Search NASA⌕ Search

SEARCH · Search NASA

Results for “STARTING”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Control and Simulation of a Grid-Forming Inverter for Hybrid PV-Battery Plants in Power System Black Start

Power system restoration is an important part of system planning. Power utilities are required to maintain black start capable generators that can energize the transmission system and provide cranking power to non-blackstart capable generators. Traditionally, hydro and diesel units are used as black start capable generators. With the increased penetration of bulk size solar farms, inverter based generation can play an important role in faster and parallel black start thus ensuring system can be brought back into service without the conventional delays that can be expected with limited black start generators. Inverter-based photovoltaic (PV) power plants have advantages that are suitable for black start. This paper proposes the modeling, control, and simulation of a grid-forming inverter-based PV-battery power plant that can be used as a black start unit. The inverter control includes both primary and secondary control loops to imitate the control of a conventional synchronous machine. The proposed approach is verified using a test system modified from the IEEE 9-bus system in the time-domain electromagnetic transient simulation tool PSCAD. The simulation results shows voltage and frequency stability during a multi-step black-start and network energization process.

Nguyen, Quan H.↗

Optimal Power System Black start using Inverter-Based Generation

Power system black start readiness is part of the system planning. Utility planners perform periodic studies to assess if their power system is capable of total restoration following a black out. Hydro and diesel generators are the most commonly used black start capable resources by power utilities. However, with increasing penetration of solar generation, inverter-based resources can be considered to provide black start capability. Since the solar inverters can be located at multiple locations throughout the power system, and in view of their unique characteristics, an optimal real-time capable plan is helpful for system operators for faster black start. Black start optimization is a multi stage mixed-integer non-linear optimization which is extremely hard to solve. In this paper, we propose an optimal black start methodology that is easier to solve and scalable in real-time. We demonstrate the proposed methodology on two test systems and illustrate how inverter-based resources can contribute and improve power system restoration.

power system restoration, blackstart, Inverter-bas↗

A Model Predictive Control Based Generator Start-Up Optimization Strategy for Restoration With Microgrids as Black-Start Resources

Microgrids (MGs) can operate in an islanded mode and serve as black-start resources for power system restoration (PSR). Here, a model predictive control (MPC) based generator start-up optimization strategy for PSR is proposed utilizing MGs as black-start resources. First, the generator start-up sequence (GSUS) optimization is formulated as a mixed integer linear programming. Then, the uncertainties of MG black-start resources (MBSRs) are modeled by discretizing the probability distribution of the forecast errors, and representative scenarios for MBSRs extracted by formulating the probability mass transportation problem. Third, the generator start-up optimization strategy considering MBSRs is proposed utilizing the MPC technique, in which the optimization objective is to maximize the energy capability of the power systems and minimize the load curtailment of the MGs in each looking-ahead interval. Simulations on the IEEE 118 bus system with MGs and Zhejiang provincial power system in China verify that the introduced strategy for PSR can successfully restore the power system and effectively determine the optimal GSUS.

24 POWER TRANSMISSION AND DISTRIBUTION↗

EXPERIMENTAL STUDY OF THE EFFECT OF START OF INJECTION AND BLEND RATIO ON SINGLE FUEL REFORMATE RCCI

A new concept of single-fuel RCCI has been proposed through the catalytic partial oxidation reformation of diesel fuel. The reformed fuel mixture is then used as the low reactivity fuel and diesel itself is used as the high reactivity fuel. In this paper, two selected reformates mixture from the reformation of diesel were selected for further analysis. Each reformate fuel mixture contained a significant fraction of inert gases (89% and 81%). The effects of the difference in the molar concentrations of the reformate mixtures were studied by experimenting with diesel as the direct injected fuel in RCCI over a varying start of injection timings and different blend ratios (i.e., the fraction of low and high reactivities fuels). The reformate mixture with the lower inert gas concentration had earlier combustion phasing and shorter combustion duration at any given diesel start of injection timing. The higher reactivity separation between reformate mixture and diesel, compared with gasoline and diesel, causes the combustion phasing of reformate-diesel RCCI to be more sensitive to the start of injection timing. The maximum combustion efficiency was found at a CA50 before TDC, whereas the maximum thermal efficiency occurs at a CA50 after TDC. The range of energy-based blend ratios in which reformate-diesel RCCI is possible is between 25% and 45%, limited by ringing intensity (RI) at the low limit of blend ratios, and COV of IMEP and combustion efficiency at the high limit. Intake boosting becomes necessary due to the oxygen deficiency caused by the low energy density of the reformate mixtures as it displaces intake air.

Hariharan, Deivanayagam↗

Starting dynamics of a linear-cavity femtosecond Mamyshev oscillator

Mamyshev oscillators can generate high-power femtosecond pulses, but starting a mode-locked state has remained a major challenge due to the suppression of continuous-wave lasing. Here, we study the starting dynamics of a linear Mamyshev oscillator designed to generate high-power femtosecond pulses while avoiding component damage. Reliable starting to stable mode-locking is achieved with a combination of modulation of the pump power and shifting of a filter passband. The starting process is automated, with full electronic control. The laser delivers 21-nJ pulses that are dechirped to 65 fs in duration outside the cavity.

Chen, Yi-Hao (ORCID:0000000244001983)↗

Convenient Syntheses of Trivalent Uranium Halide Starting Materials without Uranium Metal

Low-valent uranium coordination chemistry continues to rely heavily on access to trivalent starting materials, but these reagents are typically prepared from uranium turnings, which are becoming increasingly difficult to acquire. Here we report convenient syntheses of UI 3 (THF) 4 (THF = tetrahydrofuran) and UBr 3 (THF) 4 from UCl 4 , a more accessible uranium starting material that can be prepared from commercially available uranium oxides. UCl 3 (THF) 2 (1), UBr 3 (THF) 4 (2), and UI 3 (THF) 4 (3) were prepared by single-pot reductions from UCl 4 using KH and KC 8 and converted to 2 or 3 by halide exchange with the corresponding Me 3 SiX (where X = Br or I). Reduction of UI 4 (Et 2 O) 2 (4; Et 2 O = diethyl ether) and UI 4 (1,4-dioxane) 2 (5) was also shown to cleanly yield 3. Complex 1 was also synthesized separately by the addition of anhydrous HCl to U(BH 4 ) 3 (THF) 2 , which was prepared by thermal reduction of U(BH 4 ) 4 . All three trivalent uranium halide complexes were isolated in high crystalline yields (typically 85–99%) and their formulations were confirmed by single-crystal X-ray diffraction, elemental analysis, and 1 H NMR and IR spectroscopy. Elemental analysis conducted on triplicate samples of 1–3 exposed to vacuum for different time intervals revealed significant THF loss for all three complexes in as little as 15 min. Altogether, these results offer expedient entry into low-valent uranium chemistry for researchers lacking access to uranium turnings.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Verification and Validation of the Stakeholder Tool for Assessing Radioactive Transportation (START) – 22323

The U.S. Department of Energy (DOE) Office of Integrated Waste Management is planning for the eventual transportation, storage, and disposal of spent nuclear fuel (SNF) and high-level radioactive waste (HLW) from nuclear power plant and DOE sites. The Stakeholder Tool for Assessing Radioactive Transportation (START) is a web-based, geospatial decision-support tool developed for evaluating routing options and other aspects of transporting SNF and HLW, covering rail, truck, barge, and intermodal infrastructure and operations in the continental United States. The verification and validation (V&V) process is intended to independently assess START to provide confidence in the ability of START to accurately provide intended results. The V&V process checks the START tool using a variety of methods, ranging from independent hand calculations to comparison of START performance and results to those of other codes. The V&V activity was conducted independently from the START development team with opportunities to provide feedback and collaborate throughout the process. The V&V analyzed attributes of transportation routes produced by START, including route distance and both population and population density captured within buffer zones around routes. Population in the buffer zone, population density in the buffer zone, and route distance were all identified as crucial outputs of the START code and were subject to V&V tasks. Some of the improvements identified through the V&V process were standardizing the underlying population data in START, changing the projection of the population raster data, and changes to the methodology used for population density to improve its applicability for expected users. This collaboration also led to suggested improvements to some of the underlying shape file segments within START. A formal series of test routes went through the V&V process from START version 3.2.1 following the implementation of the recommended improvements to START. The V&V of the buffer zone population and distance reported in START were achieved by utilizing a custom workflow developed in QGIS. This platform was chosen because it is fully independent of START. The buffer zone population and route distances in START showed excellent agreement to independent V&V test results. Over 200 route test cases were run; in all cases, the percent difference in the population within the buffer zone was less than +/- 5%, and the majority of cases were below +/- 1%. These cases were also duplicated in ArcMap, which is Environmental Systems Research Institute’s (ESRI) GIS desktop application. The ArcMap results also show good agreement; however, they cannot be considered independent of START because START also uses ESRI software. The V&V tasks are currently addressing population density and estimated radiation dose in START as well as implementing further automation of the V&V process to allow larger suites of test routes to be run more easily and quickly by less experienced GIS users. These improvements to the V&V process will make it a valuable tool for the development team and the stakeholders so that each new iteration of START can easily be checked for quality and consistency. This paper and presentation will describe the V&V process, findings and implications, and ongoing V&V activities.

START, DOE, Transporation, dose, GIS↗

Characterization of GDI PM during Vehicle Start-Stop Operation

As the fuel economy regulations increase in stringency, many manufacturers are implementing start-stop operation to enhance vehicle fuel economy. During start-stop operation, the engine shuts off when the vehicle is stationary for more than a few seconds. When the brake is released by the driver, the engine restarts. Depending on traffic conditions, start-stop operation can result in fuel savings from a few percent to close to 10%. Gasoline direct injection (GDI) engines are also increasingly available on light-duty vehicles. While GDI engines offer fuel economy advantages over port fuel injected (PFI) engines, they also tend to have higher PM emissions, particularly during start-up transients. Thus, there is interest in evaluating the effect of start-stop operation on PM emissions. In this study, a 2.5L GDI vehicle was operated over the FTP75 drive cycle. Runs containing cold starts (FTP-75 cycle Phases 1 & 2) and multiple runs containing hot starts (FTP-75 cycle Phases 3 & 4) were performed each day. Note that the FTP-75 Phases 3 & 4 are identical to Phases 1 & 2 except that the engine is warmed up. Three fuels were evaluated: an 87 AKI gasoline (E0), a 21% splash blend of ethanol and the 87 AKI gasoline (E21), and a 12% splash blend of iso-butanol and the 87 AKI gasoline (iBu12). PM mass, transient particle number concentration and size distribution, and soot mass concentration were evaluated for both start-stop operation and no start-stop operation on each fuel. Three Phase 1 & 2 cycles and as many as 27 Phase 3 & 4 cycles were performed for each fuel-mode combination. Composite FTP mass emissions for E0 and iBu12 showed increased total PM emissions with start-stop operation, but E21 showed no difference. Statistical analysis of the effects of start-stop on PM number and soot emissions showed different trends for different fuels. For example, when E0 is used with start-stop operation, the particle number decreased but the soot mass tended to increase. The results of this study have implications for hybrid vehicle operation as well because the internal combustion engine in hybrid vehicles must stop and re-start during normal operation.

Storey, John↗

Hydropower Black Start: A Guidebook for Retrofitting Grid Dependent Hydropower

Not all United States (US) hydropower plants were designed to provide black start, but they are increasingly needed to uphold resilience in the evolving electric grid. This guidance is designed to help understand the minimal retrofits required for grid dependent hydropower (GDH) plants behind the point of interconnection (POI). For distribution connected hydropower plants or those with dedicated cranking paths, such upgrades can be sufficient for the plant to provide black start. For others, more coordination with the transmission system operator will be needed. This guidebook answers a number of questions relevant to retrofitting hydropower plants with black start capabilities. For example, the guidebook answers: • How flexible do the wicket gate controls need to be? • Who needs to do hydro governor model validation, why, and how? • How robust and flexible do the excitation and AVR controls need to be? • What protection settings need to be adjusted? • What relay(s) will need to be bypassed or overridden and at what risk? • What is the electrical energy demand of the station load or auxiliary power systems? • What should the strategy to energize transformer(s) along cranking path to address inrush currents be? • How should the critical load restoration be sequenced? In addition to outlining the specifications that hydropower plants need to meet for each component to be able to perform black start, this guidebook provides a set of case studies for specific upgrades needed at actual plants. Between the case studies of plants that have already performed black start retrofits and the examples of how this guidebook can be applied to scope future retrofits, five key themes have been identified for retrofit needs. 1. Protection needs “black start” mode: hydropower plants that are not designed with black start capabilities will have protections that prevent them from interconnecting to a “dead bus.” These protections will need to be overridden in every retrofit case and a separate black start mode should be established so that operators can safely switch between black start and grid connected modes, minimizing the risk to the plant. 2. Wicket gates need modern controls: digital governors accelerate the parameter tuning process and gate position sensors improve controllability, so plants with mechanical governors should be upgraded. Furthermore, a black start and islanding mode should be established for controls to maximize plant performance. 3. Robust excitation support: the DC system or excitation generator needs to be reliable enough to form and sustain the rotor electromagnetic field. These systems are typically undersized in plants that were not designed for black start, so they will need to be upgraded. 4. Turbine-governor model validation and operator training: validation of a standard hydro governor model is needed to characterize the dynamic response (i.e., inertial and primary frequency response) of the GDH. This is required for control development and old hydropower plants often have outdated or incorrect models. Operator training is also typically required to ensure the hardware retrofits are utilized correctly during the black start process. 5. Transformer and cranking path energization: any upgradation and control adjustment in front of the POI will depend upon the existing interconnection. Coordination with the transmission or distribution operator may be required.

13 HYDRO ENERGY↗

The Effect of Size on Postrelease Survival of Head-Started Mojave Desert Tortoises

Abstract Captive-rearing conservation programs focus primarily on maximizing postrelease survival. Survival increases with size in a variety of taxa, often leading to the use of enhanced size as a means to minimize postrelease losses. Head-starting is a specific captive-rearing approach used to accelerate growth in captivity prior to release in the wild. We explored the effect of size at release, among other potential factors, on postrelease survival in head-started Mojave desert tortoises Gopherus agassizii. Juvenile tortoises were reared for different durations of captivity (2–7 y) and under varying husbandry protocols, resulting in a wide range of juvenile sizes (68–145 mm midline carapace length) at release. We released all animals (n = 78) in the Mojave National Preserve, California, United States, on 25 September 2018. Release size and surface activity were the only significant predictors of fate during the first year postrelease. Larger sized head-starts had higher predicted survival rates when compared with smaller individuals. This trend was also observed in animals of the same age but reared under different protocols, suggesting that accelerating the growth of head-started tortoises may increase efficiency of head-starting programs without decreasing postrelease success. Excluding five missing animals, released head-starts had 82.2% survival in their first year postrelease (September 2018–September 2019), with all mortalities resulting from predation. No animals with >90-mm midline carapace length were predated by ravens. Our findings suggest the utility of head-starting may be substantially improved by incorporating indoor rearing to accelerate growth. Target release size for head-started chelonians will vary among head-start programs based on release site conditions and project-specific constraints.

Biodiversity & Conservation↗

Verification and Validation of START: A Spent Nuclear Fuel Routing and Decision Support Tool

The Stakeholder Tool for Assessing Radioactive Transportation (START) is a web-based geospatial decision-support tool being developed by the US Department of Energy’s Office of Integrated Waste Management (IWM) to support federal interim storage for spent nuclear fuel (SNF) and associated transportation. START provides many functions for the IWM program including: serving as a communications tool for conveying geospatial data and information, an options analysis tool for exploring potential transport modes and routes for transporting SNF from nuclear power plants to future federal interim storage facilities, an emergency response planning tool for Tribes and States to identify training needs along potential SNF transport corridors, an environmental analysis tool for estimating potential radiation dose exposure from incident-free and incident-case SNF transport conditions, and a systems analysis support tool providing route-related inputs for system throughput analysis. As part of the START development process, a verification and validation (V&V) effort is being undertaken. In the initial V&V phase, several outputs of the START tool were checked such as the total distance, population and population densities within the buffer zone, and incident free dose. The V&V process is fluid as it will be utilized after each version change to ensure that the core functionalities of the tool are maintained and the results are consistent with the previous versions. Efforts have also been put into developing scripts to aid in the process of automating certain sections of the V&V work. As some of the V&V efforts use Environmental Systems Research Institute’s (ESRI) tools upon which the START framework is built, the START data were compared against outputs from tools like Quantum Geographic Information System (QGIS) for buffer zone populations and route lengths to ensure independence of the V&V process. Good agreement was observed between the START results and the independent V&V studies with the majority of the differences falling between 1% and 5% for populations within the buffer zone and route distance. This presentation describes the development and design of the START tool, V&V methods employed for various metrics of interest and their respective results, and future plans.

START, transportation, GIS, V&V↗