The Trash Compaction Processing Systems (TCPS) Ground Unit Control Sample Testing

The Trash Compaction Processing System (TCPS) is being developed by NASA and Sierra Space to process crew trash for long-duration missions. The system compacts and thermally processes mixed spacecraft waste to reduce volume and stabilize the material while managing gas and liquid effluents. A Ground Unit (GU) located at Sierra Space in Madison, Wisconsin was used to run a series of tests using standardized control samples representing different trash conditions, including nominal, high liquid, high cloth, benign, and foam. Gas grab samples were collected during processing and analyzed to identify the compounds present in the effluent stream and compare the concentrations to the NASA spacecraft maximum allowable concentrations (SMACs). Additional testing included odor testing at White Sands Test Facility, aerosol measurements, microbiology, and tile characterization. Overall, the compounds detected in the gas samples were well below the SMAC limits for all trash models tested. The results from this testing are being used to help guide the verification approach and test planning for the TCPS Flight Unit that is planned for on-orbit testing on the International Space Station.

Control Samples

SERFE Ground Unit EVA Series After Three Year Spacesuit Stowage Period

NASA’s spacesuit government reference design for returning to the Moon is called the Exploration Extravehicular Mobility Unit (xEMU). The xEMU subassembly that provides life support, such as oxygen and thermal control, is the Portable Life Support System (PLSS). Inside the PLSS is a new technology that NASA wanted to test to provide cooling to the crew during EVAs (ExtraVehicular Activity). This technology is called the Spacesuit Water Membrane Evaporator (SWME). In order to test SWME in an improved thermal control loop (TCL) both on Earth and in Space, the Spacesuit Evaporation Rejection Flight Experiment (SERFE) was created. The Ground unit, or testbed at Johnson Space Center (JSC), tested the cooling technology in Earth’s gravity, while the Flight unit, or payload on the International Space Station (ISS), tested the cooling technology in micro-gravity. Since fluids flow differently in micro-gravity, testing in both environments would provide important data for improving cooling performance during EVAs. Both units completed 25 simulated EVAs with the same settings so SWME performance on the ground could be compared to the ISS. The Flight unit was completed first and performed EVAs on the ISS between 2020 and 2022. The Ground unit performed EVAs between 2021 and 2022. When the Flight unit came back from the ISS, it was taken apart for analysis. This analysis looked at how well SWME was able to maintain its heat rejection capability after various dwell times, such as a 90 day Airlock Coolant Loop Recovery (ALCLR) cycle, when the Extravehicular Mobility Unit (EMU) currently on the ISS would normally need maintenance. After a three year simulated spacesuit dwell, the Ground unit performed another EVA series in 2025 to test SWME’s shelf life. The results from this test series will inform mission planning as NASA plans to go back to the Moon and beyond.

Michael Lewandowski

SERFE Ground Unit EVA Series After Three Year Spacesuit Stowage Period

NASA’s spacesuit government reference design for returning to the Moon is called the Exploration Extravehicular Mobility Unit (xEMU). The xEMU subassembly that provides life support, such as oxygen and thermal control, is the Portable Life Support System (PLSS). Inside the PLSS is a new technology that NASA wanted to test to provide cooling to the crew during EVAs (ExtraVehicular Activity). This technology is called the Spacesuit Water Membrane Evaporator (SWME). In order to test SWME in an improved thermal control loop (TCL) both on Earth and in Space, the Spacesuit Evaporation Rejection Flight Experiment (SERFE) was created. The Ground unit, or testbed at Johnson Space Center (JSC), tested the cooling technology in Earth’s gravity, while the Flight unit, or payload on the International Space Station (ISS), tested the cooling technology in micro-gravity. Since fluids flow differently in micro-gravity, testing in both environments would provide important data for improving cooling performance during EVAs. Both units completed 25 simulated EVAs with the same settings so SWME performance on the ground could be compared to the ISS. The Flight unit was completed first and performed EVAs on the ISS between 2020 and 2022. The Ground unit performed EVAs between 2021 and 2022. When the Flight unit came back from the ISS, it was taken apart for analysis. This analysis looked at how well SWME was able to maintain its heat rejection capability after various dwell times, such as a 90 day Airlock Coolant Loop Recovery (ALCLR) cycle, when the Extravehicular Mobility Unit (EMU) currently on the ISS would normally need maintenance. After a three year simulated spacesuit dwell, the Ground unit performed another EVA series in 2025 to test SWME’s shelf life. The results from this test series will inform mission planning as NASA plans to go back to the Moon and beyond.

SWME

Assembly and Integration Status of a High Fidelity Ground Test Bed for the Water Processor Assembly

The Water Recovery System (WRS) is a critical component of life support aboard the International Space Station (ISS) and will play an essential role in future missions beyond Low Earth Orbit (LEO). Its primary functional units – the Urine Processor Assembly (UPA), Brine Processor Assembly (BPA), and Water Processor Assembly (WPA) – must be evaluated for extended operation, dormancy resilience, material obsolescence, and reliability under exploration-driven constraints. Ground testing is vital for developing these technologies and generating statistically relevant reliability assessments, which requires extended runtime under integrated, Flight-like conditions. Currently, no high-fidelity, fully integrated WPA ground test bed exists to support these objectives. To address this gap, NASA is developing a WPA test bed at Marshall Space Flight Center (MSFC) that combines downgraded ISS flight hardware with functionally flight-like components in a cost-effective configuration while maintaining priority hardware investigations. This paper describes the current status of hardware assembly and integration, outlines key challenges such as simulating microgravity effects and mitigating obsolescence, and presents future test objectives including software development, reliability assessments, dormancy studies, and exploration-oriented upgrades.

Water Processor Assembly

Assembly and Integration Status of a High Fidelity Ground Test Bed for the Water Processor Assembly

The Water Recovery System (WRS) is a critical component of life support aboard the International Space Station (ISS) and will play an essential role in future missions beyond Low Earth Orbit (LEO). Its primary functional units – the Urine Processor Assembly (UPA), Brine Processor Assembly (BPA), and Water Processor Assembly (WPA) – must be evaluated for extended operation, dormancy resilience, material obsolescence, and reliability under exploration-driven constraints. Ground testing is vital for developing these technologies and generating statistically relevant reliability assessments, which requires extended runtime under integrated, Flight-like conditions. Currently, no high-fidelity, fully integrated WPA ground test bed exists to support these objectives. To address this gap, NASA is developing a WPA test bed at Marshall Space Flight Center (MSFC) that combines downgraded ISS flight hardware with functionally flight-like components in a cost-effective configuration while maintaining priority hardware investigations. This paper describes the current status of hardware assembly and integration, outlines key challenges such as simulating microgravity effects and mitigating obsolescence, and presents future test objectives including software development, reliability assessments, dormancy studies, and exploration-oriented upgrades.

Mary-Elizabeth Davis

Influence of microstructure and temperature on impact toughness of H13 steel produced by binder jet additive manufacturing

Binder Jet Additive Manufacturing (BJAM) is a promising manufacturing pathway to produce H13 steel dies and tooling with complex geometries for applications in high pressure aluminum die casting, hot stamping, and injection molding. While fully dense H13 coupons produced using BJAM have been subjected to detailed microstructure characterization, properties which are critical and relevant to the aforementioned applications, such as impact toughness, have not been reported. Here, this work evaluated the influence of microstructural characteristics and test temperature on the impact toughness of H13 produced by BJAM. Coupons were produced from three different powder size distributions (PSDs), with nominal powder size ranges of −22 μm, 10-32 μm, and 15-53 μm. Coupons were printed, sintered, hot isostatically pressed (HIPed), and heat treated by quenching and tempering. After HIPing, the measured porosities of the different PSDs were all less than 0.015 vol%. The −22 μm PSD BJAM material exhibited the best impact toughness of all three PSDs across the entire test temperature range from 25 to 400 °C, and also exhibited an ambient temperature impact toughness of 10.9 J at a hardness of 46 HRC, equivalent to minimum threshold requirements for premium grade H13. However, all three BJAM PSDs exhibited moderately lower impact toughness than premium grade wrought H13 from RT to 400 °C. We attribute this in part due to the very large prior-austenite grain (PAG) sizes near 400 μm and segregation from former liquid channels leading to greater amounts of carbide precipitation on PAG boundaries. Technical pathways for optimizing processing and chemistry of BJAM H13 to further improve impact toughness are discussed.

Binder jet additive manufacturing

Preparation of the Ice Certification of the Dornier 328 Regional Airliner By Numerical Simulation and By Ground Test

The Dornier 328, a new regional airliner, is to be qualified to FAR25/JAR25 requirements for operation into known icing conditions. All lifting surfaces are pneumatically deiced. Impingement limits were determined using a validated computational fluid dynamic (CFD) code. Wind tunnel tests with a model of the whole aircraft and the isolated empennage equipped with artificial ice shapes showed a degradation of handling characteristics due to ice accretion. Extensive two and three dimensional CFD calculations evaluated ice accretion at the deflection elevator horn. Icing tunnel tests were performed with a model of the horizontal tail with icing similitude fulfilled. The Dornier Do328 powerplant air induction system has successfully completed a program of icing tests in support of aircraft certification for operation into known icing conditions. Potential flight icing conditions were extensively analyzed using a CFD potential flow code and 3-D particle tracking routine to identify critical flight icing conditions. The tunnel test program verified the analytically predicted critical ice accretion surfaces of the air induction system, the adequacy of the ice protection provisions and demonstrated compliance with the applicable (JAR25) regulatory material.

D Welte

Effects of Ground Boards on Acoustic Signals

Acoustic ground boards are used to provide hard reflective surfaces for microphones when taking outdoor measurements. These boards also have a wide variety of potential impacts on the signal received by the microphones. A comprehensive experimental campaign was completed in which various ground board and microphone configurations were tested to determine their effects on the acoustic signals returned by the microphones. Comparisons are made between these setups and a free-field reference case. Normal impedance testing on various combinations of sand, plywood, and ground board material was also completed.

Mark CAnderson

Coalition for Community-Supported Affordable Geothermal Energy Systems (C2SAGES)

The C2SAGES project evaluated the feasibility of a community geothermal system for the planned Windy Ridge affordable housing development in Hinesburg, Vermont. Led by GTI Energy with Vermont Gas Systems, LN Consulting, NREL, and Frontier Energy, the work assessed technical design, energy performance, costs, business models, community engagement, maintenance, workforce development, and permitting. The proposed system was designed to serve 100% of the development’s heating, cooling, and domestic hot water loads. Compared with a baseline using air-source heat pumps and natural gas water heating, the geothermal system was estimated to reduce HVAC and domestic hot water energy use by about 45% to 48%, lower operating and maintenance costs, and reduce 30-year life-cycle costs by 37% for Phase 1 and 10% for Phase 2. Technical testing and modeling indicated that the Windy Ridge site is suitable for a community-scale geothermal system. The project also developed borehole field layouts, piping concepts, pump house designs, controls, maintenance plans, and supporting engineering drawings. The business model analysis found that first cost, ownership structure, and customer affordability remain major deployment challenges. Utility-led maintenance and operation were viewed favorably, but traditional utility cost-recovery models may require subsidy or revised financing structures to be practical for affordable housing. Community engagement highlighted the need for clear public education, transparent financing, reliable long-term maintenance, trained technicians, and the potential to pair geothermal systems with weatherization. Overall, the report concludes that community geothermal is technically feasible and offers meaningful energy, emissions, and life-cycle cost benefits, but broader deployment will depend on workable financing models and workforce readiness.

15 GEOTHERMAL ENERGY

Extending mARC II Arc-Jet Test Duration via Design and Implementation of Model System Cooling Sleeve

The mARC II is a 30 kW arc-jet facility at NASA Ames Research Center used to generate high-enthalpy flows for low-cost thermal protection system (TPS) technology development. Sustained operation of downstream instrumentation and material samples is constrained by thermal loading transmitted through the arc-jet test environment, limiting achievable run times and experimental throughput. This work presents the design, integration, and validation of a cooling sleeve implemented on the sweep arm drive motor feedthrough to mitigate thermal accumulation during testing. The addition of the cooling sleeve is a simple, robust upgrade that translates directly into enhanced facility capability by supporting longer run durations, reduced turnaround time, and higher throughput.

numerical simulations

Extending mARC II Arc-Jet Test Duration via Design and Implementation of Model System Cooling Sleeve

The mARC II is a 30 kW arc-jet facility at NASA Ames Research Center used to generate high-enthalpy flows for low-cost thermal protection system (TPS) technology development. Sustained operation of downstream instrumentation and material samples is constrained by thermal loading transmitted through the arc-jet test environment, limiting achievable run times and experimental throughput. This work presents the design, integration, and validation of a cooling sleeve implemented on the sweep arm drive motor feedthrough to mitigate thermal accumulation during testing. The addition of the cooling sleeve is a simple, robust upgrade that translates directly into enhanced facility capability by supporting longer run durations, reduced turnaround time, and higher throughput.

sting arm

Rapid Quantum Ground State Preparation via Dissipative Dynamics

Inspired by natural cooling processes, dissipation has become a promising approach for preparing low-energy states of quantum systems. However, the potential of dissipative protocols remains unclear beyond certain commuting Hamiltonians. This work provides significant analytical and numerical insights into the power of dissipation for preparing the ground state of noncommuting Hamiltonians. For quasi-free dissipative dynamics, including certain 1D spin systems with boundary dissipation, our results reveal a new connection between the mixing time in trace distance and the spectral properties of a non-Hermitian Hamiltonian, leading to an explicit and sharp bound on the mixing time that scales polynomially with system size. For more general spin systems, we develop a tensor network-based algorithm for constructing the Lindblad jump operator and for simulating the dynamics. Using this algorithm, we demonstrate numerically that dissipative ground state preparation protocols can achieve rapid mixing for certain 1D local Hamiltonians under bulk dissipation, with a mixing time that scales logarithmically with the system size. We then prove the rapid mixing result for certain weakly interacting spin and fermionic systems in arbitrary dimensions, extending recent results for high-temperature quantum Gibbs samplers to the zero-temperature regime. Together, these results show that dissipation can be a powerful tool for ground state preparation, with potential applications across condensed matter physics, quantum materials science, and beyond.

decoherence

Aerosol Can Fireball Tests: Commodity Hazards in the Transportation Environment Phase 1 Report

This report describes a series of tests performed at Sandia’s burn site to better understand the behavior of aerosol commodities and their hazards in the transportation environment. This comes on the tail of a prior study on the use cases and historical hazards associated with aerosol commodities in the shipping environment (Cambridge Systematics Incorporated, CSI, 2020). It is also mindful of the National Fire Protection Agency NFPA30B standard for safe warehousing of aerosol commodities. Warehousing is different from transit because warehousing typically involves active suppression and mitigation measures not practical or relevant to the shipping environment. Transit also typically involves tighter packing and smaller enclosure spaces. The transportation hazard space has not been heavily studied in prior testing specifically aimed towards the ground, rail, and nautical shipping environments.

54 ENVIRONMENTAL SCIENCES

Flight Service Environmental Effects on Composite Materials and Structures

NASA Langley and the U.S. Army have jointly sponsored programs to assess the effects of realistic flight environments and ground-based exposure on advanced composite materials and structures. Composite secondary structural components were initially installed on commercial transport aircraft in 1973; secondary and primary structural components were installed on commercial helicopters in 1979; and primary structural components were installed on commercial aircraft in the mid-to-late 1980's. Service performance, maintenance characteristics, and residual strength of numerous components are reported. In addition to data on flight components, 10 year ground exposure test results on material coupons are reported. Comparison between ground and flight environmental effects for several composite material systems are also presented. Test results indicate excellent in-service performance with the composite components during the 15 year period. Good correlation between ground-based material performance and operational structural performance has been achieved.

H Benson Dexter

Preliminary Findings of the Experimental Development Unit Cold Flow Test for a Generation Zero Nuclear Propulsion Engine

Nuclear thermal propulsion (NTP) technology will greatly benefit human travel to Mars by significantly shortening transit times, improving crew safety, and providing more mission flexibility than traditional chemical rockets. As part of DRACO follow-on work to develop, build, and fly a generation zero NTP engine, a full scale flight-like experimental design unit (EDU) reactor was constructed to collect sufficient on-ground performance data to characterize flow induced vibrations (FIV) of critical reactor structures/components, inform development of the engine and reactor control algorithm, and collect pressure drop and flow distribution data across the reactor. The fluid conditions for the test program were designed to achieve system responses equivalent to that of an operational engine through all phases of engine operation including reactor startup, mainstage operation, reactor shutdown, and reactor cooldown. Over 100 tests were executed, flowing either GN2 or GHe through the EDU at varying flow rates and pressures. This experiment provided early validation of flow behavior and vibration risks before nuclear testing, boosted critical subsystem TRLs, informed design iterations, and reduced future test costs. The steady-state flow parameters for the experiment were modeled in Ansys Thermal Desktop, allowing rapid tuning and experiment-informed updates to a flight-like test matrix. The EDU dynamic environment was characterized with accelerometers, strain gauges, and high-frequency pressure transducers all sampled at 20 kHz. While many narrow-band oscillations were identified, no significant FIV occurred; the reactor structural responses tend to be enveloped by typical launch vehicle ascent vibration environments (defined up to 2 kHz), although significant energy is also present at higher frequencies.

Flow Induced Vibration

ARCTRON: A Rapid Experimental Proving Ground for TPS Experiments and Arcjet Technology Development

Innovation in high-enthalpy facilities is fundamentally limited by the cost and risk of experimentation. New concepts for plasma control, diagnostics, facility components, and plasma-material interaction often require repeated iterations that are impractical to perform in production arcjets. As a result, promising ideas may remain unexplored or reach operational facilities only after significant development effort. ARCTRON is being developed as a rapid experimental proving ground where new ideas in plasma science, arcjet engineering, diagnostics, and material response can be conceived, tested, and quantitatively evaluated before transition to large-scale facilities. The platform combines radio-frequency (RF) and DC arc plasma generation, externally applied magnetic fields, configurable gas composition, reduced-pressure operation, laser heating, electrical biasing, and modular diagnostic access. These capabilities permit the plasma source, applied forcing, test article, and measurement configuration to be modified independently, allowing individual physical mechanisms to be isolated more readily than in a traditional test environment. One class of investigations addresses fundamental plasma-surface interaction physics. Conventional material tests often expose a specimen simultaneously to convective heating, reactive species, pressure, shear, radiation, and surface-current effects. The resulting material response may be measured accurately, while the contribution of each mechanism remains difficult to identify. ARCTRON is designed to vary these effects selectively. Plasma chemistry can be changed independently through configurable gas mixtures; magnetic fields and electrical biasing can modify charged-particle transport; laser heating can provide a non-plasma thermal input; and pressure, flow, and discharge mode can be varied over a broad operating space. This enables controlled tests of hypotheses involving surface catalycity, reactive-species transport, plasma-assisted oxidation, electromagnetic effects, shear, and the relative contributions of thermal and chemical loading. A second class of investigations enabled by this approach concerns the engineering of high-enthalpy facilities themselves. Arc-heated facilities are limited by electrode erosion, unstable arc attachment, localized heating, and damage to nozzles and other plasma-facing components. ARCTRON provides a lower-cost environment for testing concepts intended to mitigate these limitations. Candidate investigations include the use of applied magnetic fields to alter current paths and reduce plasma interaction with nozzle walls, ExB forcing to introduce controlled plasma rotation, magnetic or geometric approaches for distributing arc attachment, and alternative electrode or discharge configurations intended to reduce erosion and improve stability. Because the platform is reconfigurable, these concepts can be evaluated through repeated design--build--test cycles before they are considered for implementation in operational facilities. The platform also supports the development and validation of diagnostics that may be difficult to introduce initially into a large arcjet. Current and planned measurements include spatially resolved optical emission spectroscopy, electrostatic probes, fast imaging, pyrometry, calorimetry, laser-induced fluorescence, and absorption spectroscopy. These diagnostics are intended not merely to document a nominal operating condition, but to constrain the local plasma state and its relationship to component or material response. The modular facility geometry allows diagnostic concepts to be tested, calibrated, and compared under repeatable conditions before deployment in more demanding environments. ARCTRON is also supported by an integrated software suite. Automated control and data acquisition allow discharge parameters, gas composition, magnetic fields, diagnostic timing, and test configuration to be recorded as part of each experiment (STARDAC - Software for Testing, Analysis, Research Data, and Control). The Backend for Experiment Analysis, Storage, and Traceability (BEAST) is a database that provides the infrastructure needed to associate heterogeneous measurements with facility configuration, specimen identity, calibration state, geometry, and analysis provenance. This backend is particularly important for exploratory campaigns, in which many related configurations may be tested, and the value of an individual experiment depends on its connection to earlier and subsequent iterations. Complementary analysis capabilities, including computer-vision-based transient response measurements (arcjetCV), three-dimensional surface reconstruction (STARSCAN), and model-based Bayesian inference (SHIELD), and tomography data analysis (TOMATO, PuMA) can be incorporated when required by a specific hypothesis without becoming the focus of every campaign. The central objective of ARCTRON is therefore not to maximize heat flux or reproduce a complete flight environment. Its purpose is to reduce the cost and time required to ask consequential questions about plasma behavior, plasma-facing materials, diagnostics, and arcjet technology. By providing a controlled environment for rapid reconfiguration, mechanism isolation, quantitative measurement, and iterative engineering, ARCTRON can help mature concepts that would otherwise remain too speculative or too risky for evaluation in production facilities. The resulting knowledge can then guide the design of material models, focus test objectives in larger arcjets, reduce facility-development risk, and improve the physical basis of high-enthalpy ground testing. This work will present the ARCTRON architecture, operating modes, diagnostic suite, and digital experimental workflow. Initial experimental results from the first integrated operation of the facility will be presented, including flow characterization, power limitations, and deployment of the initial diagnostic suite. Ongoing development efforts aimed at catalycity characterization, magnetic plasma control, and advanced optical diagnostics will also be discussed, illustrating how the platform supports rapid iteration from concept to experiment.

experimental diagnostics