Thermal-hydraulic validation tests using the SMART-ITL facility with a single train passive safety injection system for the smart design

A test program was launched using a large-scale thermal-hydraulic integral effect test facility of SMART-ITL (or FESTA) to validate the performance of the SMART passive safety system. In this paper thermal-hydraulic validation tests using the SMART-ITL facility equipped with a single train of a passive safety injection system were performed and their major results were summarized. The effect of the flow distributor, break size and different types of Core Makeup Tank (CMT) and Safety Injection Tank (SIT) on the thermal-hydraulic behavior during a Small-Break Loss of Coolant Accident (SBLOCA) scenario was investigated for the SMART passive safety system development. During the SBLOCA scenario, the water layer was well stratified thermally in the core makeup tank, and the safety injection water was injected efficiently into the reactor pressure vessel from the initial period. Eventually, the reactor coolant system was cooled down properly. From the test results, it was estimated that the SMART passive safety system has sufficient cooling capability to deal with the SBLOCA scenario of SMART. The acquired data will be used to validate the safety analysis code and its related models, to evaluate the performance of SMART PSS, and to provide the base data during the application phase of the revision of standard design approval and construction licensing. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

System Study: High-Pressure Safety Injection 1998–2013

This report presents an unreliability evaluation of the high-pressure safety injection system (HPSI) at 69 U.S. commercial nuclear power plants. Demand, run hours, and failure data from fiscal year 1998 through 2013 for selected components were obtained from the Institute of Nuclear Power Operations (INPO) Consolidated Events Database (ICES). The unreliability results are trended for the most recent 10-year period while yearly estimates for system unreliability are provided for the entire active period. No statistically significant increasing or decreasing trends were identified in the HPSI results.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Improved Safety Injection Flow Map Associated with Target RCS Depressurization to Maintain Core Coolability of OPR1000

In Korea, Severe Accident Management Guidance (SAMG) for Optimized Power Reactor (OPR1000) has been developed through the research results related to the WOG SAMG, in which the operation phase shifts from the Emergency Operation Procedure (EOP) to the SAMG when the Core Exit Temperature (CET) reaches 923 K. Among 7 mitigation strategies envisioned, the third management strategy, injecting coolant into Reactor Coolant System (RCS) by depressurizing the RCS is one of the key strategies to fortify the in-vessel retention capability. As an aid to such mitigation strategy, a safety injection (SI) flow map has been developed by Lee et al. for predicting required flow rate associated with target RCS depressurization to recover in-vessel coolability. The mechanistic SI flow map used the CET increase rate and core water level decrease rate obtained from MELCOR code simulation. It should be noted that during the severe accident, the total heat generated is sum of the decay heat and the oxidation heat. Thus, it is necessary to consider additional heat sources by oxidation reaction between cladding, structure, control rod, and hot steam prior to the injection of coolant. It was believed that the SI model estimated required flow rate rather conservatively by considering the expected amount decay heat and the accumulated heat in the core based on the RCS pressure. However, it was confirmed that the SI model developed by Lee et al. could not represent the total heat removal especially since start of oxidation. Under transient conditions, the heat sources accumulated in the heat structures (fuel, cladding, supporting structures) should be embarked in the model for accurate contribution of the total heat source to the required flow rate. Therefore, the objective of this study is to improve the previous SI flow map predicting the injection flow rate associated with target RCS depressurization to satisfy the in-vessel coolability during severe accidents. Additional terms were developed to reflect accurate heat accumulating and included in the existing model. Resulting SI flow map includes the target RCS depressurization, which enables discharge of the required flow rate by utilizing the flow rate-pressure curve with operation of two high pressure safety injections (HPSIs). Also recent MELCOR simulation result of a postulated steam generator tube rupture (SGTR) accident verified the accuracy of the improved map.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

System Study: High-Pressure Safety Injection 1998–2012

This report presents an unreliability evaluation of the high-pressure safety injection system (HPSI) at 69 U.S. commercial nuclear power plants. Demand, run hours, and failure data from fiscal year 1998 through 2012 for selected components were obtained from the Equipment Performance and Information Exchange (EPIX). The unreliability results are trended for the most recent 10 year period while yearly estimates for system unreliability are provided for the entire active period. No statistically significant increasing or decreasing trends were identified in the HPSI results.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

System Study: High-Pressure Safety Injection 1998-2020

This report presents an unreliability evaluation of the high-pressure safety injection system (HPSI) at 69 U.S. commercial nuclear reactors. Demand, run hours, and failure data from calendar years 1998–2020 for selected components were obtained from the Institute of Nuclear Power Operations (INPO) Industry Reporting and Information System (IRIS), formerly the INPO Consolidated Events Database (ICES). The unreliability results are trended for the most recent 10-year period while yearly estimates for system unreliability are provided for the entire active period. No statistically significant increasing or decreasing trends were identified in the HPSI results.

99 GENERAL AND MISCELLANEOUS↗

System Study: High-Pressure Safety Injection 1998-2014

This report presents an unreliability evaluation of the high-pressure safety injection system (HPSI) at 69 U.S. commercial nuclear power plants. Demand, run hours, and failure data from fiscal year 1998 through 2014 for selected components were obtained from the Institute of Nuclear Power Operations (INPO) Consolidated Events Database (ICES). The unreliability results are trended for the most recent 10 year period, while yearly estimates for system unreliability are provided for the entire active period. No statistically significant increasing or decreasing trends were identified in the HPSI results.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

System Study: High-Pressure Safety Injection 1998-2022

This report presents an unreliability evaluation of the high-pressure safety injection system (HPSI) at 62 U.S. commercial operating nuclear reactors. New Standardized Plant Analysis Risk (SPAR) models with the most recent SPAR parameter update results were used in this report. Demand, run hours, and failure data from calendar years 1998–2022 for selected components were obtained from the Institute of Nuclear Power Operations Industry Reporting and Information System. The unreliability results are trended for the most recent 10-year period while yearly estimates for system unreliability are provided for the entire active period. Highly statistically significant increasing trends were identified in both the HPSI system start-only unreliability and 8-hour mission unreliability.

99 GENERAL AND MISCELLANEOUS↗

System Study: High-Pressure Safety Injection 1998-2024

This report presents an unreliability evaluation of the high-pressure safety injection system (HPSI) at 62 U.S. commercial operating nuclear reactors. New Standardized Plant Analysis Risk (SPAR) models with the most recent SPAR parameter update results were used in this report. Demand, run hour, and failure data from calendar years 1998 to 2024 for selected components were obtained from the Institute of Nuclear Power Operations Industry Reporting and Information System. The unreliability results are trended for the most recent 10-year period and yearly estimates for system unreliability are provided for the entire active period. Statistically significant decreasing trends were identified in both the HPSI system start-only unreliability and 24-hour mission unreliability.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

System Study: High-Pressure Safety Injection 1998–2018

This report presents an unreliability evaluation of the high-pressure safety injection system (HPSI) at 69 U.S. commercial nuclear power plants. Demand, run hours, and failure data from calendar years 1998 through 2018 for selected components were obtained from the Institute of Nuclear Power Operations (INPO) Industry Reporting and Information System (IRIS), formerly the INPO Consolidated Events Database (ICES). The unreliability results are trended for the most recent 10 year period while yearly estimates for system unreliability are provided for the entire active period. No statistically significant increasing or decreasing trends were identified in the HPSI results.

99 GENERAL AND MISCELLANEOUS↗

Systems Engineering (SE) Approach of Developing A Passive Safety Injection System (PSIS) to Cope with APR1400 Extended Station Black-Out (SBO) Accident Using RELAP5

On 11 March 2011 the power supply and cooling of the three Fukushima Daiichi reactors were disabled by a major earthquake followed by a relatively high tsunami waves. The earthquake damaged the electrical grid which is the normal power supply for the reactors, then the tsunami waves disabled the emergency diesel generators of the Fukushima Daiichi reactors, which left the plant with no alternating current (AC) source. This condition is called 'Station Black-Out'. The reactors were tripped immediately, but due to the nuclear physics phenomena, the reactor cores were still producing thermal power, which is generated by the decay of radioactive fission products in the reactor core, known as decay heat. The decay heat had not been circulated to an external heat sink and eventually the accumulative heat produced in the core led to damage to the reactor cores. After the Fukushima Daiichi accident, Design Extension Condition (DEC) such as total loss of feed water (TLOFW), and prolonged Station Black-Out (SBO) attracted the attention of nuclear experts. The attention focuses on the defense in depth concept, redundancy and sustainability of the systems, and development of the passive safety systems, which rely on natural physics laws. The topic of this paper is to discuss the possibility of attaching a Passive Safety Injection System (PSIS) to the APR1400. The PSIS is a safety system which provides adequate cooling water to the steam generators after the loss of the Auxiliary Feed Water System (AFWS) during an extended SBO accident. The PSIS will be available while the power supply of the plant is being recovered and the active safety systems take over the functionality. The anticipated PSIS will be automatically actuated to enhance the engineered safety feature and to reduce the human errors. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Thermo-Mechanical Analysis of SBLOCA with Loss of One Safety Injection System Using SCDAP/RELAP5

Design Extension Condition (DEC) for nuclear power plants has been being deliberated to bring it within a safety regulation boundary, following the 2011 Fukushima Daiichi accident. Moreover, a new regulation on the LOCA accident analysis designated as 10CFR50.45(c) has been proposed based on a concern of the non-conservatism of current criterion neglecting fuel burn-up effect on the cladding embrittlement. Therefore, a more comprehensive and realistic simulation of fuel rod behavior is required to cope with the stringent environment under LOCA accidents. A SCDAP/RELAP5 system analysis code has been used mainly on the prediction of severe accident phenomena. It has a set of mechanistic models for the fuel deformation, which plays an important role particularly in the early phase progression of the fuel melting. However, limited work has been done focusing on the models only to the fuel failure estimation through the DBA or candidates of DEC. Therefore, some analyses were performed here with a burnup dependent core model to understand the capability of SCDAP/RELAP5 to predict the thermo-mechanical behavior of the fuel cladding such as ballooning, burst and external/internal oxidation. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Estimation of Core Recovery Time with TRACE

Following the severe accident in Fukushima Daiichi Nuclear Power Plant in Japan, safety related concerns about the zirconium based claddings used in current light water reactors have increased. High corrosion resistance and low neutron absorption cross section make zirconium a suitable cladding material for normal nuclear plant operational conditions. However, for nuclear accident scenarios when safety functions of the plant are lost, Zr claddings undergo exothermic reaction with steam and exacerbate the accident conditions. The exothermic reaction increases the temperature of the cladding and accelerates core melting in severe accident progression. And the generation of explosive hydrogen gas accumulates and challenges the structural integrity. The accident tolerant fuel (ATF) concept is the fuel and cladding system that gives a longer time margin, compared to standard Zr claddings, to cope with the accident when core cooling systems are lost in a nuclear power plant. The ATF cladding should have slower oxidation kinetics and less hydrogen generation than Zr to alleviate consequences of cladding interaction with steam at high temperatures. The maximum time available to mitigate progression of severe accident is an important measure to evaluate benefits of ATF claddings. For this work, the maximum time available to mitigate progression of severe accident is selected as the time at which cladding melting reaction starts. Melting reaction is selected as an upper limit because of the degradation of coolable geometry. Maintaining the coolable geometry is a regulation criteria for both loss of coolant (LOCA) analyses and outside the LOCA analyses. Once the melting of the cladding starts, it exacerbates the deformation of the fuel assembly and hottest rods within the core cannot be cooled by water reflood and results in fuel melting progression. The aim of this work is to evaluate time margin gain of ATF cladding in a severe accident scenario of LOCA without safety injections and station blackout considering oxidation kinetics only. Also it is assumed that safety injections are recovered before melting of the claddings start and the sensitivity of safety injection actuation time on core recovery is analyzed. The core recovery time is the time when makeup water from safety injections quench the fuel rods and halt the progression of the severe accident. This time is estimated by initiating safety injections at different times and observing the hot rod behavior which represents 1/5. of the core in this work. It is considered that core is not recoverable when 20% of the core is damaged.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

RELAP-7 Simulation Resolving an SBO Scenario on a Simplified Geometry of a BWR

The RELAP-7 code is the next generation nuclear reactor system safety analysis code being developed at the Idaho National Laboratory (INL). RELAP-7 will become the main reactor systems toolkit for the Risk-Informed Safety Margin Characterization Pathway of the Light Water Reactor Sustainability Program and the next generation tool in the RELAP reactor safety/systems analysis application series (i.e., the replacement for RELAP5). The code is being developed based on Idaho National Laboratory’s modern scientific software development framework – MOOSE (the Multi-Physics Object-Oriented Simulation Environment). During Fiscal Year 2013, a number of physical components with two-phase flow capability have been developed to support the simplified boiling water reactor (BWR) station blackout analyses. The case selected for demonstration calculation is built from the specifications documented in an Organization for Economic Cooperation and Development benchmark problem for BWR turbine trip analysis. The reference design for the benchmark problem was from the Peach Bottom-2 nuclear station, which is a General Electric BWR-4 design. The demonstration case includes the major components for the primary system of a BWR, as well as the safety system components for reactor core isolation cooling (RCIC) and the wet well of a BWR containment. The case was initially run to steady-state with RELAP-7. The station blackout transient simulations were subsequently initiated by using the INL-developed RAVEN code. Two scenarios for the station blackout simulations have been considered. Scenario I represents an extreme station blackout accident with no safety injection functioning. The reactor core could experience dry out fairly quickly with this scenario. Scenario II represents a more probable station blackout accident progression with the RCIC system functioning. In this scenario, the RCIC system is fully coupled with the reactor primary system and the safety injection to provide makeup cooling water to the reactor core from the suppression pool is dynamically simulated. With the RCIC system functioning, the core dry out is significantly postponed when compared to the results from Scenario I. This fully coupled RCIC system simulation capability represents the first-of-a-kind simulation capability. Sensitivity studies have also been carried out to study the effect of RCIC control strategy with varying core makeup cooling water mass flow rates. The next stage of development will be to demonstrate more refined BWR station blackout analyses with more realistic geometries, to be reported in the next demonstration simulation report.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Contribution to modeling of the reflooding of a severely damaged reactor core using PRELUDE experimental results

In case of accident at a nuclear power plant, water sources may not be available for a long period of time and the core heats up due to the residual power. The reflooding (injection of water into core) may be applied if the availability of safety injection is recovered during accident. If the injection becomes available only in the late phase of accident, water will enter a core configuration that will differ significantly from original rod-bundle geometry. Any attempt to inject water after significant core degradation can lead to further fragmentation of core material. The fragmentation of fuel rods may result in the formation of a 'debris bed'. The typical particle size in a debris bed might reach few millimeters (characteristic length-scale: 1 to 5 mm), i.e., a high permeability porous medium. The French 'Institut de Radioprotection et de Surete Nucleaire' is developing experimental programs (PEARL and PRELUDE) and simulation tools (ICARE-CATHARE and ASTEC) to study and optimize the severe accident management strategy and to assess the probabilities to stop the progress of in-vessel core degradation. It is shown that the quench front exhibits either a ID behaviour or a 2D one, depending on injection rate or bed characteristics. The PRELUDE experiment covers a rather large range of variation of parameters, for which the developed model appears to be quite predictive. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Major results from safety-related integral effect tests with VISTA-ITL for the SMART design

A series of integral effect tests (IETs) was performed by the Korea Atomic Energy Research Inst. (KAERI) using the VISTA integral test loop (VISTA-ITL) as a small-scale IET program. Among them this paper presents major results acquired from the safety-related IETs with the VISTA-ITL facility for the SMART design. Three small-break loss-of-coolant accident (SBLOCA) tests of safety injection system (SIS) line break, shutdown cooling system (SCS) line break and pressurizer safety valve (PSV) line break were successfully performed and the transient characteristics of a complete loss of flowrate (CLOF) was simulated properly with the VISTA-ITL facility. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Reliability enhancement of APR + diverse protection system regarding common cause failures

The Advanced Power Reactor Plus (APR +) nuclear power plant design has been developed on the basis of the APR1400 (Advanced Power Reactor 1400 MWe) to further enhance safety and economics. For the mitigation of Anticipated Transients Without Scram (ATWS) as well as Common Cause Failures (CCF) within the Plant Protection System (PPS) and the Emergency Safety Feature - Component Control System (ESF-CCS), several design improvement features have been implemented for the Diverse Protection System (DPS) of the APR + plant. As compared to the APR1400 DPS design, the APR + DPS has been designed to provide the Safety Injection Actuation Signal (SIAS) considering a large break LOCA accident concurrent with the CCF. Additionally several design improvement features, such as channel structure with redundant processing modules, and changes of system communication methods and auto-system test methods, are introduced to enhance the functional reliability of the DPS. Therefore, it is expected that the APR + DPS can provide an enhanced safety and reliability regarding possible CCF in the safety-grade I and C systems as well as the DPS itself. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

IJS procedure for RELAP5 to TRACE input model conversion using SNAP

The TRAC/RELAP Advanced Computational Engine (TRACE) advanced, best-estimate reactor systems code developed by the U.S. Nuclear Regulatory Commission comes with a graphical user interface called Symbolic Nuclear Analysis Package (SNAP). Much of efforts have been done in the past to develop the RELAP5 input decks. The purpose of this study is to demonstrate the Institut 'Josef Stefan' (IJS) conversion procedure from RELAP5 to TRACE input model of BETHSY facility. The IJS conversion procedure consists of eleven steps and is based on the use of SNAP. For calculations of the selected BETHSY 6.2TC test the RELAP5/MOD3.3 Patch 4 and TRACE V5.0 Patch 1 were used. The selected BETHSY 6.2TC test was 15.24 cm equivalent diameter horizontal cold leg break in the reference pressurized water reactor without high pressure and low pressure safety injection. The application of the IJS procedure for conversion of BETHSY input model showed that it is important to perform the steps in proper sequence. The overall calculated results obtained with TRACE using the converted RELAP5 model were close to experimental data and comparable to RELAP5/MOD3.3 calculations. Therefore it can be concluded, that proposed IJS conversion procedure was successfully demonstrated on the BETHSY integral test facility input model. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

SIT Makeup Effect on the Loss of Residual Heat Removal during Mid-loop Operation

For the loss of cooling during the mid-loop operation, the plant needs to have a sufficient time for operator action without active makeup measures such as a loss of alternating current (AC) power. This concern is raised after the Fukushima accident. Especially, in addition to the loss of residual heat removal (LORHR), if the AC power or active makeup measures are unavailable, the passive makeup using gravity feed or pressurized feed will provide sufficient time before core uncovery. This paper investigates means of the passive makeup measures using safety injection tank (SIT) after the LORHR event to prevent or delay the core uncovery and fuel failure for the typical advanced power reactor 1400 (APR1400). Unfortunately, the refueling water storage tank of APR1400 cannot be used for gravity makeup since it is located on the bottom of the containment with a lower elevation than the reactor vessel. So, the SIT makeup and the effect on the core uncovery are investigated. The results show that gravity makeup of a SIT provides insufficient means but the slightly pressurized SIT is required for sufficient operator action time for the LORHR with the station black out (SBO) during the mid-loop operation for the APR1400. (authors)