Search NASASearch

SEARCH · Search NASA

Results for “Storage Field Development Plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Prairie State Generating Company Site: Storage Field Development Plan

This Storage Field Development plan presents the Storage Complex characterization results, construction, monitoring, operational plans, and costs associated with the proposed Prairie State Energy Campus - Carbon Capture and Storage (PSEC-CCS) project in Washington County, Illinois, near Marissa. The proposed storage complex, known as the St. Peter-Everton Storage Complex, comprises the St. Peter Sandstone and Everton sandstone reservoirs, with the Maquoketa Shale serving as the primary confining unit and the Knox Group as lower confining unit. The lowermost Underground Source of Drinking Water (USDW) identified for the site is the Pennsylvanian section.

01 COAL, LIGNITE, AND PEAT

Storage Field Development Plan: One Earth Energy

This Storage Field Development plan presents the Storage Complex characterization results, construction, monitoring, and operational plans, and costs associated with the proposed One Earth Sequestration Carbon Capture and Storage (OES-CCS) site in McLean County, Illinois, near Gibson City. The proposed storage complex, known as the Mt. Simon Storage Complex, comprises the Cambrian Mt. Simon Sandstone reservoir and the primary seal, the Cambrian Eau Claire Formation. The lowermost Underground Source of Drinking Water (USDW) identified for the site is the Ordovician St. Peter Sandstone. Geologic characterization of the Mt. Simon Storage Complex at the OES-CCS site was performed by the Illinois Storage Corridor CarbonSAFE Phase III project, which also prepared and submitted three UIC Class VI applications to construct three injection wells; the permit applications were submitted and are in the federal EPA review process. A characterization well, OEE #1, was drilled to collect site-specific data. These data were analyzed and used to develop the UIC Class VI applications. The OEE #1 well will be converted to an in-zone monitoring (IZM) well for the injection phase. The proposed buildout for the OES-CCS site includes (1) three injection wells (OES #1, OES #2, and OES #3), (2) two IZM wells, (3) two above confining zone (ACZ) monitoring wells, one of which will be used to monitor the lowermost USDW, (4) capture and compression facilities, and (5) transportation facilities, i.e., pipelines. A pre-operational testing program was proposed in the Class VI permit application and will be employed at the site pending approval. Additional pre-injection (baseline), syn-injection, and post-injection monitoring and site care procedures will be followed by OES to ensure that injection activities are protective of human health and the environment. Injection is scheduled to begin in 2025, distributed across the three injection wells in accordance with the permit operating conditions. One Earth Sequestration intends to inject up to 90 million tonnes of CO 2 over a period of approximately 20 years. Injection will begin at approximately 0.5 million tonnes of CO 2 annually and ramp up to a maximum of 4.5 million tonnes annually. Daily injection rates are expected to range from 1,400 to 1,500 tonnes per day initially and reach a maximum of approximately 4,225 tonnes per day, depending on site geology and injectivity at each injection well location, and CO 2 availability. The costs associated with the OES-CCS project include pre-operational costs (e. g. additional seismic data acquisition and well drilling), capture and transportation facility and equipment costs, predicted field operating expenditures (OpEx), and decommissioning and post-injection site care (PISC) costs. The risks associated with project activities, such as site construction, injection operations, and verification of secure storage were evaluated, and mitigation strategies proposed to alleviate those risks.

09 BIOMASS FUELS

TCCSP Project Implementation Plan

The TCCSP CarbonSAFE Phase II efforts focused on developing the technical, community, and economic foundation for a commercial-scale regional geologic storage complex for CO 2 captured. TCCSP has conducted a thorough evaluation of the regional, local, and site-specific geology, legacy well infrastructure, injection site design, and project planning as part of the CarbonSAFE Phase II TCCSP. Specially, the work performed under the CarbonSAFE Phase II has significantly furthered the advancement towards the commerciality of the TCCSP storage complex by delivering on the following objectives: Objective 1: Acquire site-specific characterization data to validate carbon dioxide (CO 2 ) storage estimates of reservoir units and the competency of confining layers in the region to prevent CO 2 leakage to develop a commercial-scale CO 2 project. Objective 2: Assess technical, economic, regulatory, and stakeholder aspects of the TCCSP.

54 ENVIRONMENTAL SCIENCES

EMPOWERED Distributed Energy Resources Permit Accelerator Pilot

This report summarizes the EMPOWERED Distributed Energy Resources (DER) Permit Accelerator Pilot project. Its primary objective was to streamline the design, installation, permitting, and inspections of targeted Distributed Energy Resource (DER) solutions. Streamlining these processes is critical to strengthening and accelerating the adoption of DER solutions nationwide. Moreover, streamlined processes help expedite the clean energy transition and expand energy resilience by improving understanding and capability among key stakeholders like property owners, code officials, and the general workforce. The project team accomplished this by developing and deploying a set of design and permitting guides for simple DER solutions, which they rolled out via a permitting pilot program. The project team developed nine permitting and inspection guides for simple DER solutions, as follows: 1. Single-Family and Duplex: Electric Vehicle Service Equipment (EVSE), and Storage, Solar + Storage (each in two code cycles) 2. Multi-family and Office: EVSE, Storage, Solar + Storage (each in two code cycles) 3. A permitting process guide to support the implementation of the permitting guides. The guides cover key code requirements via plan review and field inspection checklists for code officials and building owners to follow to streamline the permitting and inspections process for DER solutions. Following the development of the initial set of guides, the project team formed two cohorts, each made up of four jurisdictions, to participate in the Permit Accelerator Pilot. Each cohort received training and technical assistance to support them in incorporating the guides into use. The project successfully engaged jurisdictions in two disparate US regions: Chelsea, Somerville, Natick, and Norwood in metro Boston; and Pima County, Town of Gilbert, Flagstaff, and Sedona in Arizona. Feedback gathered from the project was valuable in refining the guides to better address jurisdictional needs. After the pilot period, the project team developed final versions of the guides based on extensive feedback from the cohorts and from external technical peer review. Feedback included needs and barriers related to implementation, as well as detailed technical improvements from external peer review. The final guides were presented in a series of webinars with a national reach, with 192 attendees from 35 states in the live session of the final webinar, and the final guides are posted online and available for use nationwide. Key findings: • The most receptive jurisdictions were those adjacent to other jurisdictions that had already adopted similar initiatives. The least receptive jurisdictions were those in the midst of adopting new code cycles. • The most common barrier to jurisdictional adoption of new guidelines were internal administrative and process delays, more so than technical barriers. • The main technical barrier to adoption proved to be the concern of fire hazard risks posed by energy storage systems. There is some apprehension in the code enforcement community about the safety of the batteries. Education coordinated with fire and safety services will help alleviate concerns and increase confidence in the acceptance of innovative technologies. • Opportunities to further leverage and advance the guides and related resources include outreach, education, and jurisdictional support; updates to the resources to align with code cycle changes and local requirements; and advancements supporting emerging technologies.

14 SOLAR ENERGY

Phase II Field Demonstration at Lansing Smith Generating Plant, Southport, Florida (Final Report)

The Final Technical Report: Field Test Design and Pressure Management Strategies for Phase II Field Demonstration of Optimal Pressure Control, Plume Management, and Produced Water Strategies presents the culmination of multi-year efforts under the U.S. Department of Energy’s Brine Extraction and Storage Test (BEST) program, led by EPRI in partnership with Gulf Power at the Plant Smith site near Panama City, Florida. The project was designed to evaluate and demonstrate the technical feasibility of managing subsurface pressures and fluid movement associated with large-scale CO₂ injection, using low-salinity water as a proxy fluid. Through a combination of field injection testing, reservoir modeling, and optimization studies, the research team developed and refined active and passive brine extraction strategies aimed at controlling injection-induced pressure buildup, mitigating risks of fault activation, and managing plume migration. The field demonstration incorporated a new injection well (TIW-2), a new monitoring/extraction well (TEMW-A), and an existing well (TIW-1) repurposed for passive pressure relief. Complementary geophysical monitoring was designed to track plume development and evaluate the effectiveness of pressure management strategies. The report details the integrated workflow encompassing wellfield development, regulatory permitting, model calibration, and survey design. It includes a comprehensive electromagnetic (EM) modeling and inversion study used to develop a cost-effective, time-lapse geophysical monitoring plan capable of imaging the evolving low-salinity plume within the highly saline Lower Tuscaloosa formation. Reservoir simulation results guided the design of the 17-month injection program and the timing of active extraction to maintain formation pressures below a hypothetical fault reactivation threshold. Supporting analyses evaluated potential injectivity risks related to clay fines migration and geochemical incompatibility, identifying practical mitigation measures such as salinity and pH control. The final design recommends a series of crosswell EM surveys—conducted before, during, and after injection—as the most effective and economical approach for plume imaging, supplemented by continuous downhole pressure and flow monitoring. Collectively, the study provides a field-ready framework for cost-effective pressure management and monitoring in support of future CO₂ storage projects.

01 COAL, LIGNITE, AND PEAT

Southwest Regional Partnership on Carbon Sequestration: Phase III (Final Scientific/Technical Report)

The Southwest Regional Partnership on Carbon Sequestration (SWP) is one of 7 regional partnerships formed in 2003 under the U.S. Department of Energy’s (DOE) Regional Carbon Sequestration Partnerships (RCSPs) initiative. The overall purpose of the initiative was to help determine and implement the technology, infrastructure, and regulations most appropriate to promote carbon storage in different regions of the country. Covering Arizona, Colorado, New Mexico, Oklahoma, Utah, and parts of Texas, Wyoming, and Kansas, the SWP evaluated regional carbon storage and utilization potential and focused on technologies and sites that could complement the region’s strong position in energy production. The project progressed through three phases: • Phase I (2003–2005): Characterized regional geologic formations and CO 2 sources, assessed sequestration potential, and identified pilot test sites. • Phase II (2005–2013): Conducted small-scale field tests to validate sequestration methods, including geologic and terrestrial projects. • Phase III (2008–2022): Demonstrated large-scale CO 2 injection at a commercial oil field to test monitoring, verification, and long-term storage strategies. This report covers Phase III. The final project site, the Farnsworth Unit (FWU) in Texas, provided real-world testing of reservoir characterization, monitoring, and risk evaluation tools and processes that could be used in any commercial scale carbon capture, utilization, and storage (CCUS) project. Extensive data collection and analysis helped refine best practices for reservoir characterization, injection monitoring, and storage verification. The SWP contributed to national databases, DOE best practice manuals, and regional geological assessments to support future sequestration efforts. Key lessons learned include the importance of robust data management, strategic site selection, regulatory navigation, and effective industry collaboration. The project’s findings will inform ongoing and future carbon storage initiatives. Task 1 (Regional Characterization) • The SWP continued to participate in national outreach efforts and NATCARB. • The SWP evaluated multiple potential sites before selecting the FWU as the primary field test location. Task 2 (Public Outreach and Education) • The SWP contributed to national databases, DOE best practice manuals, and regional geological assessments to support future sequestration efforts. Task 3 (Permitting and Regulatory Compliance) • The SWP ensured compliance with federal and state regulations, including National Environmental Policy Act (NEPA) requirements. • The SWP obtained all necessary permits for drilling, injection, and monitoring activities. Task 4 (Site Characterization and Planning) • The SWP developed work plans for four key activities: characterization, simulation, monitoring and verification, and risk evaluation. • The SWP collected and synthesized legacy data from multiple sources to build initial static geological models and dynamic reservoir models demonstrating project feasibility. • The SWP conducted an initial risk evaluation and developed mitigation plans. Task 5 (Field Operations and Data Collection) • The SWP drilled, logged, and cored three characterization wells to gather critical subsurface data. • The SWP conducted multiple geophysical surveys, including 3D seismic, crosswell seismic, and vertical seismic profiling, to improve reservoir characterization. Task 6 (Monitoring and Verification) • The SWP performed extensive geological characterization using data from characterization wells and seismic surveys. • The SWP established a surface monitoring network to track CO 2 flux in soil gas, groundwater chemistry, and near-surface atmospheric CO 2 levels. • The SWP built and refined reservoir models to study the effects of relative permeability on simulation behavior and improve calibration with experimental data. Task 7 (Risk Assessment and Model Refinement) • The SWP conducted multiple studies to evaluate reservoir integrity, predict CO 2 plume behavior and improve predictive modeling capabilities. • The SWP refined geological models and used them to enhance the accuracy of simulation models. • The SWP continued quantitative risk assessment of top-ranked risks and strengthened the link between qualitative and quantitative risk methodologies.

02 PETROLEUM

Metal hydrides: a historical perspective

Metal hydrides are known for their outstanding performance as materials for hydrogen storage and processing. These materials find applications for short- and long-term energy storage, compression and supply of hydrogen gas, thermal energy storage, as electrodes and electrolytes in rechargeable batteries, for the microstructural optimisation of functional materials, in thin film technologies, as catalysts, getters and in many other uses. After the discovery of the first binary metal hydrides back in the 19th century, their studies covered all possible binary M-H systems and expanded rapidly into the field of ternary hydrides following the recognition of the excellent hydrogen storage performance of LaNi 5 - and TiFe-based materials, which operate efficiently at room temperature and at near-ambient H 2 pressures. This review aims to provide an overview of the early works, as well as selected recent results on various classes of metal hydrides. It also covers the recent activities from the major contributing countries and continents, including USA, Europe, Japan, China and Australia. These studies relate to achieving the hydrogen storage systems goals set by the Department of Energy in the United States which inspired the research activities at the national and international level, through execution of the tasks on hydrogen-based energy storage managed by the International Energy Agency. The review is prepared by international experts in the field and covers the most important past developments and also presents the recent achievements in the field.

08 HYDROGEN

Essay: A Path for the Construction of a Muon Collider

Muons are elementary particles and provide cleaner collision events that can explore higher energies compared to composite particles like protons. Muons are also far heavier than their electron cousins, meaning that they emit less synchrotron radiation that effectively limits the energies of circular electron-positron colliders. These characteristics open up the possibility for a muon collider to surpass the direct energy reach of the Large Hadron Collider while achieving unprecedented precision measurements of standard model processes. In this Essay, after briefly summarizing the progress achieved so far, I identify important missing research and development steps and envision a compelling plan to bring a muon collider to reality in the next two decades. A muon collider could allow for the exploration of physics that is not available with current technologies. For example, it may provide a way to study the Higgs boson directly or probe new particles, including those related to dark matter or other phenomena beyond the standard model. . Published by the American Physical Society 2025

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS

Voucher Opportunity 5-15: Independent Assessment of Monitoring, Reporting, and Verification (MRV) Technologies and Practices for Enhanced Rock Weathering (CRADA 718) Abstract

Development of robust, transparent, and precise monitoring, reporting, and verification (MRV) technologies and practices is critical for carbon dioxide removal (CDR) project developers to comply with regulatory and permitting requirements, voluntary carbon market (VCM) protocols, and to ensure safety while reducing environmental impacts. Enhanced rock weathering (ERW)-based CDR technologies focus on removing atmospheric carbon through conversion into thermodynamically stable solid or aqueous carbonate forms for permanent storage (i.e., mineralization). This highly durable form of CDR enhances naturally occurring silicate rock weathering cycles by optimizing application of finely-ground silicate rock particles (i.e., from basalt) on terrestrial agricultural lands to accelerate natural silicate rock weathering and mineralization. Enhanced rock weathering may also provide improved crop yields and enhance soil health. A critical aspect for commercialization of these technologies is the development of MRV to quantify the net removal and durable storage of atmospheric CO 2 . For ERW systems, it is essential to accurately characterize the mineral feedstock selected for application to establish the baseline geochemical composition, mineral dissolution rates, and carbon removal potential of the feedstocks to estimate overall net removal. Given the difficulty with conducting MRV for ERW in diverse soil/environment types, over large application areas, and due to complex chemical reaction networks, this project will accelerate understanding towards consensus on best practices for MRV. The overall objectives of the proposed voucher project are to: 1) Characterize and analyze feedstock(s) intended for ERW field application by Lithos Carbon (“Voucher Recipient”/ “CRADA Participant”) to determine overall mineralization potential; 2) Facilitate knowledge transfer and documentation of experimental protocols, instrumentation, and other relevant best practices; and 3) Support the Voucher Recipient’s broader technology commercialization and ERW Research Facility development plans. This work will align with the Voucher Recipient’s MRV plans for field sites and build upon complementary efforts conducted by PNNL on mineralization MRV.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH

Development of a Multi-Robot System for Autonomous Inspection of Nuclear Waste Tank Pits

This paper introduces the overall design plan, development timeline, and preliminary progress of the Autonomous Pit Exploration System project. This project aims to develop an advanced multi-robot system for the efficient inspection of nuclear waste-storage tank pits. The project is structured into three phases: Phase 1 involves data collection and interface definition in collaboration with Hanford Site experts and university partners, focusing on tank riser geometry and hardware solutions. Phase 2 includes the selection of sensors and robot components, detailed mechanical design, and prototyping. Phase 3 integrates all components into a cohesive system managed by a master control package which also incorporates digital twin and surrogate models, and culminates in comprehensive testing and validation at a simulated tank pit at the Idaho National Laboratory. Additionally, the system’s communication design ensures coordinated operation through shared data, power, and control signals. For transportation and deployment, an electric vehicle (EV) is chosen to support the system for a full 10 h shift with better regulatory compliance for field deployment. A telescopic arm design is selected for its simple configuration and superior reach capability and controllability. Preliminary testing utilizes an educational robot to demonstrate the feasibility of splitting computational tasks between edge and cloud computers. Successful simultaneous localization and mapping (SLAM) tasks validate our distributed computing approach. More design considerations are also discussed, including radiation hardness assurance, SLAM performance, software transferability, and digital twinning strategies.

Nuclear waste management

Power-Hardware-in-the-Loop Experiments of a Microgrid With a Grid-Forming Battery Inverter: Preprint

Microgrids continue to proliferate, and they are transitioning away from using conventional generating resources to increasingly relying on inverter-based resources (IBRs) as the voltage and frequency leaders. It is crucial to evaluate the capability of IBRs to provide microgrid stability and resilience. Hardware-in-the-loop (HIL) experiments were conducted to de-risk the field deployment of the San Diego Gas & Electric Company Borrego Springs Microgrid, where a battery inverter was upgraded with grid-forming (GFM) capability to serve as the island leader. This paper presents the HIL experimental results from an HIL test bed that uses a power-hardware-in-the-loop (PHIL) interface with a power inductor that was previously developed for PHIL simulations of microgrids where the inverters need to switch modes, i.e., between grid-following and GFM as the microgrid transitions between grid-connected and islanded operation. This paper presents more details on the interface and HIL simulation results of the planned islanding and load steps in islanded operation to show the effectiveness of the inverters in managing the voltage and frequency.

24 POWER TRANSMISSION AND DISTRIBUTION

Mic-hackathon 2024: hackathon on machine learning for electron and scanning probe microscopy

Microscopy is one of the primary sources of information on materials structure and functionality at the nanometer and atomic scales. The data generated through microscopy is often contained in well-structured datasets, enriched with extensive metadata and sample histories, although not always with the same level of detail or storage format. The broad incorporation of data management plans by major funding agencies ensures the preservation and accessibility of this data. However, deriving insights from these rich datasets remains challenging due to the lack of established code ecosystems, standardized benchmarks, and integration strategies. Correspondingly, the efficiency of data usage is very low, and time expenditures at the analysis stage are enormous. In addition to post-acquisition data analysis, the emergence of application programming interfaces by major microscope manufacturers now creates opportunities for real-time ML-based data analytics to enable automated decision making, and particularly ML-agent controlled real-time microscope operation. Despite these opportunities, there is a significant gap in integrating the ML community with the broader microscopy community, limiting the value that these methods bring to physics and materials discovery and materials optimization. Hackathons address these challenges by fostering collaboration between ML experts and microscopy professionals, encouraging the development of innovative solutions that leverage ML for microscopy and preparing the workforce of the future both for microscopy-intensive domains areas, instrument manufacturers, and ML scientists interested in real world applications for fundamental research, materials optimization, and manufacturing. The hackathon generated benchmark datasets and digital twins of microscopes that further contribute to the development of the field and establish data analysis ecosystems. All the codes can be found at GitHub(https://github.com/KalininGroup/Mic-hackathon-2024-codes-publication/tree/1.0.0.1) and Zenodo (https://zenodo.org/records/15579940).

97 MATHEMATICS AND COMPUTING

Power-Hardware-in-the-Loop Experiments of a Microgrid with a Grid-Forming Battery Inverter

Microgrids continue to proliferate, and they are transitioning away from using conventional generating resources to increasingly relying on inverter-based resources (IBRs) as the voltage and frequency leaders. It is crucial to evaluate the capability of IBRs to provide microgrid stability and resilience. Hardware-in-the-loop (HIL) experiments were conducted to de-risk the field deployment of the San Diego Gas & Electric Company Borrego Springs Microgrid, where a battery inverter was upgraded with grid-forming (GFM) capability to serve as the island leader. This paper presents the HIL experimental results from an HIL test bed that uses a power-hardware-in-the-loop (PHIL) interface with a power inductor that was previously developed for PHIL simulations of microgrids where the inverters need to switch modes, i.e., between grid-following and GFM as the microgrid transitions between grid-connected and islanded operation. This paper presents more details on the interface and HIL simulation results of the planned islanding and load steps in islanded operation to show the effectiveness of the inverters in managing the voltage and frequency.

24 POWER TRANSMISSION AND DISTRIBUTION

An Educational Program on Concentrated Solar Power and Heliostats for Power Generation and Industrial Processes

The objective of this project was to design and implement a comprehensive educational and applied research program in Concentrated Solar Thermal Power (CSTP) and heliostat technologies at Northeastern University. In alignment with the U.S. Department of Energy's Heliostat Consortium (HelioCon) goals, the project aimed to expand student and public understanding of CSTP systems while simultaneously contributing to workforce development and the broader decarbonization strategy. A particular emphasis was placed on integrating hands-on student design projects and publicly disseminating educational content relevant to CSTP systems. The project addressed a critical gap in renewable energy education: CSTP and heliostats, despite their importance in utility-scale solar energy, are rarely included in standard mechanical engineering programs. This project established new pathways for students to engage with the topic through the creation of a 4-credit graduate/senior elective course, development of five industry-facing short courses, and the inclusion of CSTP-based capstone design projects. Over two academic years, 36 students across six senior design teams developed and tested technologies such as deformable heliostats, beacon-based tracking systems, and solar-powered pyrolizers for biomass-to-biochar conversion. Concurrently, 30 undergraduate and graduate students were enrolled in the new academic course centered around CSTP principles. To ensure the relevance and accessibility of the short course content, the project team engaged with industry professionals, technical policy stakeholders, and potential course participants through structured surveys and informal consultations. Feedback from 28 respondents guided the structure, length, and delivery format of the courses - resulting in a modular design broken into five workshops. The feedback emphasized the need for flexible, asynchronous delivery and practical case studies, particularly in areas such as heliostat control, thermal storage, and solar fuel production. This engagement helped align the courses with the evolving knowledge demands of the renewable energy workforce and ensured that participants from both technical and policy backgrounds could meaningfully benefit from the material. The research and educational activities advanced the understanding of heliostat control systems, optical performance under misalignment, and thermal system integration in solar-driven pyrolysis applications. Methods and designs explored in this project proved to be both technically effective and economically feasible at the lab scale. Prototypes were constructed using commercially available components and custom-fabricated elements, demonstrating that meaningful performance improvements can be achieved with modest material and fabrication costs, supporting the feasibility of student-led research in this field. The public benefit of this project is twofold. First, it cultivates a pipeline of engineers trained to be familiar with CSTP principles, an essential workforce need identified by the Department of Energy for achieving its 2030 cost and deployment targets. Second, it contributes openly accessible educational materials, course content, and experimental frameworks to the broader community, enabling other institutions to adopt or adapt similar programming. Through outreach activities, curriculum integration, and technical exposure, this project contributes to a more informed and capable renewable energy workforce while supporting innovation in heliostat and CSTP system design. A new technical report is being prepared to document the development of the course and its outcomes, with plans to publish it in the ASME Open Access Journal of Engineering to ensure global accessibility, free of cost.

14 SOLAR ENERGY

Williston basin associated co 2 storage field laboratory

The Williston Basin Associated CO 2 Storage Field Laboratory (WBCFL), led by the Energy & Environmental Research Center (EERC) in partnership with Denbury (now ExxonMobil), was established to advance understanding of CO 2 enhanced oil recovery (EOR) and associated geologic CO 2 storage in the Williston Basin. The specific objective of the WBCFL was to conduct field and laboratory activities to inform decisionmakers regarding the 1) efficacy of associated storage in stacked geologic reservoirs during EOR operations; 2) CO 2 injectivity, oil production, and storage in residual oil zones (ROZs); 3) use of a novel CO 2 storage monitoring, verification, and accounting (MVA) technology (active seismoelectric [ASE] monitoring), and 4) life cycle and techno-economic factors for EOR development scenarios targeting ROZs. The project location was the Pennel Field in southeast Montana, which is part of the Cedar Creek Anticline (CCA) geologic structure within the Williston Basin.

02 PETROLEUM

Defining Infrastructure Feasibility for Hub-Scale Offshore Atlantic Carbon Storage in the Northeastern United States

In the Northeast U.S., deep rock formations along the Atlantic outer continental shelf may have the potential to sequester 150–1136 million metric tons of CO2. However, the design and infrastructure necessary to develop offshore carbon storage in this region is not well defined because there has been little oil and gas exploration and no commercial production. Consequently, an infrastructure feasibility design was completed for a hub-scale offshore CO2 storage system along the Northeast U.S. Atlantic. The design included development of a detailed, site-specific geological model for a location near the Great Stone Dome geological structure in the Baltimore Canyon Trough off the coast of Delaware, Maryland, and New Jersey. A field injection system topology design was completed to portray a design with eight wells in two clusters connected by central manifolds. Reservoir simulations were completed for the injection system that showed the hub may be able to inject 17 million metric tons (MMT) of CO2 per year for thirty years, but injection rates varied substantially across the eight wells. A CO2 pipeline design determined feasible routes from the east coast shoreline to the injection field. Finally, the CO2 injection system design included subsea injection trees, manifolds, and power umbilicals. This is the first study to define large-scale carbon storage design and infrastructure options for the offshore Atlantic, which can help to progress this region towards field characterization and early-mover deployment for future decarbonization in the region.

29 ENERGY PLANNING, POLICY, AND ECONOMY

An Architectural Survey of the U12G Tunnel Historic District, Nevada National Security Site, Nye County, Nevada

The U.S. Department of Energy (DOE), in conjunction with the National Nuclear Security Administration Nevada Field Office (NNSA/NFO), proposes to demolish six buildings and three storage areas located at the U12g Tunnel portal area in Area 12 of the Nevada National Security Site (NNSS). The buildings are 12-358 (Signal Vault); 12-201800 (Storage Quonset Hut); 12-202555 (Walker Shack); 12-868 (Pipe Assembly); 12-B100933 (Electrical Shop); 12-B100944 (Conference Room); and Storage Area 1; Storage Area 2; and Storage Area 3. The buildings and storage areas were selected for demolition as part of the DOE’s Real Property Efficiency Plan to reduce the footprint of unused and non-operational facilities on the NNSS. They are all vacant and have no proposed uses for current or upcoming NNSS missions. Demolition activities constitute an undertaking subject to review under Section 106 of the National Historic Preservation Act (NHPA) (54 United States Code [USC] § 306101) and its implementing regulations, 36 Code of Federal Regulations (CFR) Part 800. Identification efforts began with resources proposed for demolition in federal Fiscal Year (FY) 23. Four buildings were proposed to be demolished in FY23 (12-358, 12-868, 12-201800, and 12-202555). These buildings and the U12g Tunnel Historic District (SHPO No. D444) were recorded in Identification, Evaluation, and Finding of Adverse Effect for the Proposed Demolition of Five Buildings in Area 12, Nevada National Security Site, Nye County, Nevada (Menocal et al. 2023). Identification efforts indicated three buildings (12-358, 12-201800, and 12-868) supported nuclear testing in the U12g Tunnel. The fourth building post-dated the use of U12g Tunnel for nuclear testing activities. The report recommended that three of the four buildings (12-358, 12-201800, 12-868) and the U12g Tunnel Historic District may be eligible for the National Register of Historic Places (NRHP). The report also found that the undertaking would have an adverse effect on the three buildings and on the historic district. The Nevada State Historic Preservation Office (SHPO) concurred with the report’s findings (Reed 2023). The U12g Tunnel was determined eligible as a historic district under the Secretary of the Interior’s (SOI) Significance Criterion A, at the local level, in the context of the Cold War as an underground testing environment for the development of nuclear weapons and to assess the effects of a nuclear explosion on materials and equipment with a period of significance from 1959 to 1971. It was also determined eligible under Significance Criterion C for embodying the distinctive characters of a horizontal tunnel complex used for nuclear testing and as a significant and distinguishable entity. The three buildings were determined to be contributing elements of the district. The undertaking was expanded with the addition of two buildings and three storage areas proposed to be demolished and located within U12g Tunnel Historic District in FY24. These five resources (12-B100933, 12-B100944, and Storage Areas 1, 2, and 3) were recorded in Supplemental Identification, Evaluation, and Finding of Effect for Additional Proposed Demolition at U12g Tunnel, Area 12, Nevada national Security Site, Nye County, Nevada (Brannan et al. 2024). Identification efforts indicated that the two buildings and Storage Area 1 supported nuclear testing in the U12g Tunnel. Storage Area 1 and Storage Area 2 post-dated the nuclear testing activities at U12g Tunnel and were not recommended as contributing elements to the district. The report also found that the undertaking would have an adverse effect on the newly identified buildings and one storage area and on the historic district. The SHPO concurred that the expanded undertaking would result in adverse effects to historic properties (Reed 2025). To resolve these adverse effects, NNSA/NFO, in consultation with the SHPO, is following standard mitigation as stipulated in the 2024 Programmatic Agreement DE-GM58-22NA25554 Among the U.S. Department of Energy and the Nevada State Historic Preservation Officer and the Advisory Council on Historic Preservation Concerning the Protection of Historic Properties on the Nevada National Security Site, Nye County, Nevada (hereafter referred to as the NNSS PA). The standard mitigation measures are outlined in Appendix D of the NNSS PA. As such, this architectural survey has been prepared in accordance with Appendix D of the NNSS PA and follows the report format outlined in Appendix F. It includes a historic context that describes the district’s origin, history, and support functions, its significance in the context of nuclear testing on the NNSS, and identifies contributing and non-contributing elements within the district. The report is accompanied by Architectural Resource Assessment (ARA) forms for individual resources and a Historic District Resource Assessment (HDRA) for the U12g Tunnel Historic District. In total, this architectural report identified 32 primary resources within the district boundary. Six of the primary resources were previously identified as contributing elements. An additional 17 resources are recommended as contributing elements to the district for a total of 23 contributing elements. The other nine resources identified are recommended as non-contributing elements to the district.

12-201800

HERO CarbonSAFE Phase 2 Project in the Columbia River Basalt Group

The Hermiston, Oregon Basalt CarbonSAFE Phase II project (HERO CarbonSAFE) seeks to accelerate the deployment of commercial carbon dioxide (CO2) storage projects in basaltic rocks. Basalt CO2 storage has several advantages to conventional saline storage reservoirs including 1. The potential for rapid mineralization of CO2, 2. Associated decreases in pressure and CO2 migration risks, 3. Reduced long-term monitoring requirements with respect to plume tracking, 4. Widespread geographic distribution and, 5. Large storage potential due to thickness, porosity, and CO2 interactions with basalt. And for locations such as the Pacific Northwest, Hawaii, Iceland, India and Japan, basalts may offer the only economically feasible option for local CO2 storage. However, there are limited field-scale assessments of CO2 storage in basalt, and current carbon capture utilization and storage (CCUS) permitting and regulatory frameworks were developed for conventional saline reservoirs. HERO CarbonSAFE is designed to address research gaps and uncertainties associated with basalt storage. Specifically, the project will assess the feasibility of CO2 injection in the deep layered basalts, long-term storage (mineralization), practical approaches for large-scale implementation (50+ million metric tons of CO2 over 30 years), lithology-specific risks, and the technoeconomic potential for CO2 storage in basalts. The HERO CarbonSAFE project will assess feasibility of developing a commercial-scale (50+ million metric tons of CO2) geological storage complex within the Columbia River Basalt Group (CRBG), a layered continental flood basalt complex that underlies Calpine’s natural gas-fired Hermiston Power Project (HPP) in Hermiston, OR (Figure 1). Under this 2-year CarbonSAFE Phase II project, the HERO team will conduct a data acquisition campaign that includes drilling a stratigraphic well to a total depth of ~1,500 m into the thick layered basalts proximal to HPP. A comprehensive well logging and hydrologic testing program will be augmented with new core collected from flow zones and sealing units, and comprehensive laboratory testing to help refine the kinetic rates of mineralization. The newly acquired information will be integrated with existing data from regional wells to correlate basalt injection zone properties to develop storage hub/commercial-scale models. Using these models, the project team will evaluate injection scenarios to define the technical and economic potential for storing a minimum of 50 million metric tons of CO2 over a 30-year period, along with a robust sensitivity analysis on key parameters governing reservoir viability for sustainable injection over a commercial project lifetime. Specific technical objectives of HERO are: (1) assessing the reservoir response of a series of stacked layered reservoir flowtop sequences occurring in this area of the CRBG to commercial-scale injection volumes; (2) extending prior efforts by the project team to characterize the deep layered basalts encountered in regional studies, to leverage prior investments by U.S. Department of Energy’s (DOE) Carbon Storage program; (3) leveraging DOE’s mineralization characterization efforts to advance model parametrization for commercial scale injection of CO2 in basalts; (4) conducting risk assessments associated with scaling up to commercial storage hub injection goals, while validating DOE’s National Risk Assessment Partnership (NRAP) tools, to identify potential constraints that would prevent the CRBG from serving as a commercial-scale storage complex; (5) developing mitigation plans to address identified risks; (6) developing a commercial-scale injection and monitoring, verification and accounting (MVA) strategy; (7) utilizing computational models to define and minimize, if possible, the Area of Review (AoR) under Class VI regulations; and (8) developing a robust CO2 management strategy for CRBG that also considers a regional source/sink approach that is responsive to stakeholder needs and industrial demand. Specific institutional objectives are: (1) identifying and developing plans to mitigate the nontechnical challenges associated with the build-out of a commercial-scale storage complex within the CRBG with integrated CO2 sources; (2) implementing the community outreach plan; (3) conducting regulatory research, including a survey of issues related to pore space ownership, MVA and long-term assurance of mineralization-based storage, to support an eventual application for a UIC Class VI permit; (4) advancing the project’s plan for CO2 liability management; and (5) continuing to refine and update the project’s economic model. The final objective is the preparation of a comprehensive Site Characterization Plan that draws upon the technical and institutional feasibility assessments to prepare the project for future commercialization efforts.

58 GEOSCIENCES