and trades-off between the overall cost and energy consumption for multiple remanufacturing cycles. Both levels of the framework require modeling component reuse for multiple remanufacturing cycles, which we achieve by using a branched power-law model that provides probabilistic scenarios of reusing the component or replacing it with a new part. We demonstrate the utility of this framework with the case study of an infinitely variable transmission (IVT) used by some agricultural machines manufactured by John Deere and show snapshots of a prototype software tool that we developed for easy use by designers.

Engineering↗

Assessing the Impact of Lubrication on Efficiency and Life Cycle Economics of the US Wind Turbine Fleet: Cooperative Research and Development (Final Report)

As with any mechanical system, lubrication plays a key role in the performance of wind turbines used to generate electricity. The lubricant design offers a way to optimize the competing requirements of efficiency, component reliability, and maintenance strategy. This project will estimate the impact of improved lubrication on the levelized cost of energy of the US wind turbine fleet as a means of identifying opportunities for disruptive innovation or system-level optimization. The models developed will provide a clear understanding of the benefits and potential for advanced lubrication of wind turbines. The project will enable identification of high value targets for wind turbine component suppliers and a roadmap that highlights where the greatest return on technology investment can be achieved. This will promote efficient resource allocation in areas of new technology development.

17 WIND ENERGY↗

GPU age-aware scheduling to improve the reliability of leadership jobs on Titan

In 2015, OLCF's Titan supercomputer experienced a significant increase in GPU related job failures. The impact on jobs was serious and OLCF decided to replace ~50% of the GPUs. Unfortunately, jobs using more than 20% of the machine (i.e., leadership jobs) continued to encounter higher levels of application failures. These jobs contained significant amounts of both the low-failure rate and high-failure rate GPUs. The impacts of these failures are more adversely felt by leadership jobs due to longer wait times, runtimes, and higher charge rates. In this work, we have designed techniques to increase the use of low-failure GPUs in leadership jobs through targeted resource allocation. We have employed two complementary techniques, updating both the system ordering and the allocation mechanisms. Using simulation, the application of these techniques resulted in a 33% increase in low-failure GPU hours being assigned to leadership jobs. Our GPU Age-Aware Scheduling has been used in production on Titan since July of 2017.

Zimmer, Christopher↗

High Performance Computing Facility Operational Assessment 2016 - Oak Ridge Leadership Computing Facility

Oak Ridge National Laboratory’s (ORNL’s) Leadership Computing Facility (OLCF) continues to surpass its operational target goals: supporting users; delivering fast, reliable systems; creating innovative solutions for high-performance computing (HPC) needs; and managing risks, safety, and security associated with operating one of the most powerful computers in the world. The results can be seen in the cutting-edge science delivered by users and the praise from the research community. Calendar year (CY) 2016 was filled with outstanding operational results and accomplishments: a very high rating from users on overall satisfaction for the third year in a row; the greatest number of core hours delivered to research projects; the largest number of research publications for the life of Titan; and success in delivering on the allocation of 60%, 30%, and 10% of core hours offered for the Innovative and Novel Computational Impact on Theory and Experiment (INCITE), Advanced Scientific Computing Research Leadership Computing Challenge (ALCC), and Director’s Discretionary (DD) programs, respectively. These accomplishments, coupled with the extremely high utilization rate, represent the fulfillment of the promise of Titan: maximum use by maximum-size simulations.

97 MATHEMATICS AND COMPUTING↗

Mental Models for Managing Grid Cybersecurity Risk - ARC Industry Forum, Cybersecurity and Energy Transition

A proper mental model of the concepts of cyber risk and its components of threat and exploitability and consequence is necessary to allocate limited resources to different security activities, especially when considered alongside reliability and regulatory and economic risks. Understanding the consequence and frequency different risks are realized also helps align the right mitigations to the right risks. Cyber-informed engineering (CIE) is an emerging method to “engineer out” cyber risk across product and system lifecycles, and INL has a portfolio of programs operationalizing CIE’s principles for the energy sector.

24 POWER TRANSMISSION AND DISTRIBUTION↗

High Performance Computing Facility Operational Assessment 2015: Oak Ridge Leadership Computing Facility

Oak Ridge National Laboratory’s (ORNL’s) Leadership Computing Facility (OLCF) continues to surpass its operational target goals: supporting users; delivering fast, reliable systems; creating innovative solutions for high-performance computing (HPC) needs; and managing risks, safety, and security aspects associated with operating one of the most powerful computers in the world. The results can be seen in the cutting-edge science delivered by users and the praise from the research community. Calendar year (CY) 2015 was filled with outstanding operational results and accomplishments: a very high rating from users on overall satisfaction that ties the highest-ever mark set in CY 2014; the greatest number of core-hours delivered to research projects; the largest percentage of capability usage since the OLCF began tracking the metric in 2009; and success in delivering on the allocation of 60, 30, and 10% of core hours offered for the INCITE (Innovative and Novel Computational Impact on Theory and Experiment), ALCC (Advanced Scientific Computing Research Leadership Computing Challenge), and Director’s Discretionary programs, respectively. These accomplishments, coupled with the extremely high utilization rate, represent the fulfillment of the promise of Titan: maximum use by maximum-size simulations. The impact of all of these successes and more is reflected in the accomplishments of OLCF users, with publications this year in notable journals Nature, Nature Materials, Nature Chemistry, Nature Physics, Nature Climate Change, ACS Nano, Journal of the American Chemical Society, and Physical Review Letters, as well as many others. The achievements included in the 2015 OLCF Operational Assessment Report reflect first-ever or largest simulations in their communities; for example Titan enabled engineers in Los Angeles and the surrounding region to design and begin building improved critical infrastructure by enabling the highest-resolution Cybershake map for Southern California to date. The Titan system provides the largest extant heterogeneous architecture for computing and computational science. Usage is high, delivering on the promise of a system well-suited for capability simulations for science. This success is due in part to innovations in tracking and reporting the activity on the compute nodes, and using this information to further enable and optimize applications, extending and balancing workload across the entire node. The OLCF continues to invest in innovative processes, tools, and resources necessary to meet continuing user demand. The facility’s leadership in data analysis and workflows was featured at the Department of Energy (DOE) booth at SC15, for the second year in a row, highlighting work with researchers from the National Library of Medicine coupled with unique computational and data resources serving experimental and observational data across facilities. Effective operations of the OLCF play a key role in the scientific missions and accomplishments of its users. Building on the exemplary year of 2014, as shown by the 2014 Operational Assessment Report (OAR) review committee response in Appendix A, this OAR delineates the policies, procedures, and innovations implemented by the OLCF to continue delivering a multi-petaflop resource for cutting-edge research. This report covers CY 2015, which, unless otherwise specified, denotes January 1, 2015, through December 31, 2015.

97 MATHEMATICS AND COMPUTING↗

Investigation of test methods, material properties, and processes for solar cell encapsulants

Photovoltaic (PV) modules consist of a string of electrically interconnected silicon solar cells capable of producing practical quantities of electrical power when exposed to sunlight. To insure high reliability and long term performance, the functional components of the solar cell module must be adequately protected from the environment by some encapsulation technique. The encapsulation system must provide mechanical support for the cells and corrosion protection for the electrical components. The goal of the program is to identify and develop encapsulation systems consistent with the PV module operating requirements of 30 year life and a target cost of $0.70 per peak watt ($70 per square meter) (1980 dollars). Assuming a module efficiency of ten percent, which is equivalent to a power output of 100 watts per square meter in midday sunlight, the capital cost of the modules may be calculated to be $70.00 per square meter. Out of this cost goal, only 20 percent is available for encapsulation due to the high cost of the cells, interconnects, and other related components. The encapsulation cost allocation may then be stated as $14.00 per square meter, included all coatings, pottant and mechanical supports for the cells.

Source record↗

IEEE PES GM Poster - Cyber-Informed Engineering Approach to Mitigating BESS Supply Chain Concerns

Battery energy storage systems (BESS) are increasingly important to meet the needs of grid resilience and reliability. BESS provide critical grid services, maintaining stability of the grid with increased variable conditions. However, there are significant geopolitical and security concerns regarding their operation in critical infrastructure, due to lack of a domestic supply chain and prevalence of foreign entity of concern (FEOC) components in BESS and associated inverter-based resources. The supply chain challenge is dually exacerbated by a lack of alternative suppliers who can meet the economic targets for energy delivery and a potentially adversarial supply chain. Solutions are needed to secure components, addressing mixed layers of risk and engineering controls. This paper presents a specific application of Cyber-Informed Engineering (CIE) principles for BESS and recommends an alternative strategy to blocking the supply chain, ensuring that grid modernization targets can be met despite lack of a validated or secure supply chain. This study focuses on the United State (U.S.) use case, but the process can be applied globally to address supply chain security challenges. CIE practices represent the next step in functional assurance and risk mitigation, ensuring optimal resource allocation and enhancing security measures to safeguard the future of energy in the U.S. and beyond.

25 - ENERGY STORAGE↗

Satellite Embedding-Based Population Imputation for Areas with Missing Building Footprint Data: A Computer Vision-Based Approach

High-resolution population modeling is important for supporting effective decision-making across diverse sectors. LandScan Mosaic generates population estimates at the level of individual buildings and aggregates them to 3 arc-second grids, and this approach performs well in regions where building footprint data are comprehensive and reliable. However, large portions of the globe still suffer from incomplete, sparse, or entirely missing building stock datasets, creating a structural limitation for strictly building-based population models. To address this research gap, this study proposes a computer vision-based framework that employs Google Earth Engine satellite embeddings and UNet, which allows us to directly impute grid-level population estimates in building-data-deficient areas. Applied to Taiwan as a case study, the framework achieved strong predictive performance with R$^{2}$ of 0.89, RMSE of 18.70, and MAE of 8.41, outperforming traditional machine learning approaches. Notably, the proposed framework effectively addressed building false-positive errors inherent in Global Human Settlement Layer (GHSL) data, correctly identifying uninhabited areas that were erroneously classified as populated. The framework also offers significant advantages for global population mapping, particularly in terms of scalability and temporal consistency, thereby extending the coverage and accuracy of high-resolution population products in data-scarce regions worldwide. Urban planners, decision makers, and related stakeholders can obtain granular population distributions to support more accurate and targeted infrastructure investment, service delivery, resource allocation, and risk assessment decisions.

97 MATHEMATICS AND COMPUTING↗