Search NASA⌕ Search

SEARCH · Search NASA

Results for “Reliability and Integrity Management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

ACCELERATED DEPLOYMENT OF NOVEL MATERIALS BASED ON RELIABILITY INTEGRITY MANAGEMENT USING CUMULATIVE DAMAGE MODELING

There is currently no widely agreed, detailed general method for licensing a novel plant incorporating novel materials (or materials being deployed in novel environments); in many such situations, there are no directly applicable engineering code cases for decision-makers (including regulators) to rely on. This paper discusses a framework for solving this problem that is based on the Reliability and Integrity Management (RIM) approach delineated in ASME BPVC Section XI Division 2. NRC Regulatory Guide 1.246, Rev. 0, endorses, with conditions, the subject portion of the 2019 ASME Code. The proposed framework is meant to support development of a licensing case by addressing certain remaining technical challenges. The framework discussed here is compatible with the Licensing Modernization Project, but applying it in a specific case will call for advances in the state of practice, if not the state of the art. The RIM approach calls for applicants to (a) allocate reliability targets to plant structures, systems, and components (SSCs), (b) show that they are able to relate the currently observed physical condition of each SSC in the program to its failure probability well enough to determine whether the target reliability allocations are being satisfied, allowing for uncertainty related to the novelty of the materials/designs/operating environments, and (c) be able to demonstrate that the proposed program of surveillances will reliably detect unacceptable degradation of an SSC before SSC failure occurs. A modeling approach potentially applicable to item (b), based on cumulative damage modeling rather than failure rates, is briefly illustrated.

22 - GENERAL STUDIES OF NUCLEAR REACTORS↗

Relating Measured Component Damage to Assessed Component Reliability in Reliability Integrity Management (RIM)

There is currently no widely agreed detailed general method for licensing a novel plant incorporating novel materials (or materials being deployed in novel environments); in many such situations, there are no directly applicable engineering code cases for decision-makers (including regulators) to rely on. It may be possible to develop an approach to licensing such a plant that is based on the Reliability and Integrity Management (RIM) approach delineated in ASME BPVC Section XI Division 2. NRC Regulatory Guide 1.246, Rev.0, endorses, with conditions, the subject portion of the ASME Code. But that portion of the ASME code is written at a very high level, and there are fundamental technical challenges associated with applying it literally to licensing a real plant. In the RIM approach, applicants need to do the following (among other things): • Allocate target reliabilities to structures, systems, and components (SSCs) that collectively support the top-level plant safety and availability objectives; • Understand failure modes of those SSCs, and the degradation mechanisms that could lead to those failure modes; • Develop and propose a program of surveillances that will identify degradation prior to failure of SSCs; • Provide a means of reporting results, taking actions for anomalous or undesirable conditions, and give the regulator assurance of continued safe operations. Applying RIM in a specific case will call for advances in the state of practice of relating physical observables to functional reliability of certain component types. Except where a given level of damage corresponds to a failed (or nearly failed) state, it is not practical to establish a precise quantitative relationship between physical observables and reliability. This paper focuses on managing risk of passive component failures based on observable damage parameters. A simple approach to cumulative damage modeling will be illustrated with a view to possible use in RIM applications.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Reliability and Integrity Management Program Implementation Approach

Nuclear energy is the most reliable and environmentally sustainable energy source available today. In the United States, nuclear-generated power accounts for approximately 20% of total electricity and over 55% of clean energy. New advanced reactors have enormous potential to help further decarbonize the energy market, enhance grid resiliency, create new jobs, and build a stronger economy. More than 50 new reactors are being developed in the United States, and the federal government realizes an urgent need to deploy nuclear technologies to meet the country’s energy, environmental, and national security goals. As such, the U.S. Department of Energy launched multiple programs to support advanced reactor deployment. The research described in this paper explores implementation strategies for the Reliability and Integrity Management Program that directly supports the U.S. Department of Energy goal to enable the near-term deployment of the advanced reactor technologies. The project is conducted under the Regulatory Development Program for advanced reactors sponsored by the U.S. Department of Energy.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Investigation and Demonstration of Reliability Target Allocation to Support Reliability and Integrity Management Program

Nuclear energy is the most reliable and environmentally sustainable energy source available today. In the United States (U.S.), nuclear-generated power accounts for approximately 20% of total electricity and over 55% of clean energy. New advanced reactors have enormous potential to help further decarbonize the energy market, enhance grid resiliency, create new jobs, and build a stronger economy. More than 50 new reactors are being developed in the U.S., and the federal government realizes an urgent need to deploy nuclear technologies to meet the country’s energy, environmental, and national security goals. As such, the U.S. Department of Energy (DOE) launched multiple programs to support advanced reactor deployment. The research described in this report explores implementation strategies for the Reliability and Integrity Management Program that directly supports the DOE goal to enable the near-term deployment of the advanced reactor technologies. The project is conducted under the Regulatory Development Program for advanced reactors sponsored by the DOE.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Reliability and Integrity Management Scoping Study

The U.S. Nuclear Regulatory Commission (NRC) is developing the regulatory framework and technical expertise to support regulatory review of advanced non-light water reactor (ANLWR) designs. The NRC staff expects most of these designs to use the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code (BPVC) Section XI, Division 2 “Requirements for Reliability and Integrity Management (RIM) Programs for Nuclear Power Plants” for developing and implementing pre-service inspection (PSI) and in-service inspection (ISI) programs. The NRC recently endorsed ASME BPVC Section XI, Division 2 (BPV XI-2) in Regulatory Guide (RG) 1.246. This new ASME code is yet to be used in any applications submitted for NRC review. This report provides an overview of the current state of knowledge and practices within the industry for the use of BPV XI-2 for the development and implementation of a PSI and ISI program for non-light water reactors.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

A Regulatory Approach to Accelerated Deployment for New Material or Applications in Advanced Reactors

New advanced reactor developers may embark on deploying materials in novel and unique environments where a material’s long-term performance may be in question or unknown. In many cases, sufficient test data may not exist for the material in the desired application, or that no prescript or applicable regulatory testing requirements are available to demonstrate the safety of the application explicitly. This study endeavors to develop the framework for a regulatory and technical approach for safe and predictable accelerated materials use in advanced reactors guided by 10 CFR Part 50.43(e)(1), Advanced Reactor Design Criteria contained in Regulatory Guide 1.232, and Reliability Integrity Management Program (RIM) principles.

99 GENERAL AND MISCELLANEOUS↗

Management of Risks Associated with Application of Novel Materials in Novel Operating Environments in Novel Reactor Designs

There is currently no widely agreed, detailed general method for licensing a novel plant incorporating novel materials (or materials being deployed in novel environments); in many such situations, there are no directly applicable engineering code cases for decision-makers (including regulators) to rely on. This paper discusses a framework for solving this problem that is based on the Reliability and Integrity Management (RIM) approach delineated in ASME BPVC Section XI Division 2. NRC Regulatory Guide 1.246, Rev. 0, endorses, with conditions, the subject portion of the ASME Code. The proposed framework is meant to support development of a licensing case by addressing certain technical challenges. The framework discussed here is compatible with the Licensing Modernization Project, but applying it in a specific case will call for advances in the state of practice, if not the state of the art. The RIM approach calls for applicants to (a) allocate reliability targets to plant structures, systems, and components (SSCs), (b) show that they are able to relate the currently observed physical condition of each SSC in the program to its failure probability well enough to determine whether the target reliability allocations are being satisfied, allowing for uncertainty related to the novelty of the materials/designs/operating environments, and (c) be able to demonstrate that the proposed program of surveillances will reliably detect unacceptable degradation of an SSC before SSC failure occurs. These challenges are discussed in the paper, and a potentially applicable modeling approach based on cumulative damage rather than failure rates is briefly illustrated.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Distribution System Congestion Management - A Survey of Reliable Integration for Aggregated Resources and Microgrids

Rising penetration of consumer-owned Distribution Grid Resources (DGRs), increasingly managed by third party aggregators and enrolled in grid services and wholesale market programs, can create localized congestion in distribution networks. Managing these constraints is challenging due to a persistent coordination and information gap: utilities are accountable for reliability and have network topology and state visibility, while aggregators control the DGR capability needed to relieve congestion. This survey synthesizes congestion management solutions for distribution systems with high DGR penetration, covering both market-based mechanisms (distribution level markets, locational pricing, flexibility auctions) and non-market-based solutions (network reconfiguration, direct DGR control, demand response, curtailment, etc.). The literature is organized across three decision horizons: long term planning, operational planning, and real-time operation. Special attention is devoted to emerging distribution system operator architectures and coordination frameworks spanning transmission system operators, aggregators, and microgrids. Drawing on recent case studies and implementations, we distill best practices, identify key technical and economic barriers, and outline research directions. The evidence points to a shift toward integrated congestion management that combines market signals with technical controls, enabled by improved monitoring, forecasting, and closed loop control capabilities.

Active Distribution Networks (ADN)↗

Impacts of Variable Renewable Energy on Bulk Power System Assets, Pricing, and Costs

We synthesize available literature, data, and analysis on the degree to which growth in variable renewable energy (VRE) has impacted to date or might in the future impact bulk power system assets, pricing, and costs. We do not analyze impacts on specific power plants, instead focusing on national and regional system-level trends. The issues addressed are highly context dependent—affected by the underlying generation mix of the system, the amount of wind and solar penetration, and the design and structure of the bulk power system in each region. Moreover, analyzing the impacts of VRE on the bulk power system is a complex area of research and there is much more to be done to increase understanding of how VRE impacts the dynamics of current and future electricity markets. While more analysis is warranted, including additional location-specific assessments, several high-level findings emerge from this synthesis: -VRE Is Already Impacting the Bulk Power Market -VRE Impacts on Average Wholesale Prices Have Been Modest -VRE Impacts on Power Plant Retirements Have So Far Been Limited -VRE Impacts on the Bulk Power Market will Grow with Penetration -The ’System Value’ of VRE will Decline with Penetration -Power System Flexibility Can Reduce the Rate of VRE Value Decline All generation types are unique in some respect—bringing benefits and challenges to the power system—and wholesale markets, industry investments, and operational procedures have evolved over time to manage the characteristics of a changing generation fleet. With increased VRE penetrations, power system planners, operators, regulators, and policymakers will continue to be challenged to develop methods to smoothly and cost-effectively manage the reliable integration of these new and growing sources of electricity supply.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

ASME – Grappling with the Concept of Component Failure

ASME concepts of component failure. Definition for failure, functionality, damage tolerance, including Magnox reactors and AGRs. How ASME is addressing damage tolerance, and Section III division 5 Design, Classification, Reliability Target for SRC-1 components, Basic analysis approach, simple assessment, and full assessments, Reference to reliability and integrity management and strategy for graphite components.

36 MATERIALS SCIENCE↗

Reliable, High Power Density Inverters for Heavy Equipment Applications

With this final report, the combined team of the University of Arkansas (UA), University of Illinois, Urbana-Champaign (UIUC), Wolfspeed, Caterpillar, and Ampaire have successfully met all of their project objectives. Noteworthy for the heavy equipment portion of the project with Caterpillar is that the team made its project milestones two years into the project by designing a power dense motor drive for a permanent magnet synchronous machine. Upon finding out that Caterpillar had pivoted to switched-reluctance machines (SRMs), the team subsequently redesigned and implemented the SRM drive with a coolant temperature of 105°C! The other major task that the UA, UIUC, and Wolfspeed teams took on was the design of a PMSM drive for a hybrid aircraft that was flown on Feb. 20, 2023 by Ampaire after extensive testing and evaluation. While there were also technical objectives in thermal management, integrated gate drivers, reliability studies, and high temperature capacitors with integrated bussing, each of these have been fully reported on in quarterly reports. In brief, advances in thermal management and high temperature capacitors were utilized in order to achieve a 105°C motor drive. The integrated gate driver work resulted in a higher density drive with no loss of efficiency. Most of the last year, during a no-cost extension, was spent waiting for the Ampaire motor drive to be tested (outside of our project). Many months passed with the device just sitting in California while the company dealt with battery-related issues. This delayed the integration and testing activities until Fall 2022. Once those began, then the process took about 4-5 months to complete culminating in the test flight in Feb. 2023. By providing technical advances and integration into final platforms, the barrier to economic impact has been lowered. This project benefits the public by overcoming key technical barriers to electrified and hybrid electric heavy equipment and aircraft. This, in turn, leads to lower greenhouse gas emissions and a cleaner environment. This final report summarizes the integrated gate driver work and the Ampaire hybrid electric aircraft integration and test flight efforts. All other information has been previously reported in quarterly reports. A summary of the motor drives created during this project is provided along with a listing of publications.

42 ENGINEERING↗

RIM: Reliability and Integrity Management/ASME BPVC Section XI Division 2

Prepared at the request of the Nuclear Energy Institute (NEI) and the Joint Committee on Nuclear Risk Management's SubCommittee on Risk Applications, this slide set presents an update on some recent Reliability and Integrity Management (RIM) Subgroup work to respond to industry questions on American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI Division 2. If approved, the briefing will be given at an upcoming workshop of the Nuclear Energy Institute (February 18-20, Washington, DC) and at an upcoming meeting of the Joint Committee on Nuclear Risk Management's SubCommittee on Risk Applications (February 25-26, College Park, MD).

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Estimation of pipe failure frequencies in the absence of operational experience data: A pilot study

Probabilistic failure metrics such as leak frequency and rupture frequency are commonly used to characterize piping reliability. The methodologies for calculating the failure metrics rely on a complex set of input parameters. Operating experience data and experimental data play an important role in informing the different input parameters. The paper describes results and conclusions of a coordinated research project to benchmark three different reliability models using a four-step procedure: reference case definition of relevance to advanced reactor designs, input parameter calibration, validation of results, and application of different methodologies upon completion of the calibration and validation steps. The reference case is a weld consisting of nickel-base alloy 152/52 and located within a primary pressure boundary of an advanced reactor. This alloy is a class of structural materials known to be highly resistant to stress corrosion cracking. Synergies between the different methods are noted and the importance of a multi-disciplinary approach to input parameter development is underscored. A key conclusion is that the three methods are equally suitable for estimating failure frequencies. In any specific application, a selection of the most practical or effective computational tool can be considered. The comparison of alternative models confirms and helps to gain confidence in the computed failure frequency estimates. The study was part of a coordinated research project organized by the International Atomic Energy Agency.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

The Emerging Interdependence of the Electric Power Grid & Information and Communication Technology

This paper examines the implications of emerging interdependencies between the electric power grid and Information and Communication Technology (ICT). Over the past two decades, electricity and ICT infrastructure have become increasingly interdependent, driven by a combination of factors including advances in sensor, network and software technologies and progress in their deployment, the need to provide increasing levels of wide-area situational awareness regarding grid conditions, and the promise of enhanced operational efficiencies. Grid operators’ ability to utilize new and closer-to-real-time data generated by sensors throughout the system is providing early returns, particularly with respect to management of the transmission system for purposes of reliability, coordination, congestion management, and integration of variable electricity resources such as wind generation.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Integrated Large-Scale Data Management Platform for Photovoltaic Power Conversion Equipment (PCE) Reliability Data

To meet the demand for accuracy and real-time capability of PV system degradation evaluation, massive volume data is needed to run high-fidelity and high-efficiency simulations and perform advanced data analysis. However, PV farm operators have a series of difficulties with PV inverter data, such as data collection from multiple channels, massive data storage, data management and massive data analysis. To address these challenges, we developed an integrated data management platform capable of data acquisition, processing, storage, query, and performing big data analysis utilizing AI algorithms. The platform can also achieve data correctness verification and provide an effective distributed data management solution to retrieve massive data and establish a connection to distributed computational frameworks.

data management platform↗

Integrated Large-Scale Data Management Platform for Photovoltaic Power Conversion Equipment (PCE) Reliability Data: Preprint

To meet the demand for accuracy and real-time capability of PV system degradation evaluation, massive volume data is needed to run high-fidelity and high-efficiency simulations and perform advanced data analysis. However, PV farm operators have a series of difficulties with PV inverter data, such as data collection from multiple channels, massive data storage, data management and massive data analysis. To address these challenges, we developed an integrated data management platform capable of data acquisition, processing, storage, query, and performing big data analysis utilizing AI algorithms. The platform can also achieve data correctness verification and provide an effective distributed data management solution to retrieve massive data and establish a connection to distributed computational frameworks.

data management↗

Case for Open-Source PEV Charge Management Data Framework

The future growth of electrified transportation could be enhanced through interaction with smart grid system architectures. This paper summarizes current literature regarding plug-in electric vehicle - renewables integration and highlights areas of need to implement such integration at a multi-utility scale. Future smart grid implementations hold the key to transferring information and control parameters between distributed and centralized decision agents. The discussion highlights the opportunity to leverage federal investments in grid renovation and electric vehicle introduction to create system-wide value from improved reliability and reduced fossil fuel consumption. An approach to scaling a previously defined 'green signal' methodology for electric vehicles will be detailed across a utility grid balancing region. The research will include a synopsis of the communications opportunities and challenges of coordinating the responses of many resources. The results are expected to show that, with some variation in the charge profiles of individual vehicles, the aggregate set can interface with grid management methods to significantly influence the ability to integrate distributed and centralized renewables to improve environmental quality.

24 POWER TRANSMISSION AND DISTRIBUTION↗