Standard practices for the implementation of computer software

A standard approach to the development of computer program is provided that covers the file cycle of software development from the planning and requirements phase through the software acceptance testing phase. All documents necessary to provide the required visibility into the software life cycle process are discussed in detail.

Irvine, A. P.↗

General Mission Analysis Tool (GMAT) Acceptance Test Plan [Draft]

The information presented in this Acceptance Test Plan document shows the current status of the General Mission Analysis Tool (GMAT). GMAT is a software system developed by NASA Goddard Space Flight Center (GSFC) in collaboration with the private sector. The GMAT development team continuously performs acceptance tests in order to verify that the software continues to operate properly after updates are made. The GMAT Development team consists of NASA/GSFC Code 583 software developers, NASA/GSFC Code 595 analysts, and contractors of varying professions. GMAT was developed to provide a development approach that maintains involvement from the private sector and academia, encourages collaborative funding from multiple government agencies and the private sector, and promotes the transfer of technology from government funded research to the private sector. GMAT contains many capabilities, such as integrated formation flying modeling and MATLAB compatibility. The propagation capabilities in GMAT allow for fully coupled dynamics modeling of multiple spacecraft, in any flight regime. Other capabilities in GMAT inclucle: user definable coordinate systems, 3-D graphics in any coordinate system GMAT can calculate, 2-D plots, branch commands, solvers, optimizers, GMAT functions, planetary ephemeris sources including DE405, DE200, SLP and analytic models, script events, impulsive and finite maneuver models, and many more. GMAT runs on Windows, Mac, and Linux platforms. Both the Graphical User Interface (GUI) and the GMAT engine were built and tested on all of the mentioned platforms. GMAT was designed for intuitive use from both the GUI and with an importable script language similar to that of MATLAB.

Dove, Edwin↗

The use of real-time, hardware-in-the-loop simulation in the design and development of the new Hughes HS601 spacecraft attitude control system

Realtime simulation and hardware-in-the-loop testing is being used extensively in all phases of the design, development, and testing of the attitude control system (ACS) for the new Hughes HS601 satellite bus. Realtime, hardware-in-the-loop simulation, integrated with traditional analysis and pure simulation activities is shown to provide a highly efficient and productive overall development program. Implementation of high fidelity simulations of the satellite dynamics and control system algorithms, capable of real-time execution (using applied Dynamics International's System 100), provides a tool which is capable of being integrated with the critical flight microprocessor to create a mixed simulation test (MST). The MST creates a highly accurate, detailed simulated on-orbit test environment, capable of open and closed loop ACS testing, in which the ACS design can be validated. The MST is shown to provide a valuable extension of traditional test methods. A description of the MST configuration is presented, including the spacecraft dynamics simulation model, sensor and actuator emulators, and the test support system. Overall system performance parameters are presented. MST applications are discussed; supporting ACS design, developing on-orbit system performance predictions, flight software development and qualification testing (augmenting the traditional software-based testing), mission planning, and a cost-effective subsystem-level acceptance test. The MST is shown to provide an ideal tool in which the ACS designer can fly the spacecraft on the ground.

Slafer, Loren I.↗

Development and application of an acceptance testing model

The process of acceptance testing large software systems for NASA has been analyzed, and an empirical planning model of the process constructed. This model gives managers accurate predictions of the staffing needed, the productivity of a test team, and the rate at which the system will pass. Applying the model to a new system shows a high level of agreement between the model and actual performance. The model also gives managers an objective measure of process improvement.

Pendley, Rex D.↗

Systems aspects of COBE science data compression

A general approach to compression of diverse data from large scientific projects has been developed and this paper addresses the appropriate system and scientific constraints together with the algorithm development and test strategy. This framework has been implemented for the COsmic Background Explorer spacecraft (COBE) by retrofitting the existing VAS-based data management system with high-performance compression software permitting random access to the data. Algorithms which incorporate scientific knowledge and consume relatively few system resources are preferred over ad hoc methods. COBE exceeded its planned storage by a large and growing factor and the retrieval of data significantly affects the processing, delaying the availability of data for scientific usage and software test. Embedded compression software is planned to make the project tractable by reducing the data storage volume to an acceptable level during normal processing.

Freedman, I.↗

Planned LMSS propagation experiment using ACTS: Preliminary antenna pointing results during mobile operations

An overview and a status description of the planned LMSS mobile K band experiment with ACTS is presented. As a precursor to the ACTS mobile measurements at 20.185 GHz, measurements at 19.77 GHz employing the Olympus satellite were originally planned. However, because of the demise of Olympus in June of 1991, the efforts described here are focused towards the ACTS measurements. In particular, we describe the design and testing results of a gyro controlled mobile-antenna pointing system. Preliminary pointing measurements during mobile operations indicate that the present system is suitable for measurements employing a 15 cm aperture (beamwidth at approximately 7 deg) receiving antenna operating with ACTS in the high gain transponder mode. This should enable measurements with pattern losses smaller than plus or minus 1 dB over more than 95 percent of the driving distance. Measurements with the present mount system employing a 60 cm aperture (beamwidth at approximately 1.7 deg) results in pattern losses smaller than plus or minus 3 dB for 70 percent of the driving distance. Acceptable propagation measurements may still be made with this system by employing developed software to flag out bad data points due to extreme pointing errors. The receiver system including associated computer control software has been designed and assembled. Plans are underway to integrate the antenna mount with the receiver on the University of Texas mobile receiving van and repeat the pointing tests on highways employing a recently designed radome system.

Rowland, John R.↗

Ground Software Technologies – Embracing Change: Mission Drivers and Technology Opportunities to Enable Long Lived Missions

Mission lifecycles have proven to extend well beyond their original design. The benefits to this are countless but introduce challenges in today’s rapidly changing ground infrastructure and software technologies used to enable mission success. What remains constant is the risk posture missions maintain when accepting change and the use of new technologies. Larger missions are ready for change in early lifecycle development but near launch and especially in operations, few continue to evolve beyond what is set in place in phase C. This paper will discuss how the Advance Multi-Mission Operations System (AMMOS) intends to address, three driving missions concerns: Maintaining functionality (hardware/software) for decades, rapidly responding to security vulnerabilities in software, and finally the ability to quickly evolve infrastructure and software changes. These driving concerns are briefly described below: 1. Maintaining functionality (hardware/software) for decades. Hardware updates considerably faster than 10 years ago. Expectations that a system can remain in place for more than 10 years is no longer valid. Expecting to find hardware replacements for a system older than 5 years will increasingly become more and more challenging. How than do missions plan for hardware changes for long lived missions? Principle Objective: Provide abstraction by virtualizing and containerizing software abstract away any hardware dependencies and package up the application lightweight units. 2. Rapidly responding to security vulnerabilities in software. Cost is often the main impediment and largely driven by the revalidation and testing of system that undergo change. In todays, environment security updates are a major diver demanding systems remain up to date. How then do missions accept these changes and avoid large testing efforts? Principle Objective: Help reduce the cost of re-testing by automation of testing, deployment, and compartmentalizing change. 3. Ability to quickly evolve infrastructure and software changes. Responding quickly to change is similar to the second concern in this paper regarding security vulnerabilities. In this case, it address broader concerns of updating software and infrastructure on a more realistic timeline. How do missions stay up to date with the most recent versions of software and allowing for improved functionality? Principle Objective: Use continuous integration techniques at the system level to ensure rapid turnaround. This paper explores each of these concerns in more detail. It focuses the AMMOS’s current plans, challenges and current roadmap.

Giovannoni, Brian J.↗

Guidelines for testing and release procedures

Guidelines and procedures are recommended for the testing and release of the types of computer software efforts commonly performed at NASA/Ames Research Center. All recommendations are based on the premise that testing and release activities must be specifically selected for the environment, size, and purpose of each individual software project. Guidelines are presented for building a Test Plan and using formal Test Plan and Test Care Inspections on it. Frequent references are made to NASA/Ames Guidelines for Software Inspections. Guidelines are presented for selecting an Overall Test Approach and for each of the four main phases of testing: (1) Unit Testing of Components, (2) Integration Testing of Components, (3) System Integration Testing, and (4) Acceptance Testing. Tools used for testing are listed, including those available from operating systems used at Ames, specialized tools which can be developed, unit test drivers, stub module generators, and the use of format test reporting schemes.

Molari, R.↗

Electric power system test and verification program

Space Station Freedom's (SSF's) electric power system (EPS) hardware and software verification is performed at all levels of integration, from components to assembly and system level tests. Careful planning is essential to ensure the EPS is tested properly on the ground prior to launch. The results of the test performed on breadboard model hardware and analyses completed to date have been evaluated and used to plan for design qualification and flight acceptance test phases. These results and plans indicate the verification program for SSF's 75-kW EPS would have been successful and completed in time to support the scheduled first element launch.

Rylicki, Daniel S.↗

CEO Sites Mission Management System (SMMS)

Late in fiscal year 2011, the Crew Earth Observations (CEO) team was tasked to upgrade its science site database management tool, which at the time was integrated with the Automated Mission Planning System (AMPS) originally developed for Earth Observations mission planning in the 1980s. Although AMPS had been adapted and was reliably used by CEO for International Space Station (ISS) payload operations support, the database structure was dated, and the compiler required for modifications would not be supported in the Windows 7 64-bit operating system scheduled for implementation the following year. The Sites Mission Management System (SMMS) is now the tool used by CEO to manage a heritage Structured Query Language (SQL) database of more than 2,000 records for Earth science sites. SMMS is a carefully designed and crafted in-house software package with complete and detailed help files available for the user and meticulous internal documentation for future modifications. It was delivered in February 2012 for test and evaluation. Following acceptance, it was implemented for CEO mission operations support in April 2012. The database spans the period from the earliest systematic requests for astronaut photography during the shuttle era to current ISS mission support of the CEO science payload. Besides logging basic image information (site names, locations, broad application categories, and mission requests), the upgraded database management tool now tracks dates of creation, modification, and activation; imagery acquired in response to requests; the status and location of ancillary site information; and affiliations with studies, their sponsors, and collaborators. SMMS was designed to facilitate overall mission planning in terms of site selection and activation and provide the necessary site parameters for the Satellite Tool Kit (STK) Integrated Message Production List Editor (SIMPLE), which is used by CEO operations to perform daily ISS mission planning. The CEO team uses the SMMS for three general functions - database queries of content and status, individual site creation and updates, and mission planning. The CEO administrator of the science site database is able to create or modify the content of sites and activate or deactivate them based on the requirements of the sponsors. The administrator supports and implements ISS mission planning by assembling, reporting, and activating mission-specific site selections for management; deactivating sites as requirements are met; and creating new sites, such as International Charter sites for disasters, as circumstances warrant. In addition to the above CEO internal uses, when site planning for a specific ISS mission is complete and approved, the SMMS can produce and export those essential site database elements for the mission into XML format for use by onboard Earth-location systems, such as Worldmap. The design, development, and implementation of the SMMS resulted in a superior database management system for CEO science sites by focusing on the functions and applications of the database alone instead of integrating the database with the multipurpose configuration of the AMPS. Unlike the AMPS, it can function and be modified within the existing Windows 7 environment. The functions and applications of the SMMS were expanded to accommodate more database elements, report products, and a streamlined interface for data entry and review. A particularly elegant enhancement in data entry was the integration of the Google Earth application for the visual display and definition of site coordinates for site areas defined by multiple coordinates. Transfer between the SMMS and Google Earth is accomplished with a Keyhole Markup Language (KML) expression of geographic data (see figures 3 and 4). Site coordinates may be entered into the SMMS panel directly for display in Google Earth, or the coordinates may be defined on the Google Earth display as a mouse-controlled polygonal definition and transferred back into the SMMS as KML input. This significantly reduces the possibility of errors in coordinate entries and provides visualization of the scale of the site being defined. CEO now has a powerful tool for managing and defining sites on the Earth's surface for both targets of astronaut photography or other onboard remote sensing systems. It can also record and track results by sponsor, collaborator, or type of study.

Trenchard, Mike↗

Frequency response of electrochemical cells

The main objective was to examine the feasibility of using frequency response techniques (1) as a tool in destructive physical analysis of batteries, particularly for estimating electrode structural parameters such as specific area, porosity, and tortuosity and (2) as a non-destructive testing technique for obtaining information such as state of charge and acceptability for space flight. The phenomena that contribute to the frequency response of an electrode include: (1) double layer capacitance; (2) Faradaic reaction resistance; (3) mass transfer of Warburg impedance; and (4) ohmic solution resistance. Nickel cadmium cells were investigated in solutions of KOH. A significant amount of data was acquired. Quantitative data analysis, using the developed software, is planned for the future.

Thomas, Daniel L.↗

Unique Challenges Testing SDRs for Space

This paper describes the approach used by the Space Communication and Navigation (SCaN) Testbed team to qualify three Software Defined Radios (SDR) for operation in space and the characterization of the platform to enable upgrades on-orbit. The three SDRs represent a significant portion of the new technologies being studied on board the SCAN Testbed, which is operating on an external truss on the International Space Station (ISS). The SCaN Testbed provides experimenters an opportunity to develop and demonstrate experimental waveforms and applications for communication, networking, and navigation concepts and advance the understanding of developing and operating SDRs in space. Qualifying a Software Defined Radio for the space environment requires additional consideration versus a hardware radio. Tests that incorporate characterization of the platform to provide information necessary for future waveforms, which might exercise extended capabilities of the hardware, are needed. The development life cycle for the radio follows the software development life cycle, where changes can be incorporated at various stages of development and test. It also enables flexibility to be added with minor additional effort. Although this provides tremendous advantages, managing the complexity inherent in a software implementation requires a testing beyond the traditional hardware radio test plan. Due to schedule and resource limitations and parallel development activities, the subsystem testing of the SDRs at the vendor sites was primarily limited to typical fixed transceiver type of testing. NASA s Glenn Research Center (GRC) was responsible for the integration and testing of the SDRs into the SCaN Testbed system and conducting the investigation of the SDR to advance the technology to be accepted by missions. This paper will describe the unique tests that were conducted at both the subsystem and system level, including environmental testing, and present results. For example, test waveforms were developed to measure the gain of the transmit system across the tunable frequency band. These were used during thermal vacuum testing to enable characterization of the integrated system in the wide operational temperature range of space. Receive power indicators were used for Electromagnetic Interference tests (EMI) to understand the platform s susceptibility to external interferers independent of the waveform. Additional approaches and lessons learned during the SCaN Testbed subsystem and system level testing will be discussed that may help future SDR integrators

Chelmins, David↗

Unique Challenges Testing SDRs for Space

This paper describes the approach used by the Space Communication and Navigation (SCaN) Testbed team to qualify three Software Defined Radios (SDR) for operation in space and the characterization of the platform to enable upgrades on-orbit. The three SDRs represent a significant portion of the new technologies being studied on board the SCAN Testbed, which is operating on an external truss on the International Space Station (ISS). The SCaN Testbed provides experimenters an opportunity to develop and demonstrate experimental waveforms and applications for communication, networking, and navigation concepts and advance the understanding of developing and operating SDRs in space. Qualifying a Software Defined Radio for the space environment requires additional consideration versus a hardware radio. Tests that incorporate characterization of the platform to provide information necessary for future waveforms, which might exercise extended capabilities of the hardware, are needed. The development life cycle for the radio follows the software development life cycle, where changes can be incorporated at various stages of development and test. It also enables flexibility to be added with minor additional effort. Although this provides tremendous advantages, managing the complexity inherent in a software implementation requires a testing beyond the traditional hardware radio test plan. Due to schedule and resource limitations and parallel development activities, the subsystem testing of the SDRs at the vendor sites was primarily limited to typical fixed transceiver type of testing. NASA's Glenn Research Center (GRC) was responsible for the integration and testing of the SDRs into the SCaN Testbed system and conducting the investigation of the SDR to advance the technology to be accepted by missions. This paper will describe the unique tests that were conducted at both the subsystem and system level, including environmental testing, and present results. For example, test waveforms were developed to measure the gain of the transmit system across the tunable frequency band. These were used during thermal vacuum testing to enable characterization of the integrated system in the wide operational temperature range of space. Receive power indicators were used for Electromagnetic Interference tests (EMI) to understand the platform's susceptibility to external interferers independent of the waveform. Additional approaches and lessons learned during the SCaN Testbed subsystem and system level testing will be discussed that may help future SDR integrators.

transmitters receivers↗

Integrated System Test Approaches for the NASA Ares I Crew Launch Vehicle

The Ares I Crew Launch Vehicle (CLV) is being developed by the U.S. National Aeronautics and Space Administration (NASA) to provide crew access to the International Space Station (ISS) and, together with the Ares V Cargo Launch Vehicle (CaLV), serves as one component of a future launch capability for human exploration of the Moon. During the system requirements definition process and early design cycles, NASA defined and began implementing plans for integrated ground and flight testing necessary to achieve the first human launch of Ares I. The individual Ares I flight hardware elements: the first stage five segment booster (FSB), upper stage, and J-2X upper stage engine, will undergo extensive development, qualification, and certification testing prior to flight. Key integrated system tests include the Main Propulsion Test Article (MPTA), acceptance tests of the integrated upper stage and upper stage engine assembly, a full-scale integrated vehicle dynamic test (IVDT), aerodynamic testing to characterize vehicle performance, and integrated testing of the avionics and software components. The Ares I-X development flight test will provide flight data to validate engineering models for aerodynamic performance, stage separation, structural dynamic performance, and control system functionality. The Ares I-Y flight test will validate ascent performance of the first stage, stage separation functionality, and a highaltitude actuation of the launch abort system (LAS) following separation. The Orion-1 flight test will be conducted as a full, un-crewed, operational flight test through the entire ascent flight profile prior to the first crewed launch.

Cockrell, Charles E., Jr.↗

Lessons Learned from the Clementine Mission

According to BMDO, the Clementine mission achieved many of its technology objectives during its flight to the Moon in early 1994 but, because of a software error, was unable to test the autonomous tracking of a cold target. The preliminary analyses of the returned lunar data suggest that valuable scientific measurements were made on several important topics but that COMPLEX's highest-priority objectives for lunar science were not achieved. This is not surprising given that the rationale for Clementine was technological rather than scientific. COMPLEX lists below a few of the lessons that may be learned from Clementine. Although the Clementine mission was not conceived as a NASA science mission exactly like those planned for the Discovery program, many operational aspects of the two are similar. It is therefore worthwhile to understand the strengths and faults of the Clementine approach. Some elements of the Clementine operation that led to the mission's success include the following: (1) The mission's achievements were the responsibility of a single organization and its manager, which made that organization and that individual accountable for the final outcome; (2) The sponsor adopted a hands-off approach and set a minimum number of reviews (three); (3) The sponsor accepted a reasonable amount of risk and allowed the project team to make the trade-offs necessary to minimize the mission's risks while still accomplishing all its primary objectives; and (4) The development schedule was brief and the agreed-on funding (and funding profile) was adhered to. Among the operational shortcomings of Clementine were the following: (1) An overly ambitious schedule and a slightly lean budget (meaning insufficient time for software development and testing, and leading ultimately to human exhaustion); and (2) No support for data calibration, reduction, and analysis. The principal lesson to be learned in this category is that any benefits from the constructive application of higher risk for lower cost and faster schedule will be lost if the schedule does not allow adequate time for the development of all essential systems or makes no allowance for human frailties. Another lesson to be drawn is that despite its limitations, if judged strictly as a science mission, Clementine attested that significant scientific information can be gathered during a technology-demonstration mission. In the current era of limited funds, when science missions will be infrequent, the opportunity to fly scientific instruments aboard missions whose objectives might be other than science must be seized and, indeed, encouraged. During such opportunities it would be inexcusable to do second-class science. Thus the scientific community must be actively involved in such projects from their initiation.

Source record↗

Integrated Testing Approaches for the NASA Ares I Crew Launch Vehicle

The Ares I crew launch vehicle is being developed by the U.S. National Aeronautics and Space Administration (NASA) to provide crew and cargo access to the International Space Station (ISS) and, together with the Ares V cargo launch vehicle, serves as a critical component of NASA's future human exploration of the Moon. During the preliminary design phase, NASA defined and began implementing plans for integrated ground and flight testing necessary to achieve the first human launch of Ares I. The individual Ares I flight hardware elements - including the first stage five segment booster (FSB), upper stage, and J-2X upper stage engine - will undergo extensive development, qualification, and certification testing prior to flight. Key integrated system tests include the upper stage Main Propulsion Test Article (MPTA), acceptance tests of the integrated upper stage and upper stage engine assembly, a full-scale integrated vehicle ground vibration test (IVGVT), aerodynamic testing to characterize vehicle performance, and integrated testing of the avionics and software components. The Ares I-X development flight test will provide flight data to validate engineering models for aerodynamic performance, stage separation, structural dynamic performance, and control system functionality. The Ares I-Y flight test will validate ascent performance of the first stage, stage separation functionality, validate the ability of the upper stage to manage cryogenic propellants to achieve upper stage engine start conditions, and a high-altitude demonstration of the launch abort system (LAS) following stage separation. The Orion 1 flight test will be conducted as a full, un-crewed, operational flight test through the entire ascent flight profile prior to the first crewed launch.

Taylor, James L.↗

Control of Technology Transfer at JPL

Controlled Technology: 1) Design: preliminary or critical design data, schematics, technical flow charts, SNV code/diagnostics, logic flow diagrams, wirelist, ICDs, detailed specifications or requirements. 2) Development: constraints, computations, configurations, technical analyses, acceptance criteria, anomaly resolution, detailed test plans, detailed technical proposals. 3) Production: process or how-to: assemble, operated, repair, maintain, modify. 4) Manufacturing: technical instructions, specific parts, specific materials, specific qualities, specific processes, specific flow. 5) Operations: how-to operate, contingency or standard operating plans, Ops handbooks. 6) Repair: repair instructions, troubleshooting schemes, detailed schematics. 7) Test: specific procedures, data, analysis, detailed test plan and retest plans, detailed anomaly resolutions, detailed failure causes and corrective actions, troubleshooting, trended test data, flight readiness data. 8) Maintenance: maintenance schedules and plans, methods for regular upkeep, overhaul instructions. 9) Modification: modification instructions, upgrades kit parts, including software

Jet Propulsion Laboratory (JPL)↗

Delivery of Colloid Micro-Newton Thrusters for the Space Technology 7 Mission

Two flight-qualified clusters of four Colloid Micro-Newton Thruster (CMNT) systems have been delivered to the Jet Propulsion Laboratory (JPL). The clusters will provide precise spacecraft control for the drag-free technology demonstration mission, Space Technology 7 (ST7). The ST7 mission is sponsored by the NASA New Millennium Program and will demonstrate precision formation flying technologies for future missions such as the Laser Interferometer Space Antenna (LISA) mission. The ST7 disturbance reduction system (DRS) will be on the ESA LISA Pathfinder spacecraft using the European gravitational reference sensor (GRS) as part of the ESA LISA Technology Package (LTP). Developed by Busek Co. Inc., with support from JPL in design and testing, the CMNT has been developed over the last six years into a flight-ready and flight-qualified microthruster system, the first of its kind. Recent flight-unit qualification tests have included vibration and thermal vacuum environmental testing, as well as performance verification and acceptance tests. All tests have been completed successfully prior to delivery to JPL. Delivery of the first flight unit occurred in February of 2008 with the second unit following in May of 2008. Since arrival at JPL, the units have successfully passed through mass distribution, magnetic, and EMI/EMC measurements and tests as part of the integration and test (I&T) activities including the integrated avionics unit (IAU). Flight software sequences have been tested and validated with the full flight DRS instrument successfully to the extent possible in ground testing, including full functional and 72 hour autonomous operations tests. Delivery of the cluster assemblies along with the IAU to ESA for integration into the LISA Pathfinder spacecraft is planned for the summer of 2008 with a planned launch and flight demonstration in late 2010.

Precision Formation Flying↗