Search NASA⌕ Search

SEARCH · Search NASA

Results for “Sensor & Control Upgrades”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Test and extraction methods for the QC parameters of silicon strip sensors for ATLAS upgrade tracker

The Quality Control (QC) of pre-production strip sensors for the Inner Tracker (ITk) of the ATLAS Inner Detector upgrade has finished, and the collaboration has embarked on the QC test programme for production sensors. This programme will last more than 3 years and comprises the evaluation of approximately 22000 sensors. 8 Types of sensors, 2 barrel and 6 endcap, will be measured at many different collaborating institutes. The sustained throughput requirement of the combined QC processes is around 500 sensors per month in total. Measurement protocols have been established and acceptance criteria have been defined in accordance with the terms agreed with the supplier. For effective monitoring of test results, common data file formats have been agreed upon across the collaboration. To enable evaluation of test results produced by many different test setups at the various collaboration institutes, common algorithms have been developed to collate, evaluate, plot and upload measurement data. This allows for objective application of pass/fail criteria and compilation of corresponding yield data. These scripts have been used to process the data of more than 3000 sensors so far, and have been instrumental for identification of faulty sensors and monitoring of QC testing progress.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Higher Education Buildings Recognized for Integrated Controls for HVAC and Lighting Systems - Case Study: California State University Dominguez Hills and University of Minnesota

This case study describes connected lighting system projects on two college campuses; Cal State Dominguez Hills and the University of Minnesota both implemented lighting and controls upgrades at mixed-use buildings, including advanced sensors, HVAC integration, and plug load control. Both projects were recognized by DOE's Integrated Lighting Campaign.

integrated lighting, higher education, college, un↗

ATLAS ITk strip sensor quality control procedures and testing site qualification

Abstract The high-luminosity upgrade of the Large Hadron Collider, scheduled to become operational in 2029, requires the replacement of the ATLAS Inner Detector with a new all-silicon Inner Tracker. Radiation hard n + -in-p micro-strip silicon sensors were developed by the ATLAS Inner Tracker strip collaboration and are produced by Hamamatsu Photonics K.K. Production of the total amount of 22000 strip sensors has started in 2020 and will continue until 2025. The ATLAS strip sensor collaboration has the responsibility to monitor the quality of the fabricated devices by performing detailed measurements of individual sensor characteristics and by comparing the obtained results with the tests done by the manufacturer. Dedicated Quality Control procedures were developed to check whether the delivered large-format sensors adhere to the ATLAS specifications. The institutes performing the Quality Control testing of the pre-production and production ATLAS ITk strip sensors had to initially be qualified for multiple high-throughput tests by successfully completing the Site Qualification process. The Quality Control procedures and the qualification process are described in this paper.

Instruments & Instrumentation↗

Demonstration and Evaluation of an Advanced Integrated Operations Concept for Hybrid Control Rooms

The U.S. nuclear industry has an urgent need to reduce operations and maintenance costs to remain economically competitive in today’s energy market. Measures to improve efficiency in operations will need to leverage technology in a way that safely transforms how plants are operated. This work describes the Evaluation of an integrated operations concept that draws together data from existing Instrumentation and Control (I&C) infrastructure, upgraded I&C systems, new sensors, and field technologies such as computer-based procedures to provide operators with centralized, streamlined instructions. The concept was developed to allow for an operator to remotely supervise many plant activities and to dramatically streamline plant operations and maintenance. This describes the methods, results, and design recommendations for the concept based on an operator workshop to evaluate the concept.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Development of an Advanced Integrated Operations Concept for Hybrid Control Rooms

The U.S. Nuclear Industry has an urgent need to reduce the operations and maintenance costs to remain economically competitive in today’s energy market. Measures to improve efficiency in operations will need to leverage technology in a way that safely transforms how plants are operated. This work describes the development of an integrated operations concept that integrates data from existing Instrumentation and Control (I&C) infrastructure, upgraded I&C systems, new sensors, and field technologies such as computer-based procedures to provide operators with centralized, streamlined instructions. The concept was developed to allow for an operator to remotely supervise many plant activities and to dramatically streamline plant operations and maintenance. This report describes the design philosophy, the analysis used to inform design, the implementation in the Human Systems Simulation Laboratory, and illustrates the design concept.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Hydropower Black Start: A Guidebook for Retrofitting Grid Dependent Hydropower

Not all United States (US) hydropower plants were designed to provide black start, but they are increasingly needed to uphold resilience in the evolving electric grid. This guidance is designed to help understand the minimal retrofits required for grid dependent hydropower (GDH) plants behind the point of interconnection (POI). For distribution connected hydropower plants or those with dedicated cranking paths, such upgrades can be sufficient for the plant to provide black start. For others, more coordination with the transmission system operator will be needed. This guidebook answers a number of questions relevant to retrofitting hydropower plants with black start capabilities. For example, the guidebook answers: • How flexible do the wicket gate controls need to be? • Who needs to do hydro governor model validation, why, and how? • How robust and flexible do the excitation and AVR controls need to be? • What protection settings need to be adjusted? • What relay(s) will need to be bypassed or overridden and at what risk? • What is the electrical energy demand of the station load or auxiliary power systems? • What should the strategy to energize transformer(s) along cranking path to address inrush currents be? • How should the critical load restoration be sequenced? In addition to outlining the specifications that hydropower plants need to meet for each component to be able to perform black start, this guidebook provides a set of case studies for specific upgrades needed at actual plants. Between the case studies of plants that have already performed black start retrofits and the examples of how this guidebook can be applied to scope future retrofits, five key themes have been identified for retrofit needs. 1. Protection needs “black start” mode: hydropower plants that are not designed with black start capabilities will have protections that prevent them from interconnecting to a “dead bus.” These protections will need to be overridden in every retrofit case and a separate black start mode should be established so that operators can safely switch between black start and grid connected modes, minimizing the risk to the plant. 2. Wicket gates need modern controls: digital governors accelerate the parameter tuning process and gate position sensors improve controllability, so plants with mechanical governors should be upgraded. Furthermore, a black start and islanding mode should be established for controls to maximize plant performance. 3. Robust excitation support: the DC system or excitation generator needs to be reliable enough to form and sustain the rotor electromagnetic field. These systems are typically undersized in plants that were not designed for black start, so they will need to be upgraded. 4. Turbine-governor model validation and operator training: validation of a standard hydro governor model is needed to characterize the dynamic response (i.e., inertial and primary frequency response) of the GDH. This is required for control development and old hydropower plants often have outdated or incorrect models. Operator training is also typically required to ensure the hardware retrofits are utilized correctly during the black start process. 5. Transformer and cranking path energization: any upgradation and control adjustment in front of the POI will depend upon the existing interconnection. Coordination with the transmission or distribution operator may be required.

13 HYDRO ENERGY↗

Quality Control of Silicon Sensor Modules for Particle Detectors

The High-Luminosity Large Hadron Collider (HL-LHC) will produce a higher rate of particle collisions than the current Large Hadron Collider (LHC), requiring important upgrades to the Compact Muon Solenoid (CMS) to handle an increased amount of data. An important upgrade is the Phase-2 Outer Tracker Upgrade, which consists of 13,000 silicon sensor modules made of two parallel silicon sensors and readout electronics. These modules undergo careful quality control checks both during and after module assembly to ensure precise and reliable detector performance. This project focuses on precision testing for quality control of silicon sensor modules at Fermilab. Hands-on work includes visual inspection, current-voltage testing, module testing, and ultraviolet (UV) light exposure of modules showing abnormal current-voltage behavior. The ultraviolet exposure process improves the abnormal sensor readout data by placing the selected sensor side of the module directly under the UV light inside a controlled box. In addition to laboratory testing and ultraviolet experiments, I developed a Python-based data tool that connects to a module database and allows selected testing conditions and module information to be retrieved and displayed efficiently. These different testing procedures, experimental processes, and computational tools support the broader goal of identifying module issues and improving modules that will be used in the CMS Outer Tracker Phase-2 Upgrade.

Siddiqui, Hooriya [DuPage Coll.] (ORCID:0009000151↗

Quality Control of Silicon Sensor Modules for Particle Detectors

The High-Luminosity Large Hadron Collider (HL-LHC) will produce a higher rate of particle collisions than the current Large Hadron Collider (LHC), requiring significant upgrades to the Compact Muon Solenoid (CMS) to handle the increased amount of data. An important upgrade is the Phase-2 Outer Tracker Upgrade, which consists of 13,000 silicon sensor modules made of two parallel silicon sensors and readout electronics. These modules undergo careful quality control checks both during and after module assembly to ensure precise and reliable detector performance. This project focuses on precision testing for quality control of silicon sensor modules at Fermilab. Hands-on work includes visual inspection, current-voltage testing, module testing, and ultraviolet (UV) light exposure of modules showing abnormal current-voltage behavior. The ultraviolet exposure process improves the abnormal sensor readout data by placing the selected sensor side of the module directly under the UV light inside a controlled box. In addition to laboratory testing and ultraviolet experiments, I developed a Python-based data tool that connects to a module database and allows selected testing conditions and module information to be retrieved and displayed efficiently. These different testing procedures, experimental processes, and computational tools support the broader goal of identifying module issues and improving modules that will be used in the CMS Outer Tracker Phase-2 Upgrade.

Siddiqui, Hooriya [DuPage Coll.; Fermilab] (ORCID:↗

Laser beam pointing stabilization using analog position-sensitive diodes

Laser wire scanners have been used for ion beam profile and emittance measurements at the Spallation Neutron Source linear accelerator. Due to propagation distances exceeding 100 m, reliable measurements require laser beam stabilization, previously accomplished with a feedback control loop using a digital camera as a position sensor [Hardin et al., Opt. Express 19, 2874 (2011)]. Here, this paper presents an upgraded pointing stabilization system utilizing analog position-sensitive diodes (PSDs) as the position detector, optimized with an optical diffuser. The new system significantly surpasses the previous system by offering an order-of-magnitude improvement in radiation tolerance and a bandwidth limited only by the burst repetition rate of the laser beam. Operating with a 60-Hz burst mode laser, the new system effectively suppresses laser beam drifts up to 30 Hz, compared to the previous system’s 4 Hz limit. In addition, the amplitude of spectral components below 0.1 Hz was reduced by a factor of more than 100, which is over seven times greater than was achieved by the previous system.

Data acquisition↗

MaPSA Quality Control and AI-Enhanced Grading For the CMS Phase-II Tracker Upgrade

The Compact Muon Solenoid (CMS) experiment will undergo changes as part of the Large Hadron Collider upgrade. The CMS tracker will be upgraded to cope with the new radiation environment and to provide tracking at the first level trigger. This upgrade features a new type of silicon module called PS Module, which combines a Pixel sensor and a Strip sensor in the same module. The pixel portion of the PS module has a sensor bump bonded to 16 Macro Pixel ASICs (MPA) to form a Macro Pixel Sub Assembly (MaPSA). At Fermilab, MaPSAs are tested for quality control before being assembled with the strip sensors, readout and service electronics to form a PS Module. All of this test data is stored in a centralized database, and is used to grade the final module to determine if it will be installed in the detector. The Phase II Outer Tracker Analyzer of Test Outputs (POTATO) is the software that processes this data and determines the module grades. Using recent technologies, an AI agent is being im plemented into POTATO in order to allow users to more efficiently sort through the large amounts of analysis data and ensure that only the user specified data is being considered. This poster will display the process of testing a MaPSA, how that test data is relevant to module assembly and grading, and how the POTATO grading tool is being improved with the use of an embedded AI agent.

Gzamouranis, Olivia [Purdue U.]↗

Quality concerns caused by quality control — deformation of silicon strip detector modules in thermal cycling tests

The ATLAS experiment at the Large Hadron Collider (LHC) is currently preparing to replace its present Inner Detector (ID) with the upgraded, all-silicon Inner Tracker (ITk) for its High-Luminosity upgrade (HL-LHC). The ITk will consist of a central pixel tracker and the outer strip tracker, consisting of about 19,000 strip detector modules. Each strip module is assembled from up to two sensors, and up to five flexes (depending on its geometry) in a series of gluing, wirebonding and quality control steps. During detector operation, modules will be cooled down to temperatures of about -35 °C (corresponding to the temperature of the support structures on which they will be mounted) after being initially assembled and stored at room temperature. In order to ensure compatibility with the detector's operating temperature range, modules are subjected to thermal cycling as part of their quality control process. Ten cycles between -35 °C and +40 °C are performed for each module, with full electrical characterisation tests at each high and low temperature point. As part of an investigation into the stress experienced by modules during cooling, it was observed that modules generally showed a change in module shape before and after thermal cycling. This paper presents a summary of the discovery and understanding of the observed changes, connecting them with excess module stress, as well as the resulting modifications to the module thermal cycling procedure.

47 OTHER INSTRUMENTATION↗

Prototype design and experimental tests of a zoom mirror system for the APS upgrade

Mirror-based zoom optics systems can offer variable focal spot sizes over a wide range, which is essential for coherent nanoprobe beamlines, such as the proposed Atomic beamline in the Advanced Photon Source (APS) upgrade project. The success of the zoom mirror system in the nano-focusing regime requires the development of high-precision deformable mirrors, in-situ surface profilers and wavefront sensors, and advanced feedback control system. A prototype 1-D zoom mirror system consists of two vertical focusing mirrors was designed, assembled, and tested at the APS 1-BM beamline. The system consists of a bender-based mirror with a capacitive-sensorarray-based real-time mirror profiler, a bimorph adaptive mirror, and a grating interferometer for the wavefront monitoring. In this work, we present the design and test results of the prototype system demonstrating its zoom focusing capability.

adaptive optics↗

AC compensation of 3D magnetic diagnostic signals in DIII-D and National Spherical Torus Experiment-Upgrade (NSTX-U) for real-time application

A time domain algorithm has been developed to remove the vacuum pickup generated by both coil current (DC) and induced vessel current (AC) in real time from three dimensional (3D) magnetic diagnostic signals in the National Spherical Torus Experiment-Upgrade (NSTX-U) and DIII-D tokamaks. The possibility of detecting 3D plasma perturbations in real time is essential in modern and future tokamaks to avoid and control MHD instabilities. The presence of vacuum field pickup, due to toroidally asymmetric (3D) coils or to misalignment between sensors and axisymmetric (2D) coils, pollutes the measured plasma 3D field, making the detection of the magnetic field produced by the plasma challenging. Although the DC coupling between coils and sensors can be easily calculated and removed, the AC part is more difficult. Here, an algorithm based on a layered low-pass filter approach for the AC compensation and its application for DIII-D and NSTX-U data is presented, showing that this method reduces the vacuum pickup to the noise level. Comparison of plasma response measurements with and without vacuum compensation shows that accurate mode locking detection and plasma response identification require precise AC and DC compensations.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Cyber Infrastructure for the Smart Electric Grid

As electric power systems undergo a transformative upgrade with the integration of advanced technologies to enable the smarter electric grid, professionals who work in the area require a new understanding of the evolving complexity of the grid. Cyber Infrastructure for the Smart Electric Grid delivers a comprehensive overview of the fundamental principles of smart grid operation and control, smart grid technologies, including sensors, communication networks, computation, data management, and cyber security, and the interdependencies between the component technologies on which a smart grid's security depends. The book offers readers the opportunity to critically analyze the smart grid infrastructure needed to sense, communicate, compute, and control in a secure way.

communication networks↗

Adding power of artificial intelligence to situational awareness of large interconnections dominated by inverter‐based resources

Abstract Large‐scale power systems exhibit more complex dynamics due to the increasing integration of inverter‐based resources (IBRs). Therefore, there is an urgent need to enhance the situational awareness capability for better monitoring and control of power grids dominated by IBRs. As a pioneering Wide‐Area Measurement System, FNET/GridEye has developed and implemented various advanced applications based on the collected synchrophasor measurements to enhance the situational awareness capability of large‐scale power grids. This study provides an overview of the latest progress of FNET/GridEye. The sensors, communication, and data servers are upgraded to handle ultra‐high density synchrophasor and point‐on‐wave data to monitor system dynamics with more details. More importantly, several artificial intelligence (AI)‐based advanced applications are introduced, including AI‐based inertia estimation, AI‐based disturbance size and location estimation, AI‐based system stability assessment, and AI‐based data authentication.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Silicon pinhole strip defects and their impact on ATLAS Inner Tracker HV current measurement

In preparation for the High-Luminsity LHC (HL-LHC) [1], the ATLAS detector will undergo major detector upgrades, including the replacement of the current Inner Detector with the new all-silicon Inner Tracker (ITk) [2]. The ITk consists of a pixel detector close to the beamline surrounded by a large-area strip detector. During detector production, the electrical properties of silicon sensors and readout electronics must be characterized through a series of quality control (QC) and quality assurance tests. These tests ensure any defect is captured at the earliest possible stage. One such defect, callled a pinhole, occurs when the strip implant and the metal readout electrode are shorted through the intermediary dielectric layer. Notably, the introduction of pinholes during module assembly and pinhole effects on completed modules, especially on leakage current measurement circuitry, have never been studied. In this paper, we investigate the effect of such connections on the sensor leakage current measurements of completed modules and introduce new ways to locate pinholed strips. Here, with minor modifications to testing procedures, such defects are shown not to impede module testing or performance.

FOS: Physical sciences↗

Identification and mitigation of memory block timing issue in ITk ABCStar during ASIC production

The ABCStar is a mixed-signal front-end readout ASIC for the strips sensor portion of the ATLAS ITk detector being developed as part of the High-Luminosity LHC upgrade. In pre-production testing, a subtle design flaw was uncovered in the ABCStar that was reducing wafer yields in some manufactured lots from the expected 90% to as low as 2%. The root cause was determined to be a timing issue in the logic synthesized to control previously silicon proven memory blocks re-used for this ASIC. The solutions proposed included manufacturing process changes by the wafer foundry, changes to the operating parameters for the ABCStar in the detector, and the possibility that a redesign might be required. The two mitigation efforts were undertaken in parallel, with the process modification route a less desirable solution since already manufactured wafers would need to be scrapped in favour of the new ones. Based on a knowledge of the existing process, and testing done on the worst performing wafers, it was proposed that raising the core operating voltage of the ABCStar from 1.20V to 1.25V could address the timing issue by sufficiently speeding up its transistors. An extensive testing program that included the effects of temperature and radiation expected over the lifetime of the ITk detector was conducted to validate that approach. Those tests and studies proved that even the worst performing wafers would have yields over 80% with the 1.25V core voltage, and neither the modified process nor redesign would be required for ensuring reliable operation of the ITk. Based on testing, a further timing mitigation was implemented to provide an additional margin of reliability by increasing the duty cycle of the clock to the ABCStar. Testing of all ABCStar wafers has been completed and the production of the detector modules using these ASICs is now well underway as a result of the efforts detailed herein.

FOS: Physical sciences↗