Search NASA⌕ Search

SEARCH · Search NASA

Results for “Validation Readiness”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Development of Level 1b Calibration and Validation Readiness, Implementation and Management Plans for GOES-R

A complement of Readiness, Implementation and Management Plans (RIMPs) to facilitate management of post-launch product test activities for the official Geostationary Operational Environmental Satellite (GOES-R) Level 1b (L1b) products have been developed and documented. Separate plans have been created for each of the GOES-R sensors including: the Advanced Baseline Imager (ABI), the Extreme ultraviolet and X-ray Irradiance Sensors (EXIS), Geostationary Lightning Mapper (GLM), GOES-R Magnetometer (MAG), the Space Environment In-Situ Suite (SEISS), and the Solar Ultraviolet Imager (SUVI). The GOES-R program has implemented these RIMPs in order to address the full scope of CalVal activities required for a successful demonstration of GOES-R L1b data product quality throughout the three validation stages: Beta, Provisional and Full Validation. For each product maturity level, the RIMPs include specific performance criteria and required artifacts that provide evidence a given validation stage has been reached, the timing when each stage will be complete, a description of every applicable Post-Launch Product Test (PLPT), roles and responsibilities of personnel, upstream dependencies, and analysis methods and tools to be employed during validation. Instrument level Post-Launch Tests (PLTs) are also referenced and apply primarily to functional check-out of the instruments.

Validation↗

Development of a PPT for the EO-1 Spacecraft

A Pulsed Plasma Thruster (PPT) has been developed for use in a technology demonstration flight experiment on the Earth Observing 1 (EO-1) New Millennium Program mission. The thruster replaces the spacecraft pitch axis momentum wheel for control and momentum management during an experiment of a minimum three-day duration. The EO-1 PPT configuration is a combination of new technology and design heritage from similar systems flown in the 1970's and 1980's. Acceptance testing of the protoflight unit has validated readiness for flight, and integration with the spacecraft, including initial combined testing, has been completed. The thruster provides a range of capability from 90 microN-sec impulse bit at 650 sec specific impulse for 12 W input power, through 860 microN-sec impulse bit at 1400 see specific impulse for 70 W input power. Development of this thruster reinitiates technology research and development and re-establishes an industry base for production of flight hardware. This paper reviews the EO-1 PPT development, including technology selection, design and fabrication, acceptance testing, and initial spacecraft integration and test.

Benson, Scott W.↗

The Exploration Crew Health and Performance System of the Future - A Shared Mental Model

The challenges involved in vehicle/habitat design and operation for long-duration deep space missions are complex, and the needs of a human crew must be considered in the context of all the system trades required to enable such missions. An exploration Crew Health and Performance (CHP) system complements all the other vehicle/habitat systems to achieve one specific and critical endpoint – ensuring that the astronauts can perform the job that they were sent into space to do. This includes accounting for all aspects of the physiological, psychological, medical, and environmental realities that the human crew must face in deep space. Along with this system complexity comes the additional need for increased autonomy of the crew due to the immense distance from Earth. The design of future systems must respect the real human capabilities and limitations within the context of a mission to the Moon or Mars. The NASA Moon to Mars Objectives document outlines the need for advanced CHP system designs: • Develop systems that monitor and maintain crew health and performance throughout all mission phases, including during communication delays to Earth, and in an environment that does not allow emergency evacuation or terrestrial medical assistance. • Evaluate and validate progressively Earth-independent crew health & performance systems and operations with mission durations representative of Mars-class missions. • Validate readiness of systems and operations to support crew health and performance for the initial human Mars exploration campaign. This presentation will outline the initial work that Exploration Medical Capability is leading on the development of a prototype design for an exploration Crew Health and Performance (CHP) system for future NASA human deep space long-duration missions. This effort will require commitment from all stakeholders to a shared mental model of what a future exploration CHP system should look like, one that will address the needs, goals, and objectives of the Agency and help to ensure mission success in deep space.

K R Lehnhardt↗

Role of CEOS Working Group on Calibration and Validation in Analysis Ready Data Products

The Committee on Earth Observation Satellites (CEOS) is leading the CEOS Analysis Ready Data for Land (CARD4L) initiative. A goal of analysis ready data products is to limit the effort needed by users to pre-process the data allowing them to concentrate on the end products. CARD4L provides a set of specifications that data providers need to meet to be considered to satisfy CARD4L. One of the working groups within CEOS, the Working Group on Calibration and Validation (WGCV) is providing a peer review process to evaluate the documentation of the data providers validation and data product accuracy assessment. The approach makes use of the expertise within WGCV to collaborate with both the CEOS Land Surface Imaging Virtual Constellation and the data providers to work towards acceptance of the...

Thome, K.↗

Oxide_Oxide Ceramic Matrix Composite (CMC) Exhaust Mixer Development in the NASA Environmentally Responsible Aviation (ERA) Project

LibertyWorks®, a subsidiary of Rolls-Royce Corporation, first studied CMC (ceramic matrix composite) exhaust mixers for potential weight benefits in 2008. Oxide CMC potentially offered weight reduction, higher temperature capability, and the ability to fabricate complex-shapes for increased mixing and noise suppression. In 2010, NASA was pursuing the reduction of NOx emissions, fuel burn, and noise from turbine engines in Phase I of the Environmentally Responsible Aviation (ERA) Project (within the Integrated Systems Research Program). ERA subtasks, including those focused on CMC components, were being formulated with the goal of maturing technology from Proof of Concept Validation (Technology Readiness Level 3 (TRL 3)) to System/Subsystem or Prototype Demonstration in a Relevant Environment (TRL 6). LibertyWorks®, a subsidiary of Rolls-Royce Corporation, first studied CMC (ceramic matrix composite) exhaust mixers for potential weight benefits in 2008. Oxide CMC potentially offered weight reduction, higher temperature capability, and the ability to fabricate complex-shapes for increased mixing and noise suppression. In 2010, NASA was pursuing the reduction of NOx emissions, fuel burn, and noise from turbine engines in Phase I of the Environmentally Responsible Aviation (ERA) Project (within the Integrated Systems Research Program). ERA subtasks, including those focused on CMC components, were being formulated with the goal of maturing technology from Proof of Concept Validation (Technology Readiness Level 3 (TRL 3)) to System/Subsystem or Prototype Demonstration in a Relevant Environment (TRL 6). Oxide CMC component at both room and elevated temperatures. A TRL≈5 (Component Validation in a Relevant Environment) was attained and the CMC mixer was cleared for ground testing on a Rolls-Royce AE3007 engine for performance evaluation to achieve TRL 6.

propulsion↗

Overview of the Predictive Simulation Capability Element of the Plume Surface Interaction Project

As part of the Game Changing Development (GCD) Program, funded by NASA’s Space Technology Mission Directorate (STMD), the development of simulation capability for the prediction of extra-terrestrial Plume Surface Interaction (PSI) environments has been undertaken by the Fluid Dynamics Branch at NASA/MSFC. The GCD PSI Project, planned to be completed over a four year period, contains a Predictive Simulation Capability (PSC) Element focused on creating simulation capability for the reliable and accurate prediction of PSI in Martian (~650 Pa) and Lunar (vacuum) ambient environments. In addition to the PSC Element, the GCD Program also contains a companion Ground Testing Element for development of focused datasets for validation of predictive capability as well as a Flight-focused Instrumentation Element. This paper describes the PSC Element of the PSI Project as well as providing descriptions of recent accomplishments and remaining work. The overall structure of the PSC Element is broken down into four areas of focus. The first area is the Prediction of Plume Flow in low pressure environments. The development approach taken is the augmentation of the existing production-mode computational fluid dynamics (CFD) tool Loci/Chem, with targeted extensions necessary to accurately model rarefied conditions found in both Martian and Lunar applications. Production readiness and validation of predictive capability are the major objectives of this task. The second area is the effect of mixed continuum/rarefied flow on crater development and ejecta sheets. A new CFD application, Loci/GGFS (Gas Granular Flow Solver), is being developed which implements an Eulerian/Eulerian two-phase model of gas- and soil-phases in order to simulate the soil erosion, crater formation, and soil ejecta transport in a fully coupled simulation. This task seeks to verify Loci/GGFS is production-ready as well as perform validation studies to determine the degree of predictive capability achieved by Loci/GGFS. The third area is focused on the details and extension of particle phase modeling of soil. In this task, Discrete Element Modeling (DEM) techniques are used to perform direct simulations of complex soil particles under the action of forcing similar to that to be cause by PSI. The simulation results are then used to construct closures to the Eulerian model of the soil phase used by Loci/GGFS. The fourth area is gas-particle interaction modeling. In this task, experiments are being conducted as well as detailed simulation results are being studied to further understand the complexities of gas-particle interactions in dilute, intermediate, and high soil volume fraction regimes. Improved models of particle drag and the particle turbulent kinetic energy (PTKE) resulting from the interaction of gas flows within particle clouds are the objective of this task.

Jeff West↗

NESC Peer Review of Exploration Systems Development (ESD) Integrated Vehicle Modal Test, Model Correlation, Development Flight Instrumentation (DFI) and Flight Loads Readiness; Uncertainty Propagation for Model Validation Sub-task

This report details a sub-task (regarding Uncertainty Propagation for Model Validation) from a NASA Engineering and Safety Center assessment that is a multi-year activity spanning the complete development of the Space Launch System integrated vehicle structural dynamic models, and the development of the certification of flight readiness for the Artemis 1 and Artemis 2 vehicles and their variants.

Exploration Systems Development; Development Fligh↗

Kilopower: Small and Affordable Fission Power Systems for Space

The Nuclear Systems Kilopower Project was initiated by NASA's Space Technology Mission Directorate Game Changing Development Program in fiscal year 2015 to demonstrate subsystem-level technology readiness of small space fission power in a relevant environment (Technology Readiness Level 5) for space science and human exploration power needs. The Nuclear Systems Kilopower Project centerpiece is the Kilopower Reactor Using Stirling Technology (KRUSTY) test, which consists of the development and testing of a fission ground technology demonstrator of a 1 kWe-class fission power system. The technologies to be developed and validated by KRUSTY are extensible to space fission power systems from 1 to 10 kWe, which can enable higher power future potential deep space science missions, as well as modular surface fission power systems for exploration. The Kilopower Project is cofounded by NASA and the Department of Energy National Nuclear Security Administration (NNSA).KRUSTY include the reactor core, heat pipes to transfer the heat from the core to the power conversion system, and the power conversion system. Los Alamos National Laboratory leads the design of the reactor, and the Y-12 National Security Complex is fabricating it. NASA Glenn Research Center (GRC) has designed, built, and demonstrated the balance of plant heat transfer and power conversion portions of the KRUSTY experiment. NASA MSFC developed an electrical reactor simulator for non-nuclear testing, and the design of the reflector and shielding for nuclear testing. In 2016, an electrically heated non-fissionable Depleted Uranium (DU) core was tested at GRC in a configuration identical to the planned nuclear test. Once the reactor core has been fabricated and shipped to the Device Assembly Facility at the NNSAs Nevada National Security Site, the KRUSTY nuclear experiment will be assembled and tested. Completion of the KRUSTY experiment will validate the readiness of 1 to 10 kWe space fission technology for NASAs future requirements for sunlight-independent space power. An early opportunity for demonstration of In-Situ Resource Utilization (ISRU) capability on the surface of Mars is currently being considered for 2026 launch. Since a space fission system is the leading option for power generation for the first Mars human outpost, a smaller version of a planetary surface fission power system could be built to power the ISRU demonstration and ensure its end-to-end validity. Planning is underway to start the hardware development of this subscale flight demonstrator in 2018.

Space nuclear power↗

Can One Satellite Data Set Validation Another? Validation of Envisat SCIAMACHY Data by Comparisons with NOAA-16 SBUV/2 and ERS-2 GOME

Validation of satellite data remains a high priority for the construction of climate data sets. Traditionally ground based measurements have provided the primary comparison data for validation. For some atmospheric parameters such as ozone, a thoroughly validated satellite data record can be used to validate a new instrument s data product in addition to using ground based data. Comparing validated data with new satellite data has several advantages; availability of much more data, which will improve precision, larger geographical coverage, and the footprints are closer in size, which removes uncertainty due to different observed atmospheric volumes. To demonstrate the applicability and some limitations of this technique, observations from the newly launched SCIAMACHY instrument were compared with the NOM-16 SBW/2 and ERS-2 GOME instruments. The SBW/2 data had all ready undergone validation by comparing to the total ozone ground network. Overall the SCIAMACHY data were found to low by 3% with respect to satellite data and 1% low with respect to ground station data. There appears to be seasonal and or solar zenith angle dependences in the comparisons with SBW/2 where differences increase with higher solar zenith angles. It is known that accuracies in both satellite and ground based total ozone algorithms decrease at high solar zenith angles. There is a strong need for more accurate measurement from and the ground under these conditions. At the present time SCIAMACHY data are limited and longer data set with more coverage in both hemispheres is needed to unravel the cause of these differences.

Hilsenrath, E.↗

Nuclear thermal propulsion transportation systems for lunar/Mars exploration

Nuclear thermal propulsion technology development is underway at NASA and DoE for Space Exploration Initiative (SEI) missions to Mars, with initial near-earth flights to validate flight readiness. Several reactor concepts are being considered for these missions, and important selection criteria will be evaluated before final selection of a system. These criteria include: safety and reliability, technical risk, cost, and performance, in that order. Of the concepts evaluated to date, the Nuclear Engine for Rocket Vehicle Applications (NERVA) derivative (NDR) is the only concept that has demonstrated full power, life, and performance in actual reactor tests. Other concepts will require significant design work and must demonstrate proof-of-concept. Technical risk, and hence, development cost should therefore be lowest for the concept, and the NDR concept is currently being considered for the initial SEI missions. As lighter weight, higher performance systems are developed and validated, including appropriate safety and astronaut-rating requirements, they will be considered to support future SEI application. A space transportation system using a modular nuclear thermal rocket (NTR) system for lunar and Mars missions is expected to result in significant life cycle cost savings. Finally, several key issues remain for NTR's, including public acceptance and operational issues. Nonetheless, NTR's are believed to be the 'next generation' of space propulsion systems - the key to space exploration.

Clark, John S.↗

GOES-R L1b Readiness Implementation and Management Plan

A complement of Readiness, Implementation and Management Plans (RIMPs) to facilitate management of post-launch product test activities for the official Geostationary Operational Environmental Satellite (GOES-R) Level 1b (L1b) products have been developed and documented. Separate plans have been created for each of the GOES-R sensors including: the Advanced Baseline Imager (ABI), the Extreme ultraviolet and X-ray Irradiance Sensors (EXIS), Geostationary Lightning Mapper (GLM), GOES-R Magnetometer (MAG), the Space Environment In-Situ Suite (SEISS), and the Solar Ultraviolet Imager (SUVI). The GOES-R program has implemented these RIMPs in order to address the full scope of CalVal activities required for a successful demonstration of GOES-R L1b data product quality throughout the three validation stages: Beta, Provisional and Full Validation. For each product maturity level, the RIMPs include specific performance criteria and required artifacts that provide evidence a given validation stage has been reached, the timing when each stage will be complete, a description of every applicable Post-Launch Product Test (PLPT), roles and responsibilities of personnel, upstream dependencies, and analysis methods and tools to be employed during validation. Instrument level Post-Launch Tests (PLTs) are also referenced and apply primarily to functional check-out of the instruments.

Validation Readiness↗

SP-100 space reactor power system for lunar, Mars, and robotic exploration

The SP-100 power system is described which was developed for three missions, namely, Pluto Orbiter with nuclear electric propulsion; human-rated surface reactor power system for lunar and Mars exploration; and earth surveillance with an integrated nuclear electric propulsion system. The reactor power systems technology is being developed to meet these requirements so that the technical database, design tools, and specifications will be applicable to these missions. The SP-100 power system design includes the following subsystems: reactor, reactor instrumentation and control, shield, heat transport, converter, heat rejection, power conditioning control and distribution, and mechanical/structural. Particular attention is given to a demonstration mission aimed at validating technology readiness for robotic, lunar, and Mars operational missions.

Mondt, Jack F.↗

National Ice Center Visiting Scientist Program

The objectives of the work done by Dr. Kim Partington were to manage NASA's polar research program, including its strategic direction, research funding and interagency and international collaborations. The objectives of the UCAR Visiting Scientist Program at the National Ice Center (NIC) are to: (1) Manage a visiting scientist program for the NIC Science Center in support of the mission of the NIC; (2) Provide a pool of researchers who will share expertise with the NIC and the science community; (3) Facilitate communications between the research and operational communities for the purpose of identifying work ready for validation and transition to an operational environment; and (4) Act as a focus for interagency cooperation. The NIC mission is to provide worldwide operational sea ice analyses and forecasts for the armed forces of the US and allied nations, the Departments of Commerce and Transportation, and other US Government and international agencies, and the civil sector. The NIC produces these analyses and forecasts of Arctic, Antarctic, Great Lakes, and Chesapeake Bay ice conditions to support customers with global, regional, and tactical scale interests. The NIC regularly deploys Naval Ice Center NAVICECEN Ice Reconnaissance personnel to the Arctic and Antarctica in order to perform aerial ice observation and analysis in support of NIC customers. NIC ice data are a key part of the US contribution to international global climate and ocean observing systems.

Austin, Meg↗

Getting Out of Orbit: Water Recycling Requirements and Technology Needs for Long Duration Missions Away from Earth

Deep-space crewed missions will not have regular access to the Earth's resources or the ability to rapidly return to Earth if a system fails. As crewed missions extend farther from Earth for longer periods, habitation systems must become more self-sufficient and reliable for safe, healthy, and sustainable human exploration. For human missions to Mars, Environmental Control and Life Support Systems (ECLSS) must be able operate for up to 1,100 days with minimal spares and consumables. These missions will require capabilities to more fully recycle atmospheric gases and wastewater to substantially reduce mission costs. Even with relatively austere requirements for use, water represents one of the largest consumables by mass. Systems must be available to extract and recycle water from all sources of waste. And given that there will be no opportunity to send samples back to Earth for analysis, analytical measurements will be limited to monitoring hardware brought on board the spacecraft. The Earth Reliant phase of NASA's exploration strategy includes leveraging the International Space Station (ISS) to demonstrate advanced capabilities for a robust and reliable ECLSS. The ISS Water Recovery System (WRS) includes a Urine Processor Assembly (UPA) for distillation and recovery of water from urine and a Water Processor Assembly (WPA) to process humidity condensate and urine distillate into potable water. Possible enhancements to more fully "close the water loop" include recovery of water from waste brines and solid wastes. A possible game changer is the recovery of water from local planetary resources through use of In Situ Resource Utilization (ISRU) technologies. As part of the development and demonstration sequence, NASA intends to utilize cis-Lunar space as a Proving Ground to verify systems for deep space habitation by conducting extended duration missions to validate our readiness for Mars.

Barta, Daniel J.↗

SPARCLE: Validation of Observing System Simulations (SPace Readiness Coherent Lidar Experiment)

NASA recently approved a mission to fly a Doppler Wind Lidar (DWL) on a U.S. Space Shuttle. SPARCLE, managed by Marshall Space Flight Center in Huntsville, AL, is targeted for launch in March 2001. This mission is viewed as a necessary demonstration of a solid state (2 micron) lidar using coherent detection before committing resources to a 3-5 year research or operational mission. While, to many, this shuttle mission is seen as the first step in a series leading to a fully operational wind observing system, to others, it is a chance to validate predictions of performance based upon theoretical models, analyses of airborne and ground-based data, and sophisticated observing system simulation experiments. This paper will be presented in two parts: first a brief overview of the SPARCLE mission and second, a summary of current performance predictions and key contributions from ground- based and airborne DWL research. The SPARCLE instrument is a 100 mJ, 6 Hz, diode-pumped 2-micron laser with a .25 m telescope using heterodyne mixing in a fiber and an InGaAs detector. A 25 cm silicon wedge scanner will be used in step-stare modes with dwells ranging from 60 seconds to .5 seconds. Pointing knowledge is achieved with a dedicated GPS/INS mounted close to the lidar. NASA's Hitchhiker program is providing the instrument enclosures (2 cans) and mission logistics support. An on-board data system is sized to record 150 Gbytes of raw signal from a two 400 MHZ A/D converters. On-board signal processing will be used to control the frequency of the Local Oscillator. SPARCLE is predicted to have a single shot backscatter sensitivity near 1x10(exp -6) m-1 sr-1, To achieve higher sensitivity, shot accumulation will be employed. Ground-based, 2 micron DWLs have been used to assess the benefits of shot accumulation (approximately SQRT for SNR). Airborne programs like MACAWS have provided good datasets for evaluating various sampling strategies and signal processing algorithms. Using these real data to calibrate our simulation models, we can describe when and how well SPARCLE is expected to preform. Outputs from these performance models will be presented.

Emmitt, G. D.↗

Aerocapture, Entry, Descent and Landing (AEDL) Human Planetary Landing Systems. Section 10: AEDL Analysis, Test and Validation Infrastructure

Contents include the following: 3 Listing of critical capabilities (knowledge, procedures, training, facilities) and metrics for validating that they are mission ready. Examples of critical capabilities and validation metrics: ground test and simulations. Flight testing to prove capabilities are mission ready. Issues and recommendations.

Arnold, J.↗

Thermal-Fluid Analysis of a Liquid-Cooled Battery Module for Electrified Aircraft

The development of safe, energy-dense batteries is critical to advancing hybrid electric and fully electrified aircraft propulsion. Achieving this capability requires a thermal management system that can maintain battery performance and safety under demanding operational conditions. The objective of this project is to support the maturation of next-generation lithium-ion batteries for electrified aircraft by conducting performance testing on integrated battery modules, specifically a 2-cell series configuration module housed within an aluminum enclosure. Designed to operate at a nominal 7.2 V with discharge rates up to 2.5C, the module will eventually be used to power an electric motor and DC-DC converter, generating substantial thermal loads that must be effectively managed to increase the usable energy and power density of electrified aircraft. To address these thermal challenges, this study presents the development and thermal-fluid analysis of a liquid-cooled thermal management system. While the full aircraft architecture utilizes an eight-string configuration, the present work evaluates a representative single-string water coolant loop to characterize baseline performance. The active cooling loop circulates water through a reservoir, pump, the battery module, and a variable area flow meter. Key performance metrics including component-level temperatures, mass flow rates, and pressure drops are quantified across the loop. Across discharge rates ranging from 0.5C to 2.5C, the active thermal loop consistently and effectively removed heat from the module, validating the design approach and confirming readiness for further development. The validated thermal performance indicates a path toward scalable battery modules that could enable energy and power dense systems for hybrid electric aircraft.

Electrified Aircraft↗