Search NASA⌕ Search

SEARCH · Search NASA

Results for “System Unreliability”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Neural correspondence to spectrum of environmental uncertainty in multiple-cue probability judgment system with time delay

Despite state-of-the-art technologies like artificial intelligence, human judgment is critically essential in cooperative systems, such as the multi-agent system (MAS), which collect information among agents based on multiple-cue judgment. Human agents can prevent impaired situational awareness of automated agents by confirming situations under environmental uncertainty. System error caused by uncertainty can result in an unreliable system environment, and this environment affects the human agent, resulting in non-optimal decision-making in MAS. Thus, it is necessary to know how human behavior is changed to capture system reliability under uncertainty. Another issue affecting MAS is time delay, which can delay agent information transfer, resulting in low performance and instability. However, it is difficult to find studies on the influence of time delay on human agents. This study is about understanding the human decision-making process under a specific system reliability environment by uncertainty with time delay. We used concepts of expected and unexpected uncertainty to implement reliability of the system usage environment with three types of time delay conditions: no time delay, regular time delay, and irregular time delay conditions. We used electroencephalogram (EEG) for human cognitive neural mechanisms in multiple-cue judgment systems to understand human decision-making. In the reliability of system usage environment, the unreliable system environment significantly creates less memory load by less utilization of system rules for decision-making. In terms of time delay, delayed information delivery does not significantly affect memory load for decision-making.

cognitive process↗

Sensor Configuration Selection for Discrete-Event Systems under Unreliable Observations

Algorithms for counting the occurrences of special events in the framework of partially-observed discrete event dynamical systems (DEDS) were developed in previous work. Their performances typically become better as the sensors providing the observations become more costly or increase in number. This paper addresses the problem of finding a sensor configuration that achieves an optimal balance between cost and the performance of the special event counting algorithm, while satisfying given observability requirements and constraints. Since this problem is generally computational hard in the framework considered, a sensor optimization algorithm is developed using two greedy heuristics, one myopic and the other based on projected performances of candidate sensors. The two heuristics are sequentially executed in order to find best sensor configurations. The developed algorithm is then applied to a sensor optimization problem for a multiunit- operation system. Results show that improved sensor configurations can be found that may significantly reduce the sensor configuration cost but still yield acceptable performance for counting the occurrences of special events.

97 MATHEMATICS AND COMPUTING↗

Mitigating the Impacts of Uncertain Geomagnetic Disturbances on Electric Grids: A Distributionally Robust Optimization Approach

Severe geomagnetic disturbances (GMDs) increase the magnitude of the electric field on the Earth’s surface (E-field) and drive geomagnetically-induced currents (GICs) along the transmission lines in electric grids. These additional currents can pose severe risks, such as current distortions, transformer saturation and increased reactive power losses, each of which can lead to system unreliability. Today several mitigation actions (e.g., changing grid topology) exist that can reduce the harmful GIC effects on the grids. Making such decisions can be challenging, however, because the magnitude and direction of the E-field are uncertain and non-stationary. In this paper, we model uncertain E-fields using the distributionally robust optimization (DRO) approach that determines optimal transmission grid operations such that the worst-case expectation of the system cost is minimized. We also capture the effect of GICs on the nonlinear AC power flow equations. For solution approaches, we develop an accelerated column-and-constraint generation (CCG) algorithm by exploiting a special structure of the support set of uncertain parameters representing the E-field. Extensive numerical experiments based on “epri-21” and “uiuc-150” systems, designed for GMD studies, demonstrate (i) the computational performance of the accelerated CCG algorithm, (ii) the superior performance of distributionally robust grid operations that satisfy nonlinear, nonconvex AC power flow equations and GIC constraints, in comparison with standard stochastic programming-based methods during the out-of-sample testing.

42 ENGINEERING↗

Stochastic correlation analysis to rank the impact of intermittent wind generation on unreliability margins of power systems

Power systems are vulnerable to extreme contingencies (like an outage of a major generating substation or transmission line) that can cause significant generation and load loss and can lead to further cascading outages of other transmission facilities and generators in the system. Power systems operators take time-ahead actions (real time to day ahead) actions based on forecasted data as well as telemetry. However, there is a probability of extreme swings in wind generation that can push the power system that is already close to system boundaries into unreliable states. Increasing penetration on wind generation and uncertainties in short term forecast can move the system into operational states that can violate N-1 reliability criteria. While the power system planning accounts for worst case analyses to mitigate such emergencies, it is necessary to understand the spatial and temporal correlation of load buses with intermittent wind generation. The ranking of wind generators based on stochastic correlation to unreliability margins of load buses provides an insight of system vulnerabilities that can be corrected by appropriate emergency controls. A Monte-Carlo simulation of wind uncertainty forecast is performed to identify the probability distributions of unreliability margins. Ranking of wind generators is performed based on stochastic correlation analysis of the wind power generated and the load losses at the buses. This helps in not only identifying weak buses in the power system but also in identifying the vulnerable wind locations to plan for system reinforcements. Power system modeling and hybrid simulation to calculate unreliability margins are performed using DCAT and demonstrated on the 32-bus Nordic test system.

generators, wind forecasting, wind power generatio↗

Learning from Trending, Precursor Analysis, and System Failures

Models of reliability growth relate current system unreliability to currently accumulated experience. But “experience” comes in different forms. Looking back after a major accident, one is sometimes able to identify previous events or measurable performance trends that were, in some sense, signaling the potential for that major accident: potential that could have been recognized and acted upon, but was not recognized until the accident occurred. This could be a previously unrecognized cause of accidents, or underestimation of the likelihood that a recognized potential cause would actually operate. Despite improvements in the state of practice of modeling of risk and reliability, operational experience still has a great deal to teach us, and work has been going on in several industries to try to do a better job of learning from experience before major accidents occur. It is not enough to say that we should review operating experience; there is too much “experience” for such general advice to be considered practical. The paper discusses the following: 1. The challenge of deciding what to focus on in analysis of operating experience. 2. Comparing what different models of learning and reliability growth imply about trending and precursor analysis.

97 MATHEMATICS AND COMPUTING↗

System Study: Emergency Power System 1998-2022

This report presents an unreliability evaluation of the emergency power system (EPS) at 93 U.S. commercial operating nuclear reactors. New Standardized Plant Analysis Risk (SPAR) models with the most recent SPAR parameter update results were used in this report. Demand, run hour, and failure data from 1998–2022 for selected components were obtained from the Institute of Nuclear Power Operations Industry Reporting and Information System. The unreliability results are trended for the most recent 10 year period while yearly estimates for system unreliability are provided for the entire active period. No statistically significant increasing or decreasing trends were identified in the industry-wide estimates of EPS system start-only unreliability, but a highly statistically significant decreasing trend was identified in the industry-wide estimates of EPS system 8-hour mission unreliability.

99 GENERAL AND MISCELLANEOUS↗

System Study: Emergency Power System 1998-2024

This report presents an unreliability evaluation of the emergency power system (EPS) at 93 U.S. commercial operating nuclear reactors. New Standardized Plant Analysis Risk (SPAR) models with the most recent SPAR parameter update results were used in this report. Demand, run hour, and failure data from 1998 to 2024 for selected components were obtained from the Institute of Nuclear Power Operations Industry Reporting and Information System. The unreliability results are trended for the most recent 10 year period while yearly estimates for system unreliability are provided for the entire active period. No statistically significant increasing or decreasing trends were identified in the industry-wide estimates of EPS system start-only unreliability, but a statistically significant decreasing trend was identified in the industry-wide estimates of EPS system 24-hour mission unreliability.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Unreliable Sustainable Infrastructure: Three Transformations to Guide Cities towards Becoming Healthy 'Smart Cities'

The term 'leapfrogging' has been applied to cities and nations that have adopted a new form of infrastructure by bypassing the traditional progression of development, e.g., from no phones to cell phones - bypassing landlines all together. However, leapfrogging from unreliable infrastructure systems to 'smart' cities is too large a jump resulting in unsustainable and unhealthy infrastructure systems. In the Global South, a baseline of unreliable infrastructure is a prevalent problem. The push for sustainable and 'smart' [re]development tends to ignore many of those already living with failing, unreliable infrastructure. Without awareness of baseline conditions, uninformed projects run the risk of returning conditions to the status quo, keeping many urban populations below targets of the United Nations' Sustainable Development Goals. A key part of understanding the baseline is to identify how citizens have long learned to adjust their expectations of basic services. To compensate for poor infrastructure, most residents in the Global South invest in remedial secondary infrastructure (RSI) at the household and business levels. The authors explore three key 'smart' city transformations that address RSI within a hierarchical planning pyramid known as the comprehensive resilient and reliable infrastructure systems (CRISP) planning framework.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

System Study: Emergency Power System 1998-2020

This report presents an unreliability evaluation of the emergency power system (EPS) at 104 U.S. commercial nuclear power plants. Demand, run hours, and failure data from 1998 through 2020 for selected components were obtained from the Institute of Nuclear Power Operations (INPO) Industry Reporting and Information System (IRIS), formerly the INPO Consolidated Events Database (ICES). The unreliability results are trended for the most recent 10 year period while yearly estimates for system unreliability are provided for the entire active period. Statistically significant decreasing trends were identified in the industry-wide estimates of EPS system start-only mission as well as EPS system unreliability (8-hour mission).

99 GENERAL AND MISCELLANEOUS↗

System Study: Auxiliary Feedwater 1998-2022

This report presents an unreliability evaluation of the auxiliary feedwater (AFW) system at 62 U.S. commercial operating nuclear reactors. New Standardized Plant Analysis Risk (SPAR) models with the most recent SPAR parameter update results were used in this report. Demand, run hour, and failure data from calendar year 1998–2022 for selected components were obtained from the Institute of Nuclear Power Operations Industry Reporting and Information System. The unreliability results are trended for the most recent 10 year period while yearly estimates for system unreliability are provided for the entire active period. No statistically significant increasing or decreasing trends were identified in the industry-wide estimates of AFW system start-only unreliability, but a highly statistically significant decreasing trend was identified in the industry-wide estimates of AFW system 8-hour mission unreliability.

99 GENERAL AND MISCELLANEOUS↗

System Study: Emergency Power System 1998-2014

This report presents an unreliability evaluation of the emergency power system (EPS) at 104 U.S. commercial nuclear power plants. Demand, run hours, and failure data from fiscal year 1998 through 2014 for selected components were obtained from the Institute of Nuclear Power Operations (INPO) Consolidated Events Database (ICES). The unreliability results are trended for the most recent 10 year period while yearly estimates for system unreliability are provided for the entire active period. An extremely statistically significant increasing trend was observed for EPS system unreliability for an 8-hour mission. A statistically significant increasing trend was observed for EPS system start-only unreliability.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Generating synthetic signaling networks for in silico modeling studies

Predictive models of signaling pathways have proven to be difficult to develop. Reasons include the uncertainty in the number of species, the complexity in species’ interactions, and the sparseness and uncertainty in experimental data. Traditional approaches to developing mechanistic models rely on collecting experimental data and fitting a single model to that data. This approach works for simple systems but has proven unreliable for complex systems such as biological signaling networks. For example, uncertainty and sparseness of the data often result in overfitted models that have little predictive value beyond recapitulating the experimental data itself. Thus, there is a need to develop new approaches to create predictive mechanistic models of complex systems. However, to determine the effectiveness of any new algorithm, a baseline model is needed to test its performance. To meet this need, we developed a method for generating artificial synthetic networks that are reasonably realistic and thus can be treated as ground truth models. These synthetic models can then be used to generate synthetic data for developing and testing algorithms designed to recover the underlying network topology and associated parameters. Here, we describe a simple approach for generating synthetic signaling networks that can be used for this purpose.

42 ENGINEERING↗

System Study: Auxiliary Feedwater 1998-2024

This report presents an unreliability evaluation of the auxiliary feedwater (AFW) system at 62 U.S. commercial operating nuclear reactors. New Standardized Plant Analysis Risk (SPAR) models with the most recent SPAR parameter update results were used in this report. Demand, run hour, and failure data from calendar years 1998 to 2024 for selected components were obtained from the Institute of Nuclear Power Operations Industry Reporting and Information System. The unreliability results are trended for the most recent 10 year period and yearly estimates for system unreliability are provided for the entire active period. No statistically significant increasing or decreasing trends were identified in the industry-wide estimates of AFW system start-only unreliability, but a statistically significant decreasing trend was identified in the industry-wide estimates of AFW system 24-hour mission unreliability.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Sensitivity Analysis of the Kalman Filter and Its Applications in Power Systems

Power system model integrity is essential to many planning and operation tasks to ensure the safety and reliability of electricity delivery. Inaccurate system models would result in unreliable assessment of system security conditions and cause large-scale blackouts such as the 2003 Northeast Blackout. This dictates a strong need for knowing the sensitivity of the model to errors in certain input variabless. Our previous work has demonstrated the feasibility of applying the Extended Kalman Filter (EKF) to dynamically monitor generator parameters using disturbance data recorded by phasor measurement units (PMU). This paper uses simulation to examine the effectiveness of augmenting the state variables with the uncertain input variables to improve state variable tracking and to calibrate the input variables

Anderson, Kevin K.↗

Application of Kalman Filter to Improve Model Integrity for Securing Electricity Delivery

Power system model integrity is essential to many planning and operation tasks to ensure the safety and reliability of electricity delivery. Inaccurate system models would result in unreliable assessment of system security conditions and cause large-scale blackouts such as the 2003 Northeast Blackout. This dictates a strong need for model calibration and verification, which should be done periodically and preferably, in an automatic manner. Our previous work has demonstrated the feasibility of applying Extended Kalman Filter (EKF) to calibrate generator parameters using disturbance data recorded by phasor measurement units (PMU). This paper proposes to use Riccati equation to investigate EKF’s performance, especially regarding parameter identifiability. The covariance, which can be derived from the Riccati equation, offers insight into the uncertainties of parameters estimated by the EKF-based method. Simulation results show the effectiveness of the proposed approach.

calibration↗

System Study: Isolation Condenser 1998-2022

This report presents an unreliability evaluation of the isolation condenser (ISO) system at three U.S. commercial operating boiling water reactors. New Standardized Plant Analysis Risk (SPAR) models with the most recent SPAR parameter update results were used in this report. Demand, run hour, and failure data from calendar year 1998–2022 for selected components were obtained from the Institute of Nuclear Power Operations (INPO) Industry Reporting and Information System (IRIS). The unreliability results are trended for the most recent 10 year period while yearly estimates for system unreliability are provided for the entire active period. No statistically significant increasing or decreasing trends were identified in the ISO results.

99 GENERAL AND MISCELLANEOUS↗

System Study: Reactor Core Isolation Cooling 1998-2022

This report presents an unreliability evaluation of the reactor core isolation cooling (RCIC) system at 28 U.S. commercial operating boiling water reactors. New Standardized Plant Analysis Risk (SPAR) models with the most recent SPAR parameter update results were used in this report. Demand, run hour, and failure data from calendar years 1998–2022 for selected components were obtained from the Institute of Nuclear Power Operations Industry Reporting and Information System. The unreliability results are trended for the most recent 10 year period while yearly estimates for system unreliability are provided for the entire active period. Statistically significant decreasing trends were identified in both the RCIC system start-only unreliability and 8-hour mission unreliability.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

System Study: Emergency Power System 1998–2018

This report presents an unreliability evaluation of the emergency power system (EPS) at 104 U.S. commercial nuclear power plants. Demand, run hours, and failure data from 1998 through 2018 for selected components were obtained from the Institute of Nuclear Power Operations (INPO) Industry Reporting and Information System (IRIS), formerly the INPO Consolidated Events Database (ICES). The unreliability results are trended for the most recent 10 year period while yearly estimates for system unreliability are provided for the entire active period. No statistically significant increasing or decreasing trends were identified in the EPS results.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗